CC - Agency CommentsCn
CENTRAL
DISTRICT
HEALTH
DEPARTMENT '1AIN OFFICE • -�;? N. ARMSTRONG PL. • BOISE, D 8', oszs • (zos;� 5 ���. i • FAX, ��� ssoo
" To improve the health of our contmtutities hY identiJjatrg .custoinuble Solutions to commuttitl' heahh issues,
dt,i,elopll7g parlF[ershlpS for imp lent en ration of strute,,, ies, and tlemottstratittg our success throe,{h meaS[lrentent of o[rteolnes. "
16-0104
February 11, 2016
Christopher D. Rich
Ada County Recorder
200 West Front Street
Boise, ID 83702
RE: Silverwater Subdivision No. 2
Dear Mr. Rich:
Central District Health Department has reviewed and does approve the final plat for this
subdivision for central water and central sewer facilities. Final approval was given
February 11, 2016.
Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based
on a review by a Qualified Licensed Professional Engineer (QLPE) representing City of
Meridian and the QLPE approval of the design plans and specifications and the conditions
imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is
cautioned that at the time of this approval, no drinking water extensions or sewer extensions
were constructed. Building construction can be allowed with appropriate building permits if
drinking water extensions or sewer extensions have since been constructed or if the developer
is simultaneously constructing those facilities. If the developer fails to construct facilities then
sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by
the issuance of a certificate of disapproval, and no construction of any building or shelter
requiring drinking water or sewer/septic facilities shall be allowed.
Ada ' Boise Count, Office
707 N. Armstrong P!.
Eoise, IC 8-7L,4
mm,jmzati'_ -7450
nlor Ir U t -, 46C
rAX, F'S
Serrin, 6 ctlleV, Elmore, Boi.ce, and Adu Cotmties
Elmore Coil�cty Off',ce
c E. 8tf
Valley County Of`:Ce
G3 N. l .; St.
?h. e_7i 4
If you have any questions, please call 327-8517.
Sin rely,
Lori Badigian, R.E.H.S.
Senior Environmental Health Specialist
cc: Trilogy Development, Shawn Brownlee
Leavitt Engineers
City of Meridian
LB:bk
1503 FIRST STREET SOUTH
FAX #208-463-0092
City of Meridian
City Clerk's Office
33 E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
RE: FP 15-013/Silverwater Subdivision No. 2
Dear Jaycee:
NAMPA, IDAHO 83651-4395
nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application
be filed, for review, prior to final platting. Please contact Suzy Hewlett at 466-7861 for
fLirther information.
Al] laterals and waste ways must bra protected, The Disaict's Ridenbaugh Canal courses along
thQ south boundaryof this project. The District's easement for the Ridenbaugh Canal; at this
location is a minimum of one hundred feet (100'), fifty feet (510') each side of the centerline.
The District's Kennedy Lateral also courses through this proposed project. The District's
easement for the Kennedy Lateral is fifty-five feet (55'); twenty feet (20') left and thirty-five
feet (35') right of centerline facing downstream.
These easements must be protected. Any encroachment without a signed License
Agreement and approved plan before any construction is started is unacceptable.
All municipal surface drainage must be retained on site. If any municipal surface drainage
leaves the site, the Nampa & Meridian Irrigation District (NMID) must review drainage plans.
Sincerely,
Greg G Curtis
Water SupQrintendent
Nampa & McTidiap 1-rugation District
GGCidbg
PC: Office/File
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
24 April 2015
Justin Bozovich
JUB Engineers, Inc.
250 S. Beechwood Ave., Suite 201
Boise, ID 83709
1503 FIRST STREET SOUTH NAMPA, IDAHO 836514395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
RE: Land Use Change Application — Silverwater Subdivision No. 2
Please note the District now requires three (3) sets of plans
Dear Mr. Bozovich:
Enclosed please find a Land Use Change Application for your use to file with the Irrigation
District for its review on the above -referenced development. If this development is under a
"rush" to be finalized, I would recommend that you submit a cashier's check, money order
or cash as payment of the fees in order to speed the process up. If you submit a company
or personal check, it must clear the bank before processing the application.
Should this development be planning a pressure urban irrigation system that will be owned,
operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G.
Curtis, Water Superintendent for the Irrigation District, concerning the installation of the
pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate
the process of contractual agreements between the owner or developer and the Irrigation
District for the ownership, operation and maintenance of the pressure urban irrigation system.
If you have any questions concerning this matter, please feel free to call on me at the District's
office, or Greg G. Curtis, at the District's shop.
Sincerely,
Suzette G. Hewlett, Asst. Secretary/Treasurer
NAMPA & MERIDIAN IRRIGATION DISTRICT
SGH/cmg
cc: File
Water Superintendent
Meridian City, City Clerk's Office 33 E. Broadway Ave. Ste 102 Meridian, ID 83642
Trilogy Development 2358 S. Titanium PI. Meridian, ID 83642
CBH Homes, Inc. 1977 E. Overland Rd. Meridian, ID 83642
enc.
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000