FFCL for Citidel II Self Storage RZ CUPCITY OF OF LAW �E IDIAN -- FINDINGS OF FACT,AND DECISION & ORDER In the Matter of the Request for Rezone of 5.44 Acres to the C -C Zoning District, Conditional Use Permit for a Self-service Storage Facility AND Alternative Compliance to deviate from the Parking Standards set forth in UDC 11 -3C -6B, for the Property Located on the East side of S. Eagle Road; North of E. Easy Jet Drive, by C4 Land, LLC. Case No(s). RZ-14-004; CUP -14-007 and ALT -14-006 For the City Council Hearing Date of: July 22, 2014 (Findings on August 5, 2014) A. Findings of Fact 1. Hearing Facts (see attached Staff Report for the hearing date of July 22, 2014, incorporated by reference) 2. Process Facts (see attached Staff Report for the hearing date of July 22, 2014, incorporated by reference) 3. Application and Property Facts (see attached Staff Report for the hearing date of July 22, 2014, incorporated by reference) 4. Required Findings per the Unified Development Code (see attached Staff Report for the hearing date of July 22, 2014, incorporated by reference) B. Conclusions of Law 1. The City of Meridian shall exercise the powers conferred upon it by the "Local Land Use Planning Act of 1975," codified at Chapter 65, Title 67, Idaho Code (I.C. §67-6503). 2. The Meridian City Council takes judicial notice of its Unified Development Code codified at Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has, by ordinance, established the Impact Area and the Amended Comprehensive Plan of the City of Meridian, which was adopted April 19, 2011, Resolution No. 11-784 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A. 4. Due consideration has been given to the comment(s) received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. 5. It is found public facilities and services required by the proposed development will not impose expense upon the public if the attached conditions of approval are imposed. CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). RZ-14-004, CUP -14-007 and ALT -14-006 -1- 6. That the City has granted an order of approval in accordance with this Decision, which shall be signed by the Mayor and City Clerk and then a copy served by the Clerk upon the applicant, the Planning Department, the Public Works Department and any affected party requesting notice. 7. That this approval is subject to the Conditions of Approval all in the attached Staff Report for the hearing date of July 22, 2014, incorporated by reference. The conditions are concluded to be reasonable and the applicant shall meet such requirements as a condition of approval of the application. C. Decision and Order Pursuant to the City Council's authority as provided in Meridian City Code § 11-5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's request for rezone, conditional use permit and alternative compliance is hereby approved per the conditions of approval in the attached Staff Report for the hearing date of July 22, 2014, attached as Exhibit A. D. Notice of Applicable Time Limits Notice of Two (2) Year Conditional Use Permit Duration Please take notice that the conditional use permit, when granted, shall be valid for a maximum period of two (2) years unless otherwise approved by the City. During this time, the applicant shall commence the use as permitted in accord with the conditions of approval, satisfy the requirements set forth in the conditions of approval, and acquire building permits and commence construction of permanent footings or structures on or in the ground. For conditional use permits that also require platting, the final plat must be signed by the City Engineer within this two (2) year period. Upon written request and filed by the applicant prior to the termination of the period in accord with 11 -5B -6.G.1, the Director may authorize a single extension of the time to commence the use not to exceed one (1) two (2) year period. Additional time extensions up to two (2) years as determined and approved by the City Council may be granted. With all extensions, the Director or City Council may require the conditional use comply with the current provisions of Meridian City Code Title I I(UDC 11-513-617). Notice of Two (2) Year Development Agreement Duration The development agreement shall be signed by the property owner and returned to the City within two (2) years of the City Council granting annexation and/or rezone (UDC 11-513-313). A modification to the development agreement may be initiated prior to signature of the agreement by all parties and/or may be requested to extend the time allowed for the agreement to be signed and returned to the City if filed prior to the end of the two (2) year approval period (UDC 11-513-317). E. Notice of Final Action and Right to Regulatory Takings Analysis 1. The Applicant is hereby notified that pursuant to Idaho Code 67-8003, denial of a development application entitles the Owner to request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). RZ-14-004, CUP -14-007 and ALT -14-006 -2- final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. 2. Please take notice that this is a final action of the governing body of the City of Meridian. When applicable and pursuant to Idaho Code § 67-6521, any affected person being a person who has an interest in real property which may be adversely affected by the final action of the governing board may within twenty-eight (28) days after the date of this decision and order seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. F. Attached: Staff Report for the hearing date of July 22, 2014 CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). RZ-14-004, CUP -14-007 and ALT -14-006 -3- By action of the City Council at its regular meeting held on the 2014. COUNCIL PRESIDENT CHARLIE ROUNTREE COUNCIL VICE PRESIDENT KEITH BIRD COUNCIL MEMBER DAVID ZAREMBA COUNCIL MEMBER JOE BORTON COUNCIL MEMBER LUKE CAVENER COUNCIL MEMBER GENESIS MILANI MAYOR TAMMY de WEERD (TIE BREAKER) 5 dayof uSk VOTED o, e2 VOTED a e VOTED I 2. VOTED aye VOTED a� e VOTED at VOTED Mayor m y de Weerd Copy served upon Applicant, The Planning Department, Public Works Department and City Attorney. By: Dated: Ci le c' • r CITY OF MERIDIAN FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION & ORDER CASE NO(S). RZ-14-004, CUP -14-007 and ALT -14-006 -4- EXHIBIT A STAFF REPORT Hearing Date: July 22, 2014 TO: Mayor and City Council C/ fERIDIAN*,�- FROM: Bill Parsons, Associate City Planner I D A H O (208)884-5533 SUBJECT: RZ-14-004, CUP -14-007 and ALT -14-006 — Citadel II Self-service Storage Facility 1. SUMMARY DESCRIPTION OF APPLICANT'S REQUEST The applicant, Citadel Storage, LLC has applied for rezone (RZ), conditional use permit (CUP) approval and alternative compliance (ALT) to develop a self-service storage facility consisting of twelve (12) storage buildings and one office building on approximately 4.8 acres in a proposed C -C zoning district. 2. SUMMARY RECOMMENDATION Staff recommends approval of the proposed applications with the conditions listed in Exhibit B, based on the Findings of Fact and Conclusions of Law in Exhibit D. The Meridian Planning and Zoning Commission heard these items on June 19, 2014. At the public hearing, the Commission voted to recommend approval of the subject RZ and CUP requests. a. Summary of Commission Public Hearing: i. In favor: Jim Conger ii. In opposition: None iii. Commenting: Jake Centers, Mike Darr and Ed Williams iv. Written testimony: Jim Conger V. Staff presenting application: Bill Parsons A. Other staff commenting on application: Justin Lucas b. Key Issue(s) of Discussion by Commission: i. The design of the proposed development. ii. The 10 -foot setback adjacent to the single family residences along the east boundary. iii. Facilitating a safe pedestrian crossing at Eagle Road. iv. Grading of the site and the elevation difference between the proposed development and the adjacent residences to the east. v. Coordination with the Sutherland Farms HOA on the relocation of the existing fence in the northeast corner of the development. A. Access and maintenance to the 10 -foot wide buffer area along the east boundary. c. Key Commission Change(s) to Staff Recommendation: i. Commission struck condition 1.2.2, bullet #4. ii. Commission struck condition 1.2.19. iii. Commission modified condition 1.2.5b striking the requirement to add the accent band to the west facade. iv. Commission modified condition 1.2.5c striking the requirement for a solid access gate for the main entrance into the complex. d. Outstanding Issue(s) for City Council: i. The 10 -foot setback along the east boundary. Based on public testimonv, the Commission recommends a 15 -foot setback. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 1 EXHIBIT A ii. The applicant is reauestinu a Council waiver to allow the main access to the 3. PROPOSED MOTION Approval After considering all staff, applicant and public testimony, I move to approve File Numbers RZ-14- 004 and CUP -14-007 as presented in staff report for the hearing date of July 22, 2014 with the following modifications: (Add any proposed modifications.) Denial After considering all staff, applicant and public testimony, I move to recommend denial of File Numbers RZ-14-004 and CUP -14-007 as presented in staff report for the hearing date of July 22, 2014 for the following reasons: (You should state specific reason(s) for denial.) Continuance I move to continue File Numbers RZ-14-004 and CUP -14-007 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance.) 4. APPLICATION AND PROPERTY FACTS a. Site Address/Location: (Parcel #S1121325785) The site is located on the east side of S. Eagle Road, north of E. Easy Jet Drive in the SW'/4 of Section 21, Township 3N., Range IE. b. Owner/Applicant: C4 Land, LLC 1627 S. Orchard Street, Suite #24 Boise, ID 83705 Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE development from S. Eagle Road. ACHD staff has approved the proposed access to The Meredean Eaule Road. ity Council heard these items on July 22. 2014. At the public hearinP_ th Council approved the subject RZ and CiJP request a, ummary of City Council Public Hearing: L In favor, dim Conger iL In opposition: None in. Commenting:.Jake Centers and Lori .tones jy, Written testimony:.7im Conger y, Staff presenting application: Bill Parsons 31 Other staff commenting an annlication: None L Key Issues of Discussion by Council- y The 104nnt wide landscape buffer on the east boundary. iL The design of the proposed facility regarding the metal siding as the primary building material, the new office elevation and the block parapets adjacent to Eagle Road c, Key Council Changes to Staff/Commission Recommendation L The Council modified condition 1.2.5b eliminating the requirement for the hyo l21 50 - foot wide parapets. The applicant is required to submit an alternative compliance application concurrent with the certificate of zoning compliance annlication to nermi jj, the 254nnt wide parapets A new condition requires on the west facade. the office building to he constructed as shown in Exhibit A. jij Condition 1.2.3. bullet #3 was undated to reflect the Council's approval of the 10 -foo wide landscape buffer on the east boundary. jy, Condition 1.2.2_ bullet #3 was updated to reflect the Council's approval of the access to S. Eagle Road. 3. PROPOSED MOTION Approval After considering all staff, applicant and public testimony, I move to approve File Numbers RZ-14- 004 and CUP -14-007 as presented in staff report for the hearing date of July 22, 2014 with the following modifications: (Add any proposed modifications.) Denial After considering all staff, applicant and public testimony, I move to recommend denial of File Numbers RZ-14-004 and CUP -14-007 as presented in staff report for the hearing date of July 22, 2014 for the following reasons: (You should state specific reason(s) for denial.) Continuance I move to continue File Numbers RZ-14-004 and CUP -14-007 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance.) 4. APPLICATION AND PROPERTY FACTS a. Site Address/Location: (Parcel #S1121325785) The site is located on the east side of S. Eagle Road, north of E. Easy Jet Drive in the SW'/4 of Section 21, Township 3N., Range IE. b. Owner/Applicant: C4 Land, LLC 1627 S. Orchard Street, Suite #24 Boise, ID 83705 Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE EXHIBIT A c. Representative: Jim Conger, Conger Management Group (336-5355) d. Applicant's Request: Please see applicant's narrative for this information. 5. PROCESS FACTS a. The subject application is for a rezone and a conditional use permit. A public hearing is required before the Planning and Zoning Commission and City Council on this matter, consistent with Meridian City Code Title 11, Chapter 5. b. Newspaper notifications published on: June 2, and 16, 2014 (Commission); June 30, and July 14, 2014 (Council) c. Radius notices mailed to properties within 300 feet on: May 22, 2014 (Commission); June 26, 2014 (Council) d. Applicant posted notice on site by: June 9, 2014 (Commission); July 11, 2014 (Council) 6. LAND USE a. Existing Land Use(s): The subject site is vacant land; zoned R-4. b. Description of Character of Surrounding Area and Adjacent Land Uses and Zoning: 1. North: Ridenbaugh Canal and Silverstone Business Park, zoned C -G 2. East: Sutherland Farms Subdivision, zoned R-8 3. South: Office Park, zoned L -O 4. West: Eagle Road, Thousand Springs Subdivision and Fire Station, zoned R-4 and L -O c. History of Previous Actions: In 2002, the property was approved as part of a larger planned unit development (AZ -02-004 and CUP -02-005) consisting of single family, office, townhomes and multi -family for the Sutherland Farms Subdivision. Specifically, the property proposed for development was approved through a use exception to allow either an office development or a multi -family development in the R-4 zoning district. A development agreement was required with the annexation of the property and recorded as instrument #102143307. d. Utilities: 1. Public Works: Location of sewer: A sewer main intended to provide service to this parcel currently exists in the Southerland Farms development to the east. Location of water: A water main intended to provide service to this parcel currently exists in S. Eagle road. Issues or concerns: None e. Physical Features: 1. Canals/Ditches Irrigation: The Ridenbaugh Canal transverses the north boundary of the project. 2. Hazards: Staff is not aware of any hazards that exist on the property. 3. Flood Plain: NA 4. Topography: NA 7. COMPREHENSIVE PLAN POLICIES AND GOALS Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE EXHIBIT A The subject property is designated Mixed Use Community (MU -C) on the Comprehensive Plan Future Land Use Map. The requested C -C zoning district is an appropriate zone for the Mixed- use Community designation of the property. The Comprehensive Plan envisions a mixed-use development to have at least three (3) different land uses. With this project, the applicant is proposing a single use for the property; however a mix of uses (residential, commercial and public/quasi-public) has developed in the area that supports the single use for this property. To the east are developed patio homes, to the north are two (2) large scale business parks, to the south is an office park and to the west is more single family residential and a fire station. The mixed use designation also encourages compatibility and connectivity between all of the uses. Similar design characteristics are encouraged so new development blends in with the character and appearance of the surrounding developments. Further, the mixed use standards encourage a transitional use between the commercial and existing residential uses. Staff believes the proposed storage facility is an ideal transitional use to buffer the patio homes from S. Eagle Road because of the low intensity of the use and the lower traffic volumes. However, staff is of the opinion the design of the facility should be more integrated with the surrounding developments to ensure the property develops in a fashion consistent with the comprehensive plan. Staff finds the following Comprehensive Plan policies to be applicable to this property and apply to the proposed development (staff analysis in italics): • Require appropriate landscape and buffers along transportation corridors (setback, vegetation, low walls, berms, etc.) (Chapter 3, pg. 54). The subject property abuts S. Eagle Road. The UDC requires a minimum 25 foot landscape buffer adjacent to this roadway. The buffer must he landscaped in accord with UDC 11-3B. • Plan for a variety of commercial and retail opportunities within the Impact Area (Chapter 3, pg. 51). This area of Meridian is lacking a self-service storage facility to serve the multiple single family and multi family developments in the