AIA Agreement with Flooring America (Dilbaughs) for Public Safety Training Facility BP 13 Floor CoveringT == I Document A132TM - 2009 Standard Form of Agreement Between Owner and ContractorConstructionManager as Adviser Edition AGREEMENT made as of the 1st day of July in the year 2014 (In inords, indicate day, neonth and year.) ADDITIONS AND DELETIONS: The author of this document has BETWEEN the Owner: added Information needed for its (Name, legal status, address and other information) completion. The author may also have revised the text of the original City of Meridian AIA standard form. An Additions and 33 E. Broadway Deletions Report that notes added Meridian, ID 83642 information as well as revisions tothe standard form text is available from the author and should be reviewed. A and the Contractor: vertical line In the left margin of this (Name, legal status, address and other it fm7nation) document indicates where the author has added necessary information Dillabaugh's Flooring America and where the author has added to or 2895 S. Federal Way deleted from the original AIA text. Boise, ID 83713 This document has Important legal consequences. Consultation with an attorney is encouraged with respect for the following Project: to Its completion or modification. (Name, location and detailed description) This document is intended to be used Meridian Public Safety Training Center and Meridian Police Dept. Remodel in conjunction with AIA Documents A232n"-2009, General Conditions of 1401 E. Watertower the Contract for Construction, Meridian, Idaho 83642 Construction Manager as Adviser Work defined in Bid Package #13 Flooring Covering Edition; B132n -2009, Standard Form of Agreement Between Owner The Construction Manager; and Architect, Construction Manager (Nanie, legal status, address and other it formation) as Adviser Edition; and C132m-2009, Standard Form of The Ewing Company, Inc. Agreement Between Owner and 1500 Eldorado, Ste. #4 Construction Manager as Adviser. Boise, ID 83704 AIA Document A232'"'-2009 is adopted In this document by The Architect: reference. Do not use with other (Name, legal status, address and other n fonnation) general conditions unless this document is modified. CSI3QA 250 S. 5" St. Boise, ID 83702 The Owner and Contractor agree as follows. AIA Document A132TM —2009 formerly A101-CMa-1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Al a Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software at 10:54:05 on 07/02/2014 under Order No.7671846646_1 which expires on 05105/2015, and Is not for resale. User Notes: (1199138402) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACTSUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as (ally a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date ofconrmencenrent, if it differs fr•oni the date of this Agreement a; ifapplicable, state that the date A411 be fixed in a notice to proceed.) Date of Commencement will be fixed by "Notice to Proceed". If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: N/A § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( ) days from the date of commencement, or as follows: (Irtser•t number of tale» dar• days. Altematively, a calendar date Inay be used when coordinated with tine date of commencement If appropriate, insert requireinents for earlier Substantial Completion of terrain portions of the Work.) AIA Document At 32-- 2009 `/formerly A10"ClIa-1992). Copyright m 1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA b Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAe Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software at 10:54:05 on 07102=4 under Order No.7671846646_1 which expires on 05105/2015, and Is not for resale. User Notes: (1199138402) Portion of the Work Substantial Completion Date All July22, 2015 , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, ifany, for liquidated damages relating tofailure to achieve Substantial Completion on time orfor bonus payments for early completion of the Work) Liquidated Damages are $500.00 per calendar day. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the following: (Check the appropriate box.) [ X ] Stipulated Sum, in accordance with Section 4.2 below [ ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below [ ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below (Based on the selection above, complete Section 4.2, 4.3 or 4.4 below. Based on the selection above, also complete either Section 5.1.4, 5.1.5 or 5.1.6 below.) § 4.2 Stipulated Sum § 4.2.1 The Stipulated Sum shall be Fifty Four Thousand Five -Hundred and Sixty One Dollars ($ 54,561), subject to additions and deletions as provided in the Contract Documents. § 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification ofaccepted alternates. If the bidding orproposal documents permit the Ormier to accept other alternates subsequent to the execution of this Agreement, attach a schedule ofsuch other alternates showing the amount for each and the date when that amount expires.) § 4.2.3 Unit prices, if any: (Identi, and state the unitprice, and state the quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price per Unit ($0.00) § 4.2.4 Allowances included in the Stipulated Sun, if any: (Identify allowance and state exclusions, if any, frrom the allowance price) Item Allowance § 4.3 Cost of the Work Plus Contractor's Fee without a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Sulu contract. (Paragraph deleted) (Table deleted) (Paragraphs deleted) AIA Document A132-- 2009 formerly AID I -CM a —1992). Copyright ©1975, 1960, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 3 this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software a(08:29:66 on 0 710 3/2 01 4 under Order No.7671846646_1 which expires on 05/05/2015, and Is not for resale. User Notes: (1333416257) 4.4 Cost of the Work Plus Contractor's Fee with a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Stun contract. (Paragraphs deleted) (Table deleted) (Paragraphs deleted) (Table deleted) (Paragraphs deleted) ARTICLE 5 PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Construction Manager by the Contractor, and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the 2501 day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the Contractor not later than the 25th day of the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than Thirty (30 ) days after the Construction Manager receives die Application for Payment. (Federal, state or local latas may require payment within a certain period of time) § 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum § 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, unless objected to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.4.3 Subject to the provisions ofthe Contact Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contact Sum properly allocable to completed Work as detennined by multiplying the percentage completion of each portion of the GVork by the share of the total Contact Sum allocated to that portion of the Work in the schedule of values, less retainage of Five percent ( 5 %). Pending final determination of cost to the Owner of changes in due Work, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions; .2 Add that portion of the Contract Su1n properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Zero percent( 0 %); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Construction Manager or Architect has uidrlleld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions. § 5.1.4.4 The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to One Hundred percent (100 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete Work and unsettled claims; and AIA Document Al32TM —2009 formerly Al011°CMa-1992). Copyright 01975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties.. Unauthorized reproduction or disldbullon of 4 this AIAe Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software at 10:54:05 on 07/02/2014 under Order No.7671846646_1 which expires on 05/05/2015, and Is not for resale. User Notes: (1109136402) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions. § 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Mork, to reduce or Bndt the retainage resultingfrom the percentages inserted in Sections 5.1.4.3.1 and 5.1.43.