AIA Agreement with Bledsoe Construction for Public Safety Training Center Architectural Woodwork Bid Package No. 6' IA Document Al32TN -2009 Standard Form of Agreement Between Owner and Contractor, Construction Manageras Adviser Edition AGREEMENT made as of the 12th day of August in the year 2014 (In urords, indicate day, month and year.) ADDITIONS AND DELETIONS: The author of this document has BETWEEN the Owner: added information needed for its (Warne, legal status, address and other nrfonnation) completion. The author may also have revised the text of the original City of Meridian AIA standard form. An Additions and 33 E. Broadway Deletions Report that notes added Meridian, ID 83642 Information as well as revisions to the standard form text is available from the author and should be reviewed. A and the Contractor: vertical line in the left margin of this (Wane, legal status, address and other information) document indicates where the author has added necessary information Bledsoe Construction, Inc. and where the author has added to or 12783 Orchard Ave. deleted from the original AIA text. Nannpa, ID 83651 This document has important legal consequences. Consultation with an attorney is encouraged with respect for the following Project: to its completion or modification. (Name, location and detailed description) This document is Intended to be used Meridian Public Safety Training Center and Meridian Police Dept. Retnodel in conjunction with AIA Documents A232--2009, General Conditions of 1401 E. Watertower the Contract for Construction, Meridian, Idaho 83642 Construction Manager as Adviser Work defined in Bid Package #6 Architectural Woodwork Edition; 6132' -zoos, Standard Form of Agreement Between Owner The Construction Manager: and Architect, Construction Manager (Nanne, legal status, address and other bfonnation) as Adviser Edition; and C132^"-2009, Standard Form of The Ewing Company, Inc. Agreement Between Owner and 1500 Eldorado, Ste. #4 Construction Manager as Adviser. Boise, ID 83704 AIA Document A232TM-2009 is adopted in this document by reference. Do not use with other The Architect: general conditions unless this (Name, legal status, address and other information) document is modified. CSHQA 250 S. 51h St. Boise, ID 83702 The Owner and Contractor agree as follows. AIA Document A102TM — 20091formerty A101 TMCMa —1992). Copyright(i) 1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA & Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the patties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of con in i en cent en t, if it differs front the date of this Agreerttent or, if applica ble, state that the date mill be fixed in a notice to proceed.) Date of Commriencement will be fixed by "Notice to Proceed". If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: N/A § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or as follows: (Insert number ofcale71dar days. Alternatively, a calendar date inay be used when coordinated with the date of conmlencetnent. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the 147ork.) AIA Document At 32--20091formerly AlllI-CMa-1992). Copyright 01975, 1980, 1992 and 2009 by The American Institute of Architects. All rights [nit. reserved. WARNING: This AIA & Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 2 this AIA° Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under Portion of the Work Substantial Completion Date All July22, 2015 , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating tofailure to achieve Substantial Completion on time or for bonus payments for early completion of the Work) Liquidated Damages are $500.00 per calendar day. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the following: (Check the appropriate box.) [ X ] Stipulated Sum, in accordance with Section 4.2 below [ ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below [ ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below (Based on the selection above, complete Section 4. 