Drainage Calculations?/(alley Engineering, Inc. CIVIL ENGINEERINGIPLANNINGICADD DRAINAGE CALCULATIONS FOR: Jump Creek Subdivision No. I PROJECT NO: 02013-024 DATE: 12-11-2014 OWNER: Trilogy Development LLC 2358 S. Titanium Meridian, TD 83642 208-895-8858 4242 N. Brookside Lane a Boise, Idaho 83714 ♦ Tel.: 208-938-0013 dbailey@baileyengineers.com The existing site topography is relatively flat, sloping gently from East to West. No significant grading is proposed for the site; earthwork will consist primarily of excavating surface soils and materials to subgrade for the drive lanes and drainage ponds. Since the drainage system is proposed to be distributed across the site, no significant cut or fill operations will be required to achieve the fall necessary for drainage facilities to function. The drainage system will consist of twelve drainage ponds — ten permanent drainage ponds and two temporary drainage ponds. The temporary ponds are designed the same as the permanent facilities, but will be excavated and removed in phase 2 of construction. The front half of the lots is accounted for in drainage calculations, as the lots will slope towards the road. Storm water from each drainage area will flow through a gutter before being routed to a catch point. Discharge from each drainage area will be routed through a sand and grease trap before discharging to the pond serving the drainage area. The ACRD Calculations Spreadsheet Version 7.4 (July 2014) was used to determine runoff volumes and sizing of the drainage ponds and sand and grease traps. Using a unique time of concentration of and a weighted runoff coefficient for all of the drainage areas, runoff volumes were calculated for each drainage area. All ponds were designed using side slopes of 3:1, and are capable of providing adequate drainage capacity for a 100 -year storm. All ponds have a footprint of less than 1500 sq ft. All ponds have only one bay, and have been increased by 15% to account for sedimentation. The only exception is Pond 8, which has both a forebay and a primary bay. The forebay in Pond 8 has been increased for sedimentation, but the primary has not been increased in size. There are four (4) drainage additional drainage areas that do not drain to ponds. These drainage areas consist of only roadway and drain to borrow ditches located along the Black Cat Rd. frontage. The sand window is designed to be continuous along the borrow ditches to provide infiltration as well as storage from the roadway. Calculations for these drainage areas and subsequent borrow ditches can be seen in Appendix 4. Methodology and Assumptions 1. Geotechnical Report from Site Consulting, LLC a. Prepared by Bob J. Arnold P.E. dated June 5, 2014. b. Ground water is located 6-7 feet below the existing surface. c. Infiltration rate: 6 inches per hour. 2. Recommendations for Homebuilders a. Prepared by Site Consulting, LLC b. Site plan is designed in accordance with recommendations 3. Calculations for existing storm water facilities. a. Rational Method used for peak flows: Qp = CIA i. Qp = Peak flow for 100 year design storm at storm duration equal to time of concentration. 1. C = Weighted runoff coefficient based on land use (Appendix 2) a. C for single family residential use =.40 b. C for asphalt =.95 2. 1= Rainfall intensity of design storm in inches/hour — Intensity - Duration -Frequency table (Appendix 3) 3. A = Area of drainage basin under consideration — The site is divided into basins as shown on attached drawing based on final site grading. (Appendix 1) Runoff Volume Calculation 1. V=CIAT a. C = Weighted runoff coefficient b. I = Rainfall intensity for 1 hour storm of 1.15 in/hr c. A = Area of drainage in acres d. T = Duration of storm of 1 hour e. Storage Volume i. Increase of 15% for sedimentation 2. Calculations can be seen in Appendix 4 iii. Pond Calculations 1. Standard sizes a. Side Slope: 3:1 (H:V) b. 100 year water depth: 2 feet deep 2. Time to Drain: Must drain within 24 hours a. Percolation rate: 6 in/hr b. Required Volume/ (Pere. Rate* Sand Area) 3. Calculation can be seen in Appendix 4 iv. Sand and Grease Trap Calculations 1. Vault size: 1000 Gallon 2. Baffle Spacing: 20 inches standard 3. Throat Width: 48 inches 4. Velocity must be less than 0.5 ft/sec List of Appendices: DRAINAGE AREA MAP —Appendix I WEIGHTED RUNOFF COEFFICIENT TABLE— Appendix 2 IDF CURVE AND RUNOFF COEFFICENTS — Appendix 3 DRAINAGE CALCULATIONS —Appendix 4 GEOTECHNICAL REPORT — Appendix 5 RECOMMENDATIONS FOR HOMEBUILDERS — Appendix 6 Jump Creek No. 1- Drainage Calculations 12/9/E014 BunMl coemnents 5ingle Fam11y0ullding Lot c=o.40 Cammon Wee/ ndX.,A— [-0.20 Asphalt/Conu¢te: [-0.95 phaz I V1001m m w/ Ora Sheet Flow Ginter Flow 91n le-Famil tot Asphalt Comrete [ommon Welehted eun.H 15X5etl ment Area Areals0a.....I U LEI 1A-10 Aeu-Ll1 bt/landsfaoe Area 150 Coe den[ Q.. Fe'd 0. rh Oralnstm Me ft.ft FaRor 1A 680E 016 1 231 lM 5592 0 005 1.01 J. Ponds 1886 2269 1B 24961 0.57 SJ 333 12645 7316 0 0.56 2A 2186 M. U 73 0 16W 583 075 I11 128 Pond2 3185 3663 28 44944 1N 56 351 35711 16809 9233 0.71 3A 42040 098 56 528 3023] 12609 0 056 LA 135 Ned3 3341 3842 3B 20235 0.46 62 242 14500 5725 0 056 4A 34234 079 56 483 23415 10789 0 05] L16 0.91 Pond4 2159 2590 4B 4295 010 0 157 0 4295 0 095 5 41322 095 56 642 25722 15595 2601 062 119 OBS Ponds Eb0 2806 6 240]0 055 0 55B 0 15593 84]] A9 1.19 090 Pond 6 1572 1800 7 168]] 0.39 0 481 0 14422 MS 0;84 1.01 ] 1357 1561 SA 16115 03] S6 236 10702 5413 0 0.58 8B 16260 037 56 215 11500 4760 0 0.56 27755 0.64 61 248 15324 12431 0 065 233 4330 4980BC 80 1093 03] fi0 219 11306 4]77 0 0.56 113SPondi 9 62650 L44 SB 669 41689 20969 0 059 1.65 3460 392910 55635 1.28 52 598 34840 20]95 0 061 ].62 n 3235 3720 Temp Ml 55307 1.2] SB 308 35162 20145 0 0.60 1.]0 d1 3157 3631 Tem p2 24663 05] 53 165 15719 8944 0 00 0.8E nd2 141] 1630 Boise Area Intensity -Duration -Frequency Intensity (Inches per hour) 10 25 30 50 100 1.96 Deal," Storm 2 6. 3.11 1.66 2.00 2.06 0.12 10 min 1.21 1.67 0.25 15 min 1.02 1.41 0.33 20 min 0.85 1.17 0.42 25 min 0.74 1.01 0.50 30 min 0.71 0.98 0.58 35 min 0.59 0.81 0.67 40 min 0.54 0.74 0.75 45 min 0.50 0.68 0.83 50 min 0.42 0.64 0.92 55 min 0.45 0.62 1.00 Ihour 0.45 0.62 2.00 2 hours 0.22 0.36 3.00 3 hours 0.20 0.27 6.00 6hours 0.13 0.12 120 12 hours 0.08 0.11 24.00 24 hours 0.05 0.07 Boise Area Intensity -Duration -Frequency Intensity (Inches per hour) 10 25 30 50 100 1.96 2.37 2.44 2.73 3.11 1.66 2.00 2.06 2.30 2.62 1.37 1.67 1.72 1.91 2.28 1.19 1.44 1.48 1.65 202 1.15 139 1.43 1.59 1.82 0.95 1.14 1.18 1.31 1.50 0.87 1.05 1.08 1.20 1.37 0.81 0.97 1.00 1.11 1.26 0.75 0.90 0.93 1.04 1.17 0.73 0.88 0.90 1.01 1.15 0.73 0.88 0.90 1.01. 1.15 0.42 0.50 0.52 0.58 0.66 0.32 D.37 038 0.43 0.45 0.20 0.23 0.24 0.27 0.30 0.13 0.15 0.16 0.18 0.19 0.08 0.09 0.10 0.11 0.12 NOAA Atlas 2 Intensity Duration Frequency 3.5 lYea, 3 2.5-x-ioyea. al 2-�uYeae C --------- �Sa Year T 1.5 ry �laayeae 0.5 D 10 min 15 in 30 min 1 hour 2 hours 3hours 6hours 12 hours 24 hours Duration in minutes and hours Boise Area Depth -Duration -Frequency Intensity (inches per hour) 10 25 30 50 100 0.33 Design Storm 2 5 0.52 To 0.50 0.52 0.12 10 min 0.20 0.28 0.25 15 min 0.25 0.35 0.50 30 min 0.35 0.49 SAO 1 hour 0.45 0.62 2.00 2hours 0.54 0.21 3.00 3hours 0.61 0.80 6.00 6hours 0.80 Lou 12.00 12 hours 1.00 1.30 24.00 24 hours 1.20 1.60 Boise Area Depth -Duration -Frequency Intensity (inches per hour) 10 25 30 50 100 0.33 0.40 0:41 0.45 0.52 0.41 0.50 0.52 0.58 0.66 0.57 0.69 0.71 0.80 0.91 0.23 0.88 0.90 1.01 1.15 0.85 1.01 1.04 1.16 1.31 0.95 1.12 1.15 1.29 1.45 1.20 1.40 1.44 1.50 1.80 1.60 1.80 1.86 2.10 2.30 2.00 2.20 228 260 2.80 NOAA Atlas 2 Depth -Duration -Frequency 3 na, 2.5 2 awn, 1.5 c --� u 0.5 '___. 0. 5 1D 15 30 1 2 3 6 12 24 Duration in minutes and hours PAC2013-024 Jump Creek -Trilogy\100 Phase 1\Construct1on\Ca1cs\8457400 12/10/2014,2:13 PM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume -Rational Method NOTE: This worksheet is intended to he a guideline to standardize AIDED checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calmiations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rateusing the Rational Method calculated for post -development Calculate Pon -Development Flom (for pre-develapment Rows, increase number of storage facilities to veate new tab) User input in yellow cells. To accept default value type =1n yellow cell and point to computed cell 1 Pmlect Name Jump Creek Subdivision No. 1 -Drainage Area Hl 2 Is area drainage basin map provided] YES (map must be included with stormwoter refculotlons) 3 Enter Design Storm For Volume(100-year per ACRO policy) 100 4 Enter number of storage facilites (25 max) 17 M 5 Area of Drainage 5ubbasin(SF or Acres) Acres Acre: 6 Determine the Weighted Ronoff Coefficient (C) C=RC1xA1)-(C2eA2)1(CnxAn)l/A Weighted Aw ] Calculate Ovedand Flow Time of Concentration in Minutes (Tc) or use default 10 ueG _ae fnin to Mo Pipe Siae 10 lin) Slope lk/R) Subbasin Subbsin 5ubbsin Hydraulic Ratlius A/WeI Perm Subbasin Suhhasin 5ubbasin Subbasin mdoatrleY end lvm enl SuhbasinE 3 4 5 Subbasin6 ] 8 9 30 Pppfz 0.5] $haROW CO..antranuFfi W n 0.004 0.619 1 333 .ov A ISubbasur C o 'ho oaa fro',D.91 9It Segment 3: Overland Sheet FlowB TR -55,< '!it 0.010 S] O.200 3.4 12.0 o"0 0.56 OS0 0 n.39 949 OS3 al.1e A9apuY Aam ATv'.0 ] Calculate Ovedand Flow Time of Concentration in Minutes (Tc) or use default 10 ueG _ae fnin to Mo Pipe Siae 10 lin) Slope lk/R) Intercept Coaff. Length Manning n Hydraulic Ratlius A/WeI Perm Fiow VelocityV (fps) Flow Tlme (min) Segment 1: Pipe Flow 070 mdoatrleY end lvm enl mam.". a" next setas 049 r enr?.5..5<mlvx lui 0.14}-035. IoNer .os 02D 0 J$ Pppfz $! mellt 2: GVi¢r $haROW CO..antranuFfi W n 0.004 0.619 1 333 .ov A a C o 'ho oaa fro',D.91 9It Segment 3: Overland Sheet FlowB TR -55,< '!it 0.010 S] O.200 3.4 12.0 o"0 E1 Computed Tc -1 21.3 User -Entered Te =1 21.0 rdge rdlmdII rmerrsnyln o d.aa un , 9 Calculate the Post-Oveiapment peak discharge lQpeek) Q..E TO Calculate peak own (as. 2 -yr storm) qwn fused for S/G Trap throat velocity, WQ storm mnveyanm system sizing) V=Ci(r<=60)Ax3600 12 Calculate Vwq(for sizing WQ facilities) Enter Percentile Storm I(Both percerme=0.34In) Both. 0.34 In Euler wq Volmne lVsw=Cxi (from linebbove)xRk3600) Vwn 13 DeteptioA; Approved Discharge Rate to Surface Waters (if applicable) If, Surface Storage: Pond WQ Pond Forebay r 15% sediment V 641 k' Primary Treatment/Storage Basin V 1,329 ft' 5obuirfue Storage: Seepage Bed Volume W.Nent Sediment Factor V IIbns f[' Ioa nun "il zoo,.».+aw i),. n—l—v„ I.—Wu6 f>dimarn P:\Q013-024 Jump Creek- Trilogy\100 Phase 1\CmotrucUmr\Calc,\37165191 Version 7.4, July 2014 Try..1 S,olu, I flJnoll [attlai;nii'[" pe -s Do mown x<a: 9'rD-Ov5 -r'—'d d'Ea4 s.o. fana[v o?4 0.f0 V f a- Opo oTx A Id W 0n 11 .._y 015-040 AAirtfn 1 .cele'8'Ia5 070 mdoatrleY end lvm enl mam.". a" next setas 049 r enr?.5..5<mlvx lui 0.14}-035. IoNer .os 02D 0 J$ -r'—'d d'Ea4 0.10.0.30 se,zo Ions's ?5 <dn;r.P, as click 43 Pppfz v9i fuid,. 3andv rod .ov A a C o 'ho oaa fro',D.91 9It 91s nvtlea¢<A4% p04 o"0 E1 OS0 0 n.39 949 OS3 al.1e A9apuY Aam ATv'.0 12/9/2014, 6:50 AM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is Intended to be a guldellne to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineers methodology must result in facilities that meet or exceed these calculations In order to be accepted. i Steps for. Peak Discharge Rate using the Rational McNod calculated for port -development Calculate Post -Development Flom (for pre -development flows, increase number of storage fadllties to create new tab) - U... input in yellow cells. To accept default value type = in yellow cell and point to computed cell 1 Poll Name Romp Creek Subdivision No. I. Drainage Area M2 2 Is area drainage basin map provided? YES Romp most he included with s tormwater calculathers) 3 Enter Design Storm For VOlume(100year per ACHO policy) Soo 4 Enter rmmber of storage facilities (25 max) 10 tilt fn [Anw Mnro [rvMaa,lnr 1 S Are. of Drainage 5ublinio(SF or Acres) A ... r Acre'. 6 Determine the Weighted Runoff Coefficient (C) C=((C1xA1)a(C2xA2)alCnxAn))/A Weighted Avg ]Calculate Overland Flow Time of Concentration In Mlixams(Tc) or use defaultlD Utii CxP:uit .in Pipe SHe IO (in) Slope(ft/R) Subbasln Subbasin 5ubbasin Hydraulic Radius A/Wet Perm SubbasinSubbasin Flow Time (min) Subbasln Subbasln V Subbasin2 3 45 Subbasinfi ] 8 9 10 b 0.004 0.619 357 1.03 1.3 4.6 -. 13 Detention! Approved Discharge Rate to Surface Waters (if applicable) R.ph cfi Se men(3: 0verla0 Shedt Flow By TR•55,53oM1R 0.010 56 0.200 3.4 16.7 L l\Pa crone A9 c D D.n Oof 0U] 011 015 ..x.4121 -6k S!"a 16U a0§ 111 0.1: ar" nil 9'14 Ox) O.a. Ad.,.a nan AXE Pipe SHe IO (in) Slope(ft/R) Intercept Open. Length Manning. Hydraulic Radius A/Wet Perm Flow WIacItyV (lps) Flow Time (min) Segment l: Pipe Flow 11 Calculate mlal.... Rent(V)(forsidixg primary storage) V '3,185' to V=Ci(Tc=60)Ak36o0 tv5 12 Calculate Vwq (/or sizing WO facilities). Enter Percentile Storm l limit Percentile =0.34In) -Segment 2: Gutter Shallow Concentrated Flew b 0.004 0.619 357 Enter Wit Volume (Vivo = UI (from line above) Mx3WO) 1.3 4.6 -. 13 Detention! Approved Discharge Rate to Surface Waters (if applicable) R.ph cfi Se men(3: 0verla0 Shedt Flow By TR•55,53oM1R 0.010 56 0.200 3.4 16.7 i,2ials s.up"vil F[Ibnatt6 Purft C—Ho nit(ue v.os., In— at alS A., A,makCntllitanl.,'I- vs oo'.