area. • Protect existing residential properties from incompatible land use development on adjacent parcels (Chapter 3, pg. 53) A 6 -foot vinyl fence exists along the east and south boundary of the proposed development which was installed with the residential subdivision and the office park. The UDC requires a 25 foot wide landscape buffer between C-Czonedproperty and residential uses. The applicant is seeking a Council waiver to reduce the buffer width from 25 feet to 10 feet in accord with the UDC. The applicant contends a 10 foot wide landscape buffer provides enough separation between the storage facility and the existing homes given the operational characteristics associated with this type of use. The applicant has also provided an exhihit that demonstrates the views of the adjacent residences in relation to the proposed storage facility. The applicant believes that the metal structure with accented hardi plankpanels, approximately 9 -feet in height, will he screened adequately with proposed landscaping and the existing 6 -foot tall vinyl fence. To support the request, the applicant has submitted documentation from a majority of the adjacent neighbors supporting the reduced buffer and the proposed use. Based on testimony from adjacent residents and the operational aspects of the storage units, staff is supportive of the reduced buffer width. This buffer must he landscaped in accord with UDC 11-3B. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE EXHIBIT A • Ensure development provides safe routes and access to schools, parks and other community gathering places (Chapter 3, pg. 56). The applicant is responsible for constructing a 10 foot wide multi -use pathway along the north boundary. This pathway segment will connect with the pathway constructed in the adjacent developments (El Dorado Business Park and Sutherland Farms) however; a portion of it is separated by Eagle Road, a four lane arterial roadway. The Planning Division has concerns with pedestrian's crossing Eagle Road at the mid mile to gain access to the pathway. The City, the applicant and ACHD will need to coordinate on a solution for safe pedestrian crossing. One option is to retrofit the emergency signal installed at the Fire Station for the purpose ofproviding a signalized pedestrian crossing. • Require neighborhood and community commercial areas to create a site design compatible with surrounding uses (Chapter 3, pg. 52). The City has adopted a design manual to address compatihility between land uses. The applicant is proposing a commercial development adjacent to an established residential subdivision and an office park. Specifically, the applicant is proposing to develop the site with twelve (12) storage buildings and one office building. The primary building materials for these structures is metal siding accented with hardi plank siding and CMU block. The office building is more contemporary in design but is proposed to he constructed of stucco which is the same building materials as the adjacent commercial buildings to the north and south. The Meridian Design Manual and the UDC emphasizes a mix of materials and variations in roofplanes alongpuhlic spaces andpuhlic streets. Because this facility is on a highly visible corridor and surrounded by high quality development, staff is of the opinion the applicant should elevate the design of the facility and use building materials that complement the adjacent developments. The site must comply with the design standards set forth in UDC I I - 3A-19. • Maintain integrity of neighborhoods to preserve values and ambiance of areas (Chapter 3, pg. 52). If the applicant complies with the design guidelines outlined in the Meridian Design Manual, UDC design standards and specific use standards, staff is of the opinion the proposed use should maintain the integrity of the neighborhood. • Restrict private curb cuts and access points on collectors and arterial streets (Chapter 3, pg. 54). One access point has been provided from a shared driveway via Eagle Road. On the submitted plans this driveway will serve as secondary emergency access for the proposed development to eliminate the commercial traffic associated with the storage facility from impacting the office complex. Because the specific use standards require two means of access, the applicant is seeking Council waiver to allow the primary access from S. Eagle Road. ACHD staff has approved the proposed access to Eagle Road. • Permit new development only where urban services can be reasonably provided at the time of final approval and development is contiguous to the City (Chapter 3, pg. 45). The proposed development is contiguous to the city and city services are available to he extended to the site upon development in accord with UDC 11-3A-21. • Implement the City's Pathways Master Plan (Chapter 5, pg.71). Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGES EXHIBIT A The applicant is proposing to construct a 10 foot wide multi -use pathway along the north boundary of the proposed development in accord with the adopted plan. The proposed pathway must he constructed in accord with UDC 11-3A-8 and UDC 11 -3B -12C and the Nampa Meridian Irrigation District. Staff is of the opinion that the proposed use is generally consistent with the Comprehensive Plan and is generally compatible with the surrounding uses based on the analysis above. S. UNIFIED DEVELOPMENT CODE A. Purpose Statement of Zone: The purpose of the commercial districts is to provide for the retail and service needs of the community in accordance with the Meridian comprehensive plan. Six (6) districts are designated which differ in the size and scale of commercial structures accommodated in the district, the scale and mix of allowed commercial uses, and the location of the district in proximity to streets and highways. B. Schedule of Use: Unified Development Code (UDC) Table 11-2B-2 lists the principal permitted, accessory, conditional, and prohibited uses in the C -C zoning district. The proposed self-service storage facility requires conditional use permit (CUP) approval in the C -C zoning district. Compliance with the specific use standards listed in UDC 11-4-3-34 for the use is also required. C. Dimensional Standards: Development of the site shall comply with the dimensional standards listed in UDC 11-2B-3 for the C -C zoning district. D. Landscaping 1. UDC 11 -3B -8C regulates the parking lot standards of the development code (see section 9 below for further analysis). 2. UDC 11 -3B -9C regulates the landscape buffers adjacent to residential land uses (see section 9 below for further analysis). 3. Width of street buffer(s): 25 feet along Eagle Road. 4. The proposed pathway shall comply with the standards in accord with UDC 11 -3B -12C. E. Off -Street Parking: UDC 11 -3C -6B requires 1 space for every 500 square feet of gross floor area; a total of 74,423 square foot of building area is proposed. Based on this amount, 149 parking stalls would be required; four (4) are proposed (see section 9 below for further analysis). F. Self -Service Uses: UDC 11-3A-16 lists the specific requirements for self service uses (see section 9 below for further analysis). G. Structure and Site Design Standards: Development of this site must comply with the design standards in accord with UDC 11-3A-19. 