Staff Report - CCSTAFF REPORT MEETING DATE: TO: FROM: February 17, 2015 Mayor and City Council Bill Parsons, Planning Supervisor 208-884-5533 Bruce Freckleton, Development Services Manager 208-887-2211 SUBJECT: FP -15-003 — Ventana Commons Subdivision I. APPLICATION SUMMARY E IDIAN*-- IDAHO The applicant, Ventana, LLC, has applied for final plat (FP) approval of seventy (70) single family residential lots and five (5) common lots on 18.21 acres of land in the R-8 zoning district. IL STAFF RECOMMENDATION Staff recommends approval of the Coleman Subdivision final plat based on the analysis provided below in Section V. III. PROPOSED MOTION Approval I move to approve File Number FP -15-003 as presented in the staff report for the hearing date of February 17, 2015, with the following modifications: (Add any proposed modifications.) Denial I move to deny File Number FP -15-003, as presented during the hearing on February 17, 2015, for the following reasons: (You should state specific reasons for denial.) Continuance I move to continue File Number FP -15-003 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance.) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: The site is located the east side of N. Meridian Road; approximately 1/4 mile north of E. McMillan Road in the SW 1/4 of Section 30, Township 4 North, Range 1 East. (Parcel #S0530325420) B. Applicant/Owner(s): Ventana, LLC 1977 E. Overland Road Meridian, ID 83642 C. Representative: Becky McKay Engineering Solutions, LLP 1029 N. Rosario Street, Ste. 100 Meridian, ID 83642 Ventana Commons Subdivision - FP -15-003 PAGE 1 V. STAFF ANALYSIS The proposed final plat depicts seventy (70) single family residential lots and five (5) common lots on 18.21 acres of land in an R-8 zoning district. The average lot size is 7,822 square feet. The gross density of the development is 3.84 dwelling units per acre with a net density of 4.84 dwelling units per acre. Open space proposed for the subdivision consists of a portion of the Meridian Road street buffer, a micropath lot and several passive open space lots greater than 5,000 square feet. Overall open space is 1.79 acres or 10.17%. The proposed open space has increased from the amount approved with the preliminary plat. Staff has reviewed the proposed final plat for substantial compliance with the approved preliminary plat in accord with the requirements listed in UDC 11-613-3C.2 and found the number of buildable lots is the same and the project has an increase in the amount of useable open space. Therefore, staff deems the proposed final plat in substantial compliance with the approved preliminary plat. VI. SITE SPECIFIC CONDITIONS 1. The applicant shall comply with all applicable conditions of approval associated with this site (PP -14-002). 2. The final plat prepared by Land Solutions, stamped on January 28, 2015 by Clinton W. Hansen, shall be revised as follows: a. Note #5: Remove "...or as specifically approved with CUP -04-028." b. Lot 22, Block ldepicts an existing sewer easement and pedestrian easement; insert instrument numbers. c. Lot 25, Block lshall have 50 feet of frontage in accord with UDC Table 11-2A-6. 3. The landscape plan, prepared by The Land Group Inc, dated 01/27/15 is approved as submitted. 4. The applicant shall submit a final approval letter from the Street Naming Committee approving the street names for the proposed subdivision. 5. All fencing installed on the site shall comply with UDC 11-3A-6 and 11-3A-7. If permanent fencing does not exist at the subdivision boundary, temporary construction fencing to contain debris shall be installed around this phase prior to release of building permits for this subdivision. 6. The applicant shall obtain the City Engineer's signature on a final plat within two years of City Council approval of the preliminary plat (by September 2, 2016), in accord with UDC 11-613-7. 7. Staff's failure to cite specific ordinance provisions or conditions from the preliminary plat does not relieve the Applicant of responsibility for compliance. 8. Prior to submittal for the City Engineer's signature, have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 9. A street light plan needs to be submitted. In addition to Type 2 lighting on the subdivision's internal streets, two type 1 street lights will be required along the frontage with Meridian Road. The first should be 220' north of the ACHD pedestrian crossing signal,and the second should be 220' north fo the first. These Type 1 lights should be connected to the metered service pedestal adjacent to the pedestrian crossing. There will also need to be type 2 lights paced at the intersections of E Santiago Dr and N Hidalgo Ave and E Santiago Dr and N Zamora Way. Street light plan requirements are listed in section 6-5 of the Improvement Standards for Street Lighting. A copy of the standards can be found at http://www.meridianciiy.org_/public works.aspx?id=272 Ventana Commons Subdivision - FP -15-003 PAGE 2 10. All open space and amenities developed with Ventana Subdivision No. 1 and No. 2 and Ventana Commons Subdivision shall be owned and maintained by a single homeowner's association per the Preliminary Plat Findings. 