Staff Report to CCSTAFF REPORT MEETING DATE: September 2, 2014 TO: Mayor and City Council FROM: Sonya Watters, Associate City Planner 208-884-5533 (��E FIDIAN --- YDAHO Bruce Freckleton, Development Services Manager 208-887-2211 SUBJECT: FP -14-037 — Reflection Ridge Subdivision No. 4 I. APPLICATION SUMMARY The applicant, Mission Coast Properties ID, Inc., has applied for final plat (FP) approval of 44 single- family residential building lots and 5 common lots on 13.9 acres of land in an R-8 (medium -density residential) zoning district. This is the fourth phase of development of Reflection Ridge Subdivision. II. STAFF RECOMMENDATION Staff recommends approval of the Reflection Ridge Subdivision No. 4 final plat based on the analysis provided below in Section V. III. PROPOSED MOTION Approval I move to approve File Number FP -14-037 as presented in the staff report for the hearing date of September 2, 2014, with the following modifications: (Add any proposed modifications.) Denial I move to deny File Number FP -14-037, as presented during the hearing on September 2, 2014, for the following reasons: (You should state specific reasons for denial.) Continuance I move to continue File Number FP -14-037 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance.) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: The subject property is located approximately �/z mile south of E. Victory Road and �/z mile west of S. Locust Grove Road, in Section 30, T. 3N., R. IE. B. Applicant: Mission Coast Properties ID, Inc. 13402-13A Avenue Surrey, BC WAIC3 C. Owner: Same as applicant Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 1 D. Representative: Pat Colwell, T-0 Engineers, Inc. 332 N. Broadmore Way Nampa, ID 83687 V. STAFF ANALYSIS The proposed final plat depicts 44 single-family residential building lots and 5 common lots on 13.9 acres of land in an R-8 zoning district. The gross density of the proposed subdivision is 3.16 dwelling units (d.u.) per acre with a net density of 4.28 d.u. per acre. The minimum property size is 7,700 square feet (s.f.) with an average size of 10,174 s.f. All of the lots proposed in this phase are for single-family detached homes and must comply with the dimensional standards of the R-8 zoning district listed in UDC Table 11-2A-6. Staff has reviewed the proposed plat for compliance with the dimensional standards listed in UDC Table 11-2A-6 and found the plat to be in compliance with those standards. The layout of the proposed final plat differs from the same area shown on the approved preliminary plat. The applicant has submitted a revised site layout that depicts the overall changes to the plat (see Exhibit Q. Staff has reviewed the revised layout and has determined that the overall number of building lots has remained the same and the common area has increased from 17.9% (16.32 acres) to 20% (18.73 acres); therefore, staff finds the proposed final plat to be in substantial compliance with the approved preliminary plat in accord with the requirements listed in UDC 11 -6B -3C.2. VI. SITE SPECIFIC CONDITIONS 1. Applicant shall meet all terms of the approved annexation (AZ -05-045, Development Agreement Instrument #106108230); conditional use permit/planned development (CUP -05-046); rezone (RZ-08-005); preliminary plat (PP -08-010); variance (VAR -09-006); amended development agreement (MDA -08-003, Instrument #112007170); and time extension (TED -11-003). 2. The applicant shall obtain the City Engineer's signature on the final plat within two (2) years of the City Engineer's signature on the previous final plat; or, apply for a time extension on the preliminary plat in accord with UDC 11-6B-7. 3. The subject site is obligated to pay $1,465.56 per acre to proportionally offset costs incurred by the City of Meridian for the Victory Road Gap Sewer Project. Said payment must be received prior to obtaining the City Engineer's signature on any final plat. 4. Prior to submittal for the City Engineer's signature, have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 5. The final plat prepared by T -O Engineers, stamped on 8/26/14 by Steven J. Frisbie, shown in Exhibit D shall be revised as follows: a. Revise plat note #1 as follows: "... Building setbacks shall be measured from the property i4w-orback of sidewalk, --bete___ is more restri_ti__ " 6. The landscape plan prepared by T -O Engineers, dated July 10, 2014, shown in Exhibit E is approved as submitted. 7. All fencing installed on the site shall comply with the standards listed in UDC 11-3A-6 and 11- 3A-7. If permanent fencing does not exist at the subdivision boundary, temporary construction fencing to contain debris shall be installed around this phase prior to release of building permits for this subdivision. Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 2 8. Future homes constructed in this subdivision shall be generally compatible in appearance and bulk with the pictures/elevations included in the development agreement recorded as Instrument No. 106108230. 9. Staff's failure to cite specific ordinance provisions or conditions from the preliminary plat does not relieve the Applicant of responsibility for compliance. 10. Prior to the issuance of any new building permit, the property shall be subdivided in accordance with the UDC. VII. GENERAL REQUIREMENTS 1. Sanitary sewer service to this development is available via extension of existing mains adjacent to the development. The applicant shall install mains to and through this subdivision; applicant shall coordinate main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub -grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2. Water service to this site is available via extension of existing mains adjacent to the development. The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. 