+wn, 41F>ry n2igH6arntl4taereal PRfi42nna1 ' Sinptet� ds Mu�faerv�Ix Axddur6J gm51 AL Tnnrt:6.21"nt araas !ruou-1 ant C-111111 c.mpute. m= x1.3 PlavRav=ds UsePEniered Tc= 21.0 ganraso ecce ,a6c >„Y 1nn a-- YCalculatethePos[-Oevel.pment peak dischc,aJQPeak) Oas 1J3 cfs 10 Calculate peak Qwq(uees 2 -yr storm) ovet Obs ds (used for 5/G Trap throat velepai We storm conveyance system suing) 11 Calculate mlal.... Rent(V)(forsidixg primary storage) V '3,185' to V=Ci(Tc=60)Ak36o0 tv5 12 Calculate Vwq (/or sizing WO facilities). Enter Percentile Storm l limit Percentile =0.34In) 80th 0.94 in Enter Wit Volume (Vivo = UI (from line above) Mx3WO) VNq- 941 ft' -. 13 Detention! Approved Discharge Rate to Surface Waters (if applicable) R.ph cfi 14 Volume summary - surfzcestci Pond VAT Pond F.urbay+l5%sediment V 1,082 h' Primary Treatment/Storage Basin V 2,244 ft• Subsurface Storage: Seepage Red Volume Without Sediment Factor V 3,185 Hs Gan HMPma Seenaee Ned for ile[ien Volume With Sediment b.ea OY6 039-0.]0 .a5 all oscp -o]s 0.35 alit a.70 on A4e n.lo-02d 020-0]5 Or- .rcvtl..a. ¢. JJ•P30 lvit,o fsphals tv5 Couir2t2 .95 Cnh a 43 R.ph D9•r i,2ials s.up"vil l\Pa crone A9 c D ,he rl4 Oof 0U] 011 015 ..x.4121 -6k S!"a 16U a0§ 111 0.1: ar" nil 9'14 Ox) O.a. Ad.,.a nan AXE P:\C1013-024lump Creek-Trilogy\100 Phase 1\Com1ructlon\[ales\3]215191 12/9/2014, 8:51 AM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume- Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACRD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These cakulatlons shall establish a minimum re9ukement. The Engineers methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Nate using the Ravenal Method calculated for Dost -development _ - - -'� Calmlate Pdst-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) - user input in yellow cells. To accept default value type = In yellow cell and paint to computed cell 1 Period Name Jump Creek Subdivision No. I- Drainage Area g3 tis area drainage basin map provided? YES (map most be included with starmwofer cokulotlam) 3 Enter Design Storm For Volume(100-Year per ACHD policy) 100 4 Enter number of storage facilities 125 max) 10 n 5 Area of Drainage Subbasin(SF or Arrest Acres Ave 6 Determine the Weighted Runoff Caeffident (C) C=I(clxal)+(CxxAz)t(Cnxnn))/A Weighted Awl Subbasin Pipe She (int Subbasl0 Subbasin Subbasin Manning In Suhbasle suhbase Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 T 8 9 30 0.98 OA6 1.135 fts Primary Treatment/Storage Basin V 7,354 Segment 2: Garter Shallow Cmucidrated Flow. b 1 0004 0.619 1 528 140 3,341 1.3 6.9 090 e - o.m-oz3 cants 0.56 0.56 Segmenta: Overland Sheet Flow By TR-55,c31I ft 0Jo-0.:0 0010 56 0.200 3.4 16J 4 avmda 0.56 Mphug 5 m 09; xlwv vr ons T Calculate Overland Flow Time of Concentration in Minutes(Tc) or use default 10 UkruWbls man to" 10 Pipe She (int slope(ft/ft) Intercept Craft. Length Manning In Hydraulic Radius A/Wet Per. Flow VelocityV lips) Flow Time (min) - Segment 1: Pipe Fl ow it' 13 Detention: Approved Discharge Rate to Surface Water$if applicable) rfs 14 Volume Summary - at5 also SurtateStorage:Pond - ebe-015 WC, PondFbrebay+l5%zrdiummi - V 1.135 fts Primary Treatment/Storage Basin V 7,354 Segment 2: Garter Shallow Cmucidrated Flow. b 1 0004 0.619 1 528 Volume Without Sediment Factor V 3,341 1.3 6.9 090 e - o.m-oz3 cants 0104 3s Segmenta: Overland Sheet Flow By TR-55,c31I ft 0Jo-0.:0 0010 56 0.200 3.4 16J 4 avmda Computed Ic= 23b user-EAtered Tc= 23.0 8 palomino the average rainfall Intensity til from IN Curve based an 1 9 Calculate the Post -Development peak discharge(QPeak) or., 10 Calculate peak own (uses 2 -yr stone) CIA, (used for 5/G Trap thraatvelodty, WQstorm ronveyance system nixing) V= Ci(Tc=6o1Ax3600 T"af.d., XwmN rnnlfei- t'C' 12 Calculate Vw9 (fpr sale, WQ faoilities) Enter Percentile Storm I(80th percentile =0.34 int 80th .0.34 in - Enter WQ Volume (Vast = CA (from line above)kAk3600) Von 981. it' 13 Detention: Approved Discharge Rate to Surface Water$if applicable) rfs 14 Volume Summary - at5 also SurtateStorage:Pond - ebe-015 WC, PondFbrebay+l5%zrdiummi - V 1.135 fts Primary Treatment/Storage Basin V 7,354 k' - Subsurface Storage: Seepage Bed Volume Without Sediment Factor V 3,341 ft' See UMP04 Steps. Bed forDeslen Volume With Sediment 090 PAC3013-024 Jump Creek -Trilogy\100 Phase 1\Construc1on\CaIcA37265191 Version 2.4, July 2014 rssk+:xaV 8amtl coaNkhots for v:raovs wibms T"af.d., XwmN rnnlfei- t'C' Oan ._ 0 y5 414anwne�x6l+rNraod ."mcaPA TN!mf—,v at5 also "L,f... I, ebe-015 PxvdemAl p,,..` _ A25 -Oda . ndusvlal en$ c -1,11i o -c ane 1eft -1 •real 090 e - o.m-oz3 cants 0104 3s a+nr..si rn,d.uxnt 0Jo-0.:0 010 Pao 4 avmda Mphug 5 m 09; xlwv vr ons aoo4 fl91 u4da 5am+4 wll SN. TY" 5t?pe Aa £ 6 fbtV-il pM fh9] Pll 4l5 4+-a`a{[i1''F N:±6w 849 .JY v]l Gla 01. Is 0.20 O.2b I eo.'eo firom a:£E 12/9/2014, 8:51 AM ACHD Calculation Sheet for Finding Peak Discharge/Volume -Rational Method NOTE: This worksheet is Intended to be a guideline to standardize ACHO checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. I,. Steps for Peak Discharge, Rate using the Rational Method calculated for post -development Calculate Post -Development Flows lint pre development flows, )erase number of storage fanhtlea to create new tab) User input in yellow cells. To accept default value type = in yellow cell and point to computed cell I Project Name lump Creek Stddlviskm No. 1 -Drainage Area 94 2 is area drainage basin map provided) YES (mop most be indeded with stormwetc, calculations) 3 Enter Design Storm For Volume(100,car per ACRD policy) 100 4 Enter number of storage facilities (25 max) 10 r1ekm1huw Mnm Su6Mannz 11 5 Area of Franc, Subbasin(SF or Acres) Acre Acre: Subbasin Slope(ft/ffl Subbasin Subbasin Subbed" Hydraulic Radius A/Wet Perm Subbasin Subbasin Subbed. Subbasin 1 Subbasin2 3 4 5 Subbasin6 7 8 9 10 079 12 Calculate \f>vq(forsving WQ facilities) Segment 3: Overland Sheet Firw By TR -55,c300. ft OA10 56 0.200 3.4 163 Enter Percentile Storm I(80tb percentile -0341n) 1o.ID 89 0.34 in Enter WQ Volume(V yy C (f am line b ve)Mx3fi00)_ Van 66] it' 13 Deteglton: Approved Dabrg flkte to SudaceWaters (rfapPlicablel. cfs 0.57 0.61 6 Determine the Weighted Runoff Coeffdent (C) 0.95 C=((C1xA1)r(C2xA2)a(CoxAn)]/A Weighted qvg 7Ca1culate Overland Flow Time of Concentration in Minutes (Tc) or use default to luo, caream .In I Rev. Pipe 51ze ID (In) Slope(ft/ffl Intercept CoeN. length Manning Hydraulic Radius A/Wet Perm Flow VelaciryV lips) Flow Time (min) Segment 3: Pipe Flaw Dien __T46 ds lazed for 5/G Tmp throat velocity; WQslorm conveyance system siring ) 11Cakuale total runoff vol (V)Iforsmng primaryztorage) Segment 2: Gutter Shallow Concentrated Flow, It T 0004 1 0.619 483 V = Ci Qa6010.3600 12 Calculate \f>vq(forsving WQ facilities) Segment 3: Overland Sheet Firw By TR -55,c300. ft OA10 56 0.200 3.4 163 Enter Percentile Storm I(80tb percentile -0341n) EftlrnaleJ A. -If eoelikhnlf is, Yviom 1.0sees 4Y.I5ud.Nf. I In.."," 1.1"RnMt'C" _mnta+xn Brea+ lra,+alsmna,a<v;aai.+i AQ{I:IxnFdi S5 a �t alk E Refid[+K+!J+✓tll IA(--�t^+�pnit2ae++0r d t 3comnrn+fl t t n Computed Te - 23.0 l tirdr (Jser-Enter dTe= 23.0 9 J M v_d Arno 8Determine the average rainfall lonaeity(i) from l DF Curve based an 1 2.12 I"hr 9 Calculate the POs4Deve1opmenl peak discharge(DPeak) 0—k-1.16 cis 10 Calculate peak Dwq(uses 2 -yr storm) Dien __T46 ds lazed for 5/G Tmp throat velocity; WQslorm conveyance system siring ) 11Cakuale total runoff vol (V)Iforsmng primaryztorage) V 2,259 f[ V = Ci Qa6010.3600 12 Calculate \f>vq(forsving WQ facilities) Enter Percentile Storm I(80tb percentile -0341n) 80th 0.34 in Enter WQ Volume(V yy C (f am line b ve)Mx3fi00)_ Van 66] it' 13 Deteglton: Approved Dabrg flkte to SudaceWaters (rfapPlicablel. cfs Surface Storage: Pond WD Pond FbrebaV a 15% sediment Primary Treatment/5terage Basin 5obsurtace Storage: 5eepage-Ned Volume Without Sediment Factor V 768 ft' V 1,592 It' V 2,259 Us ime With Sediment 5ueeu NAM1f4 caanet, ar« aver, £yltli tan:4y Y)J 5 V + E i Aoo,r 1-4ECe a.5a-47a ov5 aF .. _... aw o.s 025-a.4a 4 so "a ..so -a13 aIa-O IS 010.OAa _. CIA 030 495 5.5 aa5 II55 Sm[T>w a a OM ;dJ OII 0.35 a. a Dis oxo ass ofa ass ass P:\Q013-024 Jump Creek-Trilogy\100 Phase 1\ComtrmI on\Calc,\37315191 12/9/2014, 8:52 AM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACRD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak OBdlargo Rare using the Rational Method calculated for postdevelppmeat0 Calculate Post -Development Flom (for predevelopment flows, increase number of storage facilities to create new tab) User input in yellow cells. To accept default value type =in yellow cell and point to computed cell 1 Project Name Jump Creek Subdivision No. 1 -Drainage Area Is 2 Is area drainage basin map powlded7 YES (mop most be included with stormwoter co1mlallons) 3Enter Design Storm For Volume (100 year per ACRO policy) loo 4 Enter number of storage facilities (25 max) 10 luck 1. show More Smo.tns 11 5 Area of Drainage Subbasin(SF or Acres) Acres Acre 6 Determine the Weighted Runoff Coefficient lC) C-jRZ1xA1)a(C2xA2)tlCnxAn))/A Weighted Av Subbasin I Subbasin Subbasin Subbasin Hydraulic Radler A/Wet Perm subbasin Subbasin Subbasin Subbasin 1 sobbasio2 3 4 5 Sublesin6 J 5 9 10 0.95 0.010 56 0.200 3.4 16.7 .ton Yy ve {_ PIM, 5m2Y cal pP A 0.95 4pa rn a,r1a15 Ae.xK 1-61 069 0.62 a.151 to ala is cza azo AWared 4cm A. 0.62 7Calculate Overland Flow Time of concentration in Minutes (Tc) or use default to UWKffaP➢. colo to" Pipe Size 10 (in) slope(ft/ft) Intercept CoeN. LengthLimingzr M= -Ont, Hydraulic Radler A/Wet Perm Flow Velocity lips) Flow Time (min) Se meht1:Pipe Flow adcNid ani Com -11i colt Segment 2: Gutter Shallow Concentrated Flow It 0.004 0.619 1 642 11.3 Fars.....ttenea 8.3 cay.++.'rocs alo-035 PrW.osd W4 ecce, Segment 3: Overland sheet Fbw By TR -55, <30LLft 0.010 56 0.200 3.4 16.7 .ton Yy ve e0mputep le= [>.0 user -Entered Tc= 25.0 leges —ifelnw. yr iwra umcu v. 9 Calculate the Post -Development peak discharge jurrzk) Coos 1.19 cis 10 Calculate peak Own (uses 2 -yr stems) Ova 0.44 cis (used for 5/G Trap throat velocity, WO storm conveyance system sizing ) 11 Calculate total runoff vol lV)(forsizing primaryst.mge) V .2,440 ft' V=Ci (Tc=601Ax3600 12 Calculate Vwq (for sizing WO facilities) Enter Porcenflile Storm I Pflu 1 percentile 0.34 in) Fork 0.34. In Eller WC,Volume lVw, = Cti(from line mw,)M.3600) Van, 721 it. 13 Unitarian: Approved Discharge pale to Surface Waters (if applicable) _cfs Surface Storage: Pond WO Pond I'memy♦ 15% sediment V 829. fts Primary Tv&g cut/Storage Basso V 1,739. ft' Subsurface Storage: Seepage Bed - Volume Without Sediment Factor - V 2,440 ft' See HMP045eep'age Ned for Design Volume With Sediment P:\C2013 024 Jump Creek -TFil.,A100 Phase 1\Construction\Caks\37365191 Version 7.4, July 2014 rnk-1.1 numb CoeOklenls I., vad.m sni hmc c"..I Sullµe pinpN [erlla%e.lt'L" e'.s 1--l—e, ear d39-0.4: ec,14pe%al Snry Iscor, It us. M= -Ont, pnWe.wal4.ntl a35 -04q 5 :o AlaeV.�nl.'J.vYl l -g rp adcNid ani Com -11i colt Vern ore, aeQ Fars.....ttenea O.I4'o.Zr cay.++.'rocs alo-035 PrW.osd W4 ecce, -0.55-DFS U..YylwRe sear .ton Yy ve eat: A" it baa Z colt clan nodi: ass .ton Yy ve {_ PIM, 5m2Y cal pP A 3D 4pa rn a,r1a15 Ae.xK 1-61 069 O1. a.151 to ala is cza azo AWared 4cm A. 1219/2014,9:52 AM ACRD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACNE, checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineers methodology must result in facilities that meet or exceed these calculations In order to be accepted. (. $Avon far Peak Discharge Rate using the Rational Method calwhinted for post -development 'r Calculate Post -Development flows (for pre -development Flows, imossile number of Amalie tedious to <reato new tab) _ User input in yellow sells. To accept default value type =in yellow cell and point in computed cell 1 Project Name Jump Creek Sueffulslon No. 1-Dralaage Area 06 2 Is area drainage basin map provided? YES (map most be included with stmonvoterrsfAIvtfm,) 3 Enter Design Sturm Far Volume (100 -year per ACED policy) 100 4 Enter number of storage facilities (25 max) 10 flip rn [hnw Mnrs Gihhaana IJ1 5 Area of Drainage Subbasin(SF or Acres) Anes Acre 6 Determine the Weighted Runoff Coefficient (C) C=QC1xA1)s(C2xA2)f(CnxAn))/A Weightetl Avl 5ubbaslnSubbed. Slope (X/X) Intercept Coen. Subbasin Subbasln Hydraulic Radius A/Wet Perm Subbasln Subbasin Subbasin Subbasin 1 Subbasin, 3 4 5 Subbasin6 7 0 9 to 0.55 443 Segment 3:Overland Sheet Flow By TR-SS,<306ft 0.010 B 0.200 0.0 3a1TYM1a Enter Percentile Storm I(Both percentile = 0.34 in) 0.55 0.34 m Enter WQ Volume, (V,,, - ai (from line above)xpx3600) Vaa 465 it, 13 Detention: Approved Discharge Rate to Surface Waters (if applicable) fist a-z'a ON cf, 0.69 OAS .0e cAl S 11 An S,r... e.. Ol4 932 O.fi9 a.e A a.oiei 6eT 4e{£ 7 Calculate Overland Flow Time of Concentration in Minutes (Tr) orusedefaultlo Ov ceek. min Irl Ma. Pipe Size 10 lin) Slope (X/X) Intercept Coen. Length Manning] Hydraulic Radius A/Wet Perm Flow Velodt, (fps) Flow Time (min) Segment 3: Pire Flow - A 0.4 i:v lased for 5/G Trap threatMushy. WQ storm conveyance system sizing) Lsf." I f '.:��am-fs fl.bp-9.]5 Segment 2: Gfrner Shallow Concentrated Flow b 0.004 1 0,619 1 558 V 1.3 7.2 V=Ci(TC460)Ax3600 443 Segment 3:Overland Sheet Flow By TR-SS,<306ft 0.010 B 0.200 0.0 3a1TYM1a computed 11 = e2 asef-Entered T, -1 10.0 8 Determine the average rainfall intensity (1) from FDF Curve based an 1 3.11 m/hr 9 Calculate the Post -Development peak discharge(DPeak) Q,„s 1.18 ccs 10 Calculate peak Cow, (uses 2 -yr storm) Use 0.4 i:v lased for 5/G Trap threatMushy. WQ storm conveyance system sizing) Lsf." I f '.:��am-fs fl.bp-9.]5 aerW=ysl.