11. Future homes constructed within the subdivision must comply with the submitted elevations approved with the preliminary plat. Prior to the issuance of a building permit, the Planning Division shall review all future homes adjacent to Meridian Road (Lots 2-9 and 11, Block 1) to ensure the rear facades incorporate a mix of siding materials, windows and decorative trim, pop - outs, covered porches and two variations in the roof lines to provide articulation and modulation. VII. ONGOING CONDITIONS OF APPROVAL 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 3. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 4. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11- 3A-3. 5. The applicant shall have an ongoing obligation to maintain all pathways. VIII. PROCESS CONDITIONS OF APPROVAL 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11 -5C -3B. A surety agreement may be accepted for other improvements in accord with UDC 11 -5C -3C. 3. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11 -3B -14A. 4. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. IX. GENERAL REQUIREMENTS Sanitary sewer service to this development is available via extension of existing mains adjacent to the development. The applicant shall install mains to and through this subdivision; applicant shall coordinate main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub -grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2. Water service to this site is available via extension of existing mains adjacent to the development. The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. Ventana Commons Subdivision - FP -15-003 PAGE 3 3. Street signs are to be in place, sanitary sewer and water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District (ACRD) and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. 4. Upon installation of the landscaping and prior to inspection by Planning Department staff, the applicant shall provide a written certificate of completion as set forth in UDC 11 -3B -14A. 5. A letter of credit or cash surety in the amount of 110% will be required for all incomplete fencing, landscaping, amenities, pressurized irrigation, prior to signature on the final plat. 6. The City of Meridian requires that the owner post with the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The applicant shall be required to enter into a Development Surety Agreement with the City of Meridian. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 7. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 8. All development improvements, including but not limited to sewer, water, fencing, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy, or as otherwise allowed by UDC 11-5C-1. 9. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. 10. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 11. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 12. Developer shall coordinate mailbox locations with the Meridian Post Office. 13. All grading of the site shall be performed in conformance with MCC 11-12-3H. 14. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 15. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3 -feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1 -foot above. 16. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACRD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. Ventana Commons Subdivision - FP -15-003 PAGE 4 17. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 18. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval, which must include the location of any existing street lights. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Contact the City of Meridian Transportation and Utility Coordinator at 898-5500 for information on the locations of existing street lighting. 19. The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easement widths shall be 20 -feet wide for a single utility, or 30 -feet wide for two. The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement (on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor, which must include the area of the easement (marked EXHIBIT A) and an 81/2" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. All easements must be submitted, reviewed, and approved prior to development plan approval. 