Loading...
Traffic Impact Study SouthridgeDate Yr. 0 (o Mo. 04 Day Employee or Agency I ( 5 Project Number 6607-1 ' -tom to Va*\., Traffic Impact Study South Subdivision April 14, 2006 Thompson Engineers 7699 West Riverside Drive, Boisq Id 83714 (208)853-4410,(208)344-5097 (fax) frklfric /Inpact 'Study Thompson Engineers South Ridgo, Mondial) TABLE OF CONTENTS EXECUTIVESUMMARY ................................................. I ....................... I ............. I ............. - ............... I.— I INTRODUCTION.............................. ....................... I ..... I ......... I ....... I .... I ......... I ..................... ..................... 2 PROPOSEDDEVELOPMENT............................. .... ............................... ................................................... 3 STUDYAREA CONDITIONS ..................................... ..................... ....... ...... ......................................... 6 6 LandUse ........................................................................................................ .......................................... EXISTINGCONDITIONS ...................... I ...................................... I ............. I ........................................ ...... 6 TrafficVolumes............................................................................................................. .......................... 6 RoadS stem .......... ................. ...................................................... 9 j ...................................................... SystemImprovements ......................................................................................... ...... ........... STUDYPERIOD ... ....... ....................... I ......................... I ............ I ........................... ........ _ BuildOut Year .......................................................................... ............................................ HorizonYear ....................... ................ ................................................. ................... PROJECTEDTRAFFIC .... ............................................................................... ....................... BackgroundTraffic ................................................................................................................ TripGeneration ................ ................................................................................ ....... ............ TripDistribution .................................................................................................................... TotalTraffic ..................................... ............................................................................. ....... TRAFFICANALYSIS ........................... I ..................................... — ................................... ....... Capacity Analysis and Level of Service ......................................................... ...................... Roadways................................... ... - .......... ................................ ..................................... Mitigat ion................................................................................ .............................................. ..................9 .................10 .................10 .................10 .................10 .................10 .................15 ................. 16 .................16 .................26 .................26 ...........27 .....27 SiteCirculation ..... ...................................................................... ........................ .................. .............. 27 DISCUSIONS.............................. I ............................ ..., ... I .... ........... I .............. I ...... -.1 ........................ I ....... 29 CONCLUSIONS................................ ................ I ................ I ...................................................................... 30 Thompson Traffic Impact Study p Engineers Sotith Ridge, Meridian EXECUTIVE the proposed South Ridge development is a mixed-use development, the details of which have not been finalized, and will depend on many SUMMARY things, including the findings of this report. The preliminary plan indicates the development will consist of the following: t 785 Single Family Dwellings 6 160 Apartments it An Elementary School with approximately 600 Students I[ t04,000 SF of specialty retail and commercial space ! 88,15 SF of office space B A day-care facility The area of influence is anticipated to be Overland Road, particularly the intersections of Overland Road and Ten Mile Road, and Overland Road and Linder Road. The intersections of Overland Road and Stoddard Road, and Overland Road and Meridian Road are scheduled for reconstruction by ACHD in FY 2007. These improvements are included in this report as part of the transportation system, but are not studied for impact. An interchange on Interstate 84 at Ten Mile Road is currently under study. This interchange is not currently on the ITD State Transportation Improvement Plan, but it is included in the Garvey Bond plan currently being developed by ITD. The construction of this interchange is included in this report. An overpass over Interstate 84 at Linder Road has been proposed. Right-of-way has been reserved for this construction on both sides of the Interstate. However, this project is not included in any State or regional transportation plan at this time. This project is not included in this report. The following arc the principal find ings and recommendations of the study: 9- The proposed development is projected to generate an average daily traffic of 10,200 new, external vehicle trips per day, of which 634 will occur during the AM peak hour and 894 will occur during the PM peak hour. It The proposed development will access the transportation system primarily through Overland Road. The primary intersection which will be impacted is Overland Road and Linder Road. This intersection is scheduled for reconstruction in 2007 by ACHD It During the AM Peak Hour, the Overland and Linder intersection will operate at LOS B tinder 2010 background traffic conditions, and LOS C under 2010 total traffic conditions. It will operate at LOS 13 under both the background and total traffic conditions for 2025. This is due to the construction improvements at the intersection, and the shill of traffic patterns caused by the construction of the "fen Mile Interchange. During the PM Peak I lour, the Overland and Linder intersection will operate at LOS C under 2010 background traffic conditions, and LOS D under 2010 total traffic A Traffic Impact Study Thompson Engineers South Ridge, Meridian conditions. it will operate at a similar LOS under both the background and total traffic conditions for 2025. The intersection of Overland and Ten Mile will require improvements to operate at acceptable levels of service with the addition of traffic from this project. Adding lanes to the intersection is costly, if not impossible, and will not result in an acceptable level of service. If the intersection is converted to an All -Way stop controlled intersection, an acceptable level of service can be obtained. It Overland Road and Linder Road have the capacity to absorb the traffic generated by the proposed project. A left turn lane should be constructed on Overland Road. A left turn lane in not necessary on Linder Road. Table 2A - LOS Summary AM Peak Hour Conditions 2005 2010 2025 Existing Background LOS Delay LOS I Total Back round Total Delay LOS Dela LOS Delay LOS Delay LOS Delay LOS Overland and Linder 17.3 C 21.6 C 100.4 F 10.1 B 16.1 C Overland and Ten Mile 16.5 C 22.6 C 36.7 E 13.9 B Mitigated 13.7 B West Central Entrance 13.6 B 13.6 B West Entrance 13.5 B 17.1 C B East Entrance 11.8 B West Central Entrance C 15.8 C 17.3 C 11.4 12.6 B East Central Entrance East Entrance B South Linder Entrance 18.3 17.6 C C 10.9 14.2 17.3 B C North Linder Entrance 14 8 1 11.2 B 11.1 B South Linder Entrance 10.6 B 10.8 B Ten Mile Entrance 11.7 1 B 14.2 B Table 2B - LOS Summary PM Peak Hour Conditions 2005 2010 1 2025 Existing Back Iround Total I Background Total Delay LOS Delay LOS Delay LOS Delay ILOS Delay LOS Overland and Linder 10.8 B 11.5 B 20.2 C 13.7 B 12.2 B Overland and Ten Mile 29.7 D 193.6 F 425 F Mitigated 40A E West Entrance 13.9 B 13.7 B West Central Entrance 13.6 B 13.6 B East Central Entrance 13.5 B 13A B East Entrance 19.7 C 15.8 C North Linder Entrance 11.4 B 11.9 B South Linder Entrance 10.5 B 10.9 B Ten Mile Entrance 14 8 1 1 14.2 1 B Ca'!'lsYlprojecr.+•12p06Archive105-h1 JIJ,S�adi (!it/Irloas4Saud� Nf(l "17Sty�dtr�c.rfoc Page 2 of 30 7"taffic hnpacl Shitty Thompson = Engineers Sarah Ridcfe, Meridian Thompson Engineers, Inc. has been retained to prep." a traffic impact INTRODUCTION study for the proposed South Ridge development in Meridian, Idaho. The project is located in the southwest quadrant of the intersection of Overland Road and Linder Road in Meridian, approximately as shown in Figure 1. The purpose of this study is to evaluate the anticipated traffic impacts resulting from the project and make recommendations for mitigation of the impacts. In particular, the scope of the study includes the following; I Trip Generation of the proposed development it Trip distribution and traffic assignment of the site generated traffic lk intersection capacity impacts at the intersection of Overland Rd and Linder Rd. If Intersection capacity analysis at the proposed intersection of Overland Road and Ten Mile Road. V Intersection Capacity of the six site access points. k On site average daily traffic volumes The proposed development is a mixed-use development, the details of PROPOSED which have not been finalized, and will depend on many things, including the findings of this report. A preliminary site plan is shown DEVELOPMENT in Figure 2. The preliminary plan indicates the development will consist of the following: I' 785 Single Family Dwellings 1 160 Apartments An Elementary School with approximately 600 Students 104,000 SF of specialty retail and commercial space 88,15 SF of office space M A day-care facility C:ITh'hprojecIA2006Archive105-14JUSonthlliUldocsISawhHill TlSapdote.doc Page of 30 Traffic impact Study Thompson Engineers South Ridge, Meridian re 1 P 1M Pine Ave'0 C: Vel Franldin Rd z u) s L Q5 L' �<'•ip. andl.+r nc. s� Ip icrs- ql ngh�<. resxruea _^-_ _ E Overland 69- E Victory Rd C:P E11profecIA2006ArchivelOSJAJL/SouthHlllldoesWoud, Hill Mupdate.doe Page 4 of 30 Y Meridian 13 E Y n In �, r- M w w E Fr 0 r 6 E Overland 69- E Victory Rd C:P E11profecIA2006ArchivelOSJAJL/SouthHlllldoesWoud, Hill Mupdate.doe Page 4 of 30 1�j (.'.-_,ects_6Archiveln4JI-I_h fliffidoe.Moulit III/I TIS1111(lale.doc Page 5 of 30 . z� \, / /� } �\ 1�j (.'.