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) § 5.1.5 Progress Payments Where the Contract Sum is Based on the Cost of the Work without a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Stun contract. (Paragraphs deleted) § 5.1.6 Progress Payments Where the Contract Sum is Based on the Cost of the Work with a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Sum contract. (Paragraphs deleted) § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fitllyperformed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work with or without a Guaranteed Maximum payment; and .3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If the parties mutually agree, insert the name, address and other contact information ofthe Initial Decision Maker if other than the Architect) § 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in lvriting to a binding dispute resolution method other than litigation, Claims udll be resolved by litigation in a court of competent jurisdiction) [ ] Arbitration pursuant to Section 15.4 of AIA Document A232-2009. [ X ] Litigation in a court of competent jurisdiction. [ ] Other. (Specify) AIA Document A132- —2009 {formerly At 01 TMCMa —1992). Copyright © 1975, 1980. 1992 and 2009 by The American Inst lute of Architects. All rights Init. reserved. WARNING: This AIA` Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software at 10:54:05 on 07/02/2014 under Order No.7671846646_1 which expires on 05105/2015, and Is not for resale. User Notes: (1199138402) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract maybe terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009. § 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232-2009. § 7.2 Where the Contract Sum is Based on the Cost of the Work with or without a Guaranteed Maximum Price This section deleted as it does not apply to this Stipulated Stun contract. (Paragraphs deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (!»seri rate of interest agreed aporg if arcy.) Zero % 0 § 8.3 The Owner's representative: (Nance, address and other information) Max Jensen Project Manager City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 § 8.4 The Contractor's representative: (Nanfe, address and other it formation) Josh Woodward Dillabaugh's Flooring America 2895 S. Federal Way Boise, ID 83713 § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Docurnents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document A132-2009, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. AIA Document A132--2009 formerly A701TMCMa-11992). Copyright ®1975,1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of G this AIA! Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software el 10:54:05 on 07102/2014 under Order No.7671846646_1 which expires on 0510512015, and is not for resale. User Notes: (1199138402) § 9.1.2 The General Conditions are, AIA Document A232-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages 00810 Supplementary 5/22/14 6 Conditions 00500 Contractor Agreement § 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreenfent.) Section Title Date Pages Division 1 General Requirements 5/22/14 All Sections Sealants 079200 Resilient Base and 096513 Accessories Resilient Sheet Flooring 096516 Resilient Tile Flooring 096519 Wall Covering 097200 Tile Carpeting 096813 Sheet Carpeting 096816 § 9.1.5 The Drawings: (Either list the Dralvings here or refer to an exhibit attached to this 4greement.) Exhibit D Number Title Date § 9.1.6 The Addenda, if any: Number Date Pages One 6/19/14 50 Portions of Addenda relating to bidding requirements are not part of the Contract Documents rmless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents are: (Paragraphs deleted) .4 Other documents, if any, listed below: (List here any additional documents which are intended to form part of the Contract Documents. AIA Document A232-2009 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are notpart of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) Contractor's Bid AIA Document A132-- 2009 formerly A101TmCN1a —1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under t the law. This document was produced by AIA software at 10:54:05 on 07/02/2014 under Order No.7671846646_I which expires on 05/05/2015, and Is not for resale. User Notes: (1199138402) . ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A232-2009. (State bonding requirements, rf any, and limits of liability for insurance required in Article 11 of ALL Document A232-2009.) Type of Insurance or Bond Limit of Liability or Bond AmountPerform $0.00 o Amount( $0.00)and Payment Bond 100/o Liability and`workman's Compensation See attached Exhibit 1 This Agreement is entered into as of the day and year first written abov OWNER(Si; at re) CONTRAC RI de))Tammy de eerd,Mayor �Je VQ. V.P.r (Printed name ' i title) (Printed name and title) _ .TE Qakr. 14th i Clea ��: tiouppl*"... ° ''N,h':. r 404660.. i.,-;\ O4hJD1AN ty ok *..:y -, IDAHO ) .-�....�- 'y r. SEAL e4, 4.:';',''' *i the TICE ASN118, Inst. AIA Document A132T'"-2009 Sformerly A101 T""CMa—1992).Copyright©1975,1980,1992 and 2009 by The American Institute of Architects.All rights reserved.WARNING:This AIA Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this Ale Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under / the law.This document was produced by AIA software at 10:54:05 on 07/02/2014 under Order No.7671846646 1 which expires on 05/05/2015,and is not for resale. — User Notes: (1199138402) EXHI BIT D LIST OF DRAWING SHEETS MERIDIAN PSTC GENERAL G0.1 TITLE SHEET GO.2 CODE PLAN GO.3 ASSEMBLIES GO.4 ENVELOPE COMPLIANCE & CISCA CIVIL CO.0 GENERAL INFORMATION SHEET C1.0 SITE DEMOLITION PLAN C2.0 EROSION AND SEDIMENT CONTROLPLAN C3.0 HORIZONTAL CONTROL PLAN C4.0 GRADING AND DRAINING PLAN C5.0 SITE UTILITY PLAN C6.0 WATER MAIN PLAN AND PROFILE C7.0 CIVIL DETAILS TOPOGRAPHIC SURVEY BY FOX LAND SURVEYS, INC. —FOR REFERENCE ONLY LANDSCAPE L1.0 LANDSCAPE PLAN L2.0 IRRIGATION PLAN L3.0 LANDSCAPE & IRRIGATION DETAILS ARCHITECTURAL A2.1 FLOOR PLAN A2.2 DIMENSION PLAN A2.3 ROOF PLAN A3.1 ENLARGED PLAN A4.1 EXTERIOR ELEVATIONS A4.2 BUILDING SECTIONS A4.3 WALL SECTIONS Page 1 of 8 A4.4 WALL SECTIONS A5.1 MILLWORK ELEVATIONS A6.1 REFLECTED CEILING PLAN A8.1 EXTERIOR DETAILS A8.2 EXTERIOR DETAILS A8.3 EXTERIOR DETAILS A9.1 INTERIOR DETAILS A10.1 DOOR SCHEDULES & WINDOW TYPES A11.1 INTERIOR FINISH PLAN A11.2 INTERIOR FINISHES & ELEVATIONS STRUCTURAL 50.1 GENERAL NOTES 50.2 GENERAL NOTES 51.1 FOUNDATION PLAN 52.1 ROOF FRAMING PLAN 53.1 FOUNDATION DETAILS 53.2 FRAMING DETAILS 53.3 FRAMING DETAILS 53.4 FRAMING DETAILS 53.5 FRAMING DETAILS HVAC MO.1 HVAC COVER SHEET MO.2 ENERGY COMPLIANCE SHEET M2.1 HVAC PLAN M2.2 HVAC ROOF PLAN M4.1 HVAC SCHEDULES M5.1 HVAC DETAILS M8.1 HVAC CONTROLS PLUMBING Page 2 of 9 P0.1 PLUMBING COVER SHEET P2.1 WASTE AND VENT PLAN P2.2 WATER AND GAS PLANS P2.3 PLUMBING ROOF PLAN P3.1 ENLARGED PLUMBING PLANS P4.1 PLUMBING SCHEDULES P5.1 PLUMBING DETAILS ELECTRICAL EO.1 LEGEND AND LIGHT SCHEDULE E1.0 SITE ELECTRICAL PLAN E2.0 POWERPLAN E2.1 MECHANICAL POWER PLAN E3.0 LIGHTING PLAN E4.0 SINGLE LINE AND SCHEDULES E5.0 ELECTRICAL DETAILS E6.0 ENERGY COMPLIANCE FORMS TELECOM TO.1 TELECOM SYMBOLS AND ABBREVIATIONS T0.2 TELECOM CABLING SCHEMATICS AND LABELING TO.3 TIERED CLASSROOM 128 AIV DETAILS T0.4 CLASSROOM 124 AV DETAILS T0.5 CLASSROOM 125 AV DETAILS T0.6 SIMULATION AND MAT ROOM AV DETAILS T1.0 TELECOM SITE PLAN T1.1 TELECOM PLAN T1.2 SECURITY PLAN GENERAL LIST OF DRAWING SHEETS MERIDIAN POLICE DEPT ADDITION/REMODEL Page 3 of 8 G0.1 TITLE SHEET G0.2 CODE DATA & BUILDING ASSEMBLIES G0.3 ENVELOPE COMPLIANCE AND CISCA SURVEY l OF ZTOPOGRAPHICSURVEY 2 0 F2 TOPOGRAPHIC SURVEY CIVIL 00.0 GENERAL INFORMATION SHEET C1.0 SITE DEMOLITION PLAN CZ.0 EROSION AND SEDIMENT CONTROL PLAN C3.0 HORIZONTAL CONTROL PLAN C4.0 GRADING AND DRAINAGE PLAN C5.0 SITE UTILITY PLAN C7.0 CIVIL DETAILS LANDSCAPE L1.0 LANDSCAPE PLAN L2.0 IRRIGATION PLAN 1-3.0 LANDSCAPE AND IRRIGATION PLAN ARCHITECTURAL Al.l FIRST FLOOR DEMOLITION PLAN A1.2 SECOND FLOOR DEMOLITION PLAN A1.3 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN A1.4 SECOND FLOOR REFLECTED CEILING DEMOLITION PLAN A2.1 FIRST FLOOR PLAN A2.2 SECOND FLOOR PLAN A2.3 ROOF PLAN A4.1 EXTERIOR ELEVATIONS &SECTIONS Page 4 of 8 A4.2 WALL SECTIONS A5.1 INTERNAL ELEVATIONS A6.1 FIRST FLOOR REFLECTED CEILING PLAN A6.2 SECOND FLOOR REFLECTED CEILING PLAN A8.1 EXTERIOR