HomeMy WebLinkAboutTask Order No. 10433 with Civil Survey Consultants for Franklin Road Black Cat Road to Ten Mile Road Reclaimed Water ImprovementsTASK ORDER NO. 10433
Pursuant to the
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN (OWNER) AND CIVIL SURVEY CONSULTANTS (ENGINEER)
This Task Order is made this 10� day of July, 2013 and entered into by and between the City
of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter
referred to as "City", and accepted by (CIVIL SURVEY CONSULTANTS) hereinafter referred
to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the
Master Agreement between the above mentioned parties dated October 25, 2012. The Project
Name for this Task Order 10433 is as follows:
CITY OF MERIDIAN
FRANKLIN ROAD - BLACK CAT ROAD TO TEN MILE ROAD
RECLAIMED WATER IMPROVEMENTS
PROJECT UNDERSTANDING
Per the City's request, the Engineer will provide professional engineering services related to
the design of new reclaimed water improvements to be constructed in conjunction with the
Idaho Department of Transportation (ITD) Project No. A012(368).
SCOPE OF WORK
Task 1 — Administration
1.1 Set up the contract and submit written communication through the City's project
management software (e -Builder). This includes but is not limited to the following:
• Reports
• Drawings
• Requests for information
• Request for action by City
• General Project Documentation & Communication
• Pay Invoices
Task Order 10433 Franklin Road — Black Cat to Ten Mile Reclaimed Water Improvements Page 1 of 4
CIVIL SURVEY CONSULTANTS
Task 2 — Design Improvements
2.1 Reclaimed Water Improvements:
Design approximately 6400 LF of reclaimed water main in Franklin Road.
Main will connect to existing reclaimed water main at easterly limits of
roadway project and will extend to westerly limits of roadway project.
Design reclaimed water main in Black Cat Road north of Franklin Road
that extends to limits of roadway project.
Design reclaimed water main stubs to three parcels on the southside of
Franklin Road between Black Cat Road and Ten Mile Road.
2.2 Property Owner Coordination
Engineer will send a letter to the property owners of the three parcels on
the southside of Franklin Road between Black Cat Road and Franklin
Road. The letter will advise property owner that the City is offering to
install a reclaimed water stub to their property. The letter will notify
property owner that the City will be responsible for all costs associated
with the construction of the stub and only commercial or high density
residential developments will be allowed to connect to stubs. A copy of
the letter will be provided to the City for review and approval prior to
sending it to the property owner. Engineer will respond to letters or phone
calls from property owners.
Task 3 — Construction Document Preparation and Review
3.1 Develop plans, specifications and bid schedule that meet current design
standards and standard specifications of the City, ISPWC, ITD and ACHD. One
complete set of 11 "x17" plans and specifications will be developed per ITD layout
standards. Plans will be prepared using ACHD standard blocks and line types.
3.2 Submit plans and specifications to City Engineering for departmental review and
comment. Engineer to revise plans as necessary.
3.3 Submit one (1) full size physical copies of plans and special provisions to
ITD/ACHD for review.
3.4 Submit revised plans and special provisions to City Engineering for Development
Services review. Engineer to revise plans as necessary.
3.5 Submit plans and special provisions to IDEQ for review and approval. Engineer
to revise plans as necessary and resubmit.
3.6 It is anticipated that a license agreement with Nampa Meridian Irrigation District
will be necessary for the Purdam Drain and Kennedy Lateral crossings. Engineer
Task Order 10433 Franklin Road — Black Cat to Ten Mile Reclaimed Water Improvements Page 2 of 4
CIVIL SURVEY CONSULTANTS
will submit plans to Nampa Meridian Irrigation District for review and approval.
The City shall coordinate execution of the agreement and pay all fees associated
with the agreement. All required work to extend the reclaimed water main at the
crossings shall be performed under ITD/ACHD Army Corps of Engineers and
Idaho Water Resources Permits. The City shall request that ITD/ACHD include
the reclaimed water main crossings on their Army Corps of Engineers and Idaho
Water Resources permit applications.
3.7 Submit a fully approved set of plans and special provisions to City Engineering
Department.
3.8 Submit a fully approved set of plans and special provisions to ITD/ACHD for
bidding purposes.
ASSUMPTIONS
1. It will be the City's responsibility to negotiate and execute the Joint Effort Agreement for
construction with ITD/ACHD. Plans will be prepared once the City has provided our
office with AutoCAD electronic files of the final design submittal to ITD/ACHD. The City
will obtain permission from ITD/ACHD to use the electronic files for utility design
purposes.
2. All improvements will be designed based off topographic survey information provided by
ACHD. Topographic surveying is not included as part of this scope of work.
3. The City will provide the Engineer with property owner mailing information necessary to
send project notification letters.
4. It is anticipated that all reclaimed water improvements will be installed with the public
right-of-way and this scope of services does not include preparing or obtaining
easements.
5. The City will assist the Engineer with obtaining special provision numbers from
ITD/ACHD.
6. An Erosion and Sediment Control Plan (ESCP) will not be prepared. The City will
coordinate with ITD/ACHD to have all work covered under ACHD ESCP and SWPPP.
TIME OF COMPLETION and COMPENSATION SCHEDULE
Engineering services will be completed as needed to construct improvements in conjunction
with Idaho Department of Transportation District Project No. A012(368). The preparation of
the City of Meridian's plans are dependent on the completion of the Idaho Transportation
District's plans and the schedule below is an expected schedule and may vary based on
Task Order 10433 Franklin Road — Black Cat to Ten Mile Reclaimed Water Improvements Page 3 of 4
CIVIL SURVEY CONSULTANTS
changes to the Idaho Transportation District project schedule. The schedule below is based
on a Notice to Proceed (NTP) from the City by September 2013. This results in Final
Construction plans completed by January 2014. A NTP issued on a different date will change
the schedule accordingly.
COMPENSATION AND COMPLETION SCHEDULE
Task
Description
Due Date
Compensation
7
Administration
30 days after completion
of construction
$369.90
2
Design Improvements
....... _....
Construction Documents
■ 120 days after NTP
$4,436.80
3
■ 120 days after NTP
$9,740.70
4
L I
Direct Costs — NMID Agreement
Fee
■ 30 days after completion
of construction
$350.00
TASK ORDER TOTAL $14,899.40
The Not -To -Exceed amount to complete all services listed above for this Task Order No.
10433 is fourteen thousand eight hundred ninety-nine dollars ($14,899.40). No compensation
will be paid over the Not -to -Exceed amount without prior written approval by the City in the
form of a Change Order. The hourly rates for services and direct expenses are per the Master
Agreement (by this reference made a part hereof) and will be the basis for any additions and/or
deletions in services rendered. Travel and meals are excluded from this Task Order unless
explicitly listed in the Scope of Services AND Payment Schedule.
CITY OF MERIDIAN
BY:
KEITH ATTS, Purchasing Manager
Dated:
Purchasing Approval
CIVIL SURVEY CONSULTANTS
BY: -14
_ 2>
TIM BURGESS, Vice Presi °nt
Dated: --7
Department Approval
CLINT DOT SBY, Asst. City Engi eery r
t
Dated: -;, - I � - L5
Task Order 10433 Franklin Road — Black Cal to Ten Mrle Reclaimed Water Improvements e 4 of 4 Pa
CIVIL SURVEY CONSULTANTS 9