-_,ects_6Archiveln4JI-I_h fliffidoe.Moulit III/I TIS1111(lale.doc Page 5 of 30 Traffic Impact Study Thompson Engineers South Ridge, Meridian Study Area STUDY AREA The area of influence is anticipated to be Overland Road, particularly CONDITIONS the intersections of Overland Road and Ten Mile Road, and Overland Road and Linder Road. The intersections of Overland Road and Stoddard Road, and Overland Road and Meridian Road are scheduled for reconstruction by ACI -ID in FY 2007. These improvements are included in this report as part of the transportation system, but are not studied for impact. An interchange on Interstate 84 at Ten Mile Road is currently under study. This interchange is not currently on the ITD State Transportation Improvement Plan, but it is included in the Garvey Bond plan currently being developed by ITD. This interchange is included in this report. An overpass over Interstate 84 at Linder Road has been proposed. Right-of-way has been reserved for this construction on both sides of the Interstate. I lowever, this project is not included in any State or regional transportation plan at this time. This project is not included in this report. Land Use The site is currently zoned as agricultural. In the City of Meridian Comprehensive Plan, the current use is shown as agricultural. The proposed land use in the Comprehensive Plan includes medium density housing and a neighborhood commercial center. EXISTING Traffic Volumes CONDITIONS Existing traffic counts were obtained at the intersection of Overland Road and Linder Road, and Overland Road and Ten Mile Road during the week of June 9, 2005. AM and PM counts were taken. Reduced copies of the traffic counts for existing conditions are shown in Figures 3A -D, Traffic was generally light at both intersections. No delays or queues were observed at the intersection of Overland Road and Linder Road. Queues were observed at the intersection of Overland Road and Ten Mile Road. In the AM peak hour, small queues were observed on southbound Ten Mile Road as vehicles waited to turn left onto Overland Road. These queues usually dissipated quickly. In the PM peak hour, westbound Overland Road developed a queue that was quite long and was very slow to dissipate. Daily traffic counts have been published by ACND for Overland Road, Ten Mile Road and Linder Road. Copies of the daily traffic counts are included in the appendix of this report. In 2002, Overland Road had a daily traffic volume of 5300 vpd west of Linder Road, and Ten Mile Road had a volume of 7200 vpd north of Overland Road. Linder Road had a daily traffic volume of 1200 vpd south of Overland Road in a count in 1999. C:ITEIIprojecls12006Archive105-14JLISouIhHilllducs6SouihHill TLSupdafe.doe Page 6of30 Trak impact Study Thompson Engineers South Ridge, Meridian Figure 3A Existing AM Peak Hour Conditions, Overland Road and Linder Road Overland and Linder Existing AM Peak Hour Counts Year: 2006 Overland Road 117 644 527 954 ------------ 22 A.- 0 0 527 j IL 0 0 22 22 182 22 164 l J Y 200 Linder Road Job No: 03-14 We: 6/912005 By: 1).7Tompson Checked: Overland Road 95 '1 117 22 J! 806 5271 669 162 Figure 3B Existing PM Peak Hour Conditions, Overland Road and Linder Road Overland and Linder Existing AM Peak Hour Counts Year: 2005 Overland Road I( 439 { 617LLL 178 5 5135 NU6TH 140 193 Joh No: 05-14 Date: 6/912005 By: D. Thompson Checked: Ovverland Road 433566 135 766 173220 47 - 6 47 53 Linder Road CrI7'GIIprojectsi2O06,4rchivelO5-I4,IIJ.Snurb fliUidocsWouth I ill Tlffivdatedoe Page 7 of 30 Ti�qffic ttnpacl Study Thompson Engineers South Ridge, Meridian Figure 3C Existing AM Peak Hour Conditions, Overland Road and Ten Mile Road Overland and Ten Mile Job No: 05-14 Existing AM Peak Hour Counts Datc: 6/9/2005 Year: 2086 By: D. Thompson Checked: Ten Mlle Road 99 747 372 IJ 284 88 KM Overland Road 88 103 15 622 276 519 284 243 L ti J 527 Figure 3D Existing PM Peak Hour Conditions, Overland Road and Ten Mile Road Overland and Tan Mile Existing PM Peak Hour Counts Year: 2006 Ten Mlle Road 382 34 731 Job No: 05-14 Data: 6/9/1005 By: D. Thompson Checked: 855 59 L 163 2081.'M Overland Road j =2ee 440 i 144 34 98 62 163 82 � Y l 225 CaTE11projecis12006Archivel05-14JUSouth I illldocs'South HillT/Supdale.doc Page 8 of 30 Traffic Impact Study. Thompson Engineers South Ridge, Meridiani Road System The road system in the vicinity of the project are described as follows: It Overland Road is classified as a minor arterial road by COMPASS. It consists of two-lane rural section, with no curb, gutter or sidewalk. Access is primarily unrestricted. it is posted at 40 mph. The terrain is basically flat. Near the intersection of Linder Road, ACRD obtained a daily traffic count of 5,300 vehicles in 2002. E Linder Road is classified as a proposed urban collector road by COMPASS. It consists of two-lane rural section with no curbs; gutter or sidewalk. Access is unrestricted. The terrain is considered rolling. ACHD obtained a traffic count of 1,200 vehicles per day south of Overland Road in 1999. it is posted at 35 mph. It Ten Mile Road is classified as a minor arterial road by COMPASS. It consists of two-lane rural section, with no curb, gutter or sidewalk. Access is primarily unrestricted. It is posted at 40 mph. The terrain is rolling. Near the intersection of Overland Road, ACRD obtained a daily traffic count of 7,200 vehicles in 2002. System Improvements There are several transportation improvement projects proposed or planned in the area that will have a significant impact on the transportation patterns. Some of the projects are currently in the design phase, and others are in the planning phase. Reconstruction of the Overland Road and Meridian Road Intersection. This project is scheduled for FY 2006 by ACHD. It will include additional through and turn lanes. This project is included in this study, however, since this project is design to accommodate future development in the 20 year life, no analysis is done for this intersection. 9 Overland Road Reconstruction, Meridian Road to Linder Road. This project is scheduled for FY 2007 by ACI II). It will widen Overland Road from two lanes to five lanes. The project will include improvements to the intersection of Overland Road and Linder Road, adding through lanes and turn lanes. These improvements are considered in the analysis. t Ten Mile Interchange. This project is included in the long range forecast of ITD and COMPASS. It was identified in the 1-84 Corridor Study of 2001 and being the next interchange to be constructed in the Treasure Valley, after the Karcher Interchange. It is our understanding that this project is included as part of the Garvey Bond Financing passed by the legislature in 2006. linvironntental Clearance Studies are currently underway. This project is considered in the analysis. Since this project is not included in the current STIP, we have not included it in our analysis for the design year. However, we have included it in our analysis of the horizon year. This project will have a significant impact on existing transportation patterns and the distribution of the trips generated by the proposed development. Marry of the existing vehicles are using Overland Road to access 1-84 via the Meridian Road Interchange. Many of those vehicles will now use the Ten Mile Interchange. For this C: ITrllprojectv12006Archive105-l4JUSoulhHftlwoes1soulliHill TlSupdaie.doe Page 9of30 7Yaflic Impact Study ThompsonEng/neers South Ridge, Merrdi'in reason, we have adjusted the background traffic to reflect this change of travel pattern. The adjustment was based on traffle projections in the Ten Mile Interchange Preliminary Concept Report. t Linder Road Overpass. This project is included in the long range forecast of ITD and COMPASS. It is currently unfunded. This project would also significantly alter travel patterns, but since it is not currently funded, we have not included it in our analysis. STUDY PERIOD wild Out Year The Build Out Year for this project is assumed to be 2010, based on conversations with the developer. Actual build out will depend on market conditions. The Horizon Year for this project is selected as 2025. This year will correspond with the horizon year for the preliminary concept report prepared for the Ten Mile Interchange. As mentioned above, existing traffic is adjusted in the horizon year to reflect the construction of the Ten Mile Interchange. PROJECTED Background Traffic; TRAFFIC Future traffic is obtained by expanding the existing traffic volumes by a growth factor. For the build out year, a growth factor of 3% per year is used for most roadways. Prior to expanding existing traffic for the horizon year, the existing traffic is adjusted to reflect the construction of the Ten Mile interchange. During the AM Peak Hour, east bound traffic on Overland Road is reduced by about 75% to reflect the fact that much of this traffic will use the Ten Mile Interchange in lieu of Overland Road and the Meridian Road Interchange. The westbound Overland Road traffic is similarly reduced during the PM peak hour. A growth factor for the horizon year also needs to be selected. Care should be used in selecting a horizon year growth factor because the compounding ctTect of even low growth rates over several years can have a significant impact. For this report, a growth rate of 2% per year was used on all approaches. AM and PM Background traffic volumes for 2010 and 2025 are shown in Figures 4A -4D C:ITIillprojectsl2006Archive105-14J1JSouth Hil/ldacsl.South1101T'ISulxlate.dor Page 10 of 30 Traffic Impact Study Thompson Engineers South Ridge, Meridian P � rN i n �7 d N uI 1 I ro j t �i P t' U i m Y U r Y i o N It arm I� V iz M ( Q C:ITFAprojectsl2Q06lfrchive105.14 JLJSouth I i!(Idocs Mind, diff TI.S'upd❑te.rloc Page I I of 30 Traffic Impact Study Thompson} Engineers South Ridge, Meridian N h 0 ua ti. 1 rs M N 4 i j a r U_ n C 0 O CD Y U ro O !1 I S aroi 1 d 0 CA LL r r i C.IT'f;l1projecl,02006Archive105-I4JLJSouth ilithdocsiSoulh /fill 7Lyujo ule.doe Page 12 of 30 Traffic Impact Study Thompson Engineers South Ridge, Meridian P �`l N r � , 1. 1 I S E r l :3 Y U � t 1 lYi d i � Q ry N ' 4 u} V C.-WA*llprajectsl2006Archive105-14JUSouthllillldocs6SouthlH/177Supdatedoe Page 13 of 30 Thompson Engineers Traffic Impact Study Scarth Ride, Meridian r o 'rN�I jN 5 VS to /r } j 3"S ' I e L to O { m m Nrypp m a i - - LO d ! 1 Q v v v d) ii C.'U''EllprojectA2006drehivel05-14JUSnulh I(i111doc.sWourh Ilill TlSupdn[e.doc Page 14 of 30 Traffic Impact Study Thompson Engineers South Ridge, Meridian Trip Generation Site trip generation is estimated using the procedures recommended in the latest edition of the Trip Generation Manual (71° edition). Published by the Institute of Transportation Engineers, in the absence of site-specific data. The site trip generation is obtained by applying the trips generation rates obtained from the Manual for each category of land use within the development. Table IA shows the trip generation and capture rate for the daily traffic generation. Table 113 shows the AM trip generation, capture rate, and directional split. Table 1C shows the PM trip generation, capture rate, and directional split. Since the existing traffic volumes are relatively small, pass by trips are ignored. As shown below, the site is estimated to generate 1927 trips per day, with 110 occurring in the AM peak hour and 163 occurring during the I'M peak hour. Table 1A - Summary of Mold -Use Daily Trip Generation Average Weekday Driveway Volumes Land Use Number Units Rate 24 Hour Two -Way Volume Capture Rate Volume Total Outside Trips Single Family Housing 785 Dwelling Units 9.57 7512 30% 2254 5258 Apartments 160 Dwelling Units 6.72 1075 30% 323 752 General Office Building 88.15 Th.Gr.Sq.Ft. 11.1 976 25% 245 733 Specialty Retail Center 104 T.G.LA. 44.32 4609 30% 1383 3228 Elementary School 600 Students 1.29 774 80% 619 155 Day Care 4.8 Th.Gr.Sq.Ft. 79.26 380 80% 304 76 4 13 1.55 137 15328 33% 5128 10200 Total 0 0 30%, 0 0 0 Table to . Summery of Muai-use Trip Generation Average Weekday AM peak Hour Driveway Volumes Lend Use Ize Rate E n er Total Capture I New Rate I Total Capture New Rate b a Total Now Single Family Housing 785 DU 0.19 149 30% 45 104 0.56 440 30% 132 308 0.75 589 412 Apartments 160 DU 0.1 16 40% 6 10 0.41 66 40% 26 40 0.61 82 50 General Office Building 88.2 Th.Gr.SF 1.36 120 20% 24 96 0.19 17 25% 4 13 1.55 137 109 Specialty Retail Center 104 T.G.LA. 0 0 30%, 0 0 0 0 30% 0 0 0 0 0 Elementary School 600 Students 0.23 138 70% 97 41 0.19 114 40% 46 68 0.42 252 108 Day Care 4.87h.Gr.SF 6.78 33 100% 33 0 0.01 29 50% 15 14 12.79 61 14 456 251 666 443 1121 694 Tolel C:IT1a¢;rojetlsl2006Arcltive105-14J1.78nudhUillldecsfSoull,Hill TISupdule.doe Page 15 of 30 Traffic Impact Study Thompson {Engineers South Ridge, ModdhTn Table 1C C. Summary or Multi -Use Trip Generation Average Weekday PM Peak Hour Driveway Volumes Land Use Size Rate Enter Total Capture New Rate Exit Total Capture New Rate Total New Single Family Housing 785 DU 0.64 502 25% 126 376 0.37 290 25% 73 217 1.01 793 593 160 DU 0.4 64 40% 26 38 0.22 35 30% 11 24 0.62 99 62 Apartments General Office Building 88.15 Th.Gr.SF 0.25 22 30% 7 15 1.24 109 40°k 44 65 1.49 131 80 Specialty Retail Center 104 T.G.L.A. 1.19 124 40% 50 74 1.52 158 50% 79 79 2.71 282 153 Elementary School 600 Students 0 70% 0 0 0 70% 0 0 0 0 0 4.8 Th.Gr.SF 6.19 30 9D°! 