20. Applicant shall be responsible for application and compliance with and NPDES permitting that may be required by the Environmental Protection Agency. 21. Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at (208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190. 22. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections (208)375-5211. 23. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single -point connection to the culinary water system shall be required. If a single -point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to development plan approval. X. EXHIIBITS A. Vicinity Map B. Approved Preliminary Plat (dated: 06/03/14) C. Proposed Final Plat (dated: 01/28/15) D. Proposed Landscape Plan (dated: 01/27/15) Ventana Commons Subdivision - FP -15-003 PAGE 5 Exhibit A — Vicinity Map o o.1�s 0 Vicinity Map 3Miles Legend Area of Impact O< Parcels - Meridian ----------- �'` . /� PyiGsr C�` O S 41 > t >v a E M 'C E d z , Print Date: 6/26/2014 Ventana Commons Subdivision - FP -15-003 PAGE 6 Exhibit B — Approved Preliminary Plat (dated: 06/03/14) .P ana.avxs R -y^ �•� �."+ax z. is aua3a o�rpnp�a, sp[[ Ry..g.r 1F3-VYI!&Ai ptO�s �' p � }J�g Ica n ...»R.....»RRw um.c .o -a va :�.�...........��....e.......�e.....��.. Z� C s •w �,rorx inch. sr�rcc. xrna+ � � °b""• •» Ventana Commons Subdivision - FP -15-003 PAGE 7 Exhibit C — Proposed Final Plat (dated: 1/28/15) r" +/♦ t1rRt_t .—.—...... —.. 1/4 O I mom Ift IIO. f 9V27VCi N M " BNC441% + 1 tp�1f7;7bp'$ 17Jr [ MIN116Lt OR. 11 11577 11 Q7 ' N 7 ♦ I a l � NCpCK 1 2 ♦ � f I r •N �S I �rtrt +afr 3 O rl4 II f rbt t 27 0 ♦ • 117' . 1 ♦ � ♦?y. ♦ I u N a 7 I {I L7 a aloe 12 4 ��� f19 7 Ctt ,9 ♦ I 7♦ 1 • ♦ /S ♦ 1 1 � 1 s 1r11t 7f 10 19 19 17 . 10 • 13 ♦ sl 1 I f� i 11 Iu_ a / 77 I 1 f'F N Yam2 C 441EEf11aL Oa � •7 C, I 1 it ♦1J 1♦ I 11 16 17 1/ 18 ��' _' 1 1 I [ yy 1 I I YY7 t47 fid!!' _ • 6 "i / °� ' ' '� I-s'Ji 1 N 1/A'1ligMp7r.I1r I 'N551'llay ar+'°® I M PLAT SHOYANC awl Q0 M LOCATED IN THE SW 1/4 OF SECTION 30, T.4N., RAE.. B.M. MERIDIAN, ADA COUNTY. IDAHO 2015 ICO � 110 701 tar11 .101' v K9lI arm, u aarsrl u u lacer v n 1rax. ar ♦♦ S +� w Iran• Irr S 7 ♦ 1. [s � ♦ �t I ` + 79 1. a � • 76 77 +l m ' 39 e r k . �" 70 >•s 31 �A JIM 7 tr�� w�La vwrrrKr•BawiL�OYm[fln,t\NruK4�mwsNaa KLY (r l0 alml [.r Vat)mmedoL aua Im-Y�mrt\/m KK[agla ��YIWINy 1 Ylm rm[m\iYlM KY64Yt®NnNaartlOrBttr[RB[m NUR rrmmrraa O\Rmpir Elmlar NO\>41nSm tBKO17m\r0a[MBIrm[Il�allma. 1 tE-fB®IU RIK fIa BI11 B�K/Ilr![l�\rltBNta[[K[[OK RIai ��IY a Km\KIB®Kit\4[L[Intl\WI,IIBri[BYB�KYNMIBI B�KKas OnN-K4QIj N•BNr[KB![NBBi tp\fILL[KEfeIA 7771 MKlYU1Yr[�a\\I[tr[�Kt[B4Y6R[>•B[B®Ui1BI OLm BItl BILLT. 1 mtrfttBfiarma\ram NmaalmlrUErtYavarbKENa9[rB r4a11taKmYlrY n9rmGW I1B®NO �N� Yt[m7araam\6arE,r\aY mKt•riNOWraKrtYr Yl6 ap 1ptmNtYtYB as BKy4mR t1R J-1 1. Y�ra[•aO UBi[frl[i\\N[U [tl[KKmEY pm r51BBIBI R,Od ,t'Y! L Uhl Eta[BOM♦KOIlIN[tl.lle[I.R�[lNB\y���a[Brra��IBfa[BB[Impwl�wB{r KlB[/ItI �NfNY®Brat \Rl r�iKm■\6� ��Btpt 1�I�II 1 B �!1\O �I�C I[!�®\W [U\E[R®O.B�BFn BB'�Ltlilt [fIDI� a\. 1r BBBMO tnrKm U.IBmtN[ s'tw�mrKNl. tB \aB r :aiw�i arB�[am'[1L K'�r[[YasYn +YBK�MLoeaa .mis..��waRil cal: avw�io�[�.Yt ��� itN�[ir 9mY m 1m\ta; cam w K walla N mtYta fB B tNt r9\r • NmE ata IIr K rtes s®. u. aaBsasmatn.Ba®[Is.Bi[Nnautrra EawBsarL+Ios a �i���UrY� \YntLIiL KRLm Y[fLlt[ml.[fatlf BUr IN4[Riml[%\oa tYNtE\®\,fr A11�1[IY a IBrrYNLm r�a•m,rr,\aar. f�Y11 m9911K --- iNK a111[ ® 11109N Or 6 NSOr B9.111NIC Oa a an[BR R Y mgt , IIYI9� 901L� Rf Mq m7i M mn� aw >v ralr f~tet 1y >W nrlf Yarr[ o IaE r� aa[r • ,st y rw a tint \ \\ Y riff tlaxt Y wY tea \ar ttnrrY Y Y Iml YYIf tYaet Y ai Y tY aae •YEet � m Ea m\ x Y9Yret aN aN Y B\ �Re YErrt rr m Y Y fNY IaaV1 Y i,trr hart o v r alit! tract YY car •rant car' aaYr[ tm m sE\n m ra[r tars[ aN Yalr •tarlr[ u arc t�n.f e aw saN• s Ml Y m Nre asst Y m Y mr fIt'r Y irlfr [ Y ®Y mr /XN' Y11aY[ Y mY rYM' Yalre[ Y aY as tEx ;aYrl m Y tm rax alrtre e Y aar tYlr tarts[ Y.0 o m >d rlrlf fYs[ m Y Ai alit ;Otrlf[ Y m Y am ftM caret � w Y Ut\ Oas Farr• m Y !Y llrr tmrr• ar m Y � Yae YfIaY. a m Y nmr •rlllra w �Wt Y Yttlf frac• Y Y Y rnl9' ltlarf tfa m ♦a Y are !mart as m Y Y rww hart Y m 4r Y !llltf f IfEx[ T1 m Y aVr fNre1 m Y mY Ke IarYl Y MM Y a'rr t1•rr[ 411 Y Yfrr YW"tarn"we u m Y a[ Y m aN Y D/r /aafft ar MWANA. LLC NEVELOM nON01Nl. O Ventana Commons Subdivision - FP -15-003 PAGE 8 Exhibit D — Proposed Landscape Plan (dated: 01/27/15) LANDSCAPE PUN w _ <o!p � ' �-�-'m � 7r'la'� �• ,, ,k ='` "' j, Gill ' I _ �L f L2.0 acEmr K" LANDSCAPE PUN —I. w -r LANDSCAPE PUN s —W-rc Ventana Commons Subdivision - FP -15-003 9 PAGE 9 t g ' I _ �L f L2.0 acEmr K" LANDSCAPE PUN —I. w -r LANDSCAPE PUN s —W-rc Ventana Commons Subdivision - FP -15-003 9 PAGE 9