Agency Comments - PZc
ops" RICT CENTRAL DISTRICT HEALTH DEPARTMENT Return to:
PEALTH Environmental Health Division 2 ElACz
DEPARTMENT
El Boise
El Eagle
Rezone # _ ❑ Garden City
Conditional Use # ❑ Kuna
Preliminary / Final / Short Plat Meridian
IStar
1 1.
We have No Objections to this Proposal.
❑ 2.
We recommend Denial of this Proposal.
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ bedrock from original grade ❑ other
❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
❑ 8. After written approval from appropriate entities are submitted, we can approve this proposal for:
❑ central sewage ❑ community sewage system ❑ community water well
❑ interim sewage ❑ central water
❑ individual sewage ❑ individual water
❑ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
❑ central sewage ❑ community sewage system ❑ community water
❑ sewage dry lines ❑ central water
❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
❑ 12. We will require plans be submitted for a plan review for any:
❑ food establishment ❑ swimming pools or spas ❑ child care center
❑ beverage establishment ❑ grocery store
❑ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
❑ 14.
Reviewed By:
Elmo _ �.•I
D.
-�12=
Review Sheet
15726-OOIEH1111
City of Meridian
City Clerk's Office
33 E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
RE: CUP 15-001/Franklin Mini -Storage
Dear Jaycee:
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
Nampa & Meridian Irrigation District (NMID) requires that a Land Use Change Application
be filed, for review, prior to final platting. Please contact Suzy Hewlett at 466-7861 for
further infon-nation.
All laterals and waste ways must be protected. The District's Five Mile Drain courses along
the south side of this proposed project. The District's easement for the Five Mile Drain at this
location is ,a, minimum of sixty feet (60'), thirty feet (30') each side of the centerline. This
easement must be protected. Any encroachment without a signed License Agreement
and approved plan before any construction is started is unacceptable.
All municipal surface drainage must be retained on site. If any municipal surface drainage
leaves the site, the Nampa & Meridian Irrigation District (NMID) must review drainage plans.
Sincerely,
Greg .Curtis
Water Superintendent
Nampa & Meridian Irrigation District
GGC/dbg
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
05 March 2015
Tamara Thompson
The Land Group, LLC
462 E. Shore Drive Ste 100
Eagle, ID 83616
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
SHOP: Nampa 208-466-0663
RE: Land Use Change Application — Franklin Mini -Storage
Please note the District now reauires three (3) sets of plans
Dear Tamara:
Enclosed please find a Land Use Change Application for your use to file with the Irrigation
District for its review on the above -referenced development. If this development is under a
"rush" to be finalized, I would recommend that you submit a cashier's check, money order
or cash as payment of the fees in order to speed the process up. If you submit a company
or personal check, it must clear the bank before processing the application.
Should this development be planning a pressure urban irrigation system that will be owned,
operated and maintained by the Irrigation District, I strongly urge you to coordinate with Greg G.
Curtis, Water Superintendent for the Irrigation District, concerning the installation of the
pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate
the process of contractual agreements between the owner or developer and the Irrigation
District for the ownership, operation and maintenance of the pressure urban irrigation system.
If you have any questions concerning this matter, please feel free to call on me at the District's
office, or Greg G. Curtis, at the District's shop.
Sincerely,
Daren R. Coon, Secretary/Treasurer
NAMPA & MERIDIAN IRRIGATION DISTRICT
DRC/cmg
cc: File
Water Superintendent
Meridian City, City Clerk's Office 33 E Broadway Ave Ste 102 Meridian, ID 83642
Osborne Enterprises 13965 W. Chinden Blvd. Ste 300 Boise, ID 83713
enc. COPY
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000