27 3 6.99 34 90% 31 3 13.18 63 6 Day Care 742 506 626 360. 1388 694 Total Trill Distribution In order to determine impacts, the trips generated by the site must be distributed to destinations throughout Ada County and assigned to the transportation system. Based on current travel patterns, the modal split is negligible, so all trips are assigned to vehicles, and the vehicles are assigned to the roadway system. The distribution and assignment for this development is based on existing travel patterns as determined from field observations. The distribution for current conditions is shown in Figure 5A. However, it is recognized that travel patterns will change with the construction of the Ten Mile interchange. Using data obtained from the Preliminary Concept Report for the Ten Mile Interchange, site traffic is distributed accordingly and shown in Figure 513. Site traffic is distributed at each intersection in accordance with this distribution and assignment. Figures 6A -V show the distribution of site generated traffic at each intersection. Total Traffic The site traffic is then added to the background tralTc as determined above. Figures 7A - B show the total tmffic at each intersection for AM and PM peak hour conditions for the build out year of 2010. The total traffic for each intersection for AM and PM peak hour conditions for the horizon year of 2025 are shown in Figures 8A -B. c.i7,riiprojectsl201'16ArchivelOS-14J1,J5'oulh!/flildoeslSouthI illI'Mipdale.doc Page 16 of 30 Traffic impact Study Thompson Engineers South Fridge, Meridian Figure 5A 2010 Site Traffic Distribution Diagram Figure 5A 2025 Site Traffic Distribution Diagram ii � l:Y ! 41 30 - n 44 40 OIA I Rd Ce lU�Yo -t� 69' 0 'I Va v Rd z, «� Vic ri n C,,I,y gvd 0'20G4 Mcrosort C:otF. andfm ns €uFpl4er5 tAl iight5 r4serxrarl.. C:177silprojects12OO6Arcltive105-14JUSouthililltdoes6VouthllillThSupdote.doe Page 17 of 30 69 I � Q) GQ C7 Victory RI Figure 5A 2025 Site Traffic Distribution Diagram ii � l:Y ! 41 30 - n 44 40 OIA I Rd Ce lU�Yo -t� 69' 0 'I Va v Rd z, «� Vic ri n C,,I,y gvd 0'20G4 Mcrosort C:otF. andfm ns €uFpl4er5 tAl iight5 r4serxrarl.. C:177silprojects12OO6Arcltive105-14JUSouthililltdoes6VouthllillThSupdote.doe Page 17 of 30 TraifiC tmpact Study Thompson Engineers South Ridge, Meridian i 't]tt Q: is a z, A N Ot N f i � i E I i 't]tt Q: is a z, t i i '..1'1'111projecfs12006ArchiveIO5-14JLI.Youlh HillldocsWouth Itill TlSupdafe.dn Pagc 18 or30 u I i � i E I r '..1'1'111projecfs12006ArchiveIO5-14JLI.Youlh HillldocsWouth Itill TlSupdafe.dn Pagc 18 or30 u Thompson Engineers Traffic httpact Study South Ridge, Meridian (n a^ 1 1 l 1 uoi r 0-0.. C.•t'/'Gllprrjecisl2006Areidve105-1JJ/JSputh lligldocsWouth iiiil TlSupdate.doe Page 19 of 30 A? 1 N r 61 � YY W O Y Traffic httpact Study South Ridge, Meridian (n a^ 1 1 l 1 uoi r 0-0.. C.•t'/'Gllprrjecisl2006Areidve105-1JJ/JSputh lligldocsWouth iiiil TlSupdate.doe Page 19 of 30 Traffic impact Study Thompson Engineers South Ridge, Meridian 'A f �� � •per- C���r�-7� N . '{ 1' { M R• i s Yt � InI ln{G rn a � r U C3 v F W Y CD T T 5 7 .i N 1 eat<= ....... _.. i.�...� ....`.. _._ ..... r....,.. eo (': IYZillprojectsl2006 ArchiveIOSJ4 J]JSouth lliDldoes4Vouih HIli %'LSupdote.doc Page 20 of 30 Traffic ltrlpact Study Thompson Engineers South Ridge, Meridian ro Zo O 7 _ M rte r I' c � vs M i Oaf � T 1 Y_ N V = d a uM un a N CD iT C.17'P;IlprojecR512Q06,4rehiveIO5-1d JUSauth IlilAdacAVOIldi Hill TISupdale.dac Page 21 of 30 Traffic Impact Study Thompson Engineers South Ridge, Meridian i9I � N i U Y N )v } �fi.. i YY j w � j yy. i 4 to r F r r r _ ty vH . 4r C'y 14-_I C3 (,':177iAprojeclsl2006 Archivelfl5-14 JIJSouth IlilAdoes64oulh hill I'Mipdale dos Page 22 of 30 LL Traffic impact Study Thompson Engineers South Ridge, Meridian N N ` i b i �r r �fig> b r N N ` M r r LL ( ITENirojectsl2006drehivelOSJd JW Sowh llitlidoesksouih Hill 'TBUI iale.dav Page 23 of 30 i b i M r r LL ( ITENirojectsl2006drehivelOSJd JW Sowh llitlidoesksouih Hill 'TBUI iale.dav Page 23 of 30 Traffic impact Study ThompsonEngineers South f•2idge. Meridian MJ i j { 1 3 � 3 M i �i r N e 24 of 30b Par C:1"!'EI¢)rojecls12006Archivel(15-l4JLJSoulhHitlldxx6Sovrhl/rl(TLSu/xlule.rlx U Ca F - f6 0 0 H _ Q a Y f0 d 4 LO N O N h a Q7 LL Thompson Engineers Traffic Impact Study South Ridge, Meridian C.aTF.liproject,02006ArchiveV6S-1dJIJSouthlDllldocsLSoulhHill 7GSupdate.doc Page 25 of 30 t Traffic Impact Study Thompson Engineers South Ridge, Meridian Capacity Analysis and Level of Service TRAFFIC Capacity analysis was performed using the Highway Capacity ANALYSIS Software (I -ICS 4.1e), based on the 2000 edition of the Highway Capacity Manual. Level of service for both stop controlled intersections and signalized intersections are based on the average delay of vehicles traveling through the intersection. For stop -controlled intersections, the average delay incurred by the mirror movements is used to determine the level of service. Descriptions of the level of service are included in the appendix of this report. The intersections of Overland and Linder, and Overland and Ten Mile, were analyzed for existing conditions, background traffic conditions in the build out year and the horizon year, and total traffic conditions for the build out year and the horizon year. The intersection of Overland and Ten Mile was not analyzed for the horizon year because the construction of the interchange will result in major reconstruction of this intersection. It was assumed that lane configurations will reflect the conditions proposed in the construction projects scheduled for 2007. The results of the calculations are summarized below. Copies of the calculations are included in the appendix. Peak Hour Conditions EXistln rsaCK [uuuu LOS Dela w, -- LOS Delay LOS Delay LOS F Delay LOS Delay Mitigated 40.4 E riand and Linder 17.3 C 21.6 C 100.4 F 10.1 B 16.1 C nand and Ten Mile 16.5 C 22.6 C 36.7 E 19.7 C 15.8 Mitigated East Entrance 11.4 B 11.9 B North Linder Entrance 10 5 B 10.9 B South Linder Entrance 14 17.1 C B 11.8 B st Entrance 17.3 C 12.6 B st Central Entrance 18.3 C 14.2 B t Central Entrance 17 6 C 17.3 C I Entrance 11'2 B 11.1 B th Linder Entrance 10.6 B 10.8 B th Linder Entrance 11.7 B 14.2 B Table 2B -LOS Summary PM Peak Hour Conditions 2005 2010 Total Sao2025 ound al Delay yxtstLOS DelaIng y k LOS round Delay LOS D ay k ILOS DelaLOS Overland and Linder 10.8 B 11.5 B 20.2 C 13.7 B 122 B Overland and Ten Mile 29.7 D 193.6 F 425 F Mitigated 40.4 E 13.9 B 13.7 B West Entrance 13 6 B 13.6 B West Central Entrance 13.5 B 13.4 B East Central Entrance 19.7 C 15.8 C East Entrance 11.4 B 11.9 B North Linder Entrance 10 5 B 10.9 B South Linder Entrance 14 D 14,2 B Ten Mile Entrance C':V%'F•Pprnjecfs11Q04 drehive105-I4 J/JSoa(H IlillitlncslSourh lli/1 11S110nte.dnc Page 26 of 30 fraffie Irnpact Study Thompson �y�,. Engineers South Ringer, Merklian - Roadways Overland Road east of Linder will be reconstructed to five lanes in 2007 and will have a significant amount of available capacity. West of Linder Road, Overland Road is a two lane road, and should have a capacity of about 8,500 vpd according to COMPASS planning thresholds. There should be enough capacity available to handle trips generated by this development. A lel} turn lane west of Linder is warranted for each entrance point to the site. Right turn lanes are not required, but a taper should be considered at the commercial entrance. Linder Road is a two lane road with low existing volumes. Improvements to this roadway should not be required. Left or right turn lanes into the site are not required. Ten Mile Road is nearing capacity for a two lane rural highway. Long term improvements to Ten Mile Road will be included in the Ten Mile Interchange project. Mitigation Mitigation is not needed at the Overland Road and Linder Road intersection. Improvements proposed to the intersection as part of the 2007 ACRD project will provide significant capacity. The intersection of Ten Mile Road and Linder Road will fail with the addition of the site traffic to an already congested condition. Existing topography will severely limit any possibility of adding turn lanes on any of the three approaches. Even if lanes could be added, adding lanes will not result in an acceptable level of service. The intersection was analyzed as an all -way stop controlled intersection without any additional lanes. With this control, the intersection will operate at LOS C in the AM Peak hour, and LOS E in the PM Peak Hour. Both intersections will operate at a better level of service than background traffic alone without such a change in control. Site Circulation Average daily traffic on interior roads is shown in Figure 9. Based on our estimate, none of the interior residential roads will incur a daily traffic in excess of 1,000 vehicles per day with the exception of the spine road from the commercial area to the traffic circle. This road will function as a collector. All other roads may be classified as local roads. C.,17''rnprojrcis120O6Archive105-14 JUSouih//iflldncxWondhHill Tffupdale.dac Page 27 of 30 C:4TF.Ayrofectsl2OO6dreitive105-1JJIJSorithHilAdacslSmtdtHill H.V'vpdat(Woc Palle 28of30 Traffic Impact Study Thompson Engineers South fridge, Meridian f p - r xr � �; a � 1 _ n n i cr m 0 {{ � } d O b 6 O Hi > } F' d OD LL C:4TF.Ayrofectsl2OO6dreitive105-1JJIJSorithHilAdacslSmtdtHill H.V'vpdat(Woc Palle 28of30 Traffic impact Study Thompson Engineers South Ridge, Meridian This project can be constructed with minimal impact to the transportation system, particularly with the improvements proposed to DISCUSSIONS Overland Road in 2006 and 2007 by ACHD, and the Ten Mile Interchange under consideration by ]TD. The intersection of Overland and Ten Mile will be impacted, resulting in a failure of the intersection. Observations on site indicate the intersection is failing for the westbound approach at this time. Widening the intersection will be difficult due to existing topographical features. These include a canal, existing houses, and a hill in the southeast quadrant. This study determined that adding lanes to the intersection will improve the capacity, but will not result in an acceptable level of service. In reviewing different methods of controlling the intersection, it was determined that installing stop signs on all approaches results in an acceptable level of service. However, it will