PZ - Applicant Response to Staff Report - 1/7Machelle Hill
From: Sonya Watters
Sent: Thursday, January 07, 2016 1:21 PM
To: Barbara Shiffer; Charlene Way; Jacy Jones; Jaycee Holman; Machelle Hill
Cc: Van Elg (velg@brightoncorp.com)
Subject: FW: Paramount North Forty - PP (H-2015-0034) staff report for 01/07/2016 P/Z
hearing --Brighton Response
Attachments: Paramount North Forty - PP H-2015-0034 Staff Report.pdf
From: Van Elg [mailto:velg@brightoncorp.com]
Sent: Wednesday, January 06, 2016 6:41 PM
To: Sonya Watters
Cc: Mike Wardle; Jon Wardle; Bill Parsons
Subject: RE: Paramount North Forty - PP (H-2015-0034) staff report for 01/07/2016 P/Z hearing --Brighton Response
Sonya,
On behalf of Brighton Corp, I would like to thank you for taking the time today to address a few items of clarification in
the Conditions of Approval (H-2015-0034). As we discussed, there are a couple of important clarifications/adjustments
to the Site -Specific Conditions of Approval.
Condition #1.1.3(a):
As we noted with you, ACHD also addressed the existing 4' sidewalk (part of a previously approved phase and ROW
dedication) in their staff level approval as follows (see MER15-0114):
D. Site Specific Conditions of Approval
1. Reconstruct the sidewalk on Fox Run Way to be 5-feet in width or provide 5' X 5' turnout areas
every 200 feet to meet ADA standards.
*Please adjust the conditions of approval to reflect these site -specific options for the existing sidewalk.
Condition #1.1.3(c):
This condition addresses the size, location, and easement requirements of a 10-foot wide multi -use pathway along E.
Chinden Blvd. As discussed and noted, the current berm was designed to accommodate this pathway being primarily
centered on the ROW and the 40' landscaped street buffer (5-feet on each side of the line located 70-feet from the
Center Line of E. Chinden Blvd). As discussed, the "Centered" location is most conducive to the topography and
drainage design of the existing and approved berm.
*Please adjust the condition of approval to reflect this CENTERING of the 10-foot wide multi -use pathway.
Van Elg Planning Manager
Brighton Corporation I www.BrightonCorp.com
12601 W. Explorer, Suite 200 1 Boise, ID 83713
Office 208.378.4000 1 Cell 208.576.1795