RE: FP 15-016/Paramount Sub No. 29
Dear Jaycee:
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Nampa & Meridian Irrigation District (NMID) has no comment on the above -referenced
application as it lies outside of our district boundaries. Please contact Settlers Irrigation at
344-2471 or at PO Box 7571, Boise, ID 83707.
All laterals and waste ways must be protected. All nainicipal surface drainage must he
retained on -site. If any surface drainage leaves the sitc, Na€npa & Meridian Irrigation D"iirict
('.tiMID) must review drainage plans.
Sincere]),,
Greg G. Curtis
Water Superintendent
Nampa & Meridian Irrigation District
GGC/dbg
PC:: Settlers Irrigation
OfficeiFilc
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
5'ap
West Ada
I so,SCHOOL DISTRICT
May 8, 2015
City of Meridian
City Clerk's Office, Attn: Machelle Hill
33 East Broadway Avenue
Meridian, ID 83642
Dear Planners:
Joint School District No. 2 (dba West Ada School District) has experienced phenomenal student growth
in the last ten years. Nearly every high school, middle school, and elementary school throughout the
district is operating at or over capacity. Approval of the Paramount Subdivision No. 29 will have a
significant impact on school enrollments at the elementary, middle school and high school levels in West
Ada School District. Based on U.S. census data, we can predict that these homes, when completed, will
house SO school aged children.
West Ada School District supports economic growth. However, growth fosters the need for additional
school capacity. Revenue support from developers of new residential subdivisions for the purchase of
the school sites necessary to serve the proposed subdivision is required. West Ada School District
estimates the revenue required for the purchase of future school sites is $830.00 per new home
constructed. The approval of Paramount Subdivision No. 29 will create the need for $51,460 in
revenue to purchase the school sites this subdivision will require. In lieu of these sources of revenue,
the district will accept the donation of land appropriate for a school site. Such a site would need water
and sewer service available, and prior to the commencement of construction, the district will need to
pass a bond issue for the construction of schools.
Residents cannot be assured of attending the neighborhood school as it may be necessary to bus
students to available classrooms across the district. We ask that you require the developer to provide
safe walkways, bike baths and safe pedestrian access for our students. School capacity is addressed in
Idaho code 67-6508. Joint School District No. 2 is currently operating beyond capacity. Future
development will continue to have an impact on the district's capacity.
Sincerely,
Jan Horning Ph.D.
Assistant Superintenderr
West Ada School District
Dr. Linda Clark, Superintendent
1303 E. Central Drive • Meridian, ID 83642 • P: (208) 855-4500 • F: (208) 350-5962
1i 0 j^
IDAHO TRANSPORTATION DEPARTMENT
P.O. Box 8028 (208) 334-8300
Boise, ID 83707-2028 itd.idaho.gov
May 12, 2015
Machelle Hill
Meridian City Clerk's Office
33 East Idaho Avenue
Meridian, Idaho 83642
VIA EMAIL
RE: FP-15-016 PARAMOUNT SUBDIVISION NO.29
The Idaho Transportation Department has reviewed the referenced final plat application for Paramount
Subdivision No. 29 on the northwest corner of N. Meridian Road and W. McMillan south of US-20/26.
ITD has the following comments:
1. ITD has no objection to this application. The proposed rezone generates fewer vehicle trips than the
original plan and does not require any new access to the State Highway System.
2. The City is reminded that the U.S. 20/26 Corridor is already congested. This project will increase the
number of vehicle trips in the corridor. ITD has no current funding assigned to widen U.S. 20/26.
If you have any questions, you may contact Shona Tonkin at 334-8341 or me at 332-7191.
Sincerely,
James K. Morrison
Development Services Manager
Lm.morrisongitd. idaho. gov
a�
Machelle Hill
From: Mack Myers <mack@settlersirrigation.org>
Sent: Tuesday, May 12, 2015 9:32 AM
To: clerk; Bruce Freckleton
Subject: RE: City of Meridian Dev App - Paramount Sub No. 29 FP
Settlers Irrigation does supply and operate facilities within the project site. Plans must be submitted and approved by
the District prior to any construction.
Thanks,
Mack Myers
District Manager
Settlers Irrigation District
P.O. Box 7571
Boise, ID 83707
Office 208-343 5271 Fax 208 343-1642
From: Machelle Hill [mailto:mhill@meridiancity.org]
Sent: Friday, May 08, 2015 2:20 PM
Subject: City of Meridian Dev App - Paramount Sub No. 29 FP
awl :� IDIAN
D A H O
City of Meridian
City Clerk's Office
33 E. Broadway Avenue
Meridian, ID 83642
City Council
Development Application Transmittal
To: Outer Agencies
Comments due by: May 19, 2015
Transmittal Date:
May 8, 2015
File No.:
I FP 15-016
Avylication
Hearin Date:
May 26, 2015
Request:
Final Plat approval consisting of 62 building lots, 12 common lots & 3 other lots on
18.42 acres of land in an R-8 zoning district for Paramount Sub No. 29
By:
Brighton Land Holdings, LLC
Location of Property or Project:
West side of N. Meridian Road and north side of W.
McMillan Road
City Council Action:
To View the City o Meridian Document Repository see "Searchable Documents " Link Below
Searchable Documents
The City of Meridian is requesting comments and recommendations on the application referenced above. To review the
Environmental Health Division
CENTRAL
DISTRICT
�1THRALTH
DEPARTMENT
Rezone #
Conditional Use #
CENTRAL DISTRICT HEALTH DEPARTMENT Return to:
Preliminary / Final / Short
❑ ACZ
O d ❑ Boise
❑ Eagle
❑ Garden City
❑ Kuna
Meridian
21 ❑ Star
❑ 1. We have No Objections to this Proposal.
❑ 2. We recommend Denial of this Proposal.
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ bedrock from original grade ❑ other
❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
C 8. After written approval from appropriate entities are submitted, we can approve this proposal for:
II central sewage ❑ community sewage system ❑ community water well
interim sewage *central water
❑ individual sewage ❑ individual water
49. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
central sewage ❑ community sewage system ❑ community water
❑ sewage dry lines *Y central water
❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
❑ 12. We will require plans be submitted for a plan review for any:
❑ food establishment ❑ swimming pools or spas ❑ child care center
❑ beverage establishment ❑ grocery store
❑ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
Reviewed By:
Date: S /-LL/=