result in a significantly lower level of service for the northbound and southbound approaches. This may result in queues on the northbound approach. Before installing an all -way stop controlled intersection, a study should be undertaken to ensure that this queue will not cause a sight distance problem with approaching traffic. The sight distance problem might be associated with the vertical curve as vehicle travel north. This development is designed with Neo -traditional concept, which includes a large amount of realistic mixed-use development. In addition to housing, the development includes high-density housing, medium -density housing, office space, commercial space, retail space, a school, and a day care. With such a diverse land use, we can expect a high level of captured trips. This high level of captured trips will result in fewer trips on the general transportation system, and a large volume of the trips will be captured within the development. In addition, trips will tend to be shorter, and there is an increased opportunity for non -vehicle modes of transportation, such as walking or bicycling. Such development should be encouraged. In general, the site provides opportunities to disperse internal traffic. This means fewer streets will experience high traffic volumes. Traffic is dispersed by providing a high degree if interconnectivity, allowing multiple options for drivers when selecting a route to their destination. Most of the streets enjoy a curvilinear layout, which will help in calming traffic and reducing speeds. Many of the streets are narrower than traditional neighborhoods, which will also result in lower speeds. C:17'F.llprgiecls42000ArehiveIO5-l4JIJSoulhllilAdacslSouthHill7'bSupdate.doc Page 29 of 30 Traffic impact Study Thompson Engineers South Ridge, Meridian This study identifies transportation impacts associated with the proposed subdivision in Meridian, Idaho. The following are the CONCLUSIONS principal findings and recommendations of the study: The following are the principal findings and recommendations of the study: I The proposed development is projected to generate an average daily traffic of 10,200 new, external vehicle trips per day, of which 634 will occur during the AM peak hour and 894 will occur during the PM peak hour. K The proposed development willaccess the transportation system primarily through Overland Road, 1- The primary intersection which will be impacted is Overland Road and Linder Road. This intersection is scheduled for reconstruction in 2007 by ACHD If During the AM Peak Hour, the Overland and Linder intersection will operate at LOS $ under 2010 background traffic conditions, and LOS C under 2010 total traffic conditions. It will operate at LOS l3 under both the background and total traffic conditions for 2025. This is due to the construction improvements at the intersection, and the shift of traffic patterns caused by the construction of the Ten Mile Interchange. E During the pM peak flour, the Overland and Linder intersection will operate at LOS C under 2010 background traffic Conditions, and LOS D under 2010 total traffic conditions. It will operate at a similar 1,08 under both the background and total traffic conditions for 2025. I The intersection of Overland and Ten Mile will require improvements to operate at acceptable levels of service with the addition of traffic from this project. Adding lanes to the intersection is costly, if not impossible, and will not result in an acceptable level of service. If the intersection is converted to an All -Way stop controlled intersection, an acceptable level of service can be obtained. 9 Overland Road and Linder Road have the capacity to absorb the traffic generated by the proposed project. A left turn lane should be constructed on Overland Road. A left turn lane in not necessary on Linder Road. CaTE1Wrajec&12006 Archivet05-14jusouih i!1llldocsWouih Hill7%5ipdate.doe Page 30 of 30 Thompson Engineers Traffic Impact Study South Ridga, Meridian 00 r L r, J w V co M rn M r b 00O C N rn 0 \G L� d N N O d d N c 00 W (j OL - G.� C to C p l\ F UD O _ p > IL =UJ O N w w y ID m� D D F LtV1 T it z w==' uj Z N z zy w3-)0 UzULLF ---------- .I m �y0, CC m F m F rL O T, W 3J47(OvvIMM v r W W O O o W ;z O C7 z ' Or . m m ry O N r r O N N N h - 00 r L r, J w V LO M rn M r v N rn 0 N N O d d N c 00 W (j il- of G.� C to C p FO F F O>� _ p > IL =UJ O w w y ID m� D D F LtV1 T it z w==' uj ooA�MO000°a0 N z zy w3-)0 UzULLF 00 r L r, J w Q2 1-�rnvoocoornrtn M rn M r C O N rn 0 FO �rn�rN� m M N •i ON N e ---------- m F T, W 3J47(OvvIMM W ,oma ;z ' Or . m m ry O N r r O N N N 5 O JtNOn�t'oolou�'7tn? 0 OF M Ul r 0 z---------- M DO F ti (00 to w t��-lull)t> M a 0 z J to O to O LO O to O r- Frr=�atiC600ao6i 0 a. i Q n. �w i 4 t= f z 0a�000QQQQ z p o n o n o n o LO M Page 1 O u O a- (L Ngo `S Lr) C) N N C cu � N 0 C co ami m> ui d F- F- O Z w uj it siviNatzrxwzTe ►uj - Ooro OOOOOW0 ? zww3')U VZOLLF 0 C O O �w V N O v cl ; O 0 ,,,� Mf0(p N N N fr N MOS N M N FO 2 ,j d N.r..._."__ {i C M O �O~ Z zQ0 �1� U m F z uj 0 0 O 0 w O V J Z MM NNM, Z ' ,oa O u O a- (L Ngo `S Lr) C) N N C cu � N 0 C co ami m> ui d F- F- O Z w uj it siviNatzrxwzTe ►uj - Ooro OOOOOW0 ? zww3')U VZOLLF 0 C O O �w 0 ,,,� Mf0(p N N N fr N MOS N M N FO a�mo�o�cOn�o�o O Z m F J M MM NNM, ' ,oa iz 'o ZF-O'mwrn rnrn fn f.- N M N M W N O L V N a 0 Z Or m J Q. tprnn MLO Z O r NI�1�C 6m x a O Z J CL aaan. M M aM O w 00 O U) O O, M IT 0 O =a Q W H IL �aaaaa0.a a0rM'CO u�o M V' J !L '7 V' V in vi ui iii x IL Page 2 J W Q =' c'I M MN OO M r-WMN 61 Q ` a� J r N N r r r C Ya EO za 0 z 0 0 a ui J W Q =' M MN OO M r-WMN 61 Q ` a� J r N N r r r C Ya EO za 0 z 0 a ui G O N O c6 'n W y o c0 z V _z z _ 7 H J W Q =' M MN OO M r-WMN 61 W O a� J r N N r r r Ya a 0 z _ m Y N r 't N N M (3) r -K N ASN N N W 3 -j Nr N lcO r - m r i z _ M � I z Y J 0 0 Q Z m i -N ttpp MCDLf) 00�0) Y r rr.^ rr W J �N r (O N r-N(�000 '-tNMMNN z z _ O m Y z a 0 z J N 4'N co r- Cl) -It d¢d¢dd4¢ LC) O to O Lo O 0 O r M [- O M 't O OYtii•: O rloco66cooi O ew = W a <<<<dQdddC) Ar-- O O OO r M !.t Orr:r6daoro� x a Page 3 O .0 cc::)) Co N Ti O O WO.0-p N d O O m m co a� j v io c c > > L6 d :7000 'Su z' 0 w UJ U m m m D D Y i �YY�t ZzW Zf F' o o m m 0 00 0 0� 0 Z ztow3-)U0Z0 00 00 H z z2 � Q Q 0. Y LU LUZ � Z O O � ILa_ J UJ D O M U C ? �y R -1`� 0O 2 01010) O Q l \..\ 2 Q J Z 20 7 = m H O M co! N I �Y I- 0 O co O V D U (0 � s , r z � WL,,, C O M - r 'n G R LU a > O 0 2 3 J C,4 (o 0 M r- M z I I � ;o z a D •z f - O .0 cc::)) Co N Ti O O WO.0-p N d O O m m co a� j v io c c > > L6 d :7000 'Su z' 0 w UJ U m m m D D Y i �YY�t ZzW Zf F' o o m m 0 00 0 0� 0 Z ztow3-)U0Z0 00 00 H z z2 � Q Q 0. Y LU LUZ � Z O O � ILa_ J UJ �y -1`� 0O 01010) Q Z _ m H O M co! N I �Y I- 0 O co O V D (0 � s , r r 3 J C,4 (o N M r- M I I � ;o •z •m •=r iF 0 O � J Q ------------ O '•tMK O m V' M � J O 2 O m� z a 0. 0. 0. a a a a LOoUnoU)oino M V O co V O Ovvv66!6ioio Q Za aw Z gaan.aaaaa a Oo�no�nou�o p Ix (P �v oM� U u. v v v a vi ui Page 4 Detailed Traffe_Counts DATE COUNT %GROW"fli PEAK HRCOUNI'S PEAK%ADT STREET- OVERLAND RD, Fi1D MAPLE GROVE RD, ADA COUNTY ID: 1464 E/O MAPLE GROVE RD APPROACH & TOTAL 9242003 33,539 3.6% EB WB AM: PM: E10 MCDERMOTT RD AM: 8/7/1996 371 PM: STREEi': OVERLAND RD, F/O TEN MILE RD, ADA COUNTY F/OTEN MILE RD APPROACH&TOTAL 12r3nm 4,903 -7.40/. W10 UNDER RD 4/10/2002 E10 TEN MILE RD 10/4/2000 W10 UNDER RD 6/9/1999 5,292 4,847 4,965 AM PM: AM: PM: AM: PM: AM: PM: 21 15 18 17 EB 393 158 453 169 500 118 448 282 609 1,725 719 1,691 592 1,747 660 1,684 381 1,339 6.7% 8.9% 7.2% 8.8% 7.1% 8.9% 6.8% 8.9% 6.1% 9.4% AM: 1,652 PM: 1,244 E/0 VINNELL ST AM: 1,626 1115/2002 32,361 PM: 1,152 W10 ViNNELL ST AM: 1,652 11/5/2002 31,575 PM: 1,064 W/O ENTERTAINMENT AVE AM: 1,528 2/7/2002 32,246 PM: 1,201 E/O MAPLE GROVE RD AM: 994 7/9/1997 22,639 PM: 792 E/0 MILWAUKEE ST 9/29/1993 18,265 STREET: OVERLAND RD, E10 MCDERM(YFT RD, ADA COUNTY FJOMCDERMOTfRD APPROACH&TOTAL 429/1998 432 16.4% EB AM: PM: E10 MCDERMOTT RD AM: 8/7/1996 371 PM: STREEi': OVERLAND RD, F/O TEN MILE RD, ADA COUNTY F/OTEN MILE RD APPROACH&TOTAL 12r3nm 4,903 -7.40/. W10 UNDER RD 4/10/2002 E10 TEN MILE RD 10/4/2000 W10 UNDER RD 6/9/1999 5,292 4,847 4,965 AM PM: AM: PM: AM: PM: AM: PM: 21 15 18 17 EB 393 158 453 169 500 118 448 282 609 1,725 719 1,691 592 1,747 660 1,684 381 1,339 6.7% 8.9% 7.2% 8.8% 7.1% 8.9% 6.8% 8.9% 6.1% 9.4% WB 192 350 82 352 107 374 84 213 I L9% 10.4% 10.1% 9.8% 12.5% 10.2% 10.7% 10.0% 8/26/2004 Counts compiled by ACRD from average daily tmlFic data collected by AMID and ITD. 571 of 761 Page 5 ID: 1428 WB 9 6.9% 32 10.9% 8 7.0% 28 12.1% ID: 1436 WB 192 350 82 352 107 374 84 213 I L9% 10.4% 10.1% 9.8% 12.5% 10.2% 10.7% 10.0% 8/26/2004 Counts compiled by ACRD from average daily tmlFic data collected by AMID and ITD. 571 of 761 Page 5 STREET: TEN MILE RD, N/OOVERLAND RD, ADA COUNTY ID: 1433 N/OOVERLANDRD APPROACH&TOTAL 1223/2002 7,185 18.00/. NB SB AM: 496 353 11.8% PM: 382 353 102% N/O OVERLAND RD AM: 1 1 1 221 5.5% 10/4/2000 6,089 PM: 365 260 10.3% STREET: TEN MILE RDtD, N USTICK RD, ADA COUNTY IIJ: 2702 N/O USTICK RD APPROACH & TOTAL 9/10/2003 3,925 46.05/o NB SB AM: 229 75 7.7% PM: 162 241 10.3"/0 SIO MCMILLAN RD AM: 118 33 5.6% 7/25/2002 2,689 PM: 177 113 10.8% N/O USTICK RD AM: 117 75 6.2% 8/2/2001 3,097 PM: 106 173 9.0% N/O USTICK RD AM: 156 84 11.1% 5/11/1999 2,168 PM: 77 152 10.6% N/O USTICK RD 1/17/1995 442 PM: 51 59 24.9% STREET: TEN MILE RDs SIO AMrFY RD, ADA COUNPV ID 1868 N/O LAKE HAZEL RD APPROACH & TOTAL 3272002 2,983 -920/0 NB SB AM: 239 75 10.5% PM: 129 189 10.7°/0 SIO AMITY RD AM: 296 82 11.5% 10/25/2001 3,286 PM: 136 198 10.2% N/O LAKE HAZEL RD AM: 148 57 8.5% 3/29/2000 2,420 PM1 96 149 10.2% BERN L HAZEL & AMITY 1/1/1990 1,647 STREET: TFN F. MILRD, SJO COLUMBIA RD, ADA COUNTY ID 1932 SIO COLUMBIA RD APPROACH & TOTAL 3/142002 3,748 9.80/0 NB SB AM: 268 132 10.7% PM: 150 208 9.6% 5/0 COLUMBIA RD AM: 222 141 10.6% 4/4/2000 3,412 PM: 118 217 9.8% S/O COLUMBIA RD 5/10/1994 ; 1,262 8/26/2004 Counts compiled by ACHD from average daily traffic data collected by ACRD and ITD. 707 of 761 Pagc 6 Detailed Traffic_COunts DATE COUNT %GROWTH PEAKHRCOUNTS PEAK%ADT STREET: CINDER RD, SIO COLUMBIA RD, ADA COUNTY ID 1946 S40 COLUMBIA RD APPROACH& TOTAL 11/20/2003 1,297 47.9% NB SB AM: 65 62 9.80/. PM: 49 69 9.1% N/O HUBBARD RD AM: 21 45 7.5% 3/27/2002 877 PM: 19 45 7.3% SIO COLUMBIA RD AM: 37 45 7.9% 5/18/2000 1,033 PM: 26 47 7.1% N/O HUBBARD RD AM: 42 24 6.1% 6/16/1999 1,082 PM: 34 67 9.3% SIO COLUMBIA RD 8/18/1994 1,121 SIO COLUMBIA RD 5/17/1994 1,119 N/O HUBBARD RD 1/1/1990 1,786 STREET: CINDER RD, S/O OVERLAND RD, ADA COUNTY 1D: 2607 N/O VICTORY RD APPROACH & TOTAL 4/102002 1,007 -1530/. NB SB AM: 86 20 10.50/. PM: 44 61 10.4% SIO OVERLAND RD AM: 88 15 8.7% .:6/9/1999 1,189 PM: 35 79 9.6% NIO VICTORY RD 12/21/1994 711 SHiEET: LINDER RD, S/O SH 2026, ADA COUNTY ID 280 N/O MCMILLAN RD APPROACH& TOTAL 4/92002 6,297 1.90/. NB SB AM: 282 287 9.0% PM: 297 315 9.7% SIO SH 20/26 AM: 348 194 8.8% 6/6/2000 6.182 PM: 353 256 9.9% SIO CHINDEN AM: 193 166 6.8% 8/14/1996 5,263 PM: 280 226 9.6% SIO CHINDEN 11/2/1994 2,879 812612004 Counts compiled by ACRD from average daily traffic data eal Iected by ACI ID and ITD. 475 o/ 761 rage 7 1,raffe %dyfor en Mile Interchange, Meridian, Idaho PROJECTED TRAFFIC Traffic for years 2007 and 2027 was estimated by COMPASS using the calibrated travel demand model and the approved 2010 and 2025 demographics estimates. The model is a multi -step process, which included trip generation, trip