9. ANALYSIS a. Analysis of Facts Leading to Staff Recommendation: Rezone (RZ): The applicant has applied to rezone 5.44 acres of land with a C -C zoning district. The requested zoning is consistent with the MU -C land use designation. The original vision for the property was to develop with either office or a multi -family uses with a later phase of the Sutherland Farm project. Both the receded development agreement and the approved PD allowed these uses as a use exception in the R-4 zoning district subject to conditional use permit approval by the City. The applicant is proposing to rezone the property to develop a self-service storage facility on the property. Under the UDC this use is allowed in the proposed C -C zoning with conditional use Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 6 EXHIBIT A permit approval. Because the office and/or multi -family is no longer proposed for this property, staff recommends a new development agreement to govern the property to ensure the site develops as proposed. See staff's recommended DA provisions in Exhibit B. Conditional Use Permit (CUP): The applicant has applied for a conditional use permit to develop the property with a self-service storage facility in the C -C zoning district, in accord with UDC Table 11-213-2. The development is proposed to consist of twelve (12) storage buildings, totaling 73,775 square feet and a 648 square foot office building. Self -Service Storage Facilities: The specific use standards for the self-service storage facility listed in UDC 11-4-3-34 apply to development of this site as follows: A. Storage units and/or areas shall not be used as dwellings or as a commercial or industrial place of business. The manufacture or sale of any item by a tenant from or at a self- service storage facility is specifically prohibited. The applicant must comply with this requirement. B. On-site auctions of unclaimed items by the storage facility owners shall be allowed as a temporary use in accord with Section 11-3E temporary use requirements of this Title. The applicant must comply with this requirement. C. The distance between structures shall be a minimum of twenty-five feet (25'). All of the proposed storage buildings meet or exceed the 25 foot distance requirement. D. The storage facility shall be completely fenced, walled, or enclosed and screened from public view. Where abutting a residential district or public road, chain-link shall not be allowed as fencing material. The applicant has designed the site so the perimeter storage buildings screen the facility from public view. Staff believes the applicant generally complies with this standard however; additional design requirements are recommended for the perimeter building along the west, north and south boundary. E. If abutting a residential district, the facility hours of public operation shall be limited to 6:00 a.m. to 11:00 p.m. The project is conditioned to comply with this requirement. F. A minimum twenty five foot (25') wide landscape buffer shall be provided where the facility abuts a residential use, unless a greater buffer width is required by this title. Landscaping shall be provided as set forth in subsection 11-313-9C of this title. The applicant is requesting a Council waiver to reduce the landscape buffer from 25 feet to 10 feet. A majority of the adjacent residents have consented to the reduced buffer if the applicant installs two (2) 2 -inch caliper trees spaced 20 feet apart, perms -bark and two (2) shrubs between every tree within the landscape buffer. Based on the submitted documentation staff is supportive of the reduced buffer width. G. If the use is unattended, the standards in accord with Section 11-3A-16 self-service uses of this Title shall also apply. (See standards from UDC 11-3A-16 below). H. The facility shall have a second means of access for emergency purposes. One access point has been provided from a shared driveway via Eagle Road. On the submitted plans this driveway will serve as secondary emergency access for the proposed development to eliminate the commercial traffic associated with the storage facility from impacting the office complex. Because of this standard, the applicant is seeking Council waiver to allow the primary access from S. Eagle Road. ACHD staff has approved the proposed access to Eagle Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 7 EXHIBIT A Road. Staff supports the access based on ACHD's approval and the low traffic generation and recommends the Council approve the access point as proposed. I. All outdoor storage of material shall be maintained in an orderly manner so as not to create a public nuisance. Materials shall not be stored within the required yards. Stored items shall not block sidewalks or parking areas and may not impede vehicular or pedestrian traffic. Outdoor storage is not proposed or approved for this site. All items must he stored within an enclosed storage unit. J. The site shall not be used as vehicle wrecking or junkyard as herein defined. The applicant shall comply with this requirement. K. For any use requiring the storage of fuel or hazardous material, the use shall be located a minimum of one thousand feet (1,000') from a hospital. The applicant is not proposing to store any hazardous material on the site. The applicant shall comply with this requirement. Self -Service Uses: The proposed use of the property is for a self-service storage facility. UDC 11-3A-16 requires all unattended self-service uses to comply with the following requirements: A. Entrance or view of the self-service facility shall be open to the public street or to adjoining businesses and shall have low -impact security lighting. The proposed development is located on a prominent corridor and should he highly visible from Eagle Road. B. Financial transaction areas shall be oriented to and visible from an area that receives a high volume of traffic, such as a collector or arterial street. N/A. C. Landscape shrubbery shall be limited to no more than three feet (3') in height between entrances and financial transaction areas and the public street. N/A Site Plan: Staff has reviewed the site plan (prepared by JDE, dated 04/15/14, included as Exhibit A.2) submitted with this application. The following items should to be revised on the site plan submitted with the Certificate of Zoning Compliance application: • The planter islands adjacent to the drive aisles along the main entrance and the secondary entrance must be 5 feet in width measured from inside of curb to inside of curb and landscaped in accord with UDC 11 -3B -SC. • Provide a bike rack detail on the plans submitted with the certificate of zoning compliance application. • Except for the primary access from Eagle Road (if approved by Council), all other driveways must be reconstructed with curb, gutter and 7 -foot attached sidewalk. • Located in the northeast corner of the development is a common lot developed with the Sutherland Farms Subdivision. Existing landscaping and fencing are encroaching on the applicant's property. The submitted site plan depicts modifications to this area. The applicant should coordinate with Sutherlands Farms HOA on the modification to the common lot. The applicant should provide written documentation from the HOA approving the changes. Landscaping: Staff has reviewed the landscape plan (prepared by Jensen belts Associates, dated 02/28/14, labeled as Sheet LIA, included as Exhibit A.3) submitted with this application. The applicant is proposing to develop the site in accord with the City's s water wise concepts. In general, staff is supportive of the submitted landscape plan however; staff recommends the Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE EXHIBIT A following items be revised on the landscape plan submitted with the Certificate of Zoning Compliance application: • Construct a 25- foot wide landscape buffer adjacent to Eagle Road in accord with UDC 11-313-50 and UDC 11-313-7C. Specifically, the applicant should include boulders, rock out-cropping's, or other hardscape features in accordance with UDC 11 -3B -5N. • Parking lot landscaping is required to be provided in accord with the standards listed in UDC 11-313-8C. Each planter island that serves a single row of parking spaces is required to be landscaped with at least one tree and shall be covered with low shrubs, lawn, or other vegetative groundcover that touches at 70 percent at maturity. • If Council approves the reduction in the buffer width from 25 feet to 10 feet, the landscape buffer must be landscaped with two (2) 2 -inch caliper trees spaced 20 feet apart, perma bark and two (2) shrubs between every tree as prosed and agreed upon with the adjacent neighbors. • Pathway landscaping is required to be provided in accord with the standards listed in UDC 11-313-50 and UDC 11-313-12C. Specifically, the applicant should include boulders, rock out-cropping's, or other hardscape features in accordance with UDC 11-313-5N. Multi -use Pathway: The applicant is proposing to construct a 10 -foot wide multi -use pathway along the north boundary. This pathway segment will connect with the pathway constructed with the El Dorado Business Park and Sutherland Farms Subdivision. A portion of the pathway is separated by Eagle Road, a four lane arterial roadway. The Planning Division has concerns with pedestrian's crossing Eagle Road at the mid mile to gain access to the pathway. The City, the applicant and ACHD will need to coordinate on a solution for safe pedestrian crossing. Staff recommends the