�e..y 11 Calculate total runoff val M(for sizing primary storage] V 1,572 ft V=Ci(TC460)Ax3600 443 12 Calculate Vwq )for sizing WQ facilities) 3a1TYM1a Enter Percentile Storm I(Both percentile = 0.34 in) Both 0.34 m Enter WQ Volume, (V,,, - ai (from line above)xpx3600) Vaa 465 it, 13 Detention: Approved Discharge Rate to Surface Waters (if applicable) fist a-z'a ON cf, Surface Storage; Pond WQ Pond Fbrebay+l5%sediment V 534 ft' PrimaryTreatrnent/StoYage Rosin V 1,108 ft' Sub siuface Storage: Seepage Red Valume Without Sediment Factor V- `1,572 fe See BMP04 Seepage Red for Design Volume With Sediment P:\CZ013-024 Jump Croak -Trilogy\100 Phase 1\Cmmtructmn\faits\37415191 Verdian 7.4, July 2014 ErlNnat[tr awwll [aeNkNn[[ for V a,laur salPErcf gl Sm{yq flnnoll fP<II%Rist,-1 ((typs S,fnt ares E J tr.5q.6.?f S [tb etCwnaoe es. '_ AM 010 ft nntiaenYW clava c`.+res i:v o35 0£a Lsf." I f '.:��am-fs fl.bp-9.]5 aerW=ysl.�e..y a 21 040 A(vrN�nt d:+ling env pOO Indurtrier end cammer<n1 S,fnt ares U bU .1., neap one A'rpMlt clava c`.+res o 19-0 ]a or lcrrvad rpm AAn•a3D cess A'rpMlt '1Yi ca•naa 945 9rc4 pH3 Poch 443 3a1TYM1a E.ySt 5endyfgl sono A e p D fist a-z'a ON 00] 01, OAS .0e cAl S 11 An S,r... e.. Ol4 932 pz3 a.e A a.oiei 6eT 4e{£ 12/9/2014,8:53 AM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACRO checking of drainage calculations and shall nut replace the Engineer's calculation methodulogg. These calculations shall establish a minimum requirement. The Engineer's methodology must resuh in facilities that meet or exceed these calculations in order to be accepted. Steps far peak Discharge Rate sbblg the Rational Method calculated fat post -development ;.,, Calculate post -Development, Flows (for pre development flows, lacrosse number f storage facilities to create new to b) --_ User input In yellow cells. To accept default value type = in yellow cell and point to computed cell S Project Name Jump Creek Subd'v's'on No. 1-Oralnage Area 87 2 Is area drainage basin map provided? YES (map most be induded with IIor. watercalculatiare) 3 Enter Design Storm For Volume (100- year per ACHD policy) 100 4 Enter number of storage facilities 125 max) 10 Clkkto5M1ow More Subbasin, 71 S Area of Drainage Subbasio(SF or Acres) Anes Atte 6 Determine the Weighted Runoff Coefficient (C) C=((ClxA1)e1C2xA2)a(Cnwlq)I/A Weighted Ap 5ubbasin Slope(ft/ft) Subbasin Subbasin Subbasin Radius A/Wet Perm 50basin Subbasin Subhasln Subbasin 1 5ubbasin2 3 4 5 Subbasin6 7 8 9 10 0.39 Vxq 401 1.3 6.2 PeriY, S<Rf�tCnei a.14-a3e cis 14 Volume Summary Tara a<xnl 0.39 c DO" o 0.210 O.o e:r_<u A,al,k SVQPond Forebayrl5%sediment V 461 fta 0.84 V 956 it, sub surface Stange: Seepage Red `r -to, Sen iY wx sfopa - - Volume Without Sednnent factor V 0.89 fta 11.111-21p04 0A1 611 019 A.arape ti,, ads 3.11 2 Calculate overland Flow Time of Concentration In Minutes (Tc) or use default 10 QK—,C— a, min O Mn. Pipe Siie lint Slope(ft/ft) Intercept Coeff. Length �Ivl Radius A/Wet Perm Flow VelodtyV (fps) Flow Time Imin) Segment 1: pipe Flow LbHytlraulic _-0 — ::nalciriily 12 Calculate Vwq (for sizing WQfaailities) i J�4a.fan:1, J62-a.Za Enter Percentile Storm I(SOth percentile -0.346) 80116 w Concentrated Flowif O.o04 0.619 481 Vxq 401 1.3 6.2 PeriY, S<Rf�tCnei a.14-a3e cis 14 Volume Summary Tara a<xnl Segment 3: overland Sheet Flow By 1R-55, c 300 ft c DO" o 0.210 O.o e:r_<u onryuaeu u- User-EnteredTc= 30.0 8 Determine the average ralnrall lntenr,, untom, ma..cera. on 9 Calculate the Post_Development peak discharge IQPeak) 10 Calculate peak Dwq(u,es 2 -yr storm) (used for 5/6 Trap throat velocity, WD storm conveyance system sizing) Oar, De 102 0.40 cf, cis 11 Calculate total .... (feel IV)(In, i, , primary storage) V 1,352; R V = CI (1c=61))Ax3600 _-0 — ::nalciriily 12 Calculate Vwq (for sizing WQfaailities) i J�4a.fan:1, J62-a.Za Enter Percentile Storm I(SOth percentile -0.346) 80116 0.34 in Enter WQVolume (Von = Czi If,.. line above) xAx360O) Vxq 401 W 13 Detention: Approved Declarge, Rate to Surface Waters lRapplieable) PeriY, S<Rf�tCnei a.14-a3e cis 14 Volume Summary Tara a<xnl as-n,4J - Surf ace6torage:paid - e:r_<u A,al,k SVQPond Forebayrl5%sediment V 461 fta _ Primary Treatment/Storage Baser, V 956 it, sub surface Stange: Seepage Red `r -to, Sen iY wx sfopa - - Volume Without Sednnent factor V 1,357 fta P:\C2013-024 Jump Creek-Trilogy\100 Phase 3\Cm stm,tb.\Calc,\37465191 Version 7.4, July 2014 Ei[bnN[G Ruroll foeNM]en,, lee Vaucua Sudaa'[r iyPg pi'Hx, xaewR fnH16JIM, C' J Urb QhLs cMlreai 54 G23 _-0 — ::nalciriily a.}5.os" i J�4a.fan:1, J62-a.Za a70 ,eoIo C4Mertas 980 33a PeriY, S<Rf�tCnei a.14-a3e Sinva•cumis o9n a �; Tara a<xnl as-n,4J Fand.,p,w ewna a} oso.J.3o e:r_<u A,al,k ; 4.i }53 one's v.RS _- Sart TYbx `r -to, Sen iY wx sfopa Aa ' C 6 11.111-21p04 0A1 611 019 A.arape ti,, ads 3.11 0.35 02p .-a l8 J 23 1.35 4dt?Y<v E.am AY.4 12/9/2014, 8:53 AM ACHD Calculation Sheet for Finding Peak Discharge/Volume- Rational Method NOTE: This wmksM1eet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or earned these calculations in orderto be accepted. I _ stepsfor Peak DevelrgeenteUsing Ifor Rational Method caluselflown, tedfor ppumber 1ppmpat _ _na 'Calculate Past -Development Flows (for pre-develepment (lows, innease number ofstorage facilities to create new tab) User input in yellow cells. To accept default value type = In yellow cell and point to computed cell 1 Project Name Jump Geek Subdivision No. 1 -Drainage Area Sh 2 Is area drainage basin map provided? YES (mop most be Included with sf0rmwenter calculations) 3 Enter Design Storm For Volume (100 -year per ACHD policy) 100 4 Enter number of storage facilities (25 max) 10 CG[kta Show More Subbaeins S Area of Drainage Subbasin(SF or Acres) Acres Acre Subbasin slope (ft/(t) Subbasin Subbasin Subbasin Hydraulic Hydraulic Radius A/Wat Perm Subbed. Subbasin Subbasin 5ubbasin 1 subha0.2 3 4 5 subbasin 6 ] e 9 30 0.3] 0.37 0.64 D.37 12 Calculate Vwq (for sizing WQ facilkles) Pon9i Enter Percentile Storm I J80th percentile=0.34 in) IJS 0.010 61 0.200 3.4 1].9 V. 1,279 it' 13 Detention: Approved Discharge Rate to Surface Waters(if applicable) a tf, 14 Volume Summary 004641 Surface Storage: Pond oil 019 A ... acel" - WQ Pond Forebay a 15%sedimect - - V O.bo ft' Primary Treamient/Storage Basin V 3,0 51 b, . Seepage Red_- Subsurface Storage:ep .15 0a. 6 Determine the Weighted Runoff Coefficient (C) 0. 58 0.56 0.65 0.56 C=[(C1xA1)+(C2xA1).(CaxAc))/A Weighted Avg 2 Calculate overland Flow Time of Concentration in Minutes (TQ or use default 10 Vai.4Ut;ifi min Pipe Size 10 pn) slope (ft/(t) Intercept Coeff. Length Manningn Hydraulic Hydraulic Radius A/Wat Perm flow VelocitVV (fps) Flow Time (min) Segment 1: Pipe flow Qwu 0.89 as (used far 5/G Train throat velocity, WQ storm mnveyanre system sizing ) 095 CPruriF;t 11 Calculate total on.vol IV)(far sizing primary stomp) Segment2: Gutter Shallow Concentrated Flow b 0.004 am 248 V = CI(TC=601Ax36o) 1.3 3.2 12 Calculate Vwq (for sizing WQ facilkles) Pon9i Enter Percentile Storm I J80th percentile=0.34 in) 5egment3:Ovedand Sheet Flow By TR -55,<300 -ft 0.010 61 0.200 3.4 1].9 V. 1,279 c sa.ma evnea 1-frem ', he ...' e,t— a,. sl sad., canna_"' ouA u el f ;r 1 ]r a !Qn rv; UChS stxp9m Par' ¢:ler Computed Tc= 211 Gllwerwnda user -Entered Tc= 23.0 AeiknM Yartl ale}v 8 Determine the average rainfall intensity (1) from IDF Curve based on 1 2.23 in/hr 9 Calculate the Post -Development peak discharge(QPeak) Das 2 33 ds 10 Calculate peak Owq(uses 2 -yr storm) Qwu 0.89 as (used far 5/G Train throat velocity, WQ storm mnveyanre system sizing ) 095 CPruriF;t 11 Calculate total on.vol IV)(far sizing primary stomp) V 4,330 ft V = CI(TC=601Ax36o) ails, 12 Calculate Vwq (for sizing WQ facilkles) Pon9i Enter Percentile Storm I J80th percentile=0.34 in) 80th' 0.34 In Enter WQ V0Imne (Own = CO (from line above) xAx3600) V. 1,279 it' 13 Detention: Approved Discharge Rate to Surface Waters(if applicable) a tf, 14 Volume Summary 004641 Surface Storage: Pond oil 019 A ... acel" - WQ Pond Forebay a 15%sedimect - - V 1,471 ft' Primary Treamient/Storage Basin V 3,0 51 b, . Seepage Red_- Subsurface Storage:ep .15 0a. Volume WRhoutSementfactor V - 4,330 fta See RMPo45eepage Red for Design Volume With Sediment -ess eY2-P ]0 Is so �_ re VrvhYProa[tl Ox., 014 04D su"cu nsybp 095 CPruriF;t 695 nl c} ails, Pon9i heldL'_a'sa: 305 TOO, slap[ a 0 004641 oil 019 A ... acel" pry.v1Y at, ac. star"c% 813 913 .15 0a. xXE P:\C2013-024 Jump Crook -Trilogy\100 Phase 1\Cons[rvc0on\Ca1cs\32515191 12/9/2014,8:53 AM Version 7.Q July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOW: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in Arderto be accepted. Steps for Peak DlStharge, Raze ming the Rational Method calculated for port -development - Caloalate Past -Development Flom (for pre -development flows, Increase number of storage facilities to create new tab) 1 User Input in yellow cells. To accept default value type = in yellow cell and point to computed cell I Project Name lump Creek Subdivision No. 1 -Drainage Area 09 2 Is area drainage basin map provided? YES (map must be Included with st...termlmlotiam) 3 Enter Design Storm For Volume (100 -year per ACHO policy) 100 4 Enter number of storage facilities (25 max) 10 n 5Area of Drainage5ubbasin(SFmArms) Acres Acre 6 Determine the Weighted RuAWCoefficient (C) C-j(C1xA1)+(C2xA2)r(CnxAn)j/A Weighted Avf Subbasin Slope (ft/Q) Subbasin Subbasln Subbasin Hydraulic Radius A/Wet Perm Subbasin Subbasin Subbasin subm In 1 Subbasin2 3 4 5 Subbasi.6 7 e 9 10 1.44 6T OA04 1 0.619 1 669 015 0111 AI tef+t d'n IlA3 drear Bra Ind:u<rlal en3 iorrurnraiet Segment3:OvedanLM,sct near By TR -55,a300 -ft 1.44 C4aworki 6 a0 Ml a.Xyrtai (YYa ParFS. reT^.'elef A 19 014 0.58 020-035 poen? iynrel pnv d13 -Ola {h..,Yfrured 11.1 a.1a-a..3Q. r sheet: 0.58 A,an.:ii c45 4aaustt 095 %rck l Calculate Overland Flow Time of concentration In Minutes (Tc)oz use defaul[30 min Mso,aha 136 [Mi Pipe Size IB (in) Slope (ft/Q) Intercept CoeN. Length ManningA Hydraulic Radius A/Wet Perm Flaw Velocit v (fps) Flow Time Segment 1: Pipe Flow. a MdFn pei9hLW'irppi9RM m BSO -4.N BSO AefiNdnTill Sin€c fait'?!., a3i.a.5d Segment2: Gutter Shallow Concentrated Flow 6T OA04 1 0.619 1 669 015 0111 AI tef+t d'n IlA3 drear Bra Ind:u<rlal en3 iorrurnraiet Segment3:OvedanLM,sct near By TR -55,a300 -ft 0.010 58 0.200 1 3.4 1 17.2 C4aworki computed Tc= 25.9 User -Entered Tc= 26.0 ouesermme me average AAAMA Intensity (1) from ort Curve based on I 9 Calcvlate the POR -Development peak discharge(QPeak) - QPot ID Calmlate peak own)uses 2 -yr storm) Qwo lured for 5/G Trap threat velocity, WQ storm conveyance system sizing) 'V=CI(rc=60)Ax3600 12 Calmlate Vwq (forsining WQ facilities) Enter Percentile Storm )(80th percentile -0.34 in) Both 0.34 in Enter WQ Volunie(Vvin- CA lfmm line above) ar.360) - Vwa 7022 n' 13 Detmtmn: ApprovedDE,Imrge Pate to Surface Waters lifapplicable) - ds Surface SM.Iw: Pond WQ Pond Farebay+r'5%sediment V 1.176 W Pdmw, Treatment/Storage 8asio V 2,438 ft' Snbsmfa<e Storage: Seepage Bed Volume Without Sediment factor V 3,460 See DMP04 Sopa—, Rnd f., .-Ir. 1I.-4VAh trdimml stlkaaed auneft ca.Hlr"ants for varwos soden Typr nl fu.ixz a,Ao"1[net elenla-1 Dau'ammn areas 0.95 MdFn pei9hLW'irppi9RM m BSO -4.N BSO AefiNdnTill Sin€c fait'?!., a3i.a.5d M -sJr., 1, aoa ora A d Olt+ I 015 0111 AI tef+t d'n IlA3 drear Bra Ind:u<rlal en3 iorrurnraiet C4aworki 6 a0 Ml a.Xyrtai (YYa ParFS. reT^.'elef A 19 014 PleyPcanLs 020-035 poen? iynrel pnv d13 -Ola {h..,Yfrured 11.1 a.1a-a..3Q. r sheet: A,an.:ii c45 4aaustt 095 %rck 9%4 pears 00s Fuld, -t-4, up SPIT',, -! 'Pepe L 9 _ 4 €,, . 5 A.r,, 169 agoya. Ol4 -0.l8 a.}3 a1F A.