2, 4.3 or 4.4 below. Based on the selection above, also complete either Section 5.1.4, 5.1.5 or 5.1.6 below) § 4.2 Stipulated Sum § 4.2.1 The Stipulated Stun shall be Seventeen Thousand One Hundred Twenty-seven Dollars and Zero Cents ($ 17,127.00 ), subject to additions and deletions as provided in the Contract Documents. § 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding orproposal documents permit the Dimer to accept other alternates subsequent to the execution of thus Agreennent, attach a schedule of such other alternates shoui ng the antount for each and the date when that aanomnt expires.) § 4.2.3 Unit prices, if any: (Identify and state the unitprice, and state the quantity limitations, ifany, to which the unitprice will be applicable) Item Units and Limitations Price per Unit ($0.00) § 4.2.4 Allowances included in the Stipulated Sum, if any: (Identi& allowance and state exclusions, if any, f-oin the allowance price) Item Allowance 4.3 Cost of the Work Plus Contractor's Fee without a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Sum contract. (Paragraph deleted) (Table deleted) (Paragraphs deleted) AIA Document A132- — 2009 formerly A101`vCMa-1992). Copyright 01975, 1960, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 3 this AIA® Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under 1hn I.w TAIe A——f — nmdurod Nv AIA enewnrn n11P99-A9 nn n0.119MIA —Anr nrAnr Aln IBNAAAAAR 1 ur6ir6 —i— nn n4in5l9MS and 1. —. inn 4.4 Cost of the Work Plus Contractor's Fee with a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Sum contract. (Paragraphs deleted) (Table deleted) (Paragraphs s deleted) (Table deleted) (Paragraphs deleted) ARTICLE 5 PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Construction Manager by the Contractor, and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Surn to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the 25th day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the Contractor not later than the 25th day of the following monde. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than Thirty (30 ) days after the Construction Manager receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) § 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum § 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, unless objected to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying die percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less retahiage of Five percent ( 5 %). Pending final determination of cost to the Owner of changes in die Work, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Zero percent( 0 %); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Construction Manager or Architect has witlilield or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions. § 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified wider the following circumstances: A Add, upon Substantial Completion of the Work, a sun sufficient to increase the total payments to One Hundred percent ( 100 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete Work and unsettled claims; and AIA Document A132i°-2009 formerly AID 1TMCMa— 1992). Copyright©1975,1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 4 this AIA° Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under • IMn law Thl� rinr„mnnl u,ne nrnAi,rnA Av AIA crfAuore nl 1n-71 R7 nn nR/1717n1I -,i- A,A- AI- 7971 GARRAR 1 -hi,h —1— nn n91nR,/9n1R -A Ir nn! me .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions. § 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting front the percentages inserted in Sections 5.1.4.3.1 and 5.1.4.3.