DETAILS A9.1 INTERIOR DETAILS A10.1 FINISH PLAN A10.2 FINISH/DOOR SCHEDULE STRUCTURAL SO.1 STRUCTURAL NOTES SO.2 STRUCTURAL NOTES S1.1 FOUNDATION PLAN S1.2 SECOND FLOOR PLAN S3.1 FOUNDATION DETAILS S3.2 FRAMING DETAILS S3.3 FRAMING DETAILS S3.4 FRAMING DETAILS PLUMBING/MECHANICAL MO.1 HVAC COVER SHEET M0.2 ENERGY COMPLIANCE M1.1 FIRST FLOOR HVAC DEMOLITION PLAN M1.2 SECOND FLOOR HVAC DEMOLITION PLAN M2.1 FIRST FLOOR HVAC PLAN M2.2 SECOND FLOOR HVAC PLAN M2.3 HVAC ROOF PLAN M4.1 HVAC SCHEDULES M5.1 HVAC DETAILS M8.1 HVAC CONTROLS Page 5 of 8 P0.1 PLUMBING PLAN P2.1 FIRST FLOOR PLUMBING PLAN P2.2 SECOND FLOOR PLUMBING PLAN P2.3 PLUMBING ROOF PLAN P4.1 PLUMBING SCHEDULES AND DETAILS ELECTRICAL E0.1 LEGEND & LIGHTING SCHEDULE E1.0 SITE ELECTRICAL PLAN E1.1 SITE PHOTOMETRIC PLAN E2.0 POWER PLAN E2.1 ROOF POWER PLAN E3.0 LIGHTING PLAN E4.0 SINGLE LINE & SCHEDULES E4.1 PANEL SCHEDULES E5.0 ELECTRICAL DETAILS E6.0 ENERGY COMPLIANCE FORMS COMMUNICATIONS T0.1 TELECOM SYMBOLS AND ABBREVIATIONS T1.0 TELECOM CABLING SCHEMATICS AND LABELING T1.1 FIRST FLOORTELECOM PLAN T1.2 SECOND FLOOR TELECOM PLAN T1.3 RECOVERY, SERVERS AND SAN CABLING DETAILS T1.4 REVISED CABLING SCHEMATIC T1.5 FIRST FLOOR SECURITY PLAN A9.1 INTERIOR DETAILS A10.1 FINISH PLAN A10.2 FINISH/DOOR SCHEDULE Page 6 of 9 STRUCTURAL S0.1 STRUCTURAL NOTES 50.2 STRUCTURAL NOTES 51.1 FOUNDATION PLAN 51.2 SECOND FLOOR PLAN 53.1 FOUNDATION DETAILS 53.2 FRAMING DETAILS 53.3 FRAMING DETAILS 53.4 FRAMING DETAILS PLUMBING/MECHANICAL M0.1 HVAC COVER SHEET M0.2 ENERGY COMPLIANCE Ml.l FIRST FLOOR HVAC DEMOLITION PLAN M1.2 SECOND FLOOR HVAC DEMOLITION PLAN M2.1 FIRST FLOOR HVAC PLAN M2.2 SECOND FLOOR HVAC PLAN M2.3 HVAC ROOF PLAN M4.1 HVAC SCHEDULES M5.1 HVAC DETAILS M8.1 HVAC CONTROLS PO.1 PLUMBING PLAN P2.1 FIRST FLOOR PLUMBING PLAN P2.2 SECOND FLOOR PLUMBING PLAN P2.3 PLUMBING ROOF PLAN P4.1 PLUMBING SCHEDULES AND DETAILS ELECTRICAL Page 7 of 8 E0.1 LEGEND & LIGHTING SCHEDULE E1.0 SITE ELECTRICAL PLAN E1.1 SITE PHOTOMETRIC PLAN E2,0 POWER PLAN E2.1 ROOF POWER PLAN E3.0 LIGHTING PLAN E4.0 SINGLE LINE & SCHEDULES E4.1 PANEL SCHEDULES E5.0 ELECTRICAL DETAILS E6.0 ENERGY COMPLIANCE FORMS COMMUNICATIONS TO.1 TELECOM SYMBOLS AND ABBREVIATIONS T1.0 TELECOM CABLING SCHEMATICS AND LABELING T1.1 FIRST FLOOR TELECOM PLAN T1.2 SECOND FLOOR TELECOM PLAN T1.3 RECOVERY, SERVERS AND SAN CABLING DETAILS T1.4 REVISED CABLING SCHEMATIC T1.5 FIRST FLOOR SECURITY PLAN END OF EXHIBIT D Page 8 of 8 EXHIBIT I INSURANCE REQUIREMENTS Worker's Compensation a. State: Idaho Statutory b. Applicable Federal Statutory c. Em lover's Liability: $100,000 per Accident $500,000 Disease, Policy Limit $100,000 Disease, Each Employee 1. Commercial General Liability (including Premises -Operations, Independent Contractors, Blanket Contractual, Products and Completed Operations, Broad Form Property Damage (including Completed Operations) and coverage for X (explosion),C (collapse), and U(underground) hazards) a. General Azue_eate $2-000,000 (limit to applvPer Proiect) b Products Completed Operations Aggregate $2,000,000 C. Personal and Advertisinglniury$1.000.000 d Each Occurrence$ 1,000,000 e Fire Damage (anyone fire) $50.000 f Medical Expenses (anyone person) $5.000 3. Business Auto Liability a. $1,000,000 combined single limit of liability for bodily injury and property damage each accident covering all owned, non -owned and hired autos 4. Umbrella Liability: $1,000,000 each occurrence and aggregate. The Owner and the Construction Manager shall be named as an additional insured on the insurance required above and the insurance shall contain the severability of interest clause as follows: "the insurance afforded herein applies separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the company's liability." CONTRACTOR BID FORM CITY OF MERIDIAN PUBLIC SAFETY TRAINING CENTER Bid Due by: 2:00 PM Bid Date: June 24, 2014 Bid Package # 13 Bid Package Name: FLOOR COVERING Submitted by: (Company Name) h� Having carefully examined the Place of the Work and all matters referred to in the Instructions to Bidders and the Contract Documents and all conditions affecting the work including availability of materials and labor, the