—P flan AKE P:\[2013-024 Jump Creek -Tr logy\100 Phase 1\CwmBuction\Ca1cs\37565191 121912014, 8:54 AM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume- Rational Method NOTE: This rearksheet is Intended to be a guideline to standardize ACHO checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineers methodology muss result In facilities that meet or exceed these calculations in order to he accepted. - arge Rate using the Rational Method ocWated for post -development Calculate Post -Development Flows (for pre`J.Y.I.Psnent flows, increase number of atmage facilities to create new tabl User input in yellow cells. To .,,.at default value type = in yellow cell and point to computed cell 1 Project Name Japan Oreek Subdivision No. I. Drainage Area 010 2 Is area drainage basin map provided? YES fae, must be indadedwith sformum e, mlcudlationsJ 3 Enter Design Storm for Volume (100 -year per ACHD policy) 100 4 Enter number of storage facilities (25 max( 10 111,1.1Fnw Mnresubla ins 11 SArea of DrainageSubhazin (SFor Acres) Acres Acre 6 Determine the Weighted Runoff Coefficient B) C=11C1xA1),gzxA2H(CnxAa)]/A Weighted Ap Subbasln Slope(ft/ft) Subbasin Subbasin Subbasin Hydraulic Radius A/Wet Perm Subbasln Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbalm 6 7 B 9 10 1.18 ,}4e eeeb3 4H4 Segment 2: Gutter Shallnw Concentrated Flow b 91 598 alayxravndt o1u`d Is A1111avd 1.14 aee., 1.28 I'll o'cove0 1e4 RSQ Ba, OIS n btatt tfiis. Segmenta: Overland Sheet Flow BVIVII <3B0 -ft 0.010 52 0.200 3.3 I5.8 1zQ S dJ?6+ 0.61 i13 023 Oa. 0.61 7 Calculate Overland Flow Time of6oncentrahm in Minutes (Tc) or use default to t6teC4— min bMn. Pipe Size 10 (int Slope(ft/ft) Intercept Court. Length Manning. Hydraulic Radius A/Wet Perm Flow Velocity V lips) �FioawTim (min) Segment: Pipe Flow 0.5 etntti �l nMt f—.I Mub{am 633 neflRe tial pprr`1 0-55-V JO u A'onrot owl.., ueas- 87a indmnlalvrti iamrr.rcnl or. San(Sywil ,}4e eeeb3 4H4 Segment 2: Gutter Shallnw Concentrated Flow b 91 598 alayxravndt o1u`d Is A1111avd 1.14 aee., 210 040. I'll o'cove0 1e4 RSQ Ba, OIS n btatt tfiis. Segmenta: Overland Sheet Flow BVIVII <3B0 -ft 0.010 52 0.200 3.3 I5.8 1zQ S dJ?6+ r.ompmea lc= eta User-EntereJ Tc= 24.0 B ermin Dete the average 2lnfall Intensity (1) frmn IDP Curve based on 1 2.07 in/hr 9 Calculate the Post -Development peak discharge (Weak) Qeas 162 ds to Calculate peak own (uses 2 y storm) Q. 0.66 ds (used for S/G Trap throat velocity, WC, storm conveyance system sizing) 11 Calculate total mnoff yet M(I... Earn, primary storage( V 4,235 fr, V=CI(Tc=6o)Av360o 12. Calculate Vwn(for sizing WQ facilities) -. Enter Percentile Storm I R Oth percentile =0.34to) 80th 0.341n Enter WQ VPWIne (V - Lxi (from line novel rAx36001. You 956 it' - 13 pelenfi6n: ApprovedDharge Ra[eto Sulfate Waters hf aOPlimbie) _ds 14 Volume Summary - Surface Storage: Peru WQ Pond Forebay415% sediment V. 1.099 k' Primary Treatment/Storage Basin V 2,279 ftz Aibsarfzcc Storage: Seepage Bed Volume Without Sediment Fvc1m, V 3,235 Re Gaa PMpnd Soo—a. Rod (n,!lesion Vnlamo With Swliment P:\C3013-024 Jump Creak -Trilogy\100 Phase 1\ComtmctEon\[a1ts\37615191 Version 7.4, July 2014 blhname eu.a0 toe 11cize ss foe vwl— so.f.— two, M1sml3r2 ounnol zv"Ble Me'1" and.c. Asphalt bnitown we. 045 OrbrA <tgbtC160adeKa 059-0PQ 0.5 etntti �l nMt f—.I Mub{am 633 neflRe tial pprr`1 0-55-V JO u A'onrot owl.., ueas- 87a indmnlalvrti iamrr.rcnl or. San(Sywil ,}4e eeeb3 4H4 Pavy Sett) 0911 on, 11 cempterles 03o -Q15 alayxravndt o1u`d Is A1111avd 1.14 aee., 210 040. I'll o'cove0 1e4 RSQ Ba, 'Usch Asphalt 045 zB.1.1y 0.5 nMt 633 Rack U95 or. San(Sywil >at r"o same a O 141 Rai 004 R9S 6lt OIS n btatt tfiis. Q@s vIT ots 1zQ S dJ?6+ Q13 i13 023 Oa. 12/9/2014, 8:54 AM ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. User input in yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name Jump Creek Subdivision No. 1- Drainage Area #1 Enter number of Sand/Grease Traps (25 max) 12 Throat Velocity Baffle Vault Size Spacing Number of Peak Flow Area (fly) 0.5 fps Velocity S/G Traps Q -cis inch inch max. ok7 1000 G 1 1.01 20 48 6.67 Reference for Throat widths (inch) AUS Boise Lar -ken Wou, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 P:\C2013-024Jump Throat Velocity Is the Vault Size Spacing width Area (fly) 0.5 fps Velocity S/G Traps Q -cis inch inch max. ok7 1000 G 1 1.01 20 48 6.67 0.15 Creek -Trilogy\100 Phase 1\Construction\Gales\37665191 12/9/2014, 8:57 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. _ steps for Sand/Grease Trap Velocity_ Calculation r User input in yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name Jump Creek Subdivision No. 1- Drainage Area #2 Enter number of rn ence for Throat widths (inch) Baffle Throat Boise Velocity Is the Vault Size Number of Peak Flow Spacing width Area (ftp) 0.5 fps Velocity S/G Traps Q-cfs inch inch 48.0 max. ok? 1000 G I 1 1 1.71 20 48 1 6.67 1 0.26 60 ence for Throat widths (inch) P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Calcs\37715191 12/9/2014, 8:58 AM Version 7.4, July 2014 ADS Boise Lar -ken WQU, Vault BMP 16 G 48.0 50.5 n/a G 60.0 61.5 h/a 1000 n/a n/a 60 1500 n/a n/a 60 P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Calcs\37715191 12/9/2014, 8:58 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations In order to be accepted. User input in yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name Jump Creek Subdivision No. 1 - Drainage Area 43 Enter number of Sand/Grease Traps (25 max) 12 Baffle Throat Velocity width Area (ftz) Number of Peak Flow Traps Q-cfsinchinch max 1000 G 1 "ok? 20 48 6.67 026 Reference for Throat widths (inch) ADS Boise Lar -ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Gales\37765191 12/9/2014, 8:59 AM Version 7.4, July 2014 Vault SizeSpacing width Area (ftz) 0.5 fpsS/G Traps Q-cfsinchinch max 1000 G 1 1.71 20 48 6.67 026 P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Gales\37765191 12/9/2014, 8:59 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. F Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name Jump Creek Subdivision No. 1- Drainage Area #4 Enter number of Sand/Grease Traps (25 max) 12 Throat Velocity BaffleReference Vault Size Spacing Number of Peak Flow Area (flz) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok7 1000 G 1 1.16 20 48 6.67 for Throat widths (inch) ADS Boise Lar -ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 P;\C2013-024 Jump Creek Throat Velocity Is the Vault Size Spacing width Area (flz) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok7 1000 G 1 1.16 20 48 6.67 0.17 -Trilogy\100 Phase 1\Construction\Calcs\37815191 12/9/2014, 9:01 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sand/Grease Trap Velocity Calculation User input In yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name Jump Creek Subdivision No. 1- Drainage Area #5 Lnter u eference for Throat widths (inch) Baffle Throat Boise Velocity;V'elocity the Vault Size Number of Peak Flow Spacing width Area (ft?) 0.5 fps n/a 500 G SIG Traps Q-cfs inch inch n/a max.k? 60 1000 G 1 1.19 1 20 48 6.67 0.18 eference for Throat widths (inch) P:\C2013-024 Jump Creek .-Trilogy\100 Phase 1\Construction\Calcs\37865191 12/9/2014, 9:02 AM Version 7.4, July 2014 ADS Boise Lar -ken WQU, Vault BMP 16 000 G 48.0 50.5 n/a 500 G 60.0 61.5 n/a VQU1000 n/a n/a 60 VQU1500 n/a n/a 60 P:\C2013-024 Jump Creek .-Trilogy\100 Phase 1\Construction\Calcs\37865191 12/9/2014, 9:02 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sand/Grease Trap. Velocity Calculation User input in yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name Jump Creek Subdivision No. 1 -Drainage Area #6 Enter number of AL Baffle Throat Velocity Is the Vault Size ence for Throat widths (inch) ADS Boise Lar -ken WQU, Number of Peak Flow Spacing width Area (ftz) 0.5 fps Velocity G S 61.5 inch inch n/a max. ok? 1000 G 1 1.18 1 20 48 6.67 0.18 WJ ence for Throat widths (inch) P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Calcs\37915191 12/9/2014, 9:03 AM Version 7.4, July 2014 ADS Boise Lar -ken WQU, Vault BMP 16 G 48.0 50.5 n/a G 60.0 61.5 n/a 1000 n/a n/a 60 1500 n/a n/a 60 P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Calcs\37915191 12/9/2014, 9:03 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name Jump Creek Subdivision No. 1- Drainage Area p7 Enter number 1L ence for Throat widths (inch) Baffle Throat Boise Velocity Is the Vault Size Number of Peak Flow Spacing width Area(ft�) 0.5 fps Velocity G S/G Traps Q-cfs inch inch n/a max. ok? 1000 G 1 1.02 20 48 6.67 0.15 ence for Throat widths (inch) P:\C2013-024 Jump Creek -Trilogy\100 Phase i\Construction\Calcs\37965191 12/9/2014, 9:05 AM Version 7.4, July 2014 ADS Boise Lar -ken WQU, Vault BMP 16 G 48.0 50.5 n/a G 60.0 61.5 n/a 1000 n/a n/a 60 1500 n/a n/a 60 P:\C2013-024 Jump Creek -Trilogy\100 Phase i\Construction\Calcs\37965191 12/9/2014, 9:05 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. User input In yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name lump Creek Subdivision No. 1- Drainage Area #8 Enter numner 1,t ence for Throat widths (inch) Baffle Throat Boise Velocity is the Vault Size Number Peak Flow Spacing width Area (ft2) 0.5 fps Velocity G s S/G Traps D -ds inch inch n/a max. ok? 1000 G 1 2.33 20 48 6..67 0.35 ence for Throat widths (inch) P:\C2013-024 Jump Creek-Trilogy\100 Phase 1\Construction\Calcs\38015191 12/9/2014, 9:06 AM Version 7.4, July 2014 ADS Boise Lar -ken WQU, Vault BMP 16 G 48.0 50.5 n/a G 60.0 61.5 n/a 1000 n/a n/a 60 1500 n/a n/a 60 P:\C2013-024 Jump Creek-Trilogy\100 Phase 1\Construction\Calcs\38015191 12/9/2014, 9:06 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. L,. Steps for Sand/Grease Trap Velocity Calculation User input In yellow cells. To accept default value type = in yellow cell and point to computed cel S Project Name Jump Creek Subdivision No. 1 -Drainage Area#9 Enter number of u 3eference for Throat widths (inch) Baffle Throat Boise Velocity Is the Vault Size Number of Peak Flow Spacing width Area (ftz) 0.5 fps Velocity 1500 G S/G Traps Q-cfs inch inch n/a max. ok? 1000G 1 1.65 20 48 6.67 0.25 3eference for Throat widths (inch) P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construc1Jon\Calcs\38065191 12/9/2014,9:06 AM Version 7.4, July 2014 ADS Boise Lar -ken VUQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a ✓yQU1000 n/a n/a 60 NQU1500 n/a n/a 60 P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construc1Jon\Calcs\38065191 12/9/2014,9:06 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name lump Creek Subdivision No. 1- Drainage Area #10 or 1z teference for Throat widths (inch) Number of Peak Flow Baf#e Throat Boise Velocity Is the Vault Size Lar -ken Spacing width Area (fh) 0.5 fps Velocity S/G Traps Q-cfs inch inch 48.0 max, ok7 1000 G 1 1.62 20 48 6.67 0.24 60 teference for Throat widths (inch) P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Caics\38115191 12/9/2014, 9:07 AM Version 7.4, July 2014 ADS Boise Lar -ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a NQU1000 n/a n/a 60 NQU1500 n/a n/a 60 P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Caics\38115191 12/9/2014, 9:07 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sizing Ponds NOTE: This worksheet is Intended to he a guideline to standardise ACHD checking of draimage calculations and shall not replace the Engineer's calculation methodology. These calculative, shall establish a minimum requirement. The Engineers methodology must result in facilities that meet or exceed these calculations in order in be accepted. Steps far5hing Ponds, Site for Buckley and pool if,.. site for primary storage/treatment basin. User input In yellow cells. To accept default value type= in yellow cell and point to computed cell 1 Project Name Jump Geek l - Pond 1 < Later rummer or ponos le> mail Pond leogthat Stage (it) 3 Number of Call,(Furhbmy Pdnmr,2, Primary O0,1) 1 4 Design Storm 100. 5 Weighted Rpnoff Coefficient C 0.62 6 Area A(Acres) 0.23 nae+ 7 Approved 0ischarge Rate (if alep0da1al.) 0.00 cis 8i1 -WO Pond Forebay+l5%sediment V 2,1691 fC Toggle between Forebay and Primary Basin, enter dom and prial hor each 2540.14 w 9n0Ax %iQ• of 0.0 11 p x fl t --r} x` f 1 2,429 W rF6".ln% Forebay 9 Select Forebay Shape 5 -Irregular 30 Width of Forebay Bottom W 35.0 it 11 Length offorebay Bottom L 320 It 12 Side slier, tr!:I) H:1 3,00. 13 Enter Bottom Elevation 2538.14 it -14 Enter Top Bank Elevation 2540.64 it 15 Enter Water Surface Elevation(WSE) - 2540.14 it 16 Distance Between Farah, and Primary Basin (blank if he) 0.00 it 17 Enter Elevation Germ 0.00 it 18 Enter High Groundwater Elewitimi 2532.00 it 19 Mid Freehaard Requirement 0.50 -20 Freeboard Provided i-'-'--0,501 Link to: Flo q,r1 9F+ 2vr 21 Sand Bottom for Forebay lifltration? 6 in/hr Note: ocyrmaten reauiredij - Design lnflkatkm Rate, Enter O for no Infiltration bottom slope<1%or0 ouf low. 22 Sand Window Area for Forebay Aam 210 ice - Enter ofor noin0ltration Storm DurationI Itotal I O I Vu� I Pere Val Hr iNhr is to fe I 1.00 1.Ss o.sz I 2,169 las Saved Stage (ft) s 4i ria Pond leogthat Stage (it) Surface Area Aat Stage (it') Saved Surface Area A at Stage (it?) Surface Area A at Stage(n') OVFMOE Volume Below stage (it') 2538.14 2538.14 3.000 ^st.t>r`c 32.0 r.. � 21 Sand Bottom for Forebay lifltration? 6 in/hr Note: ocyrmaten reauiredij - Design lnflkatkm Rate, Enter O for no Infiltration bottom slope<1%or0 ouf low. 22 Sand Window Area for Forebay Aam 210 ice - Enter ofor noin0ltration Storm DurationI Itotal I O I Vu� I Pere Val Hr iNhr is to fe I 1.00 1.Ss o.sz I 2,169 las Saved Stage (ft) Pond SideSlope Widthat New Stage(it) IH,V) Stage (it) Pond leogthat Stage (it) Surface Area Aat Stage (it') Saved Surface Area A at Stage (it?) Surface Area A at Stage(n') OVFMOE Volume Below stage (it') 2538.14 2538.14 3.000 35.0 32.0 Override 821.00 0 2539.14 8.000 DO 0.0 Override 119].00 1;009 2540.14 3.000 UA 0.0 Override 1642.00 2,429 2.00 it depth mrstorage 24 25 Time to drain forebay I8.6 nm:rs 90%vo t me,e 24-hour, minimum OK SIUImdIUn P:\[2013-024 Jump Creek - Tritogy\100 Phase 1\Cam1mrtion\Calcs\38615191 12/9/2014, 9:56 AM Version 7.4, July 2014 ACRD Calculation Sheet for Sizing Ponds NOTE: This worksheet Is Intended to be a guideline to standardize ACHO checking of drainage calculations and shall not replace the Engineers calculation methodology. These calculations shall establish a minimum requirement. The Engineers methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Shing Pmtds:S124forforebay and print thensh¢ for pdrum stooge/treatment basin User Input In yellow cells. To accept default value type =1n yellow cell and point to computed cell 1 Project Name 3 Number of Cells (ForebaWPrima V-2, Primary Only=1) 1. Pond Length at Stage (to surface Area Aat stage (it') 4 Design Storm 100 Volume Sale - elowStage(ft) Stage lfts) Link to gy 5 Weighted Imnaff coefficient C 0.21- 124.0 Ig13 —fes 6 Area A(Acres) 1.08 ecres 2w ]Approved Discharge 0.ale (if applicable) 0.00 As 0.0 0.0 0'h 8 I-WQ Pond For, bay+l5%sediment V 3,663 Its P.w Toggle between foraboy and Primary Basin, enter data andpdn(for each D,W _. 