Loading...
Agency CommentsDecember 17, 2014 City of Meridian City Clerk's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RE: MCU 14-006/Baltic Place Dear Jaycee: 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Nampa & Meridian Irrigation District (NMID) has no comment on the above -referenced application. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. Sincerely,, J1 Greg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/dbg PC: Office/File APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 CENTRAL •• DISTRICT 'HEALTH DEPARTMENT CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division X1 15' Rezone # Conditional Use # Preliminary / Final / Short Plat Return to: ❑ ACZ ❑ Boise ❑ Eagle ❑ Garden City ❑ Kuna Meridian ❑ Star We have No Objections to this Proposal. F91- ❑ 2. We recommend Denial of this Proposal. ❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ❑ high seasonal ground water ❑ waste flow characteristics ❑ bedrock from original grade ❑ other ❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ❑ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ❑ central sewage ❑ community sewage system ❑ community water well ❑ interim sewage ❑ central water ❑ individual sewage ❑ individual water ❑ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ❑ central sewage ❑ community sewage system ❑ community water ❑ sewage dry lines ❑ central water ❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ❑ 12. We will require plans be submitted for a plan review for any: ❑ food establishment ❑ swimming pools or spas ❑ child care center ❑ beverage establishment ❑ grocery store ❑ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ❑ 14. Reviewed By: Date: Review Sheet 15726-001EH1111