HomeMy WebLinkAboutTask Order No. 2 with CH2M Hill, Inc. for Plant Optimization Desktop AnalysisTask Order No. 2 TO THE
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN AND C112M HILL, INC.
This Task order is entered into by and between City of MERIDIAN (OWNER) and CH2M HILL, Inc.
(ENGINEER).
A. OWNER and ENGINEER entered into a Master Agreement (AGREEMENT) for Professional
Services, dated January _, 2007.
B. Article Iof the AGREEMENT provides that the AGREEMENT may be amended by written task
order to the AGREEMENT as agreed to by OWNER and ENGINEER.
C. OWNER and ENGINEER desire to amend the AGREEMENT with this task order.
Now, Therefore, the parties agree to the following modifications:
See Attachment A.
All other terms and conditions of the original agreement will remain in full force and effect.
IN WITNESS WHEREOF, the parties execute below:
For CI -12M HILL, Inc.
e'- *
dated this da of 2007.
By:,
Name Title
For City of Meridian
dated this day of2007.
By: �` t
Name ?�� e E l�
l/"
0
cs
r
Attachment A
Scope of Work
For
Plant Optimization Desktop Analysis
City of Meridian
INTRODUCTION
This scope of work is the first in a series of tasks that will constitute a plant optimization study
for the City of Meridian Ustick Wastewater Treatment Plant (UWWTP). The first task order
includes coordination with regulatory agencies and a desktop analysis that evaluates existing unit
process plant capacities. We anticipate completion of this task in mid-February.
The second plant optimization task order scope will depend on the results of the first task order
but will include at a minimum include model calibration, review and development of costs for
Chemically Enhanced Primary Treatment and Bioaugmentation, updated flow growth estimates,
recommendations for capital projects for fiscal year 2008, for the next five fiscal years, a
recommendation for plant expansion if needed, and a schedule for recommended improvements.
We anticipate this task order to be completed by the end of March.
The third task will conduct field testing, review of field test results, and review of the step feed
and other treatment processes. We anticipate this to be done by the end of May.
SCOPE OF WORK
Task 1 Agency Coordination
CH2M HILL will participate in three meetings with IDEQ to discuss the concept of plant
optimization and the ability of this effort to rerate plant capacity. We anticipate these meetings to
occur at the IDEQ offices.
Task 2 Desktop Analysis
The desktop analysis provides important insights into both the constraints and optimization
opportunities available within the UWWTP.
Subtask 2.1 Gather Data
The Engineer will gather information from the UWWTP to develop process design criteria
including:
Page 1 of 4
• Influent flows and wastewater characteristics
• Unit Process number and sizing
• Unit Process performance
• Process Control Strategies
• Process piping sizing and configuration
• Equipment Redundancy
• Historical plant operating experience and procedures
Subtask 2.2 — Pro2D Modeling
CI -12M HILL uses a proprietary process modeling tool called Pro02D (Professional Process
Design). This model has already been started and will be refined under this task based on the
data that has been gathered. This model allows us to predict optimum operating conditions, based
on multiple scenarios that can be investigated at the desktop level. The desktop optimization is
completed in an iterative approach by first adjusting operation to the optimum condition and
monitor plant effluent and internal profiles; second, confirm model calibration; third, investigate
other optimum conditions such as simulation of seasonal affects for different operating
objectives; and fourth, adjust plant operations and repeat the third step.
Subtask 2.3 Hydraulic Evaluation
Process modeling has already identified potential additional capacity in process tankage. An
hydraulic model will be developed to simulate increased flows through the plant to identify
hydraulic bottlenecks. Once identified, these bottlenecks can be corrected so the plant can
achieve its full process capacity rating. CH2M HILL will use the WMydro hydraulic modeling
tool to evaluate hydraulic bottlenecks.
Subtask 2.4 Peak Load Analysis
Influent data will be reviewed with a risk analysis simulation tool to determine the probability of
peak flows corresponding to peak loads. Probabilities of peak loads and flows corresponding at
the same time are typically low providing opportunity to reduce design criteria to a more
reasonable level and increase plant capacity.
Subtask 2.5 Technical Memorandum
A technical report summarizing the desktop evaluation will be prepared and recommendations of
existing plant capacity increases will be provided. Recommendations for further field testing will
be included.
CH2MHILL will submit six copies of the draft technical memorandum to the City and conduct
one review meeting with City personnel. Review comments will be incorporated and two copies
will be submitted to IDEQ Boise Regional Office for review and approval.
Page 2 of 4
� y -
Task 3 - Project Management and Quality Assurance/Quality Control
CH2MHILL will be responsible for planning, managing, and executing the work in accordance
with the schedule, budget, and established quality expectations. The project management tasks
include the following work activities:
• Coordinate between tasks and team members. Document meeting decisions and action items,
assign activities to team members, and follow up to ensure timely resolution.
• Monitor project progress, including work completed, work remaining, budget expended,
schedule, estimated cost of work remaining, and estimated cost at completion.
• Monitor project activities for potential changes, anticipate changes when possible, and with
City approval, modify project tasks, task budgets, and approach.
• Manage the quality control review of work activities and project deliverables.
• Prepare and submit a monthly invoice.
ASSUMPTIONS
The following assumptions are associated with this project:
L City is allocated ten working days to review all draft deliverables.
2. City provides plant information such as influent flow rates and wastewater
characteristics.
3. Some special sampling may be required to fill in data gaps. CH2M HILL will
provide the plans for sampling and analysis by the City of Meridian.
FEE ARRANGEMENT
As consideration for providing the services enumerated under the Statement of Work, the CITY
shall pay CH2MHILL the amount shown in the table below in accordance with the
AGREEMENT. The fee shall be based on time and materials, not to exceed the total cost. The
cost for performing the Scope of Work shall not exceed this amount without a formal
amendment to this task order that increases the Scope of Work.
Task
Fee
1.0 Agency Coordination
--$7,036
2.0 Desktop Analysis
2.1 Gather Data
$ 4,122
2.2 Pro2D Modeling
$ 7,140
2.3 Hydraulic Evaluation
$ 4,934
2.4 Peak Load Analysis
$ 10,388
2.5 Technical Memorandum
$ 6,277
3.0 Project Management
$ 7,195
Total
J$47,092
Page 3 of 4
SCHEDULE
This task will be completed by February 16, 2007.
OTHER PROVISIONS
This Statement of Work will become part of the referenced AGREEMENT when executed by
both parties.
Page 4 of 4
TASK ORDER NO. 2.1
UNDER THE
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN AND C112M HILL, INC.
This Task order is entered into by and between City of MERIDIAN (OWNER) and C112M HILL, Inc.
(ENGINEER), according to the terms and conditions of the Master Agreement (AGREEMENT) for
Professional Services, dated January 1, 2007.
See Attachment A for the Scope and Fee for Task 2.1.
All other terms and conditions of the original agreement will remain in full force and effect.
IN WITNESS WHEREOF, the parties execute below:
For CI -12M HILL, Inc.
date
Lo
Name Title
For City of Meridian
IK
dated thisyU day of �� , 2007.
By:
Name Title
r.
6y Uxy C��c\1 'i I �YiA i. l�fi/lrrif7l i{tll�t\ ���`�v
Attachment A
Scope of Work
For
Task Order 2.1