distribution, and trip assignment. The travel the Transportationsanddel was Ads ore ated to reflect current traffic patterns in the region and was approved by Committee (TMAC) for transportation planning purposes. Figures 3 and 4 represent the average daily traffic based on the travel demand model for 2007 and 2027, respectively. Figures S and 6 represent the PM peak hour turning movements at each intersection for 2007 and 2027, respectively. PM peak traffic is consider critical and was used in the traffic analysis. The PM peak hour traffic was estimated as 10% of the average daily traffic. Directional splits varied. especially Directional splits for the PM peak hour was based on a combination of existsng traffic Patters, Road, four miles to the east on I-84 and other east -west roads, and the directional splits existing on Eagle of Ten Mile Road. Figure 3 – 2007 Traffic Estimate 71800(7,180) 14600(1,460) 18000(1,800) 19200(1,920) 8800(880) –'I%� 9100(910) Average daily traffic vpd (pM peak hour traffic vph) Ten Mile Rd OU22103 D:w/ ,u,.ffl,1Updata1do 1w0nd01 100(2,310) �14400(1,440)— E A E x® •• x ..p..nro.rina.m•� Business Access 73600(7,360) 1-84 Overland Rd Page 9 Figure 4 — 2027 Traffic Estimate 112,300(11,230) 7 9,400(940) Ten Mile 32,200(3,220) 34,600(3,460) Traffic Shed} for 7'en Mile Interchange, Meridian. Idaho Franklin Rd Business Access 39,700(3,970) 13,200(1, 320) 0000 14,000(1,400) 32,100(3,210) 26,900(2,690) Average daily traffic vpd (PM peak hour traffic vph) 06r2210s •�--� rte-^ D:Wd VrafclUpdate ldo ,Lrepart dx 122,400(12,240) "4 Overland Rd rage -13 Right -Turn Treatments (415 lanes) Posted Speed 35.40 mph 0- 5000 10000 15000 20000 25000 3000 35000 Projected Volume an Major Snaet Right Turn Treatments (2(3 lanes) Potted Spend (35-40 Mph) Radius Taper Tum lens E — Radlus Taper x 20 -- - ^^-^— Tum Lane r IL 10 5000 10000 10000 20000 25000 30000 35000 1 Projected Volume on Major Street Pave 10 LEFT=TURN TIECELERATION-LANE WARRANTS 30-35 mph U 200 r ro, J C y 300 n L to 15 :0 la su 40-45 mph J 0 0 to 1- -o _s ,u DHV ora -.rage peak -hour volume of vehiclestcr'ing left into the access Pagc iQ-T' 10 Thompson Engineers Traffic g, M Study South Ridge, Meridian AM Peak Hour Calculations rage i o> t TWO-WAY STOP CONTROL SUMMARY General Information[Site information ourly Flow Rate (veh/h) 1 0 585 0 1 24 105 1 0 Proportion of heavy ehicies, PHv 0 — 0 — — edian type Undivided T Channelized? 0 0 Lanes 0 1 1 0 1 0 1 1 0 onfi uration D. Thom on . Thom son Engineers Inc. rmed M 6/22/2005 me Period VM Peak Hour ourly Flow Rate (veh/h) 1 0 585 0 1 24 105 1 0 Proportion of heavy ehicies, PHv 0 — 0 — — edian type Undivided T Channelized? 0 0 Lanes 0 1 1 0 1 0 1 1 0 onfi uration TR LT U stream Signal 0 0 Minor street Northbound Southbound ovement 7 8 9 10 11 12 L T R L T R ofume veh1h 22 0 162 0 0 0 Peak -hour factor, PHF 0.90 0.90 0.90 a90 0.90 0.90 Hour Flow Rate veh/h 24 0 180 0 0 0 Proportion of heavy ehicles, PHv 0 0 0 0 0 0 Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 1 0 0 0 0 onfi uration LTR ontrol Delay, Queue ength, Level of Service pproach EB WB Northbound Southbound ovement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR olume, v (vph) 24 204 apacity, cm (vph) 1000 494 /c ratio 0.02 0.41 ueue length (95% a07 2.00 Control Delay (s/veh) 8.7 17.3 LOS A C Approach delay (s/veh) — — 17.3 Approach LOS — — C 11CS20(kir" Copyright ® 2003 Univmity or Fiorid , NI Rights Rn od VMion rage r or r HCS2000TM eoPYrigk h) 2003 Univcnity ofMrida, NI Right/ Ra cd Page 14 TWO-WAY STOP CONTROL SUMMAKY etteral Information ite Information Overland)Road and Linder Analyst . Thom son ntersection oad an /Co. Thom son E 'nears Inc. urisdiction CND Date Performed 13106 kna sis Year 010 Back round na sis Time Period AM Peak Hour Pro Oct Descri tion South Ri orthlS Street: Linder Road East/V11est Street: Ovedand tud Period hrs : 0.25 Intersection Orientation: East-West Vehicle Volumes and Adiustments Eastbound westbound Major Street 3P26 5ovement 6 1 2 Tolume RT R veh/h L 0 590 0 0.90 0 0.90 0 0.�0 Peak -hour factor PHF 090 0.90 123Proportion ourly Flow Rate (veh/h) 0 655 08 of heavy 0 _ _ — — vehicles, PHv Undivided ty 0 T Channelized? 0 0 1 0 Lanes 0 1 0 TR LT 0 nal 0 Southbound Northbound 10R ton, 7 8 9 L TRh26 0 188 0.90 0 0,9 00 0090 0.90 ctor, PHF5 0.90 0.90 Hour Flow Rate vehlh 28 0 208 Proportion of heavy 0 0 0 0 0 0 vehicles, PHv Percent grade (°/n) 0 0 Flared approach N N Storage 0 0 0 RT Channelized? 0 0 0 Lanes 0 1 0 0 onfiguration LTR Control Delayp Queue Len rth Level of Service Southbound Approach EB VVB Northbound 1 4 7 8 9 10 11 12 ovement ane Configuration LT OR olume, v (vph) 28 236 apacity, cm (vph) 942 448 /c ratio 0.03 0.53 ueue length (95%) 0,09 3.00 Control Delay (s/veh) 8.9 21.6 LOS A C .Approach delay (s/veh) — — 21.6 Approach LOS C HCS2000TM eoPYrigk h) 2003 Univcnity ofMrida, NI Right/ Ra cd Page 14 rage t ur t TWO-WAY STOP CONTROL SUMMARY General Information ite Information Overiara Road and Under Analystompson ntersection _ oad A,qenc /Co. Thom son En ineers, Inc Jurisdiction CHDY� Date Performed 13/06 _ ria sis Year 010 Total Traffic Analysis Time Period AM Peak Hour Pro ect Descri tion South ri East/West Street: Overland orth/South Street: Under Road intersection Orientation: East-West uq Period hrs: 0.25 Vehicle Volumes and Ad'ustments Westbound Ma'or Street Eastbound 5 6 Movement 1 T R T R Volume veh/h L 0 778 4 090 M 218 3.90 p 090Peak-hour factor PHF 0.90 0.95 243 0 Hourly Flow Rate (veh/h) 0proportion of heavy ehicles, PHv Undivided edian type 0 RT Channelized? 0 0 1 0 Lanes 0 1 0 TR LT onfi uration p Upstrearn signal p Southbound Minor Street Northbound 10 11 12 Movement 7 8 y L T R L 32 T 0 R 302 0 0 0 olume veh/h Peak -hour factor, PHF 0.90 0.90 p.90 p•90 0.90 0 Hour Flow Rate veh/h 35 0 317 317 0 0 Proportion of heavy 0 0 0 0 0 0 vehicles, PHv Percent grade (%) 0 0 N Flared approach N 0 Storage 0 p RT Channelized? 0 0 0 Lanes 0 1 0 0 onfi uration LTR ontrol Delay, Queue Len h Level of Service Southbound ppro ach EB WB Northbound 1 4 7 8 9 10 11 12 ovement Lane Configuration LT LTR olume, v (vph) 104 352 capacity, em (vph) 816 334 /e ratio 0.13 1.05 Queue length (95%) 0.44 12.67 Control Delay (s/veh) 10.1 100'4 LOS B F pproach delay (stveh) — — 100'4 PP roach LOS F Version A.1c ffCS2(X10TM Copyright ® 2W3 Univmity ofF'brids, at K,ghu Ro A Page 15 n1111Wnnr rage 1 or I TWO-WAY STOP CONTROL SUMMARY General Information ite Information overland Road and Linder Analyst .Thompson Agency/co. Thom son En ineers, Inc. Date Performed 4113106 na sis Time Period M Peak Hour ma or orreet 1 -- --- - 2 3 4 -- 5 6 Movement L T R L T R volume veh/h 0 778 4 0,900,90 94 219 0.90 0 0.90 ourly Peak -hour factor, PHF 0.90 0.95 243 Flow Rate (veh/h) 0 818 4 104 Proportion of heavy 0 — — 0 — — ehicles, PHv Undivided edian type 0 T Channelized? 0 1 0 Lanes 0 1 1 1 L T onfiuration T R 0 U tream Signal 0 Minor Street Northbound Southbound 12 Movement 7 8 9 10 11 R L T R L T Volume veh/h Peak -hour factor, PHF 32 0.90 0 0.90 302 0.95 0 0.90 0 0.00 0 0.�0 Hou Flow Rate veh1h 35 0 317 0 Proportion of heavy 0 0 0 0 0 0 vehicles, PHv Percent grade (%) 0 0 Flared approach N N Storage 0 0 0 RT Channelized? 0 0 Lanes 1 0 1 0 0 onfiguration L R ontrol Delay, Queue Length, Level of Service pproach EB WB Northbound Southbound ovement 1 4 7 8 9 10 11 12 Lane Configuration L L R olume, v (vph) 104 35 317 apacity, cm (vph) 816 164 379 /c ratio 0.13 0.21 0.84 Queue length (95%) 0.44 0.78 7.70 ontrol Delay (S/veh) 10.1 32.8 1 47.9 LOS B D E Approach delay (s/veh) — — 46.4 Approach LOS — — E Vmion Uc wpp,gix o. �...... ..,..... u.q .... .,.o.._____.. i/CS1U70 TM Pave 16 _ _ rage 1 or 1 {/C.S7000TM "pyngnt » �. u .... ....y .....__�,. _. __.... Version 4.1J Page 17 eil'li?nnfi Page 1 of 1 Rights Reserved RC82006TM Copy�igta (0 2003 Ummity ofF$orida, All RighL, R.e .d Vmion 4, Id Version 4.1d TWO-WAY STOP CONTROL SUMMARY General Information ite Information nalyst ency/Co. Date Performed nal sis Time Period D. Thompson Thompson Engineers, Inc. 4/13106 AM Peak Hour ntersection urisdiction natysis Year overland Rd and Ten Mile Rd ACHD 2010 Background Traffic Pro ect Description South Ridge East/West Street: Overland orth/South Street: Ten Mile Road Intersection Orientation: North-South IStudy Period hrs: 0.25 ehicle Volumes and Adjustments Major Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R ofume 35 320 275 320 115 0 Peak -Hour Factor PHF 0.90 0.90 0.90 0.90 0,90 0.90 Hourly Flow Rate, HFR 0 355 305 355 127 0 Percent HeavyVehicles 0 — — 0 — — edian Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfi uration TR LT 1 Upstream Si nal 0 0 Minor Street Westbound Eastbound ovement 7 a 9 10 11 12 L T R L T R olume 18 0 145 0 0 0 Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 20 0 161 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfi uratic n LR Delay, Queue Length, and Level of Service pproach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ane Configuration LT LR (vph) 355 181 (m) (vph) 938 382 0.38 0.47 queue length 1.78 2.46 ntrol Delay 11.2 2Z.6 [511% S B C roach Delay — — 22.6 proach LOS — — C Rights Reserved RC82006TM Copy�igta (0 2003 Ummity ofF$orida, All RighL, R.e .d Vmion 4, Id Version 4.1d rage 1 or 1 HCS2UXF"' CnPyngnc c' 2W3 Un' 4 n. j .,.. , Page 19 4113/?.006 TWO-WAY STOP CONTROL SUMMARY ite Information eneraI Information Overland Rd and Ten Mile Rd Analyst D. Thompson 0. ntersection ACHD y Thompson Engineers, Inc. urisdiction 2010 Total Traffic Date Performed 4H3N6 nalysis Year na sis Time Period AM Peak Hour Pro'ect Descri tion South Ri Street: Ten Mile Road EastlWest Street: OverlandNom-South uqy Period Mrs): 0.25 Intersection Orientation: Nath -South ehicle Volumes and Ad'ustrnents Southbound Ma'or Street Northbound 4 5 6 ovement 1 z 3 R L T R Volume L 35 T 332 283 349 0.90 12? 0.90 0 0.90 Peak -Hour Factor PHF 0.90 0.90 0.90 387 134 0 Hourly Flow Rate, HFR 0 368 314 Percent Heav Vehicles 0 — — Undivkled 0 edian T 0 RT Channelized 0 0 1 0 Lanes 0 1 0 TR LT onfiuration 0 U beam Si nal 0 Eastbound Minor Street Westhound 10 11 12 ovement 7 8 R R T L 24 T 0 207 0 0 0 Volume Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0 Hour Flow Rate, HFR 26 0 230 0 0 0 0 Pet Heavy Vehicles rcen 0 0 0 0 0 Percent Grade (%) 0 N Flared Approach N 0 forage0 0 RT Channelized 0 p 0 0 0 0 0 Lanes Configuration LR Delay, Queue Len th and Level of Service Eastbound Approach NB SB Westbound 11 12 Movement 1 4 7 8 9 10 Lane Configuration LT LR (vph) 387 256 (m) (vph) 920 358 lc 0.42 0.72 5% queue length 2.1 ? 5.31 Control Delay 11.7 36,7 LOS 8 E 7 pproach Delay — —' pproach LOS — — E VCY910p 4.1( _r All v:..ki. Ra..v,vl HCS2UXF"' CnPyngnc c' 2W3 Un' 4 n. j .,.. , Page 19 4113/?.006 Page 1 of l Rights Reserved YC,'7000TM Vmim 4.Id ('opy,jghl (0 "3 Uairmity of F kW rich, All Rights Rnmcd Page 20 version 4, Id TWO-WAY STOP CONTROL SUMMARY General Information Rite Information Linder and Commercial Analyst D. Thompson ntersecton ACHD Agency/Co- Thompson Engineers, Inc. Purisdiction 2010 Total Traffic Date Performed 411306 rnatysis Year na sis Time Period AM Peak Hour Pro'ect Descri tion South Ridge EastANest Street: North Linder Entrance orth/South Street: Intersection Orientation: North-Southud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound 6 ovement 1 2 3 R 4 L 5 T R olume LT 4 2 74 39 0 48 50 Peak -Hour Factor PHF 0.90 0.90 0.90 0.90 0.90 0.90 55 Hourly Flow Rate, HFR 4 304 0 0 53 Percent Heavy Vehicles 0 — — 0 — edian T Undrvlded 0 RT Channelized 0 0 Lanes 0 1 0 0 1 TR onfiuration LT 0 U tream signal 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume Peak -Hour Factor, PHF 0 0.90 0 0.90 0 0.90 60 0.90 D 0.90 10 0.90 Hourly Flow Rate, HFR 0 0 0 66 D 19 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (°h) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 1 R onfiguration L Delay,Queue Length, and Level of Service pproach NB SB Westbound Eastbound ovement 1 4 7 8 910 11 12 ane Configuration LT L R R (vph) 4 66 91 (m) (vph) 1495 694 986 lc 0.00 0.11 0.01 95% queue length 0.01 0.36 am Control Delay 7.4 11.6 6.7 LOS A B A pproach Delay — — 11.2 [Approach LOS — — B Rights Reserved YC,'7000TM Vmim 4.Id ('opy,jghl (0 "3 Uairmity of F kW rich, All Rights Rnmcd Page 20 version 4, Id Page 1 of 1 Rights Reserved Vm. ion 4. m HCS7A70rM Copyrigfit W 2003 Univcrtity °rFbridi, NI }iighq RaM'od Vmion 4.Id Page 21 .