Loading...
HomeMy WebLinkAboutTask Order No. 10158g with CH2M Hill Engineers, Inc. for WWTP Chemical Feed Building Control System SoftwareTASK ORDER NO. 10158g Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND CH2M HILL ENGINEERS, INC (ENGINEER) 01 a.nua .70/3 m This Task Order is made this et day of r, 2&1�2 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by (CH2M HILL ENGINEERS, INC), hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 7a) between the above mentioned parties dated September 18, 2012. The Project Name for this Task Order 10158g is as follows: CITY OF MERIDIAN WWTP CHEMICAL FEED BUILDING CONTROL SYSTEM SOFTWARE SERVICES PROJECT UNDERSTANDING Construction of the new chemical building at Meridian's Wastewater Treatment Plant is nearing completion. Control system software services, including programming and field testing, are required to provide automated monitoring and control functions for the polymer, PAX, and chlorine pumping systems. Due to the facility construction is nearly complete, the project schedule for this work is aggressive. SCOPE OF WORK CH2M HILL shall perform the following tasks in support of the Wastewater Treatment Plant Chemical Building Control System Software Services Task Order. Task 1 — Chemical Building Control System Software ENGINEER shall provide the following services: • Planning — Develop written loop descriptions to define the new automated monitoring and control features to be provided for the project. Includes one telephone coordination meeting with City staff to identify the desired monitoring and control features, development of draft loop descriptions for review by City staff, and incorporation of City review comments into the final loop descriptions to be used for programming. Task Order 101589 WWTP CHEMICAL FEED BUILDING CONTROL SYSTEM SOFTWARE SERVICES Page 1 of 6 CH2M HILL ENGINEERS, INC • Programming — Provide PLC, HMI, and OIT programming for the automated monitoring and control functions defined in the final loop descriptions. Add new analog tags to the plant's existing historian, and add critical alarms to the plant's existing WIN -911 alarm dialer software. • Site Testing — Provide up to 56 hours of onsite acceptance testing services to confirm that the new automated monitoring and control functions operate as outlined in the written loop descriptions. Testing includes a repeat of the installation contractors un -witnessed Operational Readiness Test (ORT) to confirm that the process components, field instruments, and wiring systems are complete and accurate • Training — Provide one onsite training session (up to 2 hours) to instruct operators how to use the new system graphics for automated monitoring and control. • Final Documentation — Provide final printed copies of the written loop descriptions and software functional test documentation. Provide electronic copies of the final PLC and HMI applications on CD or DVD. Deliverables One digital file of the draft loop descriptions for City review One hardcopy of the following: o Final written loop descriptions o Final software test documentation On CD or DVD with electronic copies of the following files: o Final chemical building PLC program o Final chemical building Panelview application o Final WWTP Wonderware application o Final WWTP WIN -911 application Assumptions The Not -To -Exceed amount to complete all work listed in this Task Order includes any rate increases throughout the duration of the Task Order. The Not -To -Exceed amount for this Task Order is based on the following maximum 1/0 counts shown in the Chemical Feed Design Project drawings developed by others: 0 8 DO (dwg E-4.1) 0 3 DI (dwgs E-4.2 and E-4.3) 0 2 Al (dwg E-4.4) 0 8 AO (dwg E-4.5) 0 1 DI for heat trace power failure alarm (added per 11/7/12 telephone conversation with City's PM) The scope of work is limited to control system software planning, programming, site testing, training, and final documentation services as described in this document. Other engineering services during construction, including submittal review and inspection, are not required because the facility construction is nearly complete and those services have been provided by others. Task Order 10158g WWTP CHEMICAL FEED BUILDING CONTROL SYSTEM SOFTWARE SERVICES Page 2 of 6 CH2M HILL ENGINEERS. INC • The effort related to HMI/OIT programming and testing includes new graphics and tags for the plant's existing Wonderware system and for the new Panelview 1000 terminal mounted in the chemical building's control panel face. • Where practical, the CompactLogix PLC programming effort shall use the same add-on instructions used by CH2M HILL in the blower building ControlLogix PLC to maintain consistency as much as possible. • The WWTP Wonderware system shall be upgraded to System Platform 2012 prior to CH2M HILL's onsite testing effort. In order to avaid a stranded investment in intouch graphics, the new Wonderware graphics shall be developed using System Platform objects based on a recommendation in the City's nearly -complete SCADA master plan, curently being executed by Brown and Caldwell. CH2M HILL shall use graphical objects recently developed for other CH2M HILL projects. • The new Panelview graphics shall be developed based on a CH2M HILL standard for level of detail and quality because the City does not have existing Panelview standards or an application they feel should be used as a model. The new Panelview graphics shall provide local operator interface for adjusting chemical pump automatic dosing setpoints and monitoring chemical building inputs. • The scope of work related to the plant's existing Wonderware application is based on the following: o Addition of one new chemical system overview graphic o Addition of three new process graphics (one for each chemical system) o Addition of three new pump control graphics (one for each chemical system's pumps) o New graphics shall not be required for the chemical building PLC's discrete alarm inputs. Those alarms shall be configured for display on the system's existing alarm history and summary log graphics. o An interface shall be provided to allow operators to disable each of the new system alarms o Each new analog input shall be configured to log