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) § 5.1.5 Progress Payments Where the Contract Sum is Based on the Cost of the Work without a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Simi contract. (Paragraphs deleted) § 5.1.6 Progress Payments Where the Contract Sum is Based on the Cost of the Work with a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Sum contract. (Paragraphs deleted) § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed die Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is oil the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009, tmless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If theparties mutually agree, insert the name, address and other contact it forniation of the Initial Decision 114aker, if other than the Architect.) § 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution below; or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Clainnr will be resolved by litigation in a court ofcompetentjurisdiction) [ ] Arbitration pursuant to Section 15.4 of AIA Document A232-2009. [ X ] Litigation in a court of competent jurisdiction. [ ] Other: (Spec) AIA Document At 32TM — 2009 formerly A101'^'CMa-1992). Copyright © 1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 5 this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under I the law. This document was produced by AIA software at 10:22:52 on 08/12/2014 under Order No.7671646646 1 which expires on 0510512015. and Is not for ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract maybe tenninated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009. § 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232 2009. § 7.2 Where the Contract Sum is Based on the Cost of the Work with or without a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Sum contract. (Paragraphs deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof; at the legal rate prevailing from time to time at the place where the Project is located. (hisert rate of interest agreed upon, if any.) Zero % 0 § 8.3 The Owner's representative: (Name, address and other h forniatia») Max Jensen Project Manager City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 § 8.4 The Contractor's representative: (Nance, address and other information) I Randy Odenbrett Bledsoe Construction, Inc. 12783 Orchard Ave. Nampa, ID 83651 § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are euunerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document A132-2009, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. AIA Document A132TM — 2009 formerly AID I' CMa-1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Ind. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under / the law. This document was produced by AIA software at 10:22:52 on 08/12/2014 under Order No.7671846646_1 which expires on 05/05/2015, and is not for resale. User Notes: (1311729223) § 9.1.2 The General Conditions are, AIA Document A232-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages 00810 Supplementary 5/22/14 6 Conditions 00500 Contractor Agreement § 9.1.4 The Specifications: (Either list the Specifications here or refer to air exhibit attached to this Agreement.) Section Title Date Pages Division 1 General Requirements 5/22/14 All Sections 064116 Plastic Laminate Faced Architectural Cabinets 079200 Joint Sealants 123623.13 Plastic Laminate Clad Countertops § 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreenient.) Exhibit D Number Title Date § 9.1.6 The Addenda, if any: Number Date Pages One 6/19/14 50 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated it this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents are: (Paragraphs deleted) .4 Other documents, if any, listed below: (List here any additional doctonents which are intended to farin part of the Contract Docmnents. AIA DocumentA232-2009 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample_fonns and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement They should be listed here only if intended to be part of the Contact Documents.) Contractor's Bid ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A232-2009. AIA Document Al32TM — 2009 formerly A'101' CMa-1992). Copyright© 1975, 1980, 1992 and 2009 by The Amedcan Insfitute of Architects. All rights Init. reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AlAsoflware at 10:22:52 on 08/12/2014 under Order No.7671846646_1 which expires on 05/05/2015, and is not for resale. User Notes: (1311729223) (State bonding requirements, if any, and limits of liabilityfor insurance required in Article 11 ofALI Document A232-2009) Type of Insurance or Bond Limit of