„^ �� TWO-WAY STOP CONTROL SUMMARY General Information ite Information North Linder Entrance Analyst D. Thompson ntersection ACHD Agency/Co. /Co. y Thompson Engineers, Inc. urisdiction 2025 Total Traffic Date Performed 4/13/t76 nalysis Year nal sis Time Period AM Peak Hour Pro'ect Description South Ridge East/West Street: North Linder Entrance orth/South Street: Intersection Orientation: North-South 37. Periodhrs ehicle Volumes and Ad'ustmentS Me'or Street Northbound Southbound 5 6 ovement 1 2 3 R 4 L T R L 6 T 301 39 0 48 40 olume Peak -Hour Factor PHF 0.90 0.90 0.90 0090 0.90 0.90 44 Hourly Flow Rate, HFR 6 334 0 53 percent Heavy Vehicles 0 — _ 0 Undmded edian Type 0 RT Channelized 0 0 1 0 Lanes 0 1 0 TR onfiuration LT 0 U tream Signal 0 Eastbound Minor Street Westbound 10 11 12 ovement 7 8 9 T R L T R L 0 0 0 50 0 12 Volume Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90 0�0 0130 our Flow Rate, HFR 0 0 0 55 0 0 Percent HeavyVehicles 0 0 0 0 0 Percent Grade (°h) 0 Flared Approach N N 0 0 Storage 0 RT Channelized 0 0 1 Lanes 0 0 0 f L R Configuration Dela Queue Len th, and Level of Service Eastbound Approach NB SB Westbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT L R 13 (vph) 6 55 591 992 (m)(vph) 1509 0.09 0.01 /c Q00 .0LOS 5% queue length 0.01 8.7 Delay 7.4 t0310ontrol A A 11.1 Approach Delay — B pproach LOS — Rights Reserved Vm. ion 4. m HCS7A70rM Copyrigfit W 2003 Univcrtity °rFbridi, NI }iighq RaM'od Vmion 4.Id Page 21 .„^ �� lyst TWO-WAY STOP CONTROL SUMMARY Thompson Engineers, Inc. punsalcuon 4/13176 lAnalysis Year ACHD 2010 Total Traffic rage t or 1 11CS200" C�Py^Bld Cd 21M1.f linmm ily m r,o,me, All ,.. L' Page 22 n 11 1 /7nnA North-South cuu ruuw ,,,.lumes and Ad'ustmons Northbound 4 5 rInterseeGtionrientation: 1 T LTR L 5 218 39 0 3622 Peak -Hour Factor PHF 0.90 0.90 0.90 0090 0.90 0.90 24 Hour Flow Rate, HFR 5 242 0 40 Percent He a Vehicles 0 Undh dried — Median Type 0 RT Channelized 0 0 1 p Lanes 0 1 0 TR LT p Signal 0 Eastbound Westbound 10L 11 12 r1norStreet 7 89 R LT R 00060 T 00.90 Peak-HourFactor, PHF 0.90 0 0'� 86 0.90 12 Hour Flow Rate, HFR 0 0 0 p 0 0 Percent HeavyVehicles 0 0 0 0 0 Percent Grade (dA) 0 Flared Approach N N 0 0 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 LR Configuration Delay, Queue Len th and Level of Service Eastbound Approach NB SB Westbound 12 1 4 7 8 9 10 11 Movement LRLane Configuration LT 78 (vPh) 5 726 (m) (v ph), 1551 0.11 Vic 0.00 0.36 5% queue length 0.01 10.6 Control Delay 7.3 8 A 10.6 ILOS pproach Delay — — 8 PProach LOS _ Vm iw 4.1, 11CS200" C�Py^Bld Cd 21M1.f linmm ily m r,o,me, All ,.. L' Page 22 n 11 1 /7nnA t -age 1 01 1 Rights Reserved JICS20001M Copyright tv 2003 Unirv.ity of Florida, NI Right, R.mcd Ver, ion 4.1d Vmion 4.Id Page 23 , t^nn TWO-WAY STOP CONTROL SUMMARY General Information Analyst Agency/Co. Date Performed sis Time Period 0. Thompson Thompson Engineers, Inc 4113106 AM Peak Hour ISite Information ntersection Jurisdiction Analysis Year South Linder Entrance ACHD 2025 Total Traffic roject Descri tion South HidgeastJWest Street: South Linder Entrance orthlSouth Street: J :-f�tersection Orientation: [movenal North-South to Period hrs : 0.25ehicle Volumes and Adjustments ajor Street ment 1 L Northbound 2 T 3 R 4 L Southbound 5 T 8 R olume Peak -Hour Factor PHF 3 0.90 277 0.90 39 0.90 0 0.90 50 0.90 10 0.90 Hourly Flow Rate, HFR 3 307 0 0 55 11 Percent Heaw Vehicles 0 — — 0 — — edian T UndWded RT Channelized 1 0 0 Lanes 0 1 0 0 1 0 onfi uration LT TR U tream Signal 0 0 Minor Street Westbound Eastbound ovement 7 8 9 10 11 12 L T R L T R olume 0 0 0 30 0 4 Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 0 0 33 0 4 ercent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (°/6) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Delay, Queue Length, and Level of Service pproach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ane Configuration LT LR (vph) 3 37 (m) (vph) 1549 658 is 0.00 0.06 5% queue length 0.01 0.18 ontrol Delay 7.3 10.8 LOS A B pproach Delay — — 10.8 pproach LOS — — B Rights Reserved JICS20001M Copyright tv 2003 Unirv.ity of Florida, NI Right, R.mcd Ver, ion 4.1d Vmion 4.Id Page 23 , t^nn rage i or i Rights Reserved i/cS1Gtl0TM Copyright * 2703 Univmily of Florid., AD Rights Rwm d Vmion 4. Id Vc ion 4. Id TWO-WAY STOP CONTROL SUMMARY General Information ite Information Analyst Agency/Co. Date Performed Analysis Time Period D. Thompson Thompson Engineers, Inc. 4113106 (' MAW Peak Hour ntersecbon urisdiction nalysis Year Ten Mile Road Entrance ACHD 2010 Total Traffic Project Description South Ridge East/West Street: Entrance orth/South Street: ti, ikk Intersection Orientation: North-South ud Period hrs : 0.25 ehicle Volumes and Adjustments Major Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R oiume 328 8 6 139 0 Peak -Hour Factor PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 364 8 6 154 0 Percent Heavy Vehicles 0 — — 0 — — edian Type Undivided RT Channelized 0 0 Lanes 0 1 1 1 1 0 Configuration T R L T Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 22 0 12 0 0 0 Peak -Hour Factor PHF 0.90 0.90 0.90 0,90 0.90 0,90 Hourly Flow Rate, HFR 24 0 13 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 onfiguration L R Delay,Queue Length, and Level of Service Approach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 Lane Configuration L L R (vph) 6 24 13 (m)(vph) 1198 510 665 Ir 0.01 0.05 0.02 5% queue length 0.02 0.15 am Control Delay 8.0 12.4 10.4 LOS A B B Approach Delay — — 11.7 Approach LOS — — B Rights Reserved i/cS1Gtl0TM Copyright * 2703 Univmily of Florid., AD Rights Rwm d Vmion 4. Id Vc ion 4. Id rabc 1 or t Rights Reserved V�reim<4.1e IKS2000TM �PYje 2003 Univcrnily oC}'lorid�, All Right+Rmal'cd V.icm 4.1d Page 25 d/7ZII)MV TWO-WAY STOP CONTROL SUMMARY ite Information General Information Ten Mile Road Entrance nalyst D. Thompson Thompson Engineers, Inc. ntersection udsdiction ACMD 2025 Total Traffic ency/Co. Date Performed natysis Year naI sis Time Period t`L� Pro'act Descri tion South Ridge olih/South Street: East/West Street: Entrance to Period hrs : 0.25 Intersection Orientation: North-South ehicle Volumes and Ad"ustments southbound Ma'or Street Northbound 4 5 6 ovement L T R L T R olume 0 533 12 0'90 20 0.90 195 0 Peak -Hour Factor PHF 0.90 0.90 22 26 0 Hourly Flow Rate, HFR 0 592 13 0 Percent HeavY Vehicles 0 _ _ Undivided Median Type 0 0 RT Channelized 1 1 0 Lanes 0 1 T 1 R L T onfi uration 0 U tream Si nal 0 Eastbound Minor Street Westbound 10 11 12 ovement 7 8 R T0 T R olume L 10 0 12 0.90 0 0.90 0 0.90 0.90 Peak -Hour Factor, PHF 0.90 0.90 0 0 0 Hour Flow Rate, HFR 11 0 13 0 0 0 Percent Heavy Vehicles 0 0 0 0 Percent Grade (°/.) 0 N Flared Approach N 0 Storage 0 0 RT Channelized 0 0 0 p Lanes 1 0 1 Configure L R — —A Delay,Queue Len th and Levei of Service Eastbound PProach NB SB Westbound 1D 11 12 ovement 1 4 7 8 9 Lane Configuration L L R 22 11 13 (vph) (m) (v Ph) 983 326 510 is 0.02 0.03 0.03 5% queue length 0.07 0.10 Control Delay. 8.7 16.4 L12�2 LOS AC Approach Delay — — 14'2 ppro ji�ach LOS — — B Rights Reserved V�reim<4.1e IKS2000TM �PYje 2003 Univcrnily oC}'lorid�, All Right+Rmal'cd V.icm 4.1d Page 25 d/7ZII)MV rage r of r LOS I HCS2IX70"' CopyngM 0 2D03 Univ°nity ofFlco d All RigMft Ra ad V mion k W Pagc 26 n ii a ronnF TWO-WAY STOP CONTROL SUMMARY Site Information General Information West Overland Entrance na st Thomson ntersection CHD en /Co. Thom on E "nears lnc. urisdiction 010 total Tratrc pate Performed 13A76 nal sis Year na sis Time Period M Peak Hour pro'ect Descrition South Ridge11 orth/South Street: 11 West Entrance EastJWest Street: Overland tuk Period hrs : 0.25 Intersection Orientation: East-West ehicle Volumes and Ad'ustments Westbound Maier Street Eastbound 5 6 ovement L 2 R � T R p 617 15 16 209 0 olume veh/h 0.90 090 090 090 p,gp 0.90 Peak -hour factoT PHF 16 17 232 0 Hourly Flow Rate vehlh 0 685 Proportion of heavy 0 _— ehicles, PHv Undivided edian type 0 0 RT Channelized? 0 1 0 Lanes 0 i 0 TR LT onfi uration 0 Upstream Si net 0 Southbound Minor Street Northbound 10 11 12 vl ovement T 8 R T R L 22 T 0 0 0 0 olume veh/h 0.90 0.90 0"90 0.� 0.90 0.90 eak-hour factor, PHF 0 0 Hour Flow Rate (veh/h) 24 0 66 Proportion of heavy 0 0 0 0 0 0 vehicles, PHv 0 Percent grade (°%) 0 N Flared approach N 0 0 Storage 0 RT Channelized? 0 0 p 0 1 0 0 onfi uration LTR ontrol Dela Queue Len h level of Service Southbound pproach E6 WB Northbound 11 12 ovement 1 4 7 8 9 10 LarLanes ne LT LTR Volume, v (vph) 17 9O Capacity, cm (vph) 905 387 /c ratio 0.02 0.23 ueue length (95°h) 0.06 0.89 Control Delay (s/veh) 9.1 17, i LOS A G pproach delay (s/veh) — — 17.1 r LOS I HCS2IX70"' CopyngM 0 2D03 Univ°nity ofFlco d All RigMft Ra ad V mion k W Pagc 26 n ii a ronnF i asc i vi i rresz000" Page 27 4/13/2001 rage 1 of I IrCS2000� COPS'riBlu 07D03 Univmity of Fl°tidn, Nl Right+ R� TWO-WAY STOP CONTROL SUMMARY General Information Site Information na st D. Thompson M Peak Hour ntersection Overland and East Central _ enc /Co. Thompson Engineers, Inc. urisdiction CHD Date Performed 4/13R?6 na sis Year 010 Total Traffic Analysis Project Description South Ridge EastMest Street: Overland orth/South Street: East Central Entrance Intersection Orientation: East-West [StudyPeriod hrs : 0.25 ehicle Volumes and Adjustments Major Street Eastbound Westbound ovement 1 2 3 4 5 6 L T R L T R olame veh/h 0 706 10 12 208 0 Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 our Flow Rate Leh/h) 0 784 11 13 228 0 Proportion of heavy ehicles, PHv 0 — — 0 — — edian a Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Confi uration TR LT U stream Signal 0 0 Minor Street Northbound Southbound ovement 7 8 9 10 11 12 L T R L T R olume veh/h 18 0 40 0 0 0 Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate (veh/h) 20 0 44 0 0 0 Proportion of heavy ehicles, PHv 0 0 0 0 0 0 Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channefized? O O Lanes 0 1 0 0 0 0 onfiuration LTR Control Dela queue Len h Level of Service pproach EB WB Northbound Southbound ovement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR olume, v (vph) 13 64 apacity, cm (vph) 835 335 /c ratio 0.02 0.19 ueue length (95%) 0.05 0.69 ontrol Delay (s/veh) 9.4 18.3 LOS A C pproach delay (s/veh) — — 18.3 pproach LOS — — C IrCS2000� COPS'riBlu 07D03 Univmity of Fl°tidn, Nl Right+ R� Time Period M Peak Hour W Verei°n J.ld rage i oz i HCS2000r�' Page 29 4/14/200( Page 1 of 1 TWO-WAY STOP CONTROL. SUMMARY rGeneral Information ISjte Information na stD. Thom on ntersection Overland and East Entrance enc /Co. Thompson Engineers Inc. urisdiction CHD Date Performed 13x06 . sis Year 010 Total Traffic na sis Time Period