data for access in the plant's existing Wonderware Intouch historical trend tool • The scope of work related to the building's new Panelview application is based on the following: o Addition of one new chemical system overview graphic o Addition of three new process graphics (one for each chemical system) o Addition of three new pump control graphics (one for each chemical system's pumps) o New graphics will not be required for the chemical building PLC's discrete alarm inputs. o An interface shall be provided to allow operators to disable each of the new system alarms o A historical trend will not be provided • The scope of work does not include development of new automated reports. Additional scope for development of new automated reports can be negotiated and incorporated into this task order, through a Change Order if desired by the City. • The scope of work includes addition of up to 10 new tags to the plant's existing historian. Task Order 101588 WWfP CHEMICAL FEED BUILDING CONTROL SYSTEM SOFTWARE SERVICES Page 3 of 6 CH2M HILL ENGINEERS, INC • The scope of work includes addition of up to 10 new critical alarms to the plant's existing WIN -911 alarm dialer. • Configuration of network components, including network switches, media converters, and firewalls is not required. CH2M HILL assumes this configuration has been done by others as part of the construction effort. • The panel fabricator successfully completed a panel factory test prior to shipment to confirm that the panel components are in good working order and the panel wiring is accurate. • CH2M HILL will not be required for onsite testing until the following activities are complete: o The accuracy of all 1/0 wiring in the new PLC panel has been confirmed between the panel terminals and the PLC's 1/0 modules o All field instruments are installed, powered, configured, and calibrated o Mechanical system installation and startup is complete (equipment is installed and lubricated, phase rotation has been checked, supplier's startup has been completed, and manufacturers certificate of proper installation has been issued, where applicable). o All electrical systems and final connections are complete (all conduit/wiring is installed and all conductors are terminated) o The installation contractor has performed an "Operational Readiness Test" (ORT Part 1) to confirm that all components and systems are ready for software testing. This includes confirmation of equipment operation, calibration checks for all field instrumentation, and point-to-point wiring checks for each and every PLC 1/0 point between the final field device's terminals and the PLC 1/0 module's terminals. • The installation contractor shall provide assistance for CH2M HILL's software testing effort by repeating the Operational Readiness Test (ORT Part 2) to allow CH2M HILL to confirm the system installation, the software addressing, and the software analog 1/0 scaling in preparation for software functional testing. • The City shall provide staff to assist CH2M HILL with software functional testing, which shall be executed after ORT Part 2 is complete. • Software functional testing shall require separate efforts for confirmation of the Panelview and Wonderware system functions. • O&M training for field instruments, networks, and control system hardware shall be provided by the installation contractor. CH2M HILL has not included effort for this activity. • As -built control panel drawings shall be provided by the City's panel fabricator. CH2M HILL has not included labor for as -built updates to the control panel drawings. Outside Services — Critigen: CH2M HILL shall use Critigen staff (subcontractor) to assist with software database setup and configuration. Critigen labor shall be billed as an expense on the invoices. TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by December 2012 and resulting in Final Design being completed by February 2013. A NTP issued on a Task Order 101588 WWTP CHEMICAL FEED BUILDING CONTROL SYSTEM SOFTWARE SERVICES Page 4 of 6 CH2M HILL ENGINEERS, INC different date will change the schedule accordingly. The following durations are from notice -to - proceed: • 1 month for programming • 1 month after the installation contractor has completed ORT Part 1 to complete ORT Part 2 and software functional testing. COMPENSATION The following table summarizes the estimated fee associated with this Task Order based on the work plan presented herein. Compensation and Completion Schedule Due Task ' Description i Date Compensation 1 Labor For chemical building control system software services February $28,880.00 2013 Expenses Travel $3,200.00 Outside Services (Critigen) $2,100.00 TASK ORDER TOTAL $34,000 CH2 anticipates incurring expenses for a maximum of two trips to Meridian which shall include 2 flights, airport parking for 8 days, rental car for 8 days, fuel for rental car, 8 hotel nights, meals for 8 days, and $200 allowance for incidentals required to perform the work. Flights must be booked a minimum 14 days in advance to ensure a reasonable rate and hotel and meal expenses may not exceed the City of Meridian Travel Policy allowances. The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10158g is thirty four thousand dollars ($34,000.00). Services shall be billed at an hourly rate per the existing Master Agreement up to the Not -To -Exceed amount. No additional services shall be completed nor compensation be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. The hourly rates for services and direct expenses are per the Master Agreement (by this reference made a part hereof) and will be the basis for any additions and/or deletions in services rendered. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. Task Order 101588 WWrP CHEMICAL FEED BUILDING CONTROL SYSTEM SOFTWARE SERVICES Page 5 of 6 CH2M HILL ENGINEERS, INC CITY OF MERIDIAN BY: TAI Dated: Attest: JA 1 C CH2M HILL EN INEERS, INC BY: 441 MARK BOWEN, VP and Area Manager Dated: J-4 �E 6 Cie, ai Purchasing Approval E 1R L�It�l` ,�- i. BY: SEAL KEIT ATTS, Purc asing Mana rER v` ep tpr TRt!.S: City Proje t Manager , Engineering Manager Dated:. 3 _� Task Order 10158g WWTP CHEMICAL FEED BUILDING CONTROL SYSTEM SOFTWARE SERVICES Page 6 of 6 CH2M HILL ENGINEERS, INC