undersigned hereby proposes to furnish all labor, materials, supplies, equipment, supervision, insurance and bonds in accordance with the Contract documents, within the time set forth therein, and at the prices stated below. Bidder hereby agrees to commence work under this contract on or before a date to be specified in written "Notice to Proceed" by the owner and substantially complete the work within the times stipulated in the enclosed construction schedule. Work covered by this Bid Package is specified in Volumes One Thru Five of the Specifications and Plan sets Titled 'Meridian Public Safety Training Center' and'Renovation/Addition for Meridian Police Dept' Bidding/General Conditions 096519 Resilient Tile Flooring Division 1 General Requirements (All Sections) 097200 Wall Covering 079200 Sealants` 096813 Tile Carpeting 096513 Resilient Base and Accessories 096816 Sheet Carpeting 096516 Resilient Sheet Flooring (As applicable to this work) In addition to the work required in the above sections, this bid item includes but is not limited to the following: Provide labor, material, and equipment for a complete installation of the Floor coverings and base as shown, and listed in the finish schedule. • Provide Floor patching and preparation prior to floor covering installation. • Furnish and install wall carpet. • Demo existing floor covering as indicated. • Properly covering and protecting the work of others from damage or soiling due to their performance of this work and shall include proper cleaning, restoring or replacement of any such work damaged or soiled in the performance of this work. This work does not include: Ceramic tile Flooring and ceramic tile wall finish. Acknowledgement of Addendum: #(b/l�f CONTRACTOR BID FORM Bid Package # 13 Page 1 of 3 Floor Covering Base Bid Proposal (Including all applicable taxes; Labor & Material Payment Bonds) X Base Bid: $ � r� c'b I i � I � OC) Alternate Proposals: Bidder agrees to perform alternate work as shown on the Drawings and as specified for the following sums, which sums shall be added to or deducted from, the Base Bid as indicated. The Owner reserves the right to accept the Base Bid and/or Alternates in any order or in any manner, which is most advantageous to the owner. Schedule of Alternates - Alternates are described in Section 012300 Please enter a zero (0) amount if the alternate does not affect your scope of work 1 Parking Lot East of MPD Building 2 Building Addition on West side of MPD Building 3 Display Case 4 Northwest Parking Lot 5 Break Room Remodel 6 Tiered Classroom Fixed Tables 7 Masonry Fence Add -Deduct$ N) Add -Deduct$ �l tf1 Add -Deduct $�/ia. Add -Deduct$. Add -Deduct $ Add-Deduct$l Add -Deduct$ The undersigned understands that The Ewing Co. Inc., the Owner, and the Architect reserve the right to accept, reject or negotiate any and/or all bids and wave any informality in the bidding. Final award is subject to approval by the owner. This proposal shall remain in effect for sixty (60) days past the bid date. The undersigned agrees in submitting this proposal, that if issued a Letter of Intent or a Formal Agreement that the agreement will be executed without alterations within five (5) days, and immediately furnish Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificate of Insurance. All costs shall be included in the lump sum bid. All bids must be accompanied by a Bid Bond or Bank Cashiers Check in the amount of 5% of the total bid. made Davable to the Owner. The undersigned acknowledges receipt and acceptance of the project schedule issued with Instructions to Bidders. Idaho Regis fpn No.: �L�” �1- Expires:`�����lt� Printed Nameandjitle��J�. Wo( Nvi 5re� /S�VV. ,AcWobcNvi fel /S�VV. Ac Phone fV {m`be,'Q��� - �� rJ- �� rJ Fax Number. �(�Su' iWS� (Seal .itrbis is by a -corporation') CONTRACTOR BID FORM Bid Package # 13 LCl Page 2 of 3 Floor Covering Subcontractor. (If Applicable) ` \ Company: Business Public Works License No. tIk Expires: I dk Phone Number: Y �' I �i Fax Number.NA" (If there is more than one Subcontractor, provide the same data above as an attachment to bid) CONTRACTOR BID FORM Bid Package # 13 Page 3 of 3 Floor Covering