ak M Pef 0 Hourly Flow Rate veh/h) 0 813 1 15 1 72 tut) u Proportion of heavy ehicles, PHv 0 _ _ 0 — — edian type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Confiuration TR 1 1 LT Upstream Signal 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R Volume veh/h) 6 0 50 0 0 0 Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate (veh/h) 6 0 55 0 0 0 Proportion of heavy ehicles, PHv 0 0 0 0 0 0 Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 1 0 0 0 0 Configuration LTR Control Delay, Queue enqth, Level of Service Approach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR Volume, v (vph) 72 61 Capacity, c, (vph) 812 346 /c ratio 0.09 0.18 ueue length (95%) 0.29 0.63 Control Delay (s/veh) 9.9 17.6 LOS VA C pproach delay (s/veh) — — 176 Approach LOS — — C IIC82000XM Coppight 0 2003 Univmity ofFlwi", All Ri8hte Rc cd Vmeion4.ld. rage i or i HC52000 Page 31 4/14/2006 Traffic Impact Study It Thompson Engineers South Ridge, Meridian PM Peak Hour Calculations Page 32 Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information ISite Information nal st D. Thompson 2 Thom son En ineers Inc. mna�sis 22/2005 eriod PIA Peak Hour Movement 1 2 1 3 4 5 0 R L T R L T R olume veh/h) 0 173 5 135 433 0 Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate (veh/h) 0 192 5 150 481 0 Proportion of heavy ehlcles, PHV 0 — 0 0 — — Median type Undivided F lared approach RT Channelized? N 0 1 1 1 0 Lanes 1 0 1 1 1 0 1 0 1 1 1 0 I/CS20001 M Copyright 0 2003 Uniymity or Florida, NI Rights Reserved versi� L T R L T R ofume veh/h 6 0 47 0 0 0 P eak-hour factor, PHF 0.90 0.90 0,90 0.90 0.90 0.90 H our Flow Rate veh/h 6 0 52 0 0 0 P roportion of heavy ehicles, PHv 0 0 0 0 0 0 P ercent grade (%) 0 0 F lared approach N N Storage 0 0 R T Channelized? 0 0 Lanes 0 0 0 0 0 0 onfiuration LR ontrol Dela Queue Len h Level of Service pproach EB WB Northbound Southbound ovement 1 4 7 8 9 10 11 12 ane Configuration LT LR ofume, v (vph) 150 58 apacity, cm (vph) 1368 683 /c ratio 0.11 0.08 ueue length (95%) 0.36 0.28 ouhul Delay (s/veh) 7.9 10,8 LOS A B pproach delay (s/veh) — — 10-8 Approach LOS — — B I/CS20001 M Copyright 0 2003 Uniymity or Florida, NI Rights Reserved versi� Page t of i xcsz000TM "Pyngm m w. o ...��.....,..� ....._..— _ Page 34 n/tZ/')(V1R rage t or i frCS2000TM Copyright O 2003 Univc ily of Florida, All Kighu K44 -a Page 35 All "3Mnnr; TWO-WAY STOP CONTROL SUMMAKY eaeral Information Site Information Overland Road and Under Analyst . Thompson ntersection oad __, enc /Co; Thom r1 son „En iq neers, Inc. on CHD Date Performed 113106 na sis Year 010 Tote1 Traffic Analysis Time Period M Peak Hour Proiect Descri tion South RI orth/South Street: Linder Road East/West Street: Overfand u Period film)' 0.25 intersection Orientatlon: East-West Vehicle Volumes and Ad'ustments Westbound Major Street Eastbound 4 5 6 Movement L T R L T R 0 386 1f 241 772 0 volume veh/h Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 657 0.�0 Hourly Flow Rate (vehlh) 0 428 12 267 Proportion of heavy 0 _ _ 0 — vehicles, PHV Undivided MedianL. type 0 RT Channelized? 0 0 1 0 Lanes 0r== 0 LT Confi urationTR 0 U tream Si nal Southbound Minor Street Northbound 1L 11r movement 7 8 R T L 10 T 0 142 0 0 Volume veh/h Peak -hour factor, PHF 0.90 0.90 0-90 090 0"�0Hour Flow Rate veh/h 11 0 i57 0Proportion of heavy 0 0 0 0 0 vehicles, PHV Percent grade (%) 0 0 Flared approach N N Storage 0 0 0 RT Channelized? 0 0 0 Lanes 0 0 0 0 onfiguration LR Control Delay, Queue Len h Leve i of Service Southbound Approach E13 WBI Northbound 11 12 ovement 1 4 7 8 9 10 Lane Configuration LT LR Volume, v (vph) 267 168 Capacity, cm (vph) 1131 402 1c ratio 0.24 a42 Queue length (95%) 0.92 2.02 Control Delay (sNeh) 9.2 20.2 LOS A C pproach delay (sNeh) — — 20.2 Pp roach LOS — C yr a °° a.K frCS2000TM Copyright O 2003 Univc ily of Florida, All Kighu K44 -a Page 35 All "3Mnnr; Page l of 1 Rights Reserved NCS2oodM Copyright 02W3 University of MTidn, All Rights Rmz, ud Vorsion 4.Id Version 4. Id TWO-WAY STOP CONTROL SUMMARY General Information Site Information nalyst gency/Co. Date Performed nal sis Time Period D. Thompson Thompson Engineers, Inc. 4113106 PM Peak Hour Intersection Jurisdiction Analysis Year Overland Rd and Ten Mile Rd ACHD 2005 Existing Trak Project Description South Ridge East/West Street: Overland orth/South Street: Ten Mile Road Intersection Orientation: North-South IStudy Period hrs: 0.25 Vehicle Volumes and Adjustments Major Street Northbound Southbound ovement 1 2 3 4 5 1 6 L T R L T R glume 35 163 62 34 362 0 Peak -Hour Factor PHF 0.90 0.90 0,90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 181 68 37 402 0 Percent Heavy Vehicles 0 — — 0 — — edian Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 144 0 296 0 0 0 Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hour Flow Rate, HFR 160 0 328 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 o nfiguration LR D !ay, Queue Length, and Level of Service pproach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (ph) 37 488 (m) (vph) 1328 614 lc 0.03 0.79 5% queue length 0.09 7.78 Control Delay 7.8 29.7 LOS A D Approach Delay — — 29.7 Approach LOS — — D Rights Reserved NCS2oodM Copyright 02W3 University of MTidn, All Rights Rmz, ud Vorsion 4.Id Version 4. Id rage 1 01 1 NC'82000T" Copyright 0 2003 Univmity or Honda, All Ri8hB R�-r -d Page 37 4/110,006 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Overland Rd and Ten Mile Rd Analyst D. Thompson intersection ACHD Thompson Engineers, Inc. n Jurisdiction 2010 Back roundTrafiic g Performed Date Performed Date 4/13/06 Analysis Year nal sis Time Period PM Peak Hour Pro"ect Descri tion South Ridge orthlSouth Street: Ten Mile Road East/VVest Street: Overland tud Period hrs: 0.25 Intersection Orientation: North-South ehicle Volumes and Ad-ustments southbound Ma or Street Northbound 4 5 6 ovement 1 2 3 R L T R L 35 T 189 72 156 420 0 olume Peak -Hour Factor PHF 0.90 0.90 0,90 0.90 0.90 0.90 0 Hourly Flow Rate, HFR 0 210 80 173 466 — Percent HeavyVehicles 0 — — 0 — Undivided edian Type 0 RT Channelized 0 0 1 0 Lanes 0 f 1 0 TR LT onfi uration 0 U tream Si nal 0 Eastbound Minor Street Westhound 10 11 12 movement 7 8 9 R L T R Volume L 167 T 0 344 _O 0.90 0.90 0 O.Otl 0 0.00 Peak -Hour Factor, PHF 0.90 0.90 Hourly Flow Rate, HFR 185 0 382 0 0 0 Percent Hea Vehicles 0 0 0 0 Percent Grade (%) 0 Flared Approach N N Storage 0 0 0 RT Channelized D 0 0 Lanes 0 0 0 0 configuration LR Dela , Queue Len th and Level of Service Eastbound Approach NB SB Westbound 4 7 B 9 10 11 12 Movement 1 Lane Configuration LT (vph) 173 (m) (vph) 1283 1C 0.13 1$: 5% queue length 0.47 Control Delay 8.2 LOS A pproach Delay — — 193.6 pproach LOS — — F NC'82000T" Copyright 0 2003 Univmity or Honda, All Ri8hB R�-r -d Page 37 4/110,006 rage t of t Rights Reserved /IC82mem Vmim4.ld Copyright CO 2003 Uni'mity or F"da, NI Righty R.. tt Cd Vcrsi°n 4. Id Page 38 All I 1000 TWO-WAY STOP CONTROL SUMMARY Genera{ Information ISite Information Overland Rd and Ten Mile Rd Analyst D. Thompson ntersection ACHD ency/Co. Thompson Engineers, Inc. urisdiction natysis Year 2010 Total Trac Date Performed 4/13/06 ime Period PM Peak Hour scri tion South R'Street: street: Ten Mile Roadn OverlandOMVSouth VintoerseefionOrientation: North-South tud Polumes and Adjustments Northbound Southboundet B 1 2 3 4 L S T R L 0 T 204 R 72 237 420 0 Volume Peak -Hour Factor PHF 0.90 0.90 0.90 0.90 0.90 0.90 0 Hourly Flow Rate, HFR 0 226 80 263 466 Percent Hea Vehicles 0 - - 0 edian T Undmded 0 RT Channelized 0 1 0 Lanes 0 1 0 0 Confi uration TR LT 0 U stream Signal 0 Minor Street Westbound Eastbound 12 Movement 7 8 9 10 11 T R L T R L Volume Peak -Hour Factor, PHF 177 0.90 0 0.90 394 0.90 0 0.90 0 O,gO 0 0.90 Hour Flow Rate, HFR 196 0 437 0 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 onfiguration LR Delay, Queue Length and Level of Service Approach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 263 633 (m) (vph) 1266 340 lc 0.21 1.86 5% queue length 0.78 42.24 Control Delay 8.6 425.0 LOS A F [Approach Delay - - 425.0 pproach LOS - - F - - Rights Reserved /IC82mem Vmim4.ld Copyright CO 2003 Uni'mity or F"da, NI Righty R.. tt Cd Vcrsi°n 4. Id Page 38 All I 1000 rage 1 or 1 ff=000"' Copyright 0 2003 Univas ity of Florida, All Rights RcaQved Version 4.ld ALL -WAY STOP CONTROL ANALYSIS al Information Re Information lco. [Thompson rformed Time Period .Thom n E i g3p6 MPeak Hour Inc. ntersection urisdiclion a s'Is Yoar OVWand and Ten Mile CHD 010 Mti anon D South Ridgest 1proach Street: OveAand orth/South Sheet: TenMAe e Adjustments and Site Characteristics h Eastbound Wastbound nt LT R L T R 0 0 0 1770 394 Left Lane 50 50 h Northbound Southbound ovomant L T R L T R Volume 0 204 72 440 237 0 %ThTus Left Lane 50 50 Eastbound Westbound Northbound Southbound Lt L2 L1 L2 Ll L2 Ll 1_2 nfigurationLR TR L T PH: 1.00 1,00 1.00 1.00 :low Rate 571 276 440 237 Heavy Vehicles 0 0 0 0 No. Lanes 0 1 1 2 eometry Group 1i 3; 5 Durafion, T 025 aturation Headway Adjustment Worksheet Prop. Loft -Turns 0,3 0,0 1.0 0.0 P op. Right -Turns 0.7 0.3 0.0 0,0 Prop. Heavy Vehide LT -ad) 0.2 0.2 0.2 0.2 0.5 0.5 RT-adj -0.6 -0.6 -0.6 -0,6 -0.7 -0.7 HV-adj 1.7 1.7 1.7 1.7 1.7 1.7 adj, computed I 0.00 0.00 0.00 0,00 Departure Headway and Service Time d, initial value 3.20 3.20 1 3.20 3.20 Initial 0.51 0.25 0.39 0.21 d, final value 0.00 0,00 0.00 0.00 final value 0.96 0.53 0.93 0,47 Move -up time, m 2.0 2.0 2.3 rvioo Tinto Capacity and Level of Service Eastbound Westbound Northbound Southbound Ll L2 Ll L2 Ll L2 Lt 1_2 apadty 592 506 473 487 Delay 52.30 17.66 52.39 15.77 Loa F C F C proach: Delay 1 52.30 17.66 39.57 Los F C E Intersection Delay 40.37 Intersection LOS E ff=000"' Copyright 0 2003 Univas ity of Florida, All Rights RcaQved Version 4.ld Page 1 of 1 Rights Reserved IICS200dT Vcmion 4. Id Copyright (0 2003 Univcnity or Florida, NI Rights F—mod Page 40 Vcraion 4. Id TWO-WAY STOP CONTROL SUMMARY General Information ane ite Information North Linder Entrance D. Thompson ntersection ACHD enc /CO. y Thompson Engineers, Inc. Jurisdiction 2010 Total Trac Date Performed 4193706 Analysis Year nal sis Time Period PM Peak Hour Pro act Descri tion South RI East/VJest Street: North Linder Entrance orth/South Street: Intersection Orientation: North -.South tud Period hrs : 0.25 ehicle Volumes and Ad"ustments Ma or Street Northbound southbound 5 6 ovement 1 2 1 3 R b L T R L 10 T 79 39 0 216 36 volume Peak -Hour Factor, 1 0.90 0.90 0.90 0'90 0,90 0.90 40 Hourly Flow Rate, HFR 11 87 0 0 240 — Percent Heav Vehicles 0 — — 0 — Undivided edian Type 0 RT Channelized 0 0 1 0 Lanes 0 1 0 TR onfi uration IT 0 U stream Signal 0 Eastbound Minor Street Westbound 10 11 12 ovement 7 8 9 L T R LT R Volume Peak -Hour Factor, PHF 0 0.90 0 0.90 0 0.90 60 0.90 00.90 0.90 1 Hourly Flow Rate, HFR 0 0 0 66 0 0 1 0 Percent Heavy Vehicles 0 0 0 0 Percent Grade (°k) 0 0 Flared Approach N N 0 0 Storage 0 RT Channelized VL 0 0 1 Lanes 0 0 0 1 R Configuration Delay, Queue Len th and Levet of Service Eastbound Approach NB SB Westbound 1 4 7 8 9 10 11 12 Movement L R Lane Configuration LT 1 (vph) 11 66 630 784 C (m) (vph) 1294 0.10 0.00 /c 0.01 0.35 0.00 950 queue length 0.03 Control Delay 7.8 11.4 A A LOS A 8 11.4 [Approach Delay — — B pproach LOS Rights Reserved IICS200dT Vcmion 4. Id Copyright (0 2003 Univcnity or Florida, NI Rights F—mod Page 40 Vcraion 4. Id page 1 of 1 Rights Reserved Vmsim 4.Id 11CS20001 M Cupynght 02003 Univcnity orFlutib, AN Rig6t+Rwmry d Version 4.1d Page 41 . n n innnc TWO-WAY STOP CONTROL SUMMARY