applicant coordinate with ACHD and the Fire Department to see if there is an option to retrofit the emergency signal installed at the Fire Station for the purpose of providing a signalized pedestrian crossing. Building Elevations: The proposed development is required to comply with the design review standards set forth in UDC 11-3A-19 and the Meridian Design Manual. The applicant has submitted renderings that demonstrate how the site will be viewed from the public streets and the future pathway. In the narrative, the proposed building materials for these structures include metal siding, hardi-plank siding and split face CMU block. The office building is more contemporary in design but is proposed to be constructed of stucco which is the same building materials as the adjacent commercial buildings to the north and south. Staff believes that the southern and eastern facades of this facility are adequately screened by existing structures, fencing and landscaping. Further, the applicant has also collaborated with the eastern property owners for additional landscaping along the east boundary. Staff recommends that the north and west elevations be revised to comply with the UDC and the Design Manual. The Design Manual and the UDC emphasize a mix of materials, articulated wall planes and variations in roof planes along public spaces and public streets. Further, the design standards limit the use of prefabricated steel panels to an accent material (UDC 11-3A-19A.2b). Because this facility is on a highly visible corridor, adjacent to a future pathway and is surrounded by high quality development, staff recommends revisions to the elevations that staff believes will meet the City's design review standards. With the submittal of the certificate of zoning compliance application include the following design changes: Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 9 EXHIBIT A 1) On the north elevation, the applicant should add another 20 -foot wide hardi-plank panel on the section of Building "L" directly east of the proposed office building. (The purpose of this recommendation is to further reduce the visibility of the metal paneling on this fagade adjacent to the pathway in accord with UDC 11 -3A -19A. Ia.); 2) On the west elevation, the two (2) 25 -foot wide block parapets should be extended to span 50 feet each. Further, all of the block along the west boundary, including the block parapets, should incorporate the following design elements: 1) a decorative cap or decorative cornice and an accent band consisting of a different color and textured material to provide articulation to the west fagade. (The purpose of this recommendation is to further reduce the visibility of the metal paneling on this fagade adjacent to the public street and incorporate some of the design elements from the adjacent development in accord with UDC 11 -3A -19A.1 and UDC 11 -3A -19A. Id.); 3) Both gates for the proposed development must be constructed of solid material to screen the interior of the development. (The purpose of this recommendation is to screen the interior of this storage facility from the street and adjacent properties in accord with UDC 11 -5B -8B.) If these design changes are made, staff is supportive of the submitted building elevations. Parking: Per UDC 11 -3C -6B, in commercial districts, one off-street parking space is required per 500 square feet of gross floor area. Based on the total square footage of structures on the site (74,423 s.f), 149 parking stalls are required; 5 spaces are proposed on the submitted site plan. Additionally, per UDC 11 -3C -6G, one bicycle parking space is required to be provided for every 25 vehicle spaces, in compliance with the standards listed in UDC 11 -3C -5C. The submitted site plan depicts the required bike rack. Because this is a unique use that doesn't really fit with the parking standards contained in the UDC, the applicant has requested alternative compliance in accordance with UDC 11-5B-5. Please see the alternative compliance section below for further analysis Alternative Compliance: The applicant has requested alternative compliance to deviate from the parking requirements outlined in the parking analysis above. Currently, the UDC requires the applicant provide 149 off-street parking spaces based on the square footages for the entire complex. The applicant is requesting that the parking ratio for the proposed development be calculated based on the office square footage (648 square feet) because it will be the only occupied space. Based on the operational characteristics (low traffic generation, lower intensity of use and hours of operation) for this type of facility and the storage buildings are not occupied buildings, the Director finds that four (4) parking spaces is adequate for the facility and approves the applicant's request for alternative compliance (see alternative compliance findings in Exhibit D). Certificate of Zoning Compliance (CZC) and Design Review (DES): A CZC application is required to be submitted prior to issuance of building permits. The applicant is required to obtain approval of a design review application for the proposed structures and site design for the self- service storage facility. This application may be submitted concurrently with the CZC application. The applicant must comply with the design standards listed in UDC 11-3A-19 and the guidelines contained in the Meridian Design Manual. In summary staff finds the proposed project complies with the future land use map, applicable policies of the Comprehensive plan and is conditioned to comply with the applicable development standards in the UDC. Based on the aforementioned analysis, staff recommends approval of the subject application. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 10 EXHIBIT A 10. EXHIBITS A. Drawings 1. Vicinity Map 2. Proposed Site Plan 3. Proposed Landscape Plan 4. Proposed Building Elevations B. Conditions of Approval 1. Planning Division 2. Public Works Department 3. Fire Department 4. Police Department 5. Parks Department 6. Republic Services 7. Ada County Highway District C. Legal Description and Exhibit Map D. Required Findings from Unified Development Code Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 11 A. Drawings 1. Vicinity Map Vicinity Map Legend ` � �Arw of Impact E Blue NorIZPI a- 3 � D a EXHIBIT A 0 0.25 0.5 Miles E �a. aalm as an m°�vmnl'aa,aaca�m 3' oI McMan malas n ""Is a� ¢. 'a., ii— I..s, mmpMwws aaervol are C 0 b bun0ea�end essumrs o Igtl aistauseaty tm IM N mbmb4m [mbireOman, aa, . Nate, < -'""" 1—yon Dr EQu'n Elaine Bluff Dr ,�. �r0 3 F I eek DI Indian o Dr � 3° E Raja Dr ? + u yesterni4lrt Sto _ E Easy Jet Dr 6 B in a a 3, o 511d, Or t I E Los gltpp r C 3' v < E Monk, Dr 3 / fR S�Nae4 Sb SH E Moon D peer St Q o STa4iN PI F_. m N E Nom. 4% E Vicmry R� I�� ' E Hero Dr (�E IDIZ IAN1 - Pant Dale: 5r302014 DAHO Vicinity Map D 0.225 0.4Miles lariat Dale: 5WW4 Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 10 IV� EXHIBIT A 2. Site Plan U VICINITY MAP Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 11 OH1FR ULW0.lIc APPNC/Wr: mao¢srwnce uc rmrs.axc STQm L SITE Pl pN 0.0 �a EXHIBIT A Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 13 EXHIBIT w 1Landscape m, Citadel ! Self Storage Facility— RZ-,4-00KCUPa4-007&Aar. PAGE 14 EXHIBIT A 4. Proposed Elevations n E45T ELEVATION U .. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 15 �i n E45T ELEVATION U .. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 15 EXHIBIT A Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 16 EXHIBIT A B. Conditions of Approval 1. PLANNING DIVISION 1.1.1 A new Development Agreement (DA) is required as a provision of rezone of this property. Prior to the rezone ordinance approval, a DA shall be entered into between the City of Meridian, the property owner(s) at the time of ordinance adoption, and the developer. A certificate of zoning compliance application will not be accepted until the DA is recorded. The applicant shall contact the City Attorney's Office to initiate this process. The DA shall be signed by the property owner and returned to the city within two (2) years of the City Council granting annexation. Currently, a fee of $303.00 shall be paid by the applicant to the City Clerk's office prior to commencement of the DA. The DA shall, at minimum, incorporate the following provisions: A. Future development of the site shall be consistent with the design standards in UDC 11-3A-19 and the guidelines in the Meridian Design Manual. B. The use of this property shall be restricted to the self-service storage facility approved by CUP -14-007, unless modified by City Council at a public hearing. C. Future development of this site is no longer subject to recorded DA instrument # 102143307 and CUP -02-005. D. Future development of the site shall comply with the ordinances in effect at the time of development. 