Decatur Estates Subdivision No. 2 H-2015-0027 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR DECATUR ESTATES SUBDIVISION NO. 2 – FP H-2015-0027 Page 1 of 3 BEFORE THE MERIDIAN CITY COUNCIL HEARING DATE: NOVEMBER 24, 2015 IN THE MATTER OF THE REQUEST FOR A FINAL PLAT CONSISTING OF THIRTY-FIVE (35) SINGLE-FAMILY RESIDENTIAL BUILDING LOTS AND NINE (9) COMMON AREA LOTS ON 15.17 ACRES OF LAND IN THE R-4 ZONING DISTRICT FOR PHASE 1 OF DECATUR ESTATES SUBDIVISION BY: 4345 LINDER ROAD, LLC APPLICANT ) ) ) ) ) ) ) ) ) ) ) ) ) CASE NO. H-2015-0027 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council on November 24, 2015 for final plat approval pursuant to Unified Development Code (UDC) 11-6B-3 and the Council finding that the Administrative Review is complete by the Planning and Development Services Divisions of the Community Development Department, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat, the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of “PLAT SHOWING DECATUR ESTATES SUBDIVISION NO. 1, LOCATED IN THE SE ¼ OF THE NE ¼ OF SECTION 35, T.4.N., R.1W., B.M., MERIDIAN, ADA COUNTY, IDAHO, 2015, HANDWRITTEN DATE: 10/29/15, CLINTON W. HANSEN, PLS, SHEET 1 OF 3,” is conditionally ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR DECATUR ESTATES SUBDIVISION NO. 2 – FP H-2015-0027 Page 2 of 3 approved subject to those conditions of Staff as set forth in the staff report to the Mayor and City Council from the Planning and Development Services divisions of the Community Development Department dated November 24, 2015, a true and correct copy of which is attached hereto marked “Exhibit A” and by this reference incorporated herein, and the response letter from Becky McKay, a true and correct copy of which is attached hereto marked “Exhibit B” and by this reference incorporated herein. 2. The final plat upon which there is contained the certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City’s requirements shall be signed only at such time as: 2.1 The plat dimensions are approved by the City Engineer; and 2.2 The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash surety has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest in real property which may be adversely affected by this decision may, within twenty- eight (28) days after the date of this decision and order, seek a judicial review pursuant to Idaho Code§ 67-52. By action of the City Council at its regular meeting held on the day of .:--. 52015. B Y: Tammy de.- rd� ORT$j� AT Mayor, Ci of Meridian �p Attest: ti�GO �G�G s� 1 ••�j�, c,fyo� o F 91J.1 cee man y" City Clerk p o(`¢P rRFASURE Copy served upon the Applicant, Planning and Development Services Divisions of the Community Development Department and City Attorney. By: Dated: I "--) /9 It '� ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR DECATUR ESTATES SUBDIVISION NO.2 — FP H-2015-0027 Page 3 of 3 EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 1 STAFF REPORT MEETING DATE: November 24, 2015 TO: Mayor and City Council FROM: Sonya Watters, Associate City Planner 208-884-5533 Bruce Freckleton, Development Services Manager 208-887-2211 SUBJECT: H-2015-0027 – Decatur Estates Subdivision No. 1 - FP I. APPLICATION SUMMARY The applicant, 4345 Linder Road, LLC, has applied for final plat (FP) approval of 35 single-family residential building lots and 9 common lots on 15.17 acres of land in an R-4 zoning district for the first phase of Decatur Estates Subdivision. II. STAFF RECOMMENDATION Staff recommends approval of the Decatur Estates Subdivision No. 1 final plat based on the analysis provided below in Section V. III. PROPOSED MOTION Approval I move to approve File Number H-2015-0027 as presented in the staff report for the hearing date of November 24, 2015, with the following modifications: (Add any proposed modifications.) Denial I move to deny File Number H-2015-0027, as presented during the hearing on November 24, 2015, for the following reasons: (You should state specific reasons for denial.) Continuance I move to continue File Number H-2015-0027 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuan ce.) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: The subject property is located at 4345 N. Linder Road, in the northeast ¼ of Section 35, T. 4N., R. 1W. B. Applicant: 4345 Linder Road, LLC 13967 W. Wainwright Drive, Suite 102 Boise, Idaho 83713 C. Owner: Same as Applicant EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 2 D. Representative: Becky McKay, Engineering Solutions, LLP 1029 N. Rosario Street, Ste. 100 Meridian, ID 83642 V. STAFF ANALYSIS The proposed final plat depicts 35 building lots and 9 common area lots on 15.17 acres of land in the R-4 zoning district. All of the lots proposed in this subdivision are for single-family detached homes and comply with the dimensional standards of the R-4 zoning district listed in UDC Table 11-2A-5. There are no existing structures on this site. Staff has reviewed the proposed final plat for substantial compliance with the approved preliminary plat in accord with the requirements listed in UDC 11-6B-3C.2. The total number of buildable lots has decreased by one lot and common area has in turn increased where an ACHD stormwater drainage system is now proposed on Lot 1, Block 4. Because the number of building lots has not increased and the common area has not decreased, staff finds the proposed final plat in substantial compliance with the approved preliminary plat. VI. SITE SPECIFIC CONDITIONS 1. Applicant shall meet all terms of the approved annexation (AZ-15-002, Development Agreement Inst. No. 2015-061374) and preliminary plat (PP-15-001). 2. The applicant shall obtain the City Engineer’s signature on the final plat by July 2, 2017; or, apply for a time extension in accord with UDC 11-6B-7. 3. Prior to submittal for the City Engineer’s signature, have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 4. The final plat prepared by Clinton W. Hansen, PLS., stamped and dated 10/29/15, shall be revised as follows: a. Note #13: Include the recorded instrument number. 5. The landscape plan prepared by Jensen Belts Associates, stamp dated 10/30/15, shall be revised as follows: a. Include mitigation information in accord with UDC 11-3B-10C.5 for the existing trees on the site that have been or are proposed to be removed. Coordinate with Elroy Huff, City Arborist, at 489-0589 to schedule an appointment to confirm mitigation requirements prior to removal of any trees on the site. b. Include detailed qualified open space calculations for this phase per the requirements listed in UDC 11-3G-3B. A minimum of 5.02 acres (or 12.63%) of qualified open space is required to be provided within the overall development. 