site Information General Information North Limier Analyst D. Thompson ntersection ACHD gency/Co. Thompson Engineers, Inc. Jurisdiction Year 2025 Total Traffic Performed 4/13/06atysis Analysis Time Period PM Peak Hour Project Descri tion South Ri orth/South Street: East/West Street: North Entrance udy Period hrs : 0.25 Intersection Orientation: North-South Vehicle Volumes and Adjustments Southbound et Major Street Northbound 5 6 Movement L T R T R i7 104 0 0 251 34 Volume Peak -Hour Factor PHF 0.90 0.900'p0 090 0.90 278 0.90 37 Hourly Flow Rate, HFR 18 115 0 av Percent HeVehicles 0 — — Undivided 0 edian T e 0 RT Channelized 0 0 1 0 Lanes 0 1 0 TR Configuration LT 0 U tream Signal 0 Eastbound Minor Street Westbound 10 11 12 movement 7 8 9 R L T R L 0 T 0 0 65 0 15 olume Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 16 Hour Flow Rate, HFR 0 0 0 72 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 Percent Grade (%) 0 N Flared Approach N 0 0 Storage 0 RT Channelized 0 0 1 Lanes 0 0 0 R Configuration Dela Queue Len th, and Level of Service Eastbound Approach NB SB Westbound 12 1 4 7 8 9 10 11 Movement L Ft Lane Configuration LT 72 1 6 (vph) 18 565 748 (m) (vph) 1257 0.13 0.02 /c 0.01 0.44 0.07 5% queue length 0.04 12.3 9.9 Control Delay 7.9 B A LOS A 11,9 [Approach Delay — — B pproach LOS Rights Reserved Vmsim 4.Id 11CS20001 M Cupynght 02003 Univcnity orFlutib, AN Rig6t+Rwmry d Version 4.1d Page 41 . n n innnc rage t of t TWO-WAY STOP CONTROL SUMMARY General Information ite Information Analyst D. Thompson ntersection gencyiCo. Thompson Engineers, Inc. urisdiction Date Performed 4/13/06 nalysis Year nal sis Time Period PM Peak Hour Pro'ect Des cri tion South R'Ile East/West Street: South Linder Entrance Entrancetud� Period (h Street.South 0.5 Intersection Orientation: North-South South Limier Entrance ACHD P010 Total Traffic Vehicle Volumes and Ad'ustments Southbound Major Street Northbound 4 5 6 Movement 1 T T R R L L183 10 78 0 0 48 Volume Peak -Hour Factor PHF 0.90 0.90 0.90 0'� 0.90 203 0.90 53 Hourly Flow Rate, HFR 11 87 0 Percent Heavy Vehicles 0 — — Undivided 0 edian T pe 0 RT Channelized 0 0 1 0 0 1 0 TR i uration LT0ream k,ans Si nal 0 Street Westboundr 9 10 11 12 ovement 7 8 R L T R L 0 T 0 0 30 0 14 Volume Peak -Hour Factor, PHF 0.90 0.90 0.90 0.90 0.090 0.50 Hour Flow Rate, HFR 0 0 0 33 0 0 Percent Hea Vehicles 0 0 0 0 0 Percent Grade 0 N Flared Approach N 0 Storage 0 0 RT channelized 0 0 0 Lanes 0 0 0 0 LR onfiguration Delay, Queue Len th and Level of Service Eastbound pproach NB SB Westbound 12 Movement 1 4 7 8 9 10 11 [.R Lane Configuration LT 48 (vph) 11 698 (M) (Vph) 1321 0.07 Ic 0.01 0.22 95% queue length 0.03 i0.5 Control Delay. 7.7 B LOS A 10.5 pproach Delay — — B pproach LOS — Rights Reserved Vo,xian 4.1d //CS2000rM Copyright @ 20t131)nivmity of (Mridn, All Righty Raarvcd Version 4. Id Page 42 n n z ronnC rage i or i Rights Reserved Vasian 4.1d HCS2000TM Copynghl (0 2003 Univm�ity Offlmida, AR RiglrL+ Rncrvcd Ve im 4.1d pagc 43 4/13/2006 Page 1 of t Rights Reserved 11C:S2000TM Version 4. rd <bpy`ight co 2o03 nnivc ity of Rbrida, All RighL, R—cd Vmion 4.Id Page 44 . J, o innnc TWO-WAY STOP CONTROL SUMMARY General InformationSite Information Ten Mile Road Entrance Analyst D. Thompson Intersection ACRD Agency/Co. Thompson Engineers, Inc. Jurisdiction p0f0 Total Traffic Date Performed 4113/06 Analysis Year Analysis Time Period PM Peak Hour. Project Descri tion South Ridge North/South Street: Ten Mile East/West Street: Entrance ud Period hrs : 0.25 Intersection Orientation: North-South Vehicle Volumes and Adjustments southbound Major Street Northbound 6 Movement. L T R L Q T 276 R 24 20 617 Q Volume Peak -Hour Factor PHF 0.90 0.90 0.90 0.90 0.90 685 0.90 0 Hourly Flow Rate, HFR 0 906 26 22 — Percent Heavv Vehicles 0 — — 0 _ Undivided edian T 0 RT Channelized 0 1 1 p Lanes 0 1 TR 1 L T Confi uraticn 0 U stream Si nal 0 Minor Street Westbound —E 10 -s 11 12 Movement 7 8 g T R L T R L olume Peak -Hour Factor PHF 10 0.90 0 0.90 15 0.90 0 0.0 0 0.00 0 0090 Hour Flow Rate, HFR 11 0 16 Q 0 Heavy Percent Vehicles 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N 0 0 Storage 0 RT Channelized 0 0 0 Lanes 1 Q 1 0 Confi uration L R Delay,Queue Len th, and Level of Service Eastbound Approach NB 58 Westbound 1 4 7 8 9 10 11 12 Movement Lane Configuration L L R (vph) 22 11 16 (m)(vph) 1239 254 739 lc 0.02 0.04 0.02 5% queue length 0.05 0.14 0.07 Control Delay 8.0 19.8 10.0 LOS A C A Approach Delay — — 14.0 Approach LOS — B Rights Reserved 11C:S2000TM Version 4. rd <bpy`ight co 2o03 nnivc ity of Rbrida, All RighL, R—cd Vmion 4.Id Page 44 . J, o innnc Yage 1 of 1 Rights Reserved Vcoinn 4. 1, HCS200e�` Copyright (9 2003 Univcmiry of f bride, NI Righb Rcscrv�d V,"ion 4.1d Page 45 A11119ON rage r TWO-WAY STOP CONTROL SUMMARY 1r.:e:n:e_raIInf ormation ite Information nal st aourn - - D. Thompson Agency/C7 Thompson En ineers, Inc. Date Performed 713/06 Anatysis Time Period EM Peak Hour aourn - - L T R L rc Volume veh/h) 0 263 25 85 0.90 558 0.90 0 0.90 Peak -hour factor, PHF 0.90 0.90 0.90 0 Hourly Flow Rate veh/h) 0 292 27 94 620 Proportion of heavy 0 — — 0 — — ehicles, PFfv Undivided Median type 0 RT Channelized? 0 0 Lanes 0 1 0 0 1 Configuration TR LT UpstreamSi nal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R volume veh/h) 15 0.90 0 0.90 150 0.90 0 0.90 0 0.90 0 0.90 Peak -hour factor, PHF 0 Hourly Flow Rate (veh/h) 16 0 55 0 0 Proportion of heavy 0 0 0 0 0 0 vehicles, PHv Percent grade (%} 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 1 0 1 0 0 0 0 onfiuration LTR Control Delay, Queue Length. Level of Service Approach Fg WB Northbound Southbound movement 1 4 7 a 9 10 11 12 Lane Configuration LT LTR Volume, v (vph) 94 71 Capacity, cm (vph) 1252 477 /c ratio 0.08 0.15 Queue length (95%) 0.24 1 0.52 Control Delay (s/veh) 8.1 13.9 LOS A B [Approach delay (s/veh) — — 13.9 pproach LOS — — B V_;- e.1, 1=2000TM tgpyne°r Page 46 , rage i ui i »csznoaM Page 47 4/13/200( page 1 oY 1 tics2006' Page 48 4/14/200 rage I of t HCS2lA9GTM ,.,.i�rrr��,, .,. ....... ...... ....... _ Page 49 4/14/200 rage i or i HCS1G70TM ......., Page 50 4/14/200 r agc i ui i rtcszaao Page 51 4/14/200( rage i or r TWO-WAY STOP CONTROL SUMMARY l�.... i.vnl Inf�rMnLinr� IQ;*A Infnrmni•inn Analyst D. Thompson ntersection Overland and East Central A,gency/Co. Thompson Engineers, Inc. urisdiction ACHD Date Performed 4113106 nat sis Year 2010 Total Traffic Analysis Time Period PM Peak Hour Hourl Flow Rate veh/h 0 Volume veh/h) 0 1 307 1 15 A 50 ti6z u Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourl Flow Rate veh/h 0 341 16 55 757 0 Proportion of heavy ehicles, PKV 0 — — 0 — — edian type 0 0 0 Undivided 0 0 RT Channelized? 0 0 1 P grade (%) 0 I_anas 0 1 1 0 1 0 1 0 HCS2000T" Copyright 97 2003 Uni m. ity of Florida, All Righu Ra d Vmiam 4. Id Page 52 _ ,_ _ ,_ _ _ L T R L T R Volume veh/h) 8 0 30 0 0 0 Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate (veh/h) a 0 33 0 0 0 Proportion of heavy ehicles, PHv 0 0 0 0 0 0 P grade (%) 0 0 Fercent lared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 1 0 0 0 0 onfi uration LTR Control Dela Queue Len th Level of Service pproach EB WB Northbound Southbound ovement 1 4 7 a 9 10 11 12 Lane Configuration LT LTR olume, v (vph) 55 41 apacity, cm (vph) 1213 462 /c ratio 0.05 0.09 ueue length (95%) 0.14 0.29 Control Delay (s/veh) 8.1 13.5 -OS A 8 pproach delay (s/veh) — — 13.5 pproach LOS — — 8 HCS2000T" Copyright 97 2003 Uni m. ity of Florida, All Righu Ra d Vmiam 4. Id Page 52 _ ,_ _ ,_ _ _ rage i vi i TWO-WAY STOP CONTROL SUMMARY C.ans3ml Infnrmafinn Site Infnrmatinn st P. Thom son ntersection Overland and East Central /Co. Thom son En ineers Inc urisdiction CHD Performed i 13/06 E nal sis Year 025 Total Trakis Time Period PM Peak Hour South a'or Street Eastbound Westbound ovement 1 2 3 4 5 6 L T R L T R olume veh/h 0 235 30 30 383 0 eak-hour factor, PHF [Hourly 0.90 0.90 0,90 0.90 0.90 0.90 Flow Rate yeh/h 0 261 33 33 425 0 roportion of heavy hicles, PHv 0 — 0 — — Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume veh/h) 20 0 15 0 0 0 Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0,90 0.90 Hourly Flow Rate (veh/h) 22 0 16 0 0 0 Proportion of heavy ehicles, PHv 0 0 0 0 0 0 Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 1 0 0 0 0 Confi uration LTR ontrol Delay, Queue Length, Level of Service %pproach EB WB Northbound Southbound ovement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR plume, v (vph) 33 38 Capacity, cm (vph) 1279 465 /c ratio 0.03 0.08 ueue length (95%) 0.08 0,27 Control Delay (s/veh) 7.9 13.4 LOS A B Approach delay (s/veh) — — 13.4 Approach LOS — — B IIC8100eT ' Copyright 0 2003 Univc ky of Fbrida, All Rights R=c od Vmw" 4.Id Page 53 A 11 A JnnAe rage 1 01 1 I TWO-WAY STOP CONTROL SUMMARY Gyral information Siff Infnrmafinn na st Thompson Intersection Overland and East Entrance enc /Co. Thompson Engineers, Inc. ;4M Jurisdiction CHD Date Performed 13/06 _ Analysis Year 010 Total Traffic na sis Time Period Peak Hour 22 "OaK-nourtactor, rHr U. Yu 1 0.90 1 0.90 1 0.90 1 0.90 1 0.90 'icurly Flow Rate vehih 0 352 22 88 780 0 Proportion of heavy ehicles, PHv 0— Southbound Median type Movement 7 Undivided 9 RT Channelized? 10 0 12 0 Lanes 0 1 D 1 0 1 1 1 0 Lstream 51 nal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T ft olume veh/h 30 0 80 0 0 0 P eak-hour factor, PHF 0.9D 0.90 0.90 0.90 0.90 0.90 H ourty Flow Rate (veh/h) 33 0 88 0 0 0 P roportion of heavy ehicles, PHv 0 0 0 0 0 0 Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 1 0 0 0 0 Configuration LTR Control Delay, Queue Len th Level of Service pproach EB WB Northbound Southbound ovement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR Volume, v (vph) 86 121 Capacity, cm (vph) 1196 364 /c ratio 0.07 0.33 Queue length (95%) 0.24 1.43 Control Delay (sNeh) 8.2 19,7 LOS A C pproach delay (s/veh) — — 19.7 pproach LOS — _ C HCS200p"^ Copyright O 2003 LJnivMity offlc ida, All Rights Rmmv°d Vcrsimr 4.14 Page 54 411 4/7006 i agc i VA I HCS2000' °' Copyright W 2003 llnivmiily of Flnridn, All Right, Rc m d Vmion 4.Id Page 55 4/14/2006 TWO-WAY STOP CONTROL SUMMARY General Information Site Information nalst D. Thom sone Overland andEastEntrance enc /Co. Thom son En,igneers, Inc. c6on CHD ate Performed 13/06 Rnterrection s Year 2025 Total Tralflc na sis Time Period PM Peak Hour Project Description South Ridge EastMest Street: Ovetiand North/South Street: East Entrance Intersection Orientation: East-West tud Period hrs : 0.25 ehicle Volumes and Adjustments Ma"or Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R plume veh/h 0 190 60 68 343 0 Peak -hour factor, PHF 0.90 0.90 p.90 0.90 0.90 0.90 Hourly Flow Rate veh/h) 0 211 66 75 381 0 Proportion of heavy ehicles, PHv 0 — — 0 — — Median type Undivided RT Channelized? 0 0 Lanes 0 10 A 0 1 0 Confiuration TR LT U stream Si nal 0 0 Minor Street I Northbound Southbound ovement 7 8 9 14 11 12 L T R L T R plume veh/h) 70 0 75 0 0 0 Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate (veh/h) 77 0 83 0 0 0 Proportion of heavy ehicles, PHv 0 0 0 0 0 0 Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 1 0 0 0 0 onfiuration LTR Control Dela Queue Len th Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LTR olume, v (vph) 75 160 Capacity, cm (vph) 1298 492 /c ratio 0.06 0.33 ueue length (95%) 0.18 1,40 Control Delay (s/veh) 7.9 15.8 LOS A C pproach delay (s/veh) — — 15.8 pproach LOS _ _ C HCS2000' °' Copyright W 2003 llnivmiily of Flnridn, All Right, Rc m d Vmion 4.Id Page 55 4/14/2006