94�Y !y4ah 3 � S yF,Ggv in, -- _ _- Faraday 9 Select Forebay Shape 5-bregular 10 Width of Forebay Bottom W 10.0 10.0 it 11 Length of Forebay Bottom L 124.0, 124.0k 12 Side Slopes(H:l) H:1 3,011: 3.00. 13 Enter Bottom Elevation 2538.16. 2538.16 Ti 14 EnterTcp Bank Elevation 2540.66: 2540.66 it 15 Enter Water Surface Elevation(WSE) 2540,16 2540.16 it IS Distance Between Forebayand Primary Basin (blank if nal O.W- R 12 Enter Eleyation Berm 0.0 it 18 Enter High Groundwater Elevation 2532.00 2532.00 it 19 Min. Freehaard Rct,lo meat 0.50 20 Freeboard Provided - 0.50 21 Sand Bottom for Forebay infiltration 6 6 in/hr Note: InfiRtntion required If - Design lnORratign Hate, Enter O for ne, infiltration helium slope<lY ar O oidflmy 22 Sand Window Area for Forebay Asea 368 368 fte Enter O for no infiltration Storm Duration I Itotal I O Val I Perc Vol I Discharge I DJsehame I Read Saved Stage (111) Pond Side Slope Widthat .New Stage (it) (H:V) Stage (it) Pond Length at Stage (to surface Area Aat stage (it') Saved Surface Area A at Stage (fit) Surface Area A at SIA,, (fill OVEIBDE Volume Sale - elowStage(ft) Stage lfts) 253&16 2538.16 3.000 10.0 124.0 override 1035.00 0 2539.16 2540.16 3,0W 3000 0.0 0.0 0.0 0.0 Override Override 1850.00 2238.W 2.00 kdepth for storage have Capacity? 25 Tune to dial. foeeday rk%wnnme In 24 hours mmlmum 17 9 hnecs OR STORAGE OK. P:\C2013 024 Jump Creek-Trilogy\100 Phase 1\ConshurUon\Cabs\38665391 12/9/2014, 956 AM Version 7.4, July 2014 ACRD Calculation Sheet for Sizing Ponds NOTE: This worksheet is Intended to be a guideline to standardize ACRD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineers methodology most result in (.,little, that meet or exceed these calculations In order to be accepted. Steps for Shing Ponds: Site for foreloy and print then she for Primary stooge/treatment basin. User Input In yellow cells. To accept default value type= In yellow cell and point to computed cell 1 Project Name .. rvw.un...... .......... 4 Design Storm 100 5- Weighted Runoff Coefficient C 0.56 B Area A IAcrezl - 1.44 b-1 7 Approved Discharge Nate (lf applicable) 0.0035 8 1-WQ Pond Forebay+1Mt sediment V 3,842 B Toggle between Foretiaymal Primary Basin, enardo[a and pdnrim-each .. =xxxpx f4.:aP3 a r. 4,,(`4�_ AC'S-0a�0^'�•.. Ar ."....._ e_..2 Parebay 9 Select Forebay Shape - 5 -Irregular 10 Width of Forebay Bottom W 61.0 61.0. it 11 Length of Forebay Bottom L 30.01 30.0 it 12 Side Slopes IRA) - H:1 3.00'. 3.00 13 Enter Bottom Elevation 2535.59 2535.59 Yt 14 Enter Top Bank Elevation 2538.09 2538.09 it 15 Enter Water Surface Elevation lWSQ 2532.59 2532.59, it 16 Distance Netween Forebay and Primary 8.,1. (blank if na) 0.00 it 17 Enter Elevation Berm D.00 it 18 Enter High Groundwater Elevation 2532.00 2532.00't 19 Min. FreeboardAeuirment 0.50 20 Freeboard Provided .0.501 21 Linkta: O,Y Pond Lengthat Stage (ft) CO �, saved Surtace Area A at Stage fit') Q.W Valume Below Stage (ft') 2535.59 2535.59 3.000 01.44 30.0 9,Yr 1338.00 +1.Yv 0 2536.59 3.000 0.0 t,_STI x- 1906.00 I'm 253159 3.000 n 0A Dverrlde 21 Sand Bottom for Fourbay Infiltration? 6 6 In/ Design Infiltration Rate, Enter for no infiltration 22 Sand Window Areafxr Forebay A,m '300 300 ks Enter 0 forno infiltration - - - 23 Note: infiltration 11,61ed if hurt. 11,111%or 0 oufjlow Storm Duration I uncal I Q I I Perevol I"---" I' -"- I "'_""- Saved Stage (it) Pond Side Slope Widthat New Stage (ft) ITTV) Stage (it) Pond Lengthat Stage (ft) surface Area Aat Stage (ft") saved Surtace Area A at Stage fit') Sudan. Area A at Stage(ft') OVERIDE Valume Below Stage (ft') 2535.59 2535.59 3.000 61.0 30.0 Override 1338.00 0 2536.59 3.000 0.0 0.0 Override 1906.00 I'm 253159 3.000 0.0 0A Dverrlde 2535.00 3,843 2.00 it depth for storage 24 Does ferbayheve capacity? YES 25 Gnie to drain forehay 23.1 Imun 9YA v,t me in 24 -hours minimum _ DN - P:\CZ013 Jump Creek -Trilogy\100 Phase 1\Construction\Calrs\38715191 12/9/2014, 9:57 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sizing Ponds NOTE: This worksheet is intended to be a guideline to standardize ACRO checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. _ StersforSWr, Ponch:51lefimorebayand ptletthan she for pdmary Storage /treatment basin. User input in yellow cells. To accept default value type = in yellow cell and point to computed cell 1 Praj.d Name Jump Creek l - Read 4 4 Design Storm 100: tinkto: c, 5 Weighted Runoff Coefficient C 0.61' Q'. Q.VJ 6 Area A (Acres) 0.89'. o'- 7 Approved Discharge Rate(ifopplicable) r 0.00 is Q'ss e 8 'LWq Pond Farebaya 15% Sediment V. 2,598 Toggle between Poreboy and Primary Basin, enter data and print/or earn cups maPz ¢= '` �.'9�-�`�-•r ��� w` _ _ � � ice„ ..i ; tel. u1 s .........:.........4 Forebay 9 Select Forebay Shape 5 -Irregular 10 Width of Forebay Bolton _ W Sun 50.0 R 11 length of Fmebay Bottom: - t 15.0 15.0 it 12 Side Slope, (11:1) HA 3.00 3.00 13 Enter Bottom Elevation 2535.62 253S.62 it 14 Enter Top Bank Elevation .2538.12 2S38.12 it 15 Enter Water Surface Elevation BASS) 2537.62 2537.62', It 16 Distance Between Forebay and Primary Basin (blank if nal 0.00 it 17 Enter Elevation Berm 0.00 IR 18 Enter High Groundwate,. Elevation 2532.00 2532.00 it 19 Min. Freeboard Requirement 0.50 20 Freeboard Provided - 0.50 21 Sand Bottom for Forebay Infiltration? Pond 5ide61ape Whither New StagelN) IH.V) stage (it) 6 6 in/hr Design Infiltration Rate, Enter D for no lefiltreHen Saved Surface Area A at Stage(fto) Surface Area A at &age REJ OVERIDE 22 Sand Window Area for Forebay As,a 235 235 '¢tv Enter O for no infiltration. - 15.0 - 23 Adjusted Storage Required 0 Storm Duration natal 4 I Relief Per,Vol Pre Oev Tota Override 1293.00 Val D6charge Dischai Min Hr I in/hr I chs I W Ra I it- I W 60 1.00 1 1.15 1 0.63 1 2,598 118 1 0 1 118 Note: infftnotterreaubcdo' bottom b-Onefficw Saved Stage (it) Pond 5ide61ape Whither New StagelN) IH.V) stage (it) Pond Lengthat Stage (it) Surface Area Aat Stage (fir) Saved Surface Area A at Stage(fto) Surface Area A at &age REJ OVERIDE Volume Below Stage (it') 2535.62 2535.62 3:000 50.0 15.0 Overr)de 780.00 0 2536.62 3.00 0.0 0.0 Override 1293.00 1,037 2531.62 3.000 0.0 0.0 Override 1878.00 2,6)2 2.00 ftdepth for storage 24 Does farebay have capacity? 25 Time to drain forehay 90°4 volume in 24.hours mlemam 19S hours OK STORAGE OK P:\C2013-024 Jump Creek - Trilogy\loo Phase 1\Construction\Cain\38765191 12/9/2014, 9:58 AM Version 7.4, July 2014 ACRD Calculation Sheet for Sizing Ponds NOTE: This worksheet is intended to be a guideline to standardize ACRO checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineers methodology must result in facilities that meet or exceed these calculations In order to be accepted. -:V.btld5:51te far forabay and pntRthen siz¢fnr pdmaryslorage/treatment Basin. User Input In yellow cells. To accept default value type =in yellow cell and point to computed cell 1 Pmlect Name 4 Design Storm 100. - Pond Lengthat Stage(ft) 5 Weighted Runoff Coefficient C 0.62. Suga. Area A at R,, 1fi11 OVIEMM 6 Area A (Acres) - 0.95ocree 2 Approved Discharge Rate (if applicable) 0.00 ofs 20.0 8 -.1 -WO Pond Fo1ebay+15%setlimert V 2,806-. _it, Teti between Foreboyand Primary Bosln, enter dote ardpdntfor each - 2536]] 2532.77 3L00 3.000 50a.,x Vkap,d override override 1486M 2102..1111 3,007:' pL t. �. ......y.........rl b�x.a219s 9 Select Foiehay Shape ;S -Irregular 10 Width of Feeley Bottom W 55.0.. 55.0 It 11 Length of Forebay Bottom L 20A- 20.0$ 12 Side Slopes 114:1) 11 3.00, 3.00 13 Enter BOHom Devalmo 2535.72 2535.22 it 14 Enter Top Bank Elevation 2538.22 2539.27 It 15 Enter Water Surface Elevation(WSE) 2532.27 253).228 16 Distance Between Forebay and Primary Basin (blank if no) om 8 12 Enter Elevation Beim - 9.01) it 18 Enter High Groundwater Elevation 2532.00 2532.00 It 19 Min. Freeboard Requirement 0s0 20 Freeboard Provided — - (IM 21 Sand Bottom for Forebay G81&ation? 6 6 -in/hr Deslgt lmitration Rate; Enter O for no infiltration - 22 Sued Window Area for Forebay Aiaa 214 214 ft° Enter O for no utilization - - 23 Linke: a,a 1.uJ Z a.ve p �n ss.r>�a fikR.iea Note: infiftroLon required if bottomslape<1%or O ouQlne storm Duration I itonl Q rr Pere Vol n�.�u...... m..A-....e� ve..A Saved Stage(ft) Pond Side Slope Widthat New Stage RB) )H:V) Stage(N) - Pond Lengthat Stage(ft) Surface Area Aat Stage(ftt) Savor! Surface Area A at Stage(ft') Suga. Area A at R,, 1fi11 OVIEMM Volume allow Stage Ite) 2535.]] 2535.77 3.000 55.0 20.0 override 940.00 0 2536]] 2532.77 3L00 3.000 0.0 0.0 00 0.0 override override 1486M 2102..1111 3,007:' 2.w Raeprn rorsrorage 25 Time W 11, lic mrebay 23.6 hoe, 9096 volume In 24 -hours minimum OR PAC2013-0241ump Crock -Trilogy\100 Phase 1\Conazmtk n\Calcs\38815191 12/9/2014, 9:59 AM Version 2.4, July 2014 ACHD Calculation Sheet for Sizing Ponds NOTE: This worksheet is Intended to be a guideline to standardize ACHE, checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet at exceed these calculations in order to be accepted. i_ Steps for Shln®Pends:Site for forebay, and print than size for pdmery storage'treatmant basin User Input in yellow cells. To accept default value type= in yellow cell and point to computed cell 1 Pra)ect Name 4 Design Storm - 100 Unkto:',Qp 5 Weighted Rmwff C.wWc1entC 0.69. 4''a D.v3 -Q.vi 6 Area A(Arms) 0.55 or— 2536.58 3.000 ] Approved Discharge Rate (if applicable) 0.00.c(s qva CQ.ri1 8'.1-WQ Pond Forcibly +l5%sediment V 1,808 4t' V•'O D.w Toggle between Fdreboy, and Pdmory Basin, enter data and print)oreach 3.000 ..� 9aa;s }-,at,x - , 780 2538.58 ,' 0.0 Override 1675.E 2,144 ..... Imam �_.,.y._....-Y" 9 Select Forebay Shape 10 Width of Forebay Bottom _ 11 tenth of Forebuy Battem 12 Side Slope, HA) - 13 Enter Bottom Elevation 14 Enter Top Bank Elevation - 15 Enter Water Surface Elevation(WSE) 16 Distance Between Forebay and Primary basin (blank if no) :17 Enter Elevation Berm 18 Enter High GmundwaterElevation 19 Mi.. Freeboard Requirement 20 Freeboard Provided 21 Sand Bottom for Forebay Infiltration] Design Infiltration Rate; Entero for no Infiltration 22 Sand Window Area for Forebay Entero for no infiltration _ Forebay s -Irregular W 7D,0 7010 It L 8.0 8.D 1t H:1 3.00- 3.00 2536.58. 2536.58'. it 2539.08 3539.011 it - 2530.58 - 2538.59 it ON It 0.00 If 2532.00 3532.00'. it 0.50 0.50' 6 6 in/hr'.. Note: infiltration required if bottom S)OP,l%aro outflow As=m 184 184 ftx storm Duration I itotal I Q I I Perc Vol I _... _ I _. . I Saved Stage (ft) Pond Side Slope Widthat New Stage(ft) (HEV) Stage(h) Pand Lengthat Stage(ft) Surlaze Area Aat Stage(ft) Saved Surface Area A at Stage (ft) Surface Area at Stake in) OVEHiDE Volume Below Stage (ft) 2536.58 2536.58 3.000 70.0 SO Override 505.00 0 253].58 3.000 0.0 DO Override 1054.00 780 2538.58 3.000 0.0 0.0 Override 1675.E 2,144 2.00 ftdepthforstorage 25 film to drain forebay 9014wlum , in 24 hours minimum 1].] hour STORAGE OI( P:\C2013 024Jump Creek-TrOogy\100 Phase 1\Constmction\Cabs\38865191 12/912014,9:59 AM Version 7.4, Jaly 2014 ACHD Calculation Sheet for Sizing Ponds NOTE: This worksheet Is Intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineefs methodology must result in facilities that meet or exceed these calculations in order to be accepted. I. 5[epsfor Sizing Ponds: Slzeftrt forabay and pont then sizafor pAmary storaga/treatmentbasin User Input in yellow cells. To accept default value type= in yellow cell and point to computed cell 1 Project Name lump Creek l - Pond) 4 Design Storm 100 Link to: ray 5 Weighted Runoff Coefficient C 0.84 Wo 4.n 6 Area A(Acres) 0.39— 2535.72 3.000 7 Approved Discharge Rate Jif applicable) - 0.0 cfs q,•r, L'in i 8 1 W Pond Forebay +l5%sediment V 1,561 ft' Toggle between Foreboyand Printery BusM, eniarddta dndpkajor each - Q.0 ..�y03pY1plag. -•/..,,_,•�.\ 0.0 Override 791.00 _iPGffe 575 2537.77 3.000 0.0 awlMss r p Override 129300 1,617 Tomboy 9 Select Forebay Shape '5 -Irregular 10 Width of Forebay Bottom W 520 52.0 it 11 Length of Fafebay Bottom L 8.0' 8.0 HE 12 Side Slopes (l H:1 300 - 3.00'.: 13 Color Bottom Elevation 2535.77 2535.]]. It 14 Enter Top Bank Elevation 2538.271 2538.27-. it 15 Enter Water Surface Elevation jWSE) 2537.72' 2537.77 IT 16 Distance Between Forebay and Primary Basin lblank if no) 0.00i 'ft SJ Enter Elevation Bents ON ft 18 Enter High Groundwater Elevation 2532.00' 2532.00 It 19 Min, Foudamd RegOlrement 0.50 '2o freeboard Provided - OSO •.. 21 sand Bottom for Forebay Infiltration] Design Infiltration Rate, Entero for no infiltration 22 Sand Window Areafor Forebay Enter O for no infiltration - 23 Adjusted Slorage Required Storm ouration 1 otal O. G 6 in/hr - NcWhailtrationrequiredif bottom slopeal%or 0 outflow As.m 158 ISO ke Val Perc Vol 79 Saved Stage(ftl. Pond Slde5lope Widthat New Stage (ft) (N:V) Stagejft) Pond Length at Stagelf) Surface Area Aat Stage (R°) Saved Sortace Area A at Stage lit) sooner. Area A at ,.,a IN) OVERIDE Volume Below Stage (ft') 253532 2535.72 3.000 52.0 8.0 Override 359:00 0 2536.72. 