3. Street signs are to be in place, sanitary sewer and water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District (ACHD) and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. 4. Upon installation of the landscaping and prior to inspection by Planning Department staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-311-14A. 5. A letter of credit or cash surety in the amount of 110% will be required for all incomplete fencing, landscaping, amenities, pressurized irrigation, prior to signature on the final plat. 6. The City of Meridian requires that the owner post with the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The applicant shall be required to enter into a Development Surety Agreement with the City of Meridian. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887- 2211. 7. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Please contact Land Development Service for more information at 887-2211. 8. All development improvements, including but not limited to sewer, water, fencing, and pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy, or as otherwise allowed by UDC 11-5C-1. 9. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 3 10. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 11. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 12. Developer shall coordinate mailbox locations with the Meridian Post Office. 13. All grading of the site shall be performed in conformance with MCC 11-12-3H. 14. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 15. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3 -feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1 -foot above. 16. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 17. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 18. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval, which must include the location of any existing street lights. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Contact the City of Meridian Transportation and Utility Coordinator at 898-5500 for information on the locations of existing street lighting. 19. The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easement widths shall be 20 -feet wide for a single utility, or 30 -feet wide for two. The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement (on the form available from Public Works), a legal description, which must include the area of the easement (marked EXHIBIT A) and an 81/2" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. 20. Applicant shall be responsible for application and compliance with and NPDES permitting that may be required by the Environmental Protection Agency. 21. Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at (208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190. Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 4 22. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections(208)375-5211. 23. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single -point connection to the culinary water system shall be required. If a single -point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to development plan approval. V. EXHIHtITS A. Vicinity Map B. Approved Preliminary Plat (dated: 9/11/09) C. Revised Site Layout (dated: July 2014) and Usable Open Space Analysis D. Proposed Final Plat (dated: 8/26/14) E. Proposed Landscape Plan (dated: 8/26/14) Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 5 Exhibit A — Vicinity Map 1171 a� t� /J t 1d REFLECTION RIDGE r - PHASE 4 - -- W AbUrr VICINITY MAP SCALE: 1"-1000' r' err' ■� It Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 6 Exhibit B — Approved Preliminary Plat (dated: 9/11/09) Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 7 Exhibit C — Revised Site Layout (dated: July 2014) and Usable Open Space Analysis t E 6 � y 8 r.e� ilill u 1 � x € Phase #4 1 66J e ? T -O ENGINEERS IT 101011 REFLECTION RIDGE SUBDIVISION - CITY OF MERIDIAN USABLE OPEN SPACE ANALYSIS - 93.54 ACRES 6124/2014 Prepared By: Matthew Schultz, PE Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 8 USABLE 8'PARK USABLE % PHASE COMMON LOT (SF) STRIPS (SF) OPEN SPACE (AC) OPEN SPACE 1 317,834 71,808 8.94 9.6% 2 38,995 0 0.90 1.0% 3 96,246 37,320 3.07 3.3% 4 23,530 32,240 1.28 1.4% 5 thN 7 121,287 76,808 4.55 4.9% Total 597,892 218,176 18.73 20.0% Prepared By: Matthew Schultz, PE Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 8 Exhibit D — Proposed Final Plat (dated: 8/26/14) REFLECTION RIDGE SUBMISION NO. 4 LOCAiFD Ml NWLMOF ME SUN, AND= NEV#Wi SWRIDP SEC[pNW MWNStBP 3 NMM MN EFAST. BOBS MFBmIAV CffY OE H DIAN. ADA COOMI', IDAHO lOLt C. 9 BNDemN6l. B94 7 I C'-xaTJxEEmSN rtl0 NL IpWOX _ iuZ x�o Nwm� lK S[i/. M Ycl✓n Xlo GR TIF iWl GLL15S 6 YEID L 11HLBl IdEx !Id! g1b,151U B]IMMM 6 K UN W [ DSDEx! URE (SEE D6. .. AR RmfE,ND3 �..�..� PO.O IPNGM1Op .RR LMN SWXN * NWN BPn45 <M WNINEXf AS NplN Z.OLux cw wwKNr As N. J,• Has��'0¢ • MI]' OR L HOTRRMM fM'PLS D4yr XmM mm cv ms. LY.WIDI �F� wr�� Dd `ltd IDMS FII II a LPoM! xpIXIXG S 9D i q , s+ np•0j o�,a "� p 4 n _ 40 'b�, ✓�,..ji8 s�4.�,3 „+' w '144 fy✓ � � z4 sx B 9 sxs'mssxE,• 5� .y„m�{m c� o Imo �H DE AM 'A' NOTroSCALF 3Ve 2 ® T•O •NmIN!<M OR SHEET NO -1 OF 4 Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 9 Exhibit E — Proposed Landscape Plan (dated: 8/26/14) ,.wle.i­sk 12 �� Cs,—­b- tio a..�. 14 k—R svs — Fl-sdp'4 _ �1v�m�mwwmpiai��mmx \�� ? �lke mm ; ° =d, b a �.� ,.wle.i­sk 12 �� Cs,—­b- tio a..�. 14 k—R svs — Fl-sdp'4 _ �1v�m�mwwmpiai��mmx \�� ? �lke mm "— WEST uoio I Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 10 ®®I�m000 ® X0000 o�®000 o moo©v o��®momm o��®moms o��®momo o�®comm 0�®000 ®r.�l�m�mma o��000 "— WEST uoio I Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 10 Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 11 LAND -1 a„.,., STUDIO -_ O O O o w�.� ...�...,-. PEIE o n�21 Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 11 LAND _ WEST STUDIO -_ Reflection Ridge Subdivision No. 4 FP-14-037.doc PAGE 11