Liability or Bond Amount ($0.00) Performance and Payment Bond 100% Liability and Workman's Compensation See attached Exhibit 1 This Agreement is entered into as of thZd year fust wriAaboe.OWNER gna -e) R (Signature) Tammy de Weerd, Mayor neon rnnA c&sr � 9 (Printed name and title) City °e ranted name and title) Attest: t Cityerk Fy SEAL W r� Vim er rAe TRE ASUA AIA Document At 32- —2009 formerly A101'"'CMa-1992). Copyright ®1975, 1960, 1992 and 2009 by The American Institute of Architects. All rights [nit. reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software at 10:22:52 on 08112/2014 under Order No.7671846646_1 which expires on 05/052015, and is not for resale. User Notes: (1311729223) 06/2712014 10:45 Bledsoe—Construction CONTRACTOR BIC; FORM CITY OF MERIDIAN PUBLIC SAFETY TRAINING CENTER Bid Package # 6 Bid Package Name: ARCHITECTURAL. WOODWORK TA1g208+488+2180 P.0021004 Bid Due by: 2:00 PM Bid Date: June Z4,2014 Submitted by' (Company Name) 4a50� Cf?ItJ� vcL nod f jfJf/. Having mrelully examined The Place of the Work anal all mallere referred to in itie Instructions to Bidder* and the Contract Doewnents and all eondif6uns affecting the work Including availability of materials and What the undersigned hereby Proposes to furnish all labor, materials, supplies, equipment, supervision, insurance and bards in accordance with the Contract dmivaents. within the rime set forth therein, and at the prices stated halow. Bidder hereby agrees to commence work under this contract on or before a data to be sped.fbd in wdlten 1killce to Pruvw by the owner and substantially complete the work within the limes stipJaled in His er dosed consirlmiion schedule. Work covered 6v hI%etd Packaae is specified inyornanes One Thrtr F hr -of the Sreak:a ions. anJ Plan sets TiIWJ.1 9A;file Public Safety Trainino.Center and'ReriovalionrAdditien for Meridian Polite Dent BiddinyGeneml Conditions Divislon 1 General Requirements (All Sections) 04116 Plastic Laminate Faced ArchileclumlCabirels 679zo Joint Sealants" 12W2s.13 Plastic Laminate Clad Counledops + (As applicable to this work) In addition to the work required in the above sections, this bid item Iickdes but is not timilad to the folkwl ing: + Provide material, labor arty equipment to lumish and install the casework, countadop* and window s71s as Indicated on the drawings. • Furnish and install the Pad tables in the tiered classroom. + Piovida layout for hacking supplied and installed by olhes. • Modify exislfog casework as indicated + Properly oDvadng and protecting the work or others from damage or soiling die to their padofmance of this work and shall include proper cleaning, restoring or replacement of arry such work damaged or soiled in the padomiance of Ibis work Acknowledgement of Addendum, #L(b 11$11 #"—( / / )# ( I 1 ) Base Bid Proposal (Including all applic>abte taxers; Labor & Material Payment fonds) Base Bid: $ r CONTRACTOR BID FORM Bid Package #6 Page 1 of 3 Architectural Woodwork 06/27/2014 10:45 Bledsoe—Construction P.003I004 Alternate Proposals: ewder agrees td perform alternate work as shown on the Drawings arttr as specked for the follcdving sums, which sums shall be added to or dedueled from, the Base Bid as indicated. The Ownsr reserves the right to accept the Base Bkf and/or Alternates in any order or in art's manner, which is mast advantageous to the owner. Schedule of Aitamates- Alternates are described in ftaffon 012300 Please enter a zero (0) amount if the alternate does not affect your scope of work Alternate No. Deso i tion Amount 1 Parldrkg Loi East of MPD Building) 2 Budding Addition on West side 01 MPD Big OW 3 Display Case 4 Northwest Parking Lot 6 Break Room Remodal a Tiered Classroom Foxed Tables 7 Masonry Fence Add -Deduct S Add -Deduct S ` J/•�� Add•DeductSlll�/(1�.