6. All fencing installed on the site must comply with the fencing plan depicted on the landscape plan, the conditions in this report, and with the standards listed in UDC 11-3A-6 and 11-3A-7. If permanent fencing does not exist at the subdivision boundary, temporary construction fencing to contain debris shall be installed around this phase prior to release of building permits for this subdivision. 7. Staff’s failure to cite specific ordinance provisions or conditions f rom the preliminary plat does not relieve the Applicant of responsibility for compliance. 8. The applicant shall be required to add or modify street lights at the following locations: EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 3 a) Add a streetlight at the intersections of N Oldfield Morning Sky Way and W Monument Drive b) The streetlight shown between Lots 6&7, Block 2, needs to be moved closer to the W. Astonte St. and N. Penngrove Way intersection. c) Type 1 lighting shall be required along the frontage of the development along Linder Road. Plan requirements can be found in section 6-5 of the Improvement Standards for Street Lighting at http://www.meridiancity.org/public_works.aspx?id=272. 9. Development of homes within this subdivision shall be generally consistent with the building elevation design and materials approved with the preliminary plat. 10. Applicant shall be required to connect to the existing 12-inch water main located in N. Linder Road, and the 8-inch water mains located within N. Marche Avenue, and N. Penngrove Way, thereby looping the water system into all available locations. The applicant shall also be required to extend an 8-inch water main to the north boundary of the subdivision in Penngrove Way. 11. The rear or sides of future structures on lots that face N. Linder Road on Lots 2-6, Block 1 shall incorporate articulation through changes in materials, color, modulation, and architectural elements (horizontal and vertical) to break up monotonous wall planes and roof lines. VII. GENERAL REQUIREMENTS 1. Sanitary sewer service to this development is available via extension of existing mains adjacent to the development. The applicant shall install mains to and through this subdivision; applicant shall coordinate main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2. Water service to this site is available via extension of existing mains adjacent to the development . The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. 3. Street signs are to be in place, sanitary sewer and water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District (ACHD) and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. 4. Upon installation of the landscaping and prior to inspection by Planning Department staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A. 5. A letter of credit or cash surety in the amount of 110% will be required for all incomplete fencing, landscaping, amenities, pressurized irrigation, prior to signature on the final plat. 6. The City of Meridian requires that the owner post with the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The applicant shall be required to enter into a Development Surety Agreement with the City of Meridian. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 4 7. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 8. All development improvements, including but not limited to sewer, water, fencing, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy, or as otherwise allowed by UDC 11-5C-1. 9. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. 10. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 11. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 12. Developer shall coordinate mailbox locations with the Meridian Post Office. 13. All grading of the site shall be performed in conformance with MCC 11-12-3H. 14. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 15. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above. 16. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 17. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 18. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer’s expense. Final design shall be submitted as part of the development plan set for approval, which must include the location of any existing street lights. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor’s work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Contact the City of Meridian Transportation and Utility Coordinator at 898-5500 for information on the locations of existing street lighting. 19. The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easement widths shall be 20-feet wide for a single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian’s standard forms. The EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 5 easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement (on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor, which must include the area of the easement (marked EXHIBIT A) and an 81/2” x 11” map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. All easements must be submitted, reviewed, and approved prior to development plan approval. 20. Applicant shall be responsible for application and compliance with and NPDES permitting that may be required by the Environmental Protection Agency. 21. Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at (208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190. 22. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections (208)375-5211. 23. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single -point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to development plan approval. 24. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting, crossing or laying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6. In performing such work, the applicant shall comply with Idaho Code 42-1207 and any other applicable law or regulation. V. EXHIIBITS A. Vicinity Map B. Approved Preliminary Plat (dated: 2/26/15) C. Proposed Final Plat (dated: 10/29/15) D. Proposed Landscape Plan (dated: 10/30/15) EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 6 Exhibit A – Vicinity Map EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 7 Exhibit B – Approved Preliminary Plat (dated: 2/26/15) EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 8 Exhibit C – Proposed Final Plat (dated: 10/29/15) EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 9 Exhibit D –Proposed Landscape Plan (dated: 10/30/15) EXHIBIT A Decatur Estates Sub 1 – FP H-2015-0027.doc PAGE 10