Agency Comments - PZr
May 26, 2015
City of Meridian
City Clerk's Office
33 E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
RE: CUP 15-010/Papa Murphy's; 2723 S. Bartlett Ave.
Dear Jaycee:
Nampa & Meridian Irrigation District (NMID) has no objection to the above application for
Conditional Use Permit.
irrigaton man line in t
However please be advised NMID does have a pressurize d feet (51) each is de of centerlinlc
area. The easement for the PUIS line is ten feet ( ),
This easement MUST be protected.
Sincerely,
Greg G. Curtis
Water Superintendent
Nampa & Meridian Irrigation District
GGC/dbg
PC Office/File
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
IDAHO TRANSPORTATION DEPARTMENT
P.Q. Box 8028 (208) 334-8300
Boise, ID 83707-2028 itd.idaho.gov
May 13, 2015
Machelle Hill
Meridian City Clerk's Office
33 East Idaho Avenue
Meridian, Idaho 83642
VIA EMAIL
RE: CUP 15-010 PAPA MURPHY'S
The Idaho Transportation Department has reviewed the referenced conditional use application for the Papa
Murphy's located at 2723 S. Bartlett Avenue east of SH-69. ITD has the following comments:
1. ITD has no objection to this application and requires no mitigation.
2. No access to the State Highway system is requested and none is approved with this application.
3. The application does not indicate work will be done within the State Highway System. Any work within
the State Highway System will require and application for a permit. The applicant can contact Shona
Tonkin at 334-8341 for this application.
4. Rules for Landscaping (IDAPA 39.03.42.600.04) shall apply within the State right-of-way. Some of the
requirements are:
a. Only planting of forage plants, grasses, flowers, and shrubs with a mature height not to exceed
3 feet will be allowed.
b. No trees will be allowed within the clear zone.
c. No rocks over 4 inches maximum size will be allowed within 30 feet of the edge of pavement.
d. Irrigation systems shall be no closer than 5 feet from the pavement edge and shall be adjusted
so as not to cause water to cover any portion of the highway pavement.
5. ITD has comprehensive rules governing outdoor advertising (IDAPA 39.03.60). IDAPA 39.04.32 also
requires that signs not "dazzle or blind" drivers. The current trend toward high intensity signs has caused
an increasing number of driver complaints on urban segments of the State Highway System. This
applicant should be aware of the issue and plan the site's signing and lighting strategies accordingly.
If you have any questions, you may contact Shona Tonkin at 334-8341 or me at 332-7191.
Sincerely,
James K. Morrison
Development Services Manager
jim.morrison@itd.idaho.gov
CENTRAL
•• DISTRICT
EALTH
DEPARTMENT
Rezone #
CENTRAL DISTRICT HEALTH DEPARTMENT
Environmental Health Division
Conditional Use # 0 U 2 1 S— ti lt'?
Preliminary / Final / Short Plat
Return to:
❑ ACZ Oq
❑ Boise
❑ Eagle
❑ Garden City
❑ Kuna
Meridian
❑ Star
❑ 1. We have No Objections to this Proposal.
❑ 2. We recommend Denial of this Proposal.
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ bedrock from original grade ❑ other
❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
❑ 8. After written approval from appropriate entities are submitted, we can approve this proposal for:
❑ central sewage ❑ community sewage system ❑ community water well
❑ interim sewage ❑ central water
❑ individual sewage ❑ individual water
❑ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
❑ central sewage ❑ community sewage system ❑ community water
❑ sewage dry lines ❑ central water
❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
12. We will require plans be submitted for a plan review for any:
'6 food establishment ❑ swimming pools or spas ❑ child care center
�j beverage establishment ❑ grocery store
❑ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
❑ 14.
Reviewed By:
Review Sheet
15726-001EH1111