� - Add -Deduct S��/.5,� -- Z �a Add .Deduct Sl, 7 -_- - Add-DeductS ,;`_•�, The undersigned undenslands that The Ewing Co. Inc., the Dimer, and the Archilecl reserve the right to accept, reject or negotiate arty and/or all bids and wave any informality in the bidding. Final award is subject to approval by the owner. This proposal shag remain in effect for sixty (60) days past the bid dale. The undersigned agrees in submitimo this proposal, Ihal if issued a Letter of Intent or a Formal Agreement that the 09raemen1 will be executed without ollerations within Ove (6) days, and fmnV&kIy furnish Perfomlanrs Bond, Labor and Material Payment eond, Insurance Policy and Certificate of Insurance. All coals shall be included in the lump sum W. All blds must be accompnoW W a Bid Wild or Bank Cashism Chook in the amount of 6% Of the 10101 bkf 0rede�yyatda to the Dwner. The undersigned acknowledges receipt and acceptance of the project schedule issued with Inefrucllons to Bidders. Company.•,,,x0 •.+ r I n'%�+ ' 1- -- business Address. jZ7$'� `[�r4gWw� Ayl+.�,\A&. .4 tl(iI Public WorktLicenseNo. . IZS� • /Th _..,,,,,,.__•,_„Expires: 0'�'�' . Idaho Regbt&\,,,Nor.r. U''G^ sy�'�Exraras. Printed Phone (Seat If,bkih4 tyWi"joratton) .o� J* JL6soe 6�zov�' F)&% CONTRACTOR BID FORM Bid Package #6 Page 2 of 3 Architectural Woodwork 06/27/2014 10:45 Bledsoe—Construction Subcontractor, (if Aonliceble) Cornpany Business Public Works Ucense Phone Numtff iTA8j208+466+2160 P.0041004 ff them is more than one Sulwnrraclor, provkle the same data ateve as on allochmenl to bid) CONTRACTOR BID FORM Bid Package #6 Page 3 of 3 Architectural Woodwork EXIIBrr I INSURANCE REQUIREMENTS Worker's Compensation a. State: Idaho Statutory b. Applicable Federal Statutory C. Employer's Liability $100,000 per Accident $500,000 Disease, Policy Limit $100,000 Disease, Each Employee 1. Commercial General Liability (including Premises -Operations, Independent Contractors, Blanket Contractual, Products and Completed Operations, Broad Form Property Damage (including Completed Operations) and coverage for X (explosion),C (collapse), and U(underground) hazards) a. General Agate $2,000,000 (limit to apply Per Proiect) b. Products -Completed Operations Aggreeate $2,000.000 c. Personal and Advertising Iniury $1,000,000 d. Each Occurrence $1,000,000 e. Fire Damage (any one fire) $50,000 f. Medical Expenses (any one person) $5,000 3. Business Auto Liability a. $1,000,000 combined single limit of liability for bodily injury and property damage each accident covering all owned, non -owned and hired autos 4. Umbrella Liability: $1,000,000 each occurrence and aggregate. full limit required, or by a combination of underlvin provided by an Excess or Umbrella Liability Policy The Owner and the Construction Manager shall be named as an additional insured on the insurance required above and the insurance shall contain the severability of interest clause as follows: "the insurance afforded herein applies separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the company's liability." EXHIBITD LIST OF DRAWING SHEETS MERIDIAN PSTC GENERAL G0.1 TITLE SHEET G0.2 CODE PLAN G0.3 ASSEMBLIES G0.4 ENVELOPE COMPLIANCE & CISCA CIVIL C0.0 GENERAL INFORMATION SHEET C1.0 SITE DEMOLITION PLAN C2.0 EROSION AND SEDIMENT CONTROL PLAN C3.0 HORIZONTAL CONTROL PLAN C4.0 GRADING AND DRAINING PLAN C5.0 SITE UTILITY PLAN C6.0 WATER MAIN PLAN AND PROFILE C7.0 CIVIL DETAILS TOPOGRAPHIC SURVEY BY FOX LAND SURVEYS, INC. —FOR REFERENCE ONLY LANDSCAPE 1-1.0 LANDSCAPE PLAN L2.0 IRRIGATION PLAN L3.0 LANDSCAPE & IRRIGATION DETAILS ARCHITECTURAL A2.1 FLOOR PLAN A2.2 DIMENSION PLAN A2.3 ROOF PLAN A3.1 ENLARGED PLAN A4.1 EXTERIOR ELEVATIONS A4.2 BUILDING SECTIONS A4.3 WALL SECTIONS Page 1 of 8 A4.4 WALL SECTIONS A5.1 MILLWORK ELEVATIONS A6.1 REFLECTED CEILING PLAN A8.1 EXTERIOR DETAILS A8.2 EXTERIOR DETAILS A8.3 EXTERIOR DETAILS A9.1 INTERIOR DETAILS A10.1 DOOR SCHEDULES & WINDOW TYPES A11.1 INTERIOR FINISH PLAN A11.2 INTERIOR FINISHES & ELEVATIONS STRUCTURAL S0.1 GENERAL NOTES S0.2 GENERAL NOTES S1.1 FOUNDATION PLAN S2.1 ROOF FRAMING PLAN S3.1 FOUNDATION DETAILS S3.2 FRAMING DETAILS S3.3 FRAMING DETAILS S3.4 FRAMING DETAILS S3.5 FRAMING DETAILS HVAC M0.1 HVAC COVER SHEET M0.2 ENERGY COMPLIANCE SHEET M2.1 HVAC PLAN M2.2 HVAC ROOF PLAN M4.1 HVAC SCHEDULES M5.1 HVAC DETAILS M8.1 HVAC CONTROLS PLUMBING Page 2 of 