Loading...
Agency Comments - CCJanuary 27, 2015 City of Meridian City Clerk's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 RE: VAC 15-001/Jayker Subdivision #1; for Denison Vacation Dear Jaycee: Nampa & Meridian Irrigation District (NMID) has no comment on the above -referenced application as it lies outside of our district boundaries. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. Sincerely, jlcll� Greg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg PC: Office/File APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 CENTRAL ! ! DISTRICT MR DEPARTMENT Rezone # Conditional Use # CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division Preliminary / Final / Short Plat Return to: ❑ ACZ ❑ Boise ❑ Eagle ❑ Garden City D Kuna Meridian Star 1. We have No Objections to this Proposal. ❑ 2. We recommend Denial of this Proposal. ❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ❑ high seasonal ground water ❑ waste flow characteristics ❑ bedrock from original grade ❑ other ❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ❑ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ❑ central sewage ❑ community sewage system ❑ community water well ❑ interim sewage ❑ central water ❑ individual sewage ❑ individual water ❑ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ❑ central sewage ❑ community sewage system ❑ community water ❑ sewage dry lines ❑ central water ❑ 10- This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ❑ 12. We will require plans be submitted for a plan review for any: ❑ food establishment ❑ swimming pools or spas ❑ child care center ❑ beverage establishment ❑ grocery store ❑ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ❑ 14. Reviewed By Review Sheet 15726-OOIEH1111 Pioneer Irrigation District Pblu, son P.O. BOX 426 • CALDWELL, IDAHO 83606 (208) 459-3617 www.pioneerirrigation.com January 15, 2015 City of Meridian City Clerk's Office 33 E. Broadway Avenue Meridian, ID 83642 Re: Application VAC 15-001 by Tealey's Land Surveying To Whom It May Concern: The parcel located at 3244 W. Salix Drive is in close proximity to Pioneer Irrigation District's Phyllis canal. Pioneer wants to ensure that all irrigation easements along the Phyllis canal remain intact. Sincerely, r Erica Slayton Secretary