1.2 Site Specific Conditions of Approval 1.2.1 Comply with all bulk, use, and development standards of the C -C zoning districts listed in UDC Tables 11-2B-3. 1.2.2 The site plan, prepared JDE, dated 04/15/14, is approved, with the conditions listed herein. The applicant shall revise the site plan as follows: • The planter islands adjacent to the drive aisles along the main entrance and the secondary entrance must be 5 feet in width measured from inside of curb to inside of curb and landscaped in accord with UDC 11 -3B -8C. • Provide a bike rack detail. • Except for the primary access from Eagle Road L approved by Council), all other driveways must be reconstructed with curb, gutter and 7 -foot attached sidewalk in accord with ACHD standards. 1.2.3 The landscape plan, prepared by Jensen Belts Associates, dated 02/28/14, shall be revised as follows: • Construct a 25- foot wide landscape buffer adjacent to Eagle Road in accord with UDC 11-3B-50 and UDC 11 -3B -7C. The applicant shall include boulders, rock out- cropping's, or other hardscape features in accordance with UDC 11 -3B -5N. Citadel 11 Self Storage Facility— RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 15 EXHIBIT A • Parking lot landscaping is required to be provided in accord with the standards listed in UDC 11 -3B -8C. Each planter island that serves a single row of parking spaces is required to be landscaped with at least one tree and shall be covered with low shrubs, lawn, or other vegetative groundcover that touches at 70 percent at maturity. • The Council approved a 10 -foot wide landscape buffer alone the east boundary of the proposed development. is r .. a _ "s twe .ea..,.tion to two pastom w.,rr _ width r_am rat to , 0 r et The landscape buffer shall include two (2) 2 -inch caliper trees spaced 20 feet apart, perma-bark, weed barrier and two (2) 5 -gallon shrubs between every tree as proposed and agreed upon with the adjacent neighbors. • Pathway landscaping is required to be provided in accord with the standards listed in UDC 11 -3B -12C. The applicant shall include boulders, rock out-cropping's, or other hardscape features in accordance with UDC 11 -3B -5N. • Pathway landscaping is required to be provided in accord with the standards listed in UDC 11 -3B -12C and UDC 11-3B-50. • Revise the landscape plan in accord with the site plan conditions noted in 1.2.2, bullet #1 above. 1.2.4 Development of the site shall comply with the specific use standards listed in UDC 11-4-3-34 "Storage Facility, Self -Service;" and the standards for unattended self-service uses listed in UDC 11-3A-16. All items must be stored within an enclosed storage unit. 1.2.5 The north and west elevations shall be revised as follows: a. On the north elevation, the applicant shall add another 20 -foot wide hardi-plank panel on the section of Building "L" directly east of the proposed office building; b. On thp myPO Wpiffltian-,The applicant shall submit an alternative compliance application to construct the two 2) 25 -foot wide block parapets on the west facade as nrpnpsed..hauld hp ,...tpnfl .a t..., en r t w Further, all of the block along the west boundary, including the block parapets, shall incorporate the feNewip� desis=p elea�en a decorative cap or decorative cornice andep eeeepthand to further articulate the west fagade. c. Beth The secondary entry gate adjacent to the office nark Hates for the a-606 , develet>ent must be a solid metal gate to screen the interior of the development. d. The applicant shall construct the office building as proposed in Exhibit A. The applicant shall comply with the design standards in accord with UDC 11-3A-19 and demonstrate compliance with the guidelines in the Meridian Design Manual. 1.2.6 The applicant shall submit a Certificate of Zoning Compliance application with revised plans that comply with the conditions of approval listed herein, prior to establishment of the new use. 1.2.7 All required improvements must be complete prior to obtaining a Certificate of Occupancy for the proposed development. A temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a letter of credit or cash in the amount of 110% of the cost of the required improvements (including paving, striping, landscaping, and irrigation). A bid must accompany any request for temporary occupancy. Citadel 11 Self Storage Facility-RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 16 EXHIBIT A 1.2.8 Provide temporary fencing around the perimeter of the building sites to contain debris during construction and shall be installed around the site prior to release of building permits. 1.2.9 Provide a pressurized irrigation system consistent with the standards as set forth in UDC 11-3A- 15, UDC 11-313-6 and MCC 9-1-28. 1.2.10 The applicant shall comply with the outdoor lighting standards shown in UDC 11-3A-11. Low impact security lighting shall be provided on the site in accord with UDC 11-3A-11 and the standards listed in 11 -3A -16A. 1.2.11 Per UDC 11-513-5132, the Director (at the applicant's request) approved the alternative compliance regarding the parking standards set forth in UDC 11 -3C -6B. 1.2.12 Staff s failure to cite specific ordinance provisions does not relieve the applicant of responsibility for compliance. 1.2.13 The applicant shall have a maximum of two (2) years to commence the use as permitted in accord with the conditions of approval listed above. If the use has not begun within two (2) years of approval, a time extension may be requested in accord with UDC 11-513-6F prior to expiration. If a time extension is not requested or granted and the CUP expires, a new conditional use permit must be obtained. 1.2.14 Comply with the provisions for irrigation ditches, laterals, canals and/or drainage courses, as set forth in UDC 11-3A-6. 1.2.15 The applicant shall have an ongoing obligation to maintain all pathways. Prior to Certificate of Occupancy for the first structure, a public pedestrian easement for the multi -use pathway on the north boundary shall be submitted to the Planning Division of the Community Development Department, approved by the City Council and recorded. 1.2.16 Install all utilities consistent with the standards as set forth in UDC 11-3A-21 and 11 -3B -5J. 1.2.17 The facility shall operate between the hours of 6:00 a.m. to 11:00 p.m. 1..2.18 The applicant shall coordinate all site improvements adjacent to the Ridenbaugh Canal with the Nampa Meridian Irrigation District. 2. PUBLIC WORKS DEPARTMENT 2.1 This development only requires sewer service to the small leasing office in the NW corner of the site, and therefore the applicant has proposed and Public Works has agreed to a small injection pump system that will pump the sewage generated from the leasing office over to a discharge point in Southerland Farms. 2.2 Water service to this site is available via an extension off of the existing main in S. Eagle Road, and through the SW corner into the South Stone Subdivision.. The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. 2.3 The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single -point connection to the culinary water system shall be required. If a single -point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to signature on the final plat by the City Engineer. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 17 EXHIBIT A 2.4 All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6. Plans shall be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non -approval submitted to the Public Works Department. If lateral users association approval can't be obtained, alternate plans shall be reviewed and approved by the Meridian City Engineer prior to final plat signature. 2.5 Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9-4-8 contact the City of Meridian Engineering Department at (208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190. 2.6 Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9-4-8. Contact Central District Health for abandonment procedures and inspections(208)375-5211. 