3000 0.0 0.0 Override 791.00 575 2537.77 3.000 0.0 OO Override 129300 1,617 2.00 ftdeplbforslomge 25 Time M filra:n torvbay 90%volume In 74 hour, hamomm 17.8 Moors OK...._ STUMUEUK P:\C2013-024 Jump Creek -Triiogy\100 Phase 1\Construction\CalcA38915191 12/9/2014,10:00 AM Version 7.4, Jury 2014 ACHD Calculation Sheet for Sizing Ponds NOTE: This worksheet is intended to be a guideline to standardize ACRID checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. p Steps for Siang Ponds: Sit. turf rob -By and pant then size farpriram, trndpoltreatment basin. User input in yellow cells. To accept default value type =in yellow cell and point to computed cell 1 Project Name 3 Number at Coll,(FwcbeylPrlmaq=2, F lonary Unly=l) 4 Design Storm 1W1 5 Weighted Runoff Coefficient C 0.60'. - 6 Area A(Acres) 1.75 arms 7 Approved Discharge Nate Jif applicable) 0.00 'fs 2 TWq Pond Forebay+l5%sediment V 1,471 it Toggle between Forebay and primary Brain, enter data andprintfor each. woof''- 'Si,aps 0 2536.26 253226 o 0.0 0.0 0.0 0.0 Override Override 746.00 1209.W .n* --71;51k •• (M:iv3 5. 9 Select Forebay Shape 10 Width of Forebay Bottom W -.11 Length of Forebay Bottom L 12 Side Slopes IRA) H-1 13 Enter Bottmn Elevation 14 Enter Top Bank Elevation _15 Enter Water Surface Elevation(WSE) 16 Distance Between Porebay and Prfmary Basin (blank if na) 17 Enter Elevation Berm IS Enter High Groundwater Elevation 19 Min. Freehoard Requirement 20 freeboard Provided 21 Sand Bottom for ForebaylnRltradon? Design lnfilt,atmu Rate, Enter O for no infiltration 22 Sand Window Areafor Forebay A,_o Enter 0 for no ift6hratim, Forebay 5-bregular 15.0 15.0 It 30.0 30.0 it 3,00 3.00 2535.26 2535.26 it 2537.76- 2532.76 it 2537.26 2532.26 it 0.00 it 2532.26. 2537.26 it 2531.50 2531.50 it 0.50 0.50 6 6 m/hr 137 132 $a Link to: Q., U.'n q.vi qNa 0.'rs Q.ue gn LO.vn� r i15C�R \ _ s if A}altos, Note: Infiltration required if bottom sloped%or O outflow Sudan Pre-Dev Total Max Vol Storm Duration itohl 4 pert Val �,_l___ ---_ p__a 60 Saved Stage In) Pond Side Slope Width at New Stage (ft) (H:V) Stage(fu Pond Length at Stage (it) Sladmre Area A at Stage(it)Stage Seven! Surface Area A at (0°) Sudace Area A at Stage ID') OVERIDE Volume Below Stage (ft) 2535.26 2535.26 3.000 15.0 30.0 Override 354.00 0 2536.26 253226 3.000 3.000 0.0 0.0 0.0 0.0 Override Override 746.00 1209.W --71;51k 2.D0 maeptntorstomge 24 Does forebay have capacity' YES . 25 Tina to drain fim"bay 19.3 tawrs 90% volume in 24 -hours minimum OR P:\C2013 0241ump Creek-Trilogy\100 Phase 1\Const1.1tion\Calcs\39065191 12/9/2014, 10:10 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sizing Ponds NOTE: This worksheet is Intended to be a guideline to standardize ACRO checking of drainage calculations and shall not replace the Engineer's calmlation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations In order to be accepted. Steps far Sidled Parts She 1.1 Cambay end print than She for primary stopge/treatment basin. ,.I User input In yellow cells. To accept default value type =in yellow cell and point to computed cell 1 Project Name 3 Number of Cells (FarebaWPrimary=2, Primary Onty=1) 2' 4 Design Storm _ 100 5 Weighted Runoff CaefficientC 0.60' 6 Area A(Acres) 1.75 u-, 3 Approved Discharge Bate hf appl(cable) 0.00 cis -8 �.2-Primary Treatment/Storage Basin V 3,051 7t Uri between Fareb ry and Primary Basin, enterdom ondprint foresch -r Y9iDY _^v'.:1LP3 i Primary Basin 9 Select Primary Basin Shape 5 -Irregular 10 Width of Primary Basin Bottom W 15.0 15.0. It 11 Length of Primary Basin Bottom L 30.0 30.0 it 12 Side Slope, (H:1) H:1 3.00 3.00 13 Enter Bottom Elevation 2535.26 2535.26 t 14 Enter Top Bank Eleyation - 2532]6 2537.768 15 Enter. Water Surface Elevation(WSE) 253216 2537.26 It 16 Distance Betsveen Forebay and Primary Basin (blank if na) 400 dt 12 EnterUrva0on Berm 2532.26 2537.76 ft 18 Enter High Groundwater Elevatiars 2531.50 2531.50 it 19 Min. Freeboard Bequlrrimult 0.50 20 Freeboard Provided 0.50 21 Sand Bottom for Primary/Storage Basin infiltration] Design lnfiltotlon Rate, Eriter O fdr no 101Dation `22 Simd Window Area Tor Primary Enter o for no inilltntion Storrs Duration I [total Link to: 9.� +),YJ it 7.v1. 6 6 in/hr Aaw 350 350 R, tunnH I Perc Vol I Pre -Dov I T vol Discharge DR, Note: infiltration required if bottom slope a% or 0 outflow. 11) Saved Stage (ft) Pond SIde510Pe Widthat New Stage (ft) IH,V) Stage In) Pond luunthartl Stage (ft) I Surface Alex Aat Stage(ft') Saved Surface Are.A ai Stage (ft')-.OVCRIDE Surfaca AreaAat State (N) ....y acviR o„tiaq. 6 6 in/hr Aaw 350 350 R, tunnH I Perc Vol I Pre -Dov I T vol Discharge DR, Note: infiltration required if bottom slope a% or 0 outflow. 11) Saved Stage (ft) Pond SIde510Pe Widthat New Stage (ft) IH,V) Stage In) Pond luunthartl Stage (ft) I Surface Alex Aat Stage(ft') Saved Surface Are.A ai Stage (ft')-.OVCRIDE Surfaca AreaAat State (N) Valume Below Stage ifts) 2535.26 2535.26 3.000 15.0 30.0 Override 1436,00 0 2536.26 3.000 0.0 0.0 Override 1985.00 1,711 2537.26 3.000 OO 0.0 Override 2604.00 4,005 2.00 ftdepthforstorage 25 Time to durin primary/storage basin 90%valu:ne In 24 -Hams minhnum 153 lours OK P:\C2013-024 Jump Creek-Tdlagy\100 Phase 1\Construction\Caics\3911991 12/9/2014,10:14 AM Version 7.4, July 2014 ACRD Calculation Sheet for Sizing Ponds NOTE: This worksheet is intended to be a guideline to standardize Ache checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineers methodology must result In facilities that meet or exceed these calculations in order to be accepted. Steps for Siring Ponds: Size forforebay and print then size for Bomar, storage/treatment basin. ;I User input in yellow cells. To accept default value type = in yellow cell and point to computed cell 1 Proud Name 4 Design Storm 100: tiakto: �qs 5 Weighted Runoff Coeffiriam C 0.59 0.1 V 6 Area AlAeresj 1.44mves 4.v7" 7 Approved Discharge Rate (if applicable) 0.00;efs 'Q"s C ' 81-WgPond Forel5%seJiment V 3,979' R° q,mn ,,abayt haggle between Foreboyead primary Snipe, enter onto ordprief fier vein V.vu 0.0 0.0 Ovetrule 1985.00 1.711 2537.62 3.000 0.0 9.0 0,wNde 2604.00 1 � IbRaL II ', t 1 ff..................3 si,3irAi _ I.....F..�.>j 9k0rw Forebay - 9 Select Forebay, Shape 'S -Irregular 10 Width of Forebay Bottom W 30.0 3o.0'.R 11 Length of Forebay Bottom L 54.0- 54.0 it 12 Side Slopes (Nil) H:1 3.00 3.00' 13 Enter Bottom Elevation 2535.62: 2535.62 it 14 Enter Top Bank Elevation 2538.12 2538.12 it 15 Enter Water Surface Elevation(WSE) 2537.62-. 2537.62'.. it 16 Distance Between Forebay and Primary Basin (blank line) 0.00 it 17 Enter Elevation Semi - 0.00- '.H 18 Enter High Groundwater Elevation 2531.50. 2531.SD. it 19 Min. Freehoard Requirement 0.50. 20 freeboard Provided '-.-="050i 21 Sand Bottom for Forebay Infiltration] Design Infiltration Rate, Enter 0.(or no Infiltration. 22 Sand Window Area For Forebay inter 0 for nojnBltration - 23 Noteanfil[ratiavequlredif bottom slape<1%or0ovbkpv AG., 311: 321 fir Bone, Pre-DeV Total Maggot Storm Dmatian NowQ ... Pere Vol _. _. _ Saved Stage (it) Pond Side Slope Widthat New Stage Put) IH:V) stage (it) Pond Lengthat stage(ft) Surface Area Rai Stage(it) Saved Surface Area A at Stage (to) Surraco Area A at Sta0e IB°) OVERIOE Volume Below Stage IN) 2535.62 2535.62 3.000 30.0 54.0 Override 1436.00 0 2536 62 3.000 0.0 0.0 Ovetrule 1985.00 1.711 2537.62 3.000 0.0 9.0 0,wNde 2604.00 4;005 2.00 it depth for storage capacit ? 25 Tells to d!a!n Forebay 90%volume It 24-hou¢ minimum 223 hnn(s OK STORAGEON P:\C2013 0241ump Creek- Trilogy\100 Phase 1\Constmc0on\[ales\39165191 12/9/2014,10:14 AM Version 7.4, 1u1y 2014 ACHD Calculation Sheet for Sizing Ponds NOTE: This worksheet is intended to be a guldeline to standardize ACRD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. y Steps for Sizing Ponds; Site farfure0ay end print then size for primary storage/treatment basin. ,j _.._ .. _ User input in yellow cells. To accept default value type = in yellow cell and point to computed cell I PraleRName 4 Design Storm 100 Pond Length at Stage(h) Link to:"7ga 5 Weighted Runoff Cpefgelent C 0.63 Volume Below Stage (it') a'. LSE 6 Area A(Acres) 1.28:aves 74.0 W, 7 Approved Discharge Rate inapplicable) - 0.00 'fs 0 mm 8,1-WQ Pond Forebay a 15% sediment V 3,720- Na (U%�a�'._.--7 Troupe belween Poreboyand Primary basin, enter data nndprlatforeach 1,548' Az,% ..Aj•F 0A O.0 a tu.:q^x 2613.00 no 3,794 F M'.%, s ..,...................y 9 Select Forebay Shape to Width of Forebay Bottom 11 length of Forebay Bottom 12 Side Stopes(H:l) 13 Enter Bottom Elevation 14 Enter Top Bank Elevation 15 Enter Water Surface Elevation(WSE) 16 Distanre Between Forebay and primary Basin iblank if nal 17 Enter Elevation Berm 18 Enter High Groundwater Elevation 19 Min, Freeboard Requirement 20 Freeboard Provided 21 Sand Bonom for Forebay infhration€ Design trfi@arias Pate, Enter 0 for no infliration 22 Sand Window Ar ea for Forebay Enter 0 for no m(iltration Forebay 5- Irregular W 24.0 24.0 it L 74.0 74.0 ft H:1 3.00 3.00 2535.63 2535.63 it 2538.13 2538.13 it 2537.63 2537.63 it 0.00 it 0.00 N 2531.50: 2531.50 it 0.50 0.307 S 6 in/br As,w 297 297 fta Note: Pfiltratlon required f bottom sloVe<1 %are outflow Runoff Pre-Dey Total Max Vol Strom Duration notal 4 PercVol Saved Stage (it) Pond Side Slope Width at New Stage (it) (N:V) Stage(b) Pond Length at Stage(h) Soriano Area A at Stage fill) Saved Sudacc Arca A at Stage(ft2) Surface Area A At Stage (it') OVERIOE Volume Below Stage (it') 2535.63 253563 3.000 24.0 74.0 override 1217.00 0 2536.63 3.000 0.0. 0.0 Override 1879A0 1,548' 2537.63 3.000 0A O.0 Dverride 2613.00 3,794 2.00 it depth for storage 25 Time to drain f v'bm' 90%volume o 24-h^_urs minimum YES - 22S boors OR P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Gales\39215191 12/9/2014, IM15 AM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to sUnd.rdlie ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. _ Steps for Peak Discharge Rate using the Rational Method calculated for post -development -i .Calculate Post -Development Flows If., pre -development flows, increase number of storage faeili0es to treat. new tall -_ User input in yellow cells To accept default value type = in yellow cell and point to computed sell 1 Project Name Jump Creek Subdivision No. I- Temp. Drainage Area: Al 2 Is area drainage basin map provided? YES (map most be included with starmwater regulations) 3 Enter Design Storm For Volume (100 year per ACHD policy) 100 4 Enter number of storage facilities (25 max) 17 Clickm Shvw Mme Subbases r1l S Area of Drainage Subleasin(SF or Acres) Acres Acre 6 Determine the Weighted Runoff Coefficient (C) C=((C1aA1)a(C2aA2)a(CnxAn)]/A Weighted AW 5ubbasin Iluldhosin Intercept Coeff. Subbasin Subbasin Hydraulic Radius A/Wet perm Subbasin Subbasin Subbasin Subbasin 3 Subbasin) 3 4 5 Subunit6 ) g 9 10 1.22 b O.OG4 1 0619 308 eso G35 ween 1.3 4.0 nsphr§ 1.12 v95 Segment 3: Overland sheet Flow By TR -55, <300 -ft 0010 58 0.200 3.4 12.2 ] 43 anni :3Y Ikldi Sand, Van 0.60 '-TYna 3c Int I Ill u Oa) )1 Ol5 A i ]-5>i 46§ O.60 413 ft IS I 6.33 5 }8 7Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 30fiec'eoure min 3e Mn. Pipe site ID lint 51 Pruitt) Intercept Coeff. Length Manning n Hydraulic Radius A/Wet perm Flow VelocltyV (fps) Firearm (min) Segment 1: Pip, Flow d 64U Pans, Cgr,,voA, O.ir-O,iS AleyVass.or 020 6]5 Rir'ausl said areal Segment 2: Goner Shallow Concentrated Flow b O.OG4 1 0619 308 eso G35 ween 1.3 4.0 nsphr§ (anzlpG v95 Segment 3: Overland sheet Flow By TR -55, <300 -ft 0010 58 0.200 3.4 12.2 ] 43 Computed T, -1 21.2 User-E.tered Tic =1 21.0 I Oeaermine cite average rmnran intensity pi Trom mc LUMe cover on I a.3a npnr 9 Calculate the Post -Development peak discharge IQPeak) On„a 1.20 ds 30 Calculate peak Qwq(.Sea 2 -yr stem) Qom 0.65 ds (used far S/G Trap throat velocity, Wit, storm conveyance system sizing ) V=CI(fc=60)Ax36o0 12 Calculate Vwq (for sizing WQ fwflhtls) Enter Peroentlle Storm 1180th percentile =0.34 in) Both'. 0.34 1n Enter WQ Volume(Vrq CA (from line above)AAx,360o) Van - 933: W 13 0etection: Approved Dhdlarge Hate to Surface Water, (if applicable) f, Surface Storage: Pond WQ Pond Forebay+l5%Sediment - V 1,023 ft' Primary Treatment/Storage Basin V 27724 ftr Subsurface Storage: Seepage Bed Volume Without Sediment Factor V 3,152 1t' See BMP04 Seepage Bed for Design Volume With Sediment e<Ih»alaS mearl Car"Menta for V.,,..c Sarlartr I,,, al sets, nunbn I—IlY3e1111-6' aces -1 opeuri wren o'ra-Uall 8=11;h," Sogre-I s, a, 0.35.6 -Sp Mu"n,sr -S—i5 aryromet A..ailinF arras Gab :nlmtrld ens comrnrcbl u4et ¢rocs ogV wayarepr 64U Pans, Cgr,,voA, O.ir-O,iS AleyVass.or 020 6]5 Rir'ausl said areal r. 22.040 kfi Y 4ve[I Ynaf eso G35 ween nsphr§ (anzlpG v95 erVG ] 43 anni :3Y Ikldi Sand, Van '-TYna 3c Int I Ill u Oa) )1 Ol5 A i ]-5>i 46§ bje .11lora 413 ft IS I 6.33 5 }8 Ad.. t hoer. Aaae P:\C2013-024JUmp Creek -Trilogy\100 Phase 1Vsmstruction\Cates\39265191 12/9/2014,10:27 AM Verslon 2.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sand/Grease Trap Velocity Calculation User input in yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name Jump Creek 1 -Temp SG Trap #1 = Enter number of Sand/Grease Traps (25 max) 12 Throat Number of Peak Flow Baffle Vault Size S/G Traps Spacing width Area (ft') 0.5 fps Velocity q-cfs inch inch max. ok? 1000 G 1 1.7 20 48 6.67 Reference for Throat widths (inch) Boise ADS Vault Lar -ken WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a WQU1000 n/a n/a 60 WQU1500 n/a n/a 60 P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Colts\39315191 12/9/2014, 10:28 AM Version 7.4, July 2014 Throat Velocity Is the Vault Size S/G Traps Spacing width Area (ft') 0.5 fps Velocity q-cfs inch inch max. ok? 1000 G 1 1.7 20 48 6.67 0.26 ACHD Calculation Sheet for Sizing Ponds NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's Calculation methodology. These calculations shall establish a minimum requirement. The Eagmeefs methodology must result in fatllities that net or exceed these calculations in order to be accepted. E Steps for M, Ing sands: Sun farforebayaad print then size far primary theagn/treatment basin. User input in yellow cells. To accept default Value type= In yellow cell and point to computed cell S Project Name lump Geek No. 1 -Temp Drainage Pond #1 4 Besign Storm 100. 