8 P0.1 PLUMBING COVER SHEET P2.1 WASTE AND VENT PLAN P2.2 WATER AND GAS PLANS P2.3 PLUMBING ROOF PLAN P3.1 ENLARGED PLUMBING PLANS P4.1 PLUMBING SCHEDULES P5.1 PLUMBING DETAILS ELECTRICAL E0.1 LEGEND AND LIGHTSCHEDULE E1.0 SITE ELECTRICAL PLAN E2.0 POWER PLAN E2.1 MECHANICAL POWER PLAN E3.0 LIGHTING PLAN E4.0 SINGLE LINE AND SCHEDULES E5.0 ELECTRICAL DETAILS E6.0 ENERGY COMPLIANCE FORMS TELECOM T0.1 TELECOM SYMBOLS AND ABBREVIATIONS T0.2 TELECOM CABLING SCHEMATICS AND LABELING T0.3 TIERED CLASSROOM 128 A/V DETAILS T0.4 CLASSROOM 124 AV DETAILS T0.5 CLASSROOM 125 AV DETAILS TO.6 SIMULATION AND MAT ROOM AV DETAILS T1.0 TELECOM SITE PLAN T1.1 TELECOM PLAN T1.2 SECURITY PLAN GENERAL LIST OF DRAWING SHEETS MERIDIAN POLICE DEPT ADDITION/REMODEL Page 3 of 8 G0.1 TITLE SHEET G0.2 CODE DATA & BUILDING ASSEMBLIES G0.3 ENVELOPE COMPLIANCE AND CISCA SURVEY 1 OF 2 TOPOGRAPHIC SURVEY 2 0 F2 TOPOGRAPHIC SURVEY CIVIL 00.0 GENERAL INFORMATION SHEET C1.0 SITE DEMOLITION PLAN C2.0 EROSION AND SEDIMENT CONTROL PLAN C3.0 HORIZONTAL CONTROL PLAN C4.0 GRADING AND DRAINAGE PLAN C5.0 SITE UTILITY PLAN C7.0 CIVIL DETAILS LANDSCAPE 1-1.0 LANDSCAPE PLAN L2.0 IRRIGATION PLAN L3.0 LANDSCAPE AND IRRIGATION PLAN ARCHITECTURAL A1.1 FIRST FLOOR DEMOLITION PLAN A1.2 SECOND FLOOR DEMOLITION PLAN A1.3 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN A1.4 SECOND FLOOR REFLECTED CEILING DEMOLITION PLAN A2.1 FIRST FLOOR PLAN A2.2 SECOND FLOOR PLAN A2.3 ROOF PLAN A4.1 EXTERIOR ELEVATIONS & SECTIONS Page 4 of 8 A4.2 WALL SECTIONS A5.1 INTERNAL ELEVATIONS A6.1 FIRST FLOOR REFLECTED CEILING PLAN A6.2 SECOND FLOOR REFLECTED CEILING PLAN A8.1 EXTERIOR DETAILS A9.1 INTERIOR DETAILS A10.1 FINISH PLAN A10.2 FINISH/DOOR SCHEDULE STRUCTURAL 50.1 STRUCTURAL NOTES 50.2 STRUCTURAL NOTES S1.1 FOUNDATION PLAN 51.2 SECOND FLOOR PLAN 53.1 FOUNDATION DETAILS 53.2 FRAMING DETAILS 53.3 FRAMING DETAILS 53.4 FRAMING DETAILS PLUMBING/MECHANICAL M0.1 HVAC COVER SHEET M0.2 ENERGY COMPLIANCE M1.1 FIRST FLOOR HVAC DEMOLITION PLAN M1.2 SECOND FLOOR HVAC DEMOLITION PLAN M2.1 FIRST FLOOR HVAC PLAN M2.2 SECOND FLOOR HVAC PLAN M2.3 HVAC ROOF PLAN M4.1 HVAC SCHEDULES M5.1 HVAC DETAILS M8.1 HVAC CONTROLS Page 5 of 8 P0.1 PLUMBING PLAN P2.1 FIRST FLOOR PLUMBING PLAN P2.2 SECOND FLOOR PLUMBING PLAN P2.3 PLUMBING ROOF PLAN P4.1 PLUMBING SCHEDULES AND DETAILS ELECTRICAL E0.1 LEGEND & LIGHTING SCHEDULE E1.0 SITE ELECTRICAL PLAN E1.1 SITE PHOTOMETRIC PLAN E2.0 POWER PLAN E2.1 ROOF POWER PLAN E3.0 LIGHTING PLAN E4.0 SINGLE LINE & SCHEDULES E4.1 PANEL SCHEDULES E5.0 ELECTRICAL DETAILS E6.0 ENERGY COMPLIANCE FORMS COMMUNICATIONS T0.1 TELECOM SYMBOLS AND ABBREVIATIONS T1.0 TELECOM CABLING SCHEMATICS AND LABELING T1.1 FIRST FLOOR TELECOM PLAN T1.2 SECOND FLOOR TELECOM PLAN T1.3 RECOVERY, SERVERS AND SAN CABLING DETAILS T1.4 REVISED CABLING SCHEMATIC T1.5 FIRST FLOOR SECURITY PLAN A9.1 INTERIOR DETAILS A10.1 FINISH PLAN A10.2 FINISH/DOOR SCHEDULE Page 6 of 8 STRUCTURAL 50.1 STRUCTURAL NOTES 50.2 STRUCTURAL NOTES 51.1 FOUNDATION PLAN 51.2 SECOND FLOOR PLAN 53.1 FOUNDATION DETAILS 53.2 FRAMING DETAILS 53.3 FRAMING DETAILS 53.4 FRAMING DETAILS PLUMBING/MECHANICAL M0.1 HVAC COVER SHEET M0.2 ENERGY COMPLIANCE M1.1 FIRST FLOOR HVAC DEMOLITION PLAN M1.2 SECOND FLOOR HVAC DEMOLITION PLAN M2.1 FIRST FLOOR HVAC PLAN M2.2 SECOND FLOOR HVAC PLAN M2.3 HVAC ROOF PLAN M4.1 HVAC SCHEDULES M5.1 HVAC DETAILS M8.1 HVAC CONTROLS P0.1 PLUMBING PLAN P2.1 FIRST FLOOR PLUMBING PLAN P2.2 SECOND FLOOR PLUMBING PLAN P2.3 PLUMBING ROOF PLAN P4.1 PLUMBING SCHEDULES AND DETAILS ELECTRICAL Page 7 of 8 E0.1 LEGEND & LIGHTING SCHEDULE E1.0 SITE ELECTRICAL PLAN E1.1 SITE PHOTOMETRIC PLAN E2.0 POWER PLAN E2.1 ROOF POWER PLAN E3.0 LIGHTING PLAN E4.0 SINGLE LINE & SCHEDULES E4.1 PANEL SCHEDULES E5.0 ELECTRICAL DETAILS E6.0 ENERGY COMPLIANCE FORMS COMMUNICATIONS T0.1 TELECOM SYMBOLS AND ABBREVIATIONS T1.0 TELECOM CABLING SCHEMATICS AND LABELING T1.1 FIRST FLOOR TELECOM PLAN T1.2 SECOND FLOOR TELECOM PLAN T1.3 RECOVERY, SERVERS AND SAN CABLING DETAILS T1.4 REVISED CABLING SCHEMATIC T1.5 FIRST FLOOR SECURITY PLAN END OF EXHIBIT Page 8 of 8