2.7 Street signs are to be in place, water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District prior to applying for building permits. 2.8 A letter of credit or cash surety in the amount of 110% will be required for all uncompleted fencing, landscaping, amenities, etc., prior to signature on the final plat. 2.9 All development improvements, including but not limited to sewer, fencing, micro -paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy or letters of substantial completion. 2.10 Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. 2.11 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 2.12 Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Array Corps of Engineers. 2.13 Developer shall coordinate mailbox locations with the Meridian Post Office. 2.14 All grading of the site shall be performed in conformance with MCC 11-12-314. 2.15 Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 2.16 The engineer shall be required to certify that the street centerline elevations are set a minimum of 3 -feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1 -foot above. 2.17 The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 2.18 At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 18 EXHIBIT A approved prior to the issuance of a certification of occupancy for any structures within the project. 2.19 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval. Applicant shall also include the location of any existing street lights in the development plan set. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. 2.20 The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, water and reuse infrastructure for duration of two years. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 3. FIRE DEPARTMENT 3.1 Final Approval of the fire hydrant locations shall be by the Meridian Fire Department. a. Fire Hydrants shall have the 4'h" outlet face the main street or parking lot aisle. b. The Fire hydrant shall not face a street which does not have addresses on it. c. Fire hydrant markers shall be provided per Public Works specifications. d. Fire Hydrants shall be placed on corners when spacing permits. e. Fire hydrants shall not have any vertical obstructions to outlets within 10'. f. Fire hydrants shall be place 18" above finish grade. g. Fire hydrants shall be provided to meet the requirements of the IFC Section 509.5. It. Show all proposed or existing hydrants for all new construction or additions to existing buildings within 1,000 feet of the project. 3.2 Maintain a separation of 5' from the building to the dumpster enclosure as set forth in International Fire Code Section 304.3.3. 3.3 All common driveways shall be straight or have a turning radius of 28' inside and 48' outside and shall have a clear driving surface which is 20' wide and support an imposed weight of 75,000 GVW. 3.4 Operational fire hydrants, temporary or permanent street signs, and access roads with an all weather surface are required to be installed before combustible construction material is brought onto the site, as set forth in International Fire Code Section (IFC) 501.4 and Meridian amendment to IFC 104-2J. 3.5 Acceptance of the water supply for fire protection will be by the Meridian Fire Department and water quality by the Meridian Water Department for bacteria testing. 3.6 All entrances, internal roads, drive aisles, and alleys shall have a turning radius of 28' inside and 48' outside, per International Fire Code Section 503.2.4. 3.7 All aspects of the building systems (including exiting systems), processes & storage practices shall be required to comply with the International Fire Code. No hazardous materials are allowed to be stored on the site. 3.8 All electric gates are required to be 20' in width and equipped with a Knoxbox key switch as set forth in International Fire Code Section 503.6 & National Fire Protection Standard 1141, Section 5.3.17.3. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 19 EXHIBIT A 3.9 This project will be required to provide a 20' wide swing or rolling emergency access gate as set forth in International Fire Code Sections 503.5 and 503.6. The gate shall be equipped with a Knoxbox key switch. All gates at the entrance to fire lanes shall be located a minimum of 30 feet from the roadway and shall open away from the roadway, unless other provisions are made for safe personnel operations as set forth in National Fire Protection Standard 1141, Section 5.3.17. 3.10 Ensure that all yet undeveloped parcels are maintained free of combustible vegetation as set forth in International Fire Code Section 304.1.2. 3.11 Fire lanes, streets, and structures (including the canopy height of mature trees) shall have a vertical clearance of 13'6 as set forth in International Fire Code Section 503.2.1. 3.12 Provide a Knox box entry system for the complex prior to occupancy as set forth in International Fire Code Section 506. 3.13 All hydrants constructed within the interior of the facility shall be protected by bollards. 4. POLICE DEPARTMENT 4.1 The Police Department has no concerns related to the site design submitted with this application. 5. PARKS DEPARTMENT 5.1 Construct a multi -use pathway along the north boundary as proposed. Prior to occupancy of the first structure, the applicant submit a public access easement to the Planning Division of the Community Development Department for the multi -use pathway on the north boundary for approval by City Council and subsequent recordation. 5.2 The applicant shall have an ongoing obligation to maintain the pathway. 6. REPUBLIC .SERVICES 6.1 The applicant shall submit a scaled site plan stamped approved by Republic Services verifying compliance with Republic Service's requirements with the CZC application. 7. ADA COUNTY HIGHWAY DISTRICT 7.1 .SITE SPECIFIC CONDITIONS OF APPROVAL 7.1 Replace any deteriorated or deficient sidewalk, curb, gutter, or pedestrian facilities along Eagle Road abutting the site, consistent with ACHD's Minor Improvements Policy 7203.3. 7.2 Close all 5 existing driveways on Eagle Road and replace them with vertical curb, gutter, and 7 - foot wide attached concrete sidewalk. 7.3 Construct a 34 -foot wide driveway on Eagle Road located approximately 190 -feet south of the northern property line to align with the existing Fire Station driveway on the west side of Eagle Road. 7.4 Install a key -code activated gate approximately 95 feet from the west property line as proposed. 7.5 Payment of impacts fees are due prior to issuance of a building permit. 7.6 Comply with all Standard Conditions of Approval. 7.2 STANDARD CONDITIONS OF APPROVAL 7.2.1 Any existing irrigation facilities shall be relocated outside of the right-of-way. 7.2.2 Private sewer or water systems are prohibited from being located within any ACHD roadway or right-of-way. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE20 EXHIBIT A 7.2.3 All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7.2.4 Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 7.2.5 A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 7.2.6 Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7.2.7 All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 7.2.8 In accordance with District policy, 7203.6, the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 7.2.9 Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 7.2.10 It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 7.2.11 No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 7.2.12 If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard conditions of approval in place at the time unless a waiver/variance of said requirements or other legal relief is granted by the ACHD Commission. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE 21 EXHIBIT A C. Legal Description and Exhibit Map Sawtooth land 5urveying, LLC P: (208) 398-8104 F: (208) 398-8105 101 Canal 5t., Emmett, ID 83617 May 13, 2014 Citadel 2 Rezone Legal Description A parcel of land located in the S W 1/4 of Section 21, T. 3 N., R. 1 E., B.M., City of Meridian, Ada County, Idaho, more particularly described as follows; COMMENCING at a found aluminum cap marking the WI/4 comer of Section 21; Thence South 0°00'00" West, coincident with the west line of the SW 1/4 of said Section 21, a distance of 196.20 feet to the centerline of the Ridenbaugh Canal and the POINT OF BEGINNING; Thence South 68020'30" East, coincident with said centerline of the Ridenbaugh Canal, 47.60 feet and the beginning of a non tangent curve; Thence 180.93 feet along the arc of said curve, to the right, and said centerline of the Ridenbaugh Canal, with a central angle of 25054'58", a radius of 400.00 feet, subtended by a chord bearing South 55023'00" East, 179.39 feet; Thence South 42025130" East, coincident with said centerline of the Ridenbaugh Canal, 87.10 feet and the beginning of a non tangent curve; Thence 174.95 feet along the arc of said curve, to the left, and said centerline of the Ridenbaugh Canal, with a central angle of 83031'52", a radius of 120.00 feet, subtended by a chord bearing South 84°11'30" East, 159.86 feet; Thence North 54°02'30" East, coincident with said centerline of the Ridenbaugh Canal, 36.86 feet; Thence leaving said centerline of the Ridenbaugh Canal, South 35057'04" East, 55.06 feet; Thence South 89007'19" East, 58.60 feet to a 5/8" rebar on the west boundary of Sutherland Farm Subdivision No. 4, as shown on file in Book 92 of Plats, on Page 10988, Ada County Records; Thence South 0°52'41" West, coincident with said west boundary of Sutherland Farm Subdivision No. 4, a distance of 374.29 feet; Thence leaving said west boundary of Sutherland Farts Subdivision No. 4, North 89007'40" West, 524.75 feet to the west line of said SWI/4 of Section 21; Thence North 0°00'00" East, coincident with said easterly right of way line of S. Eagle Road, 590.08 feet to the POINT OF BEGINNING. The above described parcel contains 5.44 acres more or less P:12013\13108 -CMG -CITADEL 21DmwingslDescriptions\13018-CITADEL 2 REZONE BNDRY.do= Page 11 Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE22 EXHIBIT A Together with and subject to covenants, easements and restrictions of record P:1201 MI 3108 -CMG -CITADEL 20rawings0escriptions113018-CITADEL 2 REZONE BNDRY.docx iz Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE23 S EXHIBIT A CITADEL 2 REZONE EXHIBIT Q L CMG 5/13/14 Citadel ll Self Storage Facility — RZ- 14-004, CUP -14-007 & ALT -14-006 PAGE24 101 CANAL SL EMMETT ID 83617 P. 208 398-8104 F. ((208) 398-8105 WWW.SAWTOOTHLS.COM NTS EXHIBIT A D. Required Findings from Unified Development Code 1. Rezone Findings: Upon recommendation from the Commission, the Council shall make a full investigation and shall, at the public hearing, review the application. In order to grant an annexation and/or rezone, the Council shall make the following findings: a. The map amendment complies with the applicable provisions of the Comprehensive Plan; The Council finds the proposed rezone to C -C is consistent with the proposed MU -C future land use designation. b. The map amendment complies with the regulations outlined for the proposed district, specifically the purpose statement; The Council finds that the proposed map amendment to C -C zoning district is consistent with the purpose statement of the commercial districts. c. The map amendment shall not be materially detrimental to the public health, safety, and welfare; The Council finds that the proposed zoning amendment will not be detrimental to the public health, safety, or welfare if the applicant complies with conditions outlined in this report. The Council considered all oral or written testimony provided when determining this finding. d. The map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the City including, but not limited to, school districts; and, The Council finds that the proposed zoning amendment will not result in any adverse impact upon the delivery of services by any political subdivision providing services to this site. e. The annexation is in the best of interest of the City (UDC 11-511-3.E). NA 2. Conditional Use Permit Findings: The Commission and Council shall review the particular facts and circumstances of each proposed conditional use in terms of the following, and may approve a conditional use permit if they shall find evidence presented at the hearing(s) is adequate to establish: a. That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. The Council finds that if the site is designed according to the conditions of approval in Exhibit B, the site will be large enough to accommodate the proposed use and meet the dimensional and development regulations of the C -C zoning district and self-service storage facility specific use standards if the submitted plans are amended as recommended by staff. b. That the proposed use will be harmonious with the Meridian Comprehensive Plan and in accord with the requirements of this Title. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE25 EXHIBIT A The Council finds that the proposed self-service facility in the proposed C -C zone meets the objectives of the Comprehensive Plan. c. That the design, construction, operation and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. The Council finds that the proposed self-service storage facility is compatible with other uses in the general area and will not adversely change the character of the area if the applicant complies with the site and the design modifications in Exhibit B. d. That the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity. The Council finds that the proposed development should not adversely affect other property in the vicinity if the applicant complies with all conditions of approval listed in Exhibit B of this staff report and constructs all improvements and operates the use in accordance with the UDC standards. e. That the proposed use will be served adequately by essential public facilities and services such as highways, streets, schools, parks, police and fire protection, drainage structures, refuse disposal, water, and sewer. The Council finds that sanitary sewer, domestic water and irrigation can be made available to the subject property. Please refer to comments prepared by the Public Works Department, Fire Department and other agencies. f. That the proposed use will not create excessive additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. The Council finds that the applicant will pay to extend the sanitary sewer and water mains into the site. No additional capital facility costs are expected from the City. The applicant and/or future property owners will be required to pay highway impact fees. g. That the proposed use will not involve activities or processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors. The Council finds that the proposed development will not involve uses that will create nuisances that would be detrimental to the general welfare of the surrounding area. The Council recognizes the fact that traffic and noise will increase with the approval of this development; however, the Council does not believe that the amount generated will be detrimental to the general welfare of the public. h. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. The Council finds that the proposed development will not result in the destruction, loss or damage of any natural feature(s) of major importance. The Council referenced all public testimony presented to determine whether or not the proposed development may destroy or damage a natural or scenic feature(s) of major importance. Alternative Compliance Findings: Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE26 EXHIBIT A In order to grant approval for alternative compliance, the director shall determine the following findings: 1. Strict adherence or application of the requirements is not feasible; OR The Director finds that strict adherence to the parking standards is not feasible given the operational characteristics of self-service storage facility. 2. The alternative compliance provides an equal or superior means for meeting the requirements; and The Director finds the alternative compliance provides an equal means for meeting the City's parking standards. The parking ratio for the facility is based on the size of the proposed office building (648 sq.ft.) and on the operational characteristics of the storage facility use. Therefore, the Director finds four (4) parking stalls is adequate to serve the site. 3. The alternative means will not be materially detrimental to the public welfare or impair the intended uses and character of the surrounding properties. The Director finds that the proposed alternative will not be detrimental to the public welfare or impair the use/character of the surrounding properties. Citadel 11 Self Storage Facility—RZ-14-004, CUP -14-007 & ALT -14-006 PAGE27