5 Weighted Runoff Cimiiclent C 0.60 6 Area A (Anes) 1.27 acres 7 Approved Discharge Rate (if applicable) 0.0 0, 8 1 -WO Pond Forebay+l5%sediment V 31631 it O,,da between Pnrebay and Primary Basin, enter data and pnnifor each 1kill's wk,,.�,., 7•.,.. x9^i•JTar' .. P,i .. r•`Ftes4+z l 9 Select Forebay5hape 10 Width of lembay Rattem W 11 Length of latency Bottom t 12 Side Slopes(H:I) H1 13 Enter Bottom Elevation 14 Enter Top Bank Elevation 15 Enter Water Surface Elevation(WSE) 16 Distance Between Forehay and Primary Basin (blank if no) 17 Enter Elevation Berm 18 Enter High Groundwater Elevation 19 Min. Freehoard Requirement 20 Freeboard Provided 21 sand Bottom for Forebay intimation? Design infiltration Rate. Enter 0 for no infiltration 22 Sand Window Area for Forebay Enter 0 for no infiltration 23 Forehay 5-irregu1ar 25.2: 25.2 it 54.5 54.5 it 3.00 00 2534.40 2534.40 it 2535.90 2536.90 it 2536.40 2536.40.H 0.00 it 0.5 H 2531.00 2531.00 it 0.50 "0:604 6 6'in/hr A-, 295 295 N, IF Dnkto: 9,A a's f Q �n tJ W. J.V9 �S ._ �. SYStiss Nate: infiltration regd Of if bottom slopeQ%ore outflow Storm Ouratlrmtotal O Runoff Pers Vol Pre-Dev Total Max Vol I _. Total _ Saved stage(ft] Pond Side5lope Widthat New stage (it) (WV) Stagelft) Pond Lengthat Stage(H) Surface Area A at Stage (ft) Saved Surface Area A at Stage (ft) Sao.. AreaA at Stage (ft) OVEFROF Volume Below Stage(rts) 2534.40 2534.40 3.000 25.2 54.5 Override 1367.00 0 2535.40 3.000 0.0 0.0 Override 1881.00 1,624 2536.40 3.000 0.0 0.0 Override 2466.00 3,798 2100 Hdepth for storage 75 Time to drain mantis, 90%volume in 24 hours minimum 22.2 Wo" OR STORAGE OR P:\C2013-024 Jump Creek - Trilogy\IDB Phase 1\Combustion\Calcs\39415191 12/9/2014, 30:46 AM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume -Rational Method NOTE: This worksheet Is Intended to be a guideline to standardise ACRO checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineers methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post-0evolopmem Calculate Post -Development Flows (for predevelopment flows, increase number of storage facilities to create new tab) - User input in yellow cells. To accept default value type in yellow cell and point to computed cell 1 Project Name Jump Creek Subdivision No, I. Temp. Drainage Area 82 2 Is area drainage basin map provided? YES (mop must he included with stormwnter calculations) 3 Enter Design Storm ForVol van e(100'Wor per ACH0 policy) 100 4 Ea Ler number of storage facilities (25 max) 17 ry,ktr0,,v Mnm Snhnarina 11 5Areaof Dminage5ubbasin(SFur Acres) Acres Acre! 6 Determine the Weighted Runoff Coefficient (C) C=i(C1xA1)a(C2xA2)t(CrxAn))/A Weighted AVE 5ubbasin I Subbasin Subbasin Subbasin Hydraulic Radios A/Wet Perm Subbasin Subbasin Subbasin Subbasin 1 Subbastn2 3 4 S Sordoni.6 ] 8 9 10 0.5] Segment 2: Gutter Shallow Concentrated Flow 6 0.004 1 0,619 1 165 gotRAJ -09U tr'.eteries o15 Alavarvmds n30 -0 is Sartnrnl yantran 0.5) 0.010 53 0.100 3.3 16.0 OAO•UAP 0E3 0.39 A eraked f,ert. A2E 0.60 0.60 ] Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 uuioanrc min °O Pipe Sixe 10 (in) Slope (ft/X) Intercept Coelf. Length Manningn Hydraulic Radios A/Wet Perm Flow Velo ltyV lips) Flow Tlme (min) Segment l: Pipe Flow. nmmnm a.�Plr'ftny:vi o.ar"a, nao_a.vs �a rat peraf 915 Gr2 �f+!Tent d.xlnng 5,. - i lv-urrA en3 Cnrrv+srarxr e Segment 2: Gutter Shallow Concentrated Flow 6 0.004 1 0,619 1 165 gotRAJ -09U tr'.eteries o15 Alavarvmds n30 -0 is Sartnrnl yantran Segment 3:Overland Sheet Flow Ry TR -SS, <300 -ft 0.010 53 0.100 3.3 16.0 OAO•UAP s.ompuceo ¢_ User -Entered Tc= ll.0 B Determine the average rainfall Intensity (l) from IDi Curve based oa 1 2.411 In/ 9Calculate the Post -Development peak discharge(QPeak) Qpr,s 0.85 ds to Calculate peak Own, (Uses 2 -yr storm) Ck a 11.35 ds _ (used for 5/G Trap throat velod y, WQstorm conveyance system sizing ) V=CI(Tc=60)Ax3600 12 Calculate own (for siring WQ facilities) Enter Percentile Storm I(80th percentile =0.34In) Hath0.34 In Enter WQVolume(V"=Cxi(from line above) DOR) V11,. 419 ft' 13 Detention:Approved Discharge Rateto Surface Waters lifappllcable) cfs 14 Volume summary Surface Storage: Pond - - WQ Pond Poremy♦l5%sediment. V 481 ft' Primary Treatment/5mmge Basin V 998 k' Subsurface Storage: Seepage Red Volume Without Sediment Factor V 1,417 W See RM1104 Seeoaee Bed to Desiea Volume With Sediment cahnued Ru.wGmaH(tiem. be uo I,a am, fwe. 0"tM2 PivnBtl[ fno.,ol^{" e 0--r— ­ao 810691 Wb •CFLprryp4d3e4M U9-0 G)4 nmmnm a.�Plr'ftny:vi o.ar"a, nao_a.vs �a rat peraf 915 Gr2 �f+!Tent d.xlnng 5,. - i lv-urrA en3 Cnrrv+srarxr e z—� 9 G gotRAJ -09U tr'.eteries o15 Alavarvmds n30 -0 is Sartnrnl yantran a.4a-040 . Un..rF,rovtC.cgcS OAO•UAP xue<m ap6sir. Pei (9rX.;eM PA$ nrak 993 Ao 4 ov5 tufas. SaedY seB sad T", s;ape A e z—� fro 0.2, gotRAJ U11(015 rf E2e d�fE :}4a a1? all OEn 033 C.la 0E3 0.39 A eraked f,ert. A2E P:\C2013 024 Jump Creek -Trilogy\100 Phase 1\Comt,urtmr\Calcs\39565191 12/9/2014,10:58AM Version 2.4, July 2014 ACHD Calculation Sheet for Sand/Grease Traps NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. ISteps for Sand/Grease Trap Velocity Calculation _ User input in yellow cells. To accept default value type = in yellow cell and point to computed cel 1 Project Name lump Creek No. 1- Temp SG Trap ill tnter number or 1[ 2eference for Throat widths (inch) Baffle Throat Boise Velocity Is the Vault Size Number of Peak Flow Spacing width Area (ft) 0.5fps Velocity SIG Traps Q-cfs inch inch 48.0 max. ok? 1000 G 1 1 0.85 20 48 1 6.67 1 0.13 60 2eference for Throat widths (inch) P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Calcs\39615191 12/9/2014, 10:58 AM Version 7.4, July 2014 ADS Boise Lar -ken WQU, Vault BMP 16 1000 G 48.0 50.5 n/a 1500 G - 60.0 61.5 n/a NQU1000 n/a n/a 60 NQU1500 n/a n/a 60 P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Calcs\39615191 12/9/2014, 10:58 AM Version 7.4, July 2014 ACHD Calculation Sheet for Sizing Ponds NOTE: This worksheet Is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations In order to be accepted. Steps for Sit Ing Ponds: Sltefor forebay and pHnt lhehsb4 for prlmery itomgejlromantic basin. User input in yellow cells. To accept default value type= In yellow cell and point to computed cell 1 Project Name lump Creek No. 1- Temp Drainage Pond H2 4 Design Storm 100 5 Weighted Runoff Coefficient C - 0.60 6 Area A (Acres) 0.57 all's 7 Approved Discharge Rate(if applicable) 0.00 co 8.1-WQ Pond Facet, +l5%sediment V 1,630- R Tdogte between Forebay and primary Busin, eater data and prinffor curb .y 9AsriY R,AS'xF 0 2539.06 3.000 Minei, 0.0 Override ..................... ss,3wi 9. Select ForebaySbape 5 -Irregular 10 Width of Forebay. Bottom W 15.0, 15.0 it 11 Length of Forebay Bottom - L 35.0 35.01ft 12 Side Slopes(HAf H:1 3.00 3.00- 13 Enter Bottom Elevation 2538.06 2538.06 it 14 Enter Tap Bank Elevation 2540.56 2540.560 15 Enter Water SurfaceEleyatlon RAISE) 2540.06 2540.06 it 16 Distance Between Forebay and Primary Basin (blank if na) JIM it 17 Enter Elevation Her. 0.0 it 18 Enter High Groundwater Elevation 2533.50. 2533.50.@ 19 Mia Freahoard Roun.ment ELM 20 Freeboard Provided —0.501 31. Sand Bottom for Forebay Infiltration? Deggn kgIt UOm Rate, Enter o for no Infiltration 22 Sand Wind.. Area for Forebay Enter O for no infiltration. Storm Duration I initial Unkto. G,tt 9.vU Qvi:s1 r2,v6 NkA qJ lNl 6 6 ia/br Not,:ihllratiaq re0ufmdif bottom sloped%oro outflow As,. 140 140 02 RunoNperc Vol P—Day Total Max Vol ... _. _. _ Saved Stage (it) Pond Side Slope Widthat New Stage (it) (H:V) Stage lhl Pond lengthat Stage lit) Surface Area Aat Stage (it') saved Surface Area A at Stage (W) Surfam Area A at Stage B,21 OVERID6 Volume Below Stage(it') 2538.06 2530.06 3.000 15.0 35.0 Override 525.00 0 2539.06 3.000 0.0 0.0 Override 061.00 2540.OG 3.000 - 00 OA Override 1269.00 -1175&: '. 2.00 ftdepthfarstarage 24 Does_ (orebay have capadty2 25 Time to dra6sforebay 90%vdtume in 24 hours minimum 210fmuri OR STORAGE OR P:\C2013-024 Jump Creek-TrilogyARO Phase 1\ComtructImACalcs\39665191 12/9/2014, 11:00 AM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the uniform) Method calculated for post -development j Calculate PosbDevelopment Flows (far pre -development flows, Increase number of storage facilities to create new tab) User Input in yellow cells. To accept data ult value type = in yellow cell and point to computed cell 1 Project Name 1 -Anne Entrance North 2 Is area drainage basin map provided? (map must be included with stormwater calculations) 3 Enter Design Storm For Volume (100 year per ACHD policy) 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) Acres Acre 6 Determine the Weighted Runoff Coefficient (C) C=((C1xA1)+(C2xA2)+ICnxAn))/A Weighted Avl YES 100 17 Click to Show More 5u1bbasms I+1 SubbasinSubbasin 1 3.11 Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin2 3 4 5 6 ] 8 9 10 0.10 Mph iamb• 12 Calculate Vwq(for sizing WQ facilities) 050-075 R'vvzAnai U.'a0 Enter Percentile Storm 1180th percentile = 0.34 in) 0.25 O 30 80th 0.10 Enter WQ Volume (Vwo= Cxi(from line above) xAx3600) Van 116 w 13 Detention: Approved Discharge Rate to Surface Waters (if applicable) cis 0.95 Heavyareas 09p PUL-, czrzzienzv 010-025 0.95 0.20-035 - Rautnad Va,d areaz 0.20-040 m anva ....e areal 7Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default uacalnras _ 30 min (logo 8 Determine the average rainfall Intensity (I) from IDF Curve based on 1 3.11 in/hr 9 Calculate the Past- Development peak discharge(QPedk) Q lk 0.30 cis 10 Calculate peak Qwq(uses 2 -yr storm) Own 0.31 cfs (used for SIG Trap throat velocity, WQ storm conveyance system sizing ) aH�d2=h.nl 11 Calculate total runoff vol IV)(for sizing primary storage) V 994 It V= Ci (Tc=6D)Ax3600 Mph iamb• 12 Calculate Vwq(for sizing WQ facilities) 050-075 R'vvzAnai U.'a0 Enter Percentile Storm 1180th percentile = 0.34 in) 0.25 O 30 80th 0.341. Enter WQ Volume (Vwo= Cxi(from line above) xAx3600) Van 116 w 13 Detention: Approved Discharge Rate to Surface Waters (if applicable) cis Surface Sturagei Pond WQ Pond Forebey+l5%sediment V 134 it _ Primary Treatment/Storage Basin V 277 it, 5 uhsorface Storage Seepage Bed -Volume Without Sediment Factor - V 394 it, See BM PO4 Seepage Bed for Design Volume With Sediment P:\[2013-024 Jump Crack -Trilogy\100 Phase 1\Constmction\Calcs\3971S391 Version 7.4, July 2014 '__-Eslimated Rwwlf cvelf enb tai V.kan svlf e, - Type of svoso, I RIn."CneffkRmM -c- ss 0.111oaui.t er:9 attA} 016033 Urban ntrlF.ec±heod azeas 039-O JO aH�d2=h.nl Mph iamb• 050-075 R'vvzAnai U.'a0 0.25 O 30 Annes.tA d.lh, oleos - -D30 .4.no !and acmmerna! tulrarea} 050 Heavyareas 09p PUL-, czrzzienzv 010-025 91src,6wdf 0.20-035 - Rautnad Va,d areaz 0.20-040 m anva ....e areal 0,10-0.30 $treats Azphyt 995 Cnocrtte 905 BBek ,�... 0.85 9ovfa.'p�y^->...-�, 095._.... ra,l,n 56", COO IOi`tYPc 1400. A C p 11. b,3q 004 O0I 0-1J 9.13 ANAs. z! &11 009035 Oa !3ee,'6a 0.13 0 I 0.2.3 0.28 I Adapted from ASCE 121912014,3:21 PM ACHD Calculation Sheet for Sizing Rural Swale/Borrow Ditch NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. i,,, ,_ Stepsfo[ sizing Rural Swale User Input in yellow cells. To accept default value type =. in yellow cell and point to computed cell 1 Project Name lump Creek No. 1 -Anne Entrance North n tnrer numner or Kura] awaies/borrow uucnes lee max) 0.00 ft/ft u 3 Design Storm 100 8 Sand Window Width Weighted Runoff Coefficient C 0.95 Link to:(Ovt 4 Area A (Acres) 0.10 acres QV14 Approved discharge rate for the given storm (if applicable) 0.00 cfs Qv16 1 5 Design Vol With 0% Sed for Swales V 394 ft, O V17 6 Length of Swale 146 it 13 Calculate cross-sectional area Am 7 Sand Bottom for Infiltration? (Note: infiltration required if Longitudinal Slopecl%) 0.00 ft/ft Design Infiltration Rate 18 Enter Total Number of Driveways 6 in/hr 8 Sand Window Width 19 Enter Total Length of all Driveways 2.00 ft 9 Set Swale Bottom Width 6 0.00 ft 10 Set Swale Top Width 21 Adjusted Length of Infiltration. Area 8.00 it 11 Set Swale Depth y 1.00 ft 12 Swale Side Slopes H:1 Sxs 4.00 13 Calculate cross-sectional area Am 4.00 ft' Axs=y'z+by 90% volume in 24 -hours minimum OK 14 Total Swale Capacity Without Driveways 584 ft' 15 Does it Have Capacity? OK 16 Time to Drain 2.7 hr 90% volume in 24 -hours minimum OK Check Swale With Driveways 17 Avg. Driveway Fill Slope in Swale (H/V) 0.00 ft/ft 18 Enter Total Number of Driveways 0 ea 0.0 ft' Deduct driveway slope 19 Enter Total Length of all Driveways 0 it 0.0 fta Deduct driveway length 20 Lost Swale Length From Trees, etc. 0 ft 0.0 fta Deduct other 21 Adjusted Length of Infiltration. Area 146.0 ft 22 Excess Capacity=Storage- Deductions - Runoff Volume 190.4 ft' 23 Is Capacity Good? YES 24 Time to Drain _ 6.0 hr 90% volume in 24 -hours minimum OK P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\[alts\39965191 12/9/2014, 3:30 PM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in fadlities that meet or exceed these calculations in order to be accepted. _ Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre,development flows, Increase number of storage facilities to create new tab) To _.. - _ _ User input in yellow cells. To accept default value type = in yellow cell and point to computed cell 1 Project Name lump creek Subdivision No. 1- Anne Entrance South 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Sturm For Volume(100.year per ACHD policy) 100 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) Acres Acre. 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)rjC2xA2)t(CnxAn)I/A Weighted Avl 17 Click to Shaw Mnre Suhhaainn n Subbasln 3.11 -in/hr Subbasln Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasln2 3 4 5 6 7 8 9 10 0.10 ➢60.n 71 Fesltlential lrulnl) Q.s-010 AOa'rr 44 AwaItu:4'w e» 0.10 —` tMuartat >ad E.,ow tnh,sacm Q-0 0.95 t1.r9 Psrks, 2M1tle,i. 0.14-0.25 P1s%srpenSt 0.95 R311rpad %rrd arev 020-9 Ao uuimllusd amus 0.]0.0.30 7 Calculate Overland Flow Time of Concentration in Minutes (Tr) or use default U»talwa:e 1G min (norm 8 Determine the average rainfall intensity (1) from IDF Curve based on 1 3.11 -in/hr 9 Calculate the Post -Development peak discharge(QPeak) Qces 0.30 cis lu Calculate peak Qwq loses 2 -yr storm) (hm 0.11 cfs (used for S/G Trap throat velocity, WQ storm conveyance system sizing ) 11 Calculate total runoff vbl(V) ff., sizing primary storage)- V 394 eft V=Ci (Tc=60)Ax3600 - 12 Calculate Vwq (for sizing WQ facilities) Enter Percentile Storm I(BOth pegemile=0.34 in) _ Roth 0.34 in Enter WQ Volume (Vwu' Cxl(from line above) x 0600) Vwo 116 ft' 13 Detention: Approved Discharge Rate to Surface Waters (if applicable) bis SUrfaCe Storage: Pond WR Pond Forebay, 15%sediment V 134 k' Primary Treatment/Storage Basin V 277 ft' Subsurface Storage: Seepage Bad Volume Without Sediment Factor. V 394 ft' See BMP04 Seepage Bed for Design Volume With Sediment P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\C➢nstr dm.\Calc,\39865191 Version 7.4, July 2014 Estimated Runoff cut&&nb iw veeiws svdues Type of Sort.. Runoff C.0khmu "c- euuness nowneas+utas O:To09s Ul bdr)nlijh60{hppfl E(eaF 050.070 van#s-nal Rnattfamki ➢30.050 atpn:aamdy ➢60.n 71 Fesltlential lrulnl) Q.s-010 AOa'rr 44 AwaItu:4'w e» 070 —` tMuartat >ad E.,ow tnh,sacm Q-0 H4arya". t1.r9 Psrks, 2M1tle,i. 0.14-0.25 P1s%srpenSt 030-035 R311rpad %rrd arev 020-9 Ao uuimllusd amus 0.]0.0.30 suers' Asphaq 095 canvate 095 Back 684 coach Heh15 s3n0Y"o SOii ftiOe slope A d C P Rat p7x IInt ➢Ay ➢11 0.15 Avrra4e }.6t4 Sfeap>6i Op9 OIT ➢]3 O.eO 6.53 018 o P3 0.28 I ACapted/r Orn AKE 12/9/2014, 3:25 PM ACHD Calculation Sheet for Sizing Rural Swale/Borrow Ditch NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. steps for Sizing Ruraf•�,_ User input in yellow cells. To accept default value type = In yellow cell and point to computed cell 1 Project Name Jump Creek No. 1 -Anne Entrance South tme, 3 Design Storm 1uu Design Infiltration Rate Weighted Runoff Coefficient C 0.95 Link to: QVi3 4 Area A (Acres) 0.10 acres [V1-_•� b 0.00 it QV75 j Approved discharge rate for the given storm (if applicable) 0.00 cis QV16 5 Design Vol With 0% Sed for Swales V 394 ft3 2vv 6 Length of Swale 146 it 13 Calculate cross-sectional area An 7 Sand Bottom for Infiltration? (Note: infiltration required if Longitudinal Sloped%) Design Infiltration Rate 6 in/hr 8 Sand Window Width 2.00 ft 9 Set Swale Bottom Width b 0.00 it 10 Set Swale Top Width 8.00 ft 11 Set Swale Depth y 1.00 ft 12 Swale Side Slopes H:1 Sxs 4.00 13 Calculate cross-sectional area An 4.00 ft' Axs=Y z+6y 14 Total Swale Capacity Without Driveways 584 ft3 15 Does it Have Capacity? OK 16 Time to Drain 2.7 hr 90% volume in 24 -hours minimum OK Check Swale With Driveways 17 Avg. Driveway Fill Slope in Swale (H/V) 0.00 ft/ft 18 Enter Total Number of Driveways 0 ea 0.0 ft" Deduct driveway slope 19 Enter Total Length of all Driveways 0 it _ 0.0 ft' Deduct driveway length 20 Lost Swale Length From Trees, etc. 17 it .(68,0) ft' Deduct other 21 Adjusted Length of Infiltration Area 146.0 it 22 Excess Capacity=Storage- Deductions - Runoff Volume 122.4 ft' 23 Is Capacity Good? YES 24 Time to Drain 6.0 hr 90% volume in 24 -hours minimum OK P:\C2013-024 Jump Creek - Trilogy\100 Phase 1\Construction\Calcs\39915191 12/9/2014,3:30 PM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHO checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result In facilities that meet or exceed these calculations In order to be accepted. Steps for Peak Discharge Rete using the Rational Method calculated for post)]evelopment - ,Ca lculatePost-Development Flows (for pre -development flows, increase number of storage facilities to create new tab) - -� User input in yellow cells. To accept default value type = in yellow cell and point to computed cell I Project Name Jump Creek Subdivision No. 1- Daphne Entrance North Gl 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm For Volume(100year per ACHD policy) 100 4 Enter number of storage facilities (25 max) Uvs [awhte 17 [ION.Click to Show More Sobbazinz 5 Area of Drainage Sulmmin (SF or Acres) Acres Acre; 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Av( Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 6 7 B 9 to 0.45 _..025.040. 75 044 925 Se'd_nbsl ocmD. Ape�l¢A�tdmlhnx areas OAS nnnsmbi and enm ot,,so S rma., 080 0.95 0 so P,u4_ Lxrles 0,10-025 PIfYa*rendt 0.95 Aaa dy_darem 0.20040 UI`Lmplpe`LF NLas 010.010 7 Calculate Overland Flow Time of Concentration In Minutes (Tel or use default 10 in ,ase ,ono... —ve ua.,ea... 9 Calculate the Post -Development peak discharge(QPeak) Qn. 133 cis' SU Calculate peak Qwq(uses 2 -yr storm) Qwn 0.52 cis (used for SIG Trap throat velocity, WQ storm conveyance system sizing ) V=Ci(Tc=60)Ax3600 12 Calculate Vwq (for sizing WQ facilities) - EnterPercentileStorml (Both percentile =(134 in) Both 0.34 in En[erWQVolume lV,,c'Cxi(fmmBmeabove)xAx3600) - Vwo 523 fir 13 Detention: Approved Discharge Rate to Surface Waters (if applicable) cis So, face 5t mage: Punt WQ Pond Forebay+l5%sediment V 602 it - Primary Treatment/Storage Basin V - 1,248 it Subsurface Storage: Seepage Bed Volume Without Sediment Factor - V 1,771. it' Sar AMPM rr,oaar And ini nation VnhlmA With Sadimant P:A2013-024 Jump Creek Trilogy\100 Phase 1\Construction\[alts\B5W400 Version 7.4, July 2014 E'limazed Rwwii [oelfrckalr for V. was S A., pe Ofs,ofar! mason CMflkl nm, C- BUAnt» Dp'n'nI91iT M1.1 07¢.095 Urban nN;hborhsacl 054 070 sme.zr rrso 0.35-A NI ffamlly Mu¢�dxmlly _..025.040. 75 044 925 Se'd_nbsl ocmD. Ape�l¢A�tdmlhnx areas 6.70 nnnsmbi and enm ot,,so S rma., 080 H,.w nz., 0 so P,u4_ Lxrles 0,10-025 PIfYa*rendt 020-0.35 Aaa dy_darem 0.20040 UI`Lmplpe`LF NLas 010.010 #4reets t 095 C:miccas ret[ 0.95 9rlck des 4.1s 095 ,411, Sind, 2011 scan!YFe 51.00 A p C P Plot0 zo 0.04 467 0.t1 0.15 nn<nge 2-..qa 0.09 012 015 0,20 0.23 019 033 028 I Adaptedfl rl .ASC: 12/10/2014, 4:21 PM ACHD Calculation Sheet for Sizing Rural Swale/Borrow Ditch NOTE: This worksheet is intended to be a guideline to standardize ACRD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sizing Rural Swale User input in yellow cells. To accept default value type = in yellow cell and point to computed cell 1 Project Name Jump Creek No. 1- Daphne Entrance North urner numuer m nurai nwaies/morrow urines Weighted Runoff Coefficient C 0.95 Link to: QV13 4 Area A (Acres) 0.45 acres 19 EnterTotal Length of all Driveways 9,y14 [Qv -15 Approved discharge rate for the given storm (if applicable) 0,00 cis 17 ft QvJ6 5 Design Vol With 0% Sed for Swales V 1,771 it, QV17 6 Length of Swale 568 ft 23 Is Capacity Good? ---YES' 7 Sand Bottom for Infiltration? (Note: infiltration required if Longitudinal Slope<7%) 24 Time to Drain 6.9 Design Infiltration Rate 90% volume in 24 -hours minimum 6 in/hr 8 Sand Window Width 2.00 ft 9 Set Swale Bottom Width b 0.00 ft 10 Set Swale Top Width 8.00 ft 11 Set Swale Depth y 1.00 it 12 Swale Side Slopes 11:1 Sxs 4.00 13 Calculate cross-sectional area An 4.00 ft' Am=y'z+by 14 Total Swale Capacity Without Driveways 2,272 it, 15 Does it Have Capacity? - OK 16 Time to Drain 3.1 hr 90% volume in 24 -hours minimum OK Check Swale With Driveways - 17 Avg, Driveway Fill Slope in Swale (H/V) 0.00 ft/ft 18 Enter Total Number of Driveways 0 ea 0.0 ft' Deduct driveway slope 19 EnterTotal Length of all Driveways 0 ft 0.0 W Deduct driveway length 20 Lost Swale Length From Trees, etc. 17 ft (65,0) -ft' Deduct other 21 Adjusted Length of Infiltration Area 568.0 ft 22 Excess Capacity=Storage- Deductions - Runoff Volume 432.8 ft' 23 Is Capacity Good? ---YES' 24 Time to Drain 6.9 hr 90% volume in 24 -hours minimum ---OK-- P:\C2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Calcs\8557400 12/10/2014,4:21 PM Version 7.4, July 2014 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. ' Stepiftlr Peak Discharge Rate using the Rational Method calculated for post-devolopment r ---� Calculate Post -Development Flo. (for pre -development flaws, increase number of storage facilities to create new tab) - Userinputlnyellowcells. To accept default value type= in yellow cell and point to camp Wed cell - - 1Project Name Jump Creek Subdivision No. I- Daphne Entrance South 2 Is area drainage basin map provided? YES )mop most be included with shormwater calculations) 3 Enter Design Storm For Volume (100 -year per ACHD policy) 100 4 Enter number of storage facilities (25 max) 5 Area of Drainage Subbasin (SF or Acres) Acres Acre 6 Determine the Weighted Runoff Coefficient (C) C=11C1xA1)+(C2xA2)+(Coxgn)(/A Weighted Avl 17 Subbasin 3.11. in/hr Suhbasln Subbasin Subbasin Subbasin Subbasin Subbasin SubbasinI Subbasin 1 Subbasin 2 3 4 5 6 7 B 9 Io 0.43 P to o a -i Qe Id nbl lrmaq 035.040 Apl-ruled dxw06n,ereaS 0.43 mdvztnal aed cao,'O,ol UE4tareaf Ob0 0.95 QqB psk; aurelerteS 0,10-0: Y5 Pkvnpunll 0.95 Rallroady dareas 030-041+ Unimproaed aeeat 010.030 7Ca1culateoverland Flow TimeofConcentrationin Minutes(Tc) or use default uiWfalo -- lomin {to od .. veaonn,rc lne average mmran m[en5lry pl ROm 1UY LUrve based on 1 4 Calculate the Post -Development peak discharge(QPeak) Qas 3.11. in/hr 10 Calculampeak Qwq(uses2-yrstmm) Qwq 1:27 cfs 749 ­oft (used for S/G Trap throat velocity, WQ storm conveyance system sizing ) 11 Calculate total runoffvol (V) (fgrsaing primary storage) - V 1,693 jr, V=Ci(Tc=60)Ak3600 12 Calculate Vwq (for sizing WQ facilkies) Enter Percentile Storm I(Bath percentile -0.34 in) Ruth 0.34 In Enter WQ Volume(Vsvq- Cxl(from line above) xM3600) Vivo 500 'ft, 13 Detention: Approved 'Discharge Rate to Surface Waters(if applicable) :cis 14 Volume Summary - Surface Storage: Pard WQ Pond Forebay+l5%sederent Primary Treatment/Storage Basin - Sol ..0-tt a Storage: SeepageBad Volume Without Sediment Factor V 575 it, V - 1,193 ft' V 1;693 ft' um, Weh Sedimrnr- - P:\C2013-024 Jump Creek- Trilogy\100 Phase 1\Con5tmction\Calcs\8607400 Version 7.4, July 2014 EUudld Ruacff C.Hk ents tot ver'ive, sudwes Type I Bar." -C' 9.AO1 t5 Dpwnts. a eas. 01p 04i urban Oolhbalhaad arms 030-030 acitzka SnQa.ba!Ihy O a35 OW r,G,p..fama; P to o a -i Qe Id nbl lrmaq 035.040 Apl-ruled dxw06n,ereaS 030 mdvztnal aed cao,'O,ol UE4tareaf Ob0 M{av}a,tai QqB psk; aurelerteS 0,10-0: Y5 Pkvnpunll 020-03S Rallroady dareas 030-041+ Unimproaed aeeat 010.030 strxan A:phatt 0 a cmcrcte 0:9S ' Wick 0.95 RUYi1S 0.95 ileldi. SbfiOf i011 Sall rYpe sWpe 4 3 P Flat OQM Op t 40a 0.11 O.tS Aaartye3 Ali 0.09 4SS 015 OI?9 p a6B o.i5 a.sa pzs o:xa I ABactealznm-su 12/10/2014, 4:22 PM ACHD Calculation Sheet for Sizing Rural Swale/Borrow Ditch NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result In facilities that meet or exceed these calculations in order to be accepted. Steps for Sizing Rural Swale User input in yellow cells. To accept default value type = in yellow cell and point to computed cell 1 Project Name Jump Creek No. 1- Daphne Entrance South -J-1 IIUIIIU�F U6 north awaiesiaormw uitcnes Its max) 0.00 ft/ft 4 18 Enter Total Number of Driveways 3 Design Storm 100 19 Enter Total Length of all Driveways 0 ft Weighted Runoff Coefficient C 0.95 Link to: QV13 4 Area A(Acres) 0.43 acres QV14 Approved discharge rate for the given storm (if applicable) 0.00 cfs 23 Is Capacity Good? rQV14—� QV15 5 Design Vol With 094 Sed for Swales V 1,693 ft' QV17 6 Length of Swale 557 ft 7 Sand Bottom for Infiltration? (Note: infiltration required if Longitudinal Slope<196) Design Infiltration Rate 6 in/hr 8 Sand Window Width 2.00 ft 9 Set Swale Bottom Width b 0.00 ft 10 Set Swale Top Width 8,00 ft 11 Set Swale Depth y 1.00 ft 12 Swale Side Slopes H:1 Sxs 4.00 13 Calculate cross-sectional area An 4.00 ft' A�=yzz+by 14 Total Swale Capacity Without Driveways 2,228 fit' 15 Does it Have Capacity? OK 16 Time to Drain 3.0 hr 90% volume in 24 -hours minimum OK Check Swale With Driveways 17 Avg. Driveway Fill Slope in Swale (H/V) 0.00 ft/ft 18 Enter Total Number of Driveways 0 ea OA W Deduct driveway slope 19 Enter Total Length of all Driveways 0 ft 0.0 fta Deduct driveway length 20 Lost Swale Length From Trees, etc. 17 ft (68.0) ft' Deduct other 21 Adjusted Length of Infiltration Area 557.0 ft 22 Excess Capacity=Storage- Deductions - Runoff Volume 467.5 ft' 23 Is Capacity Good? YES 24 Time to Drain 6.8 hr 90% volume in 24 -hours minimum OK PAC2013-024 Jump Creek -Trilogy\100 Phase 1\Construction\Calcs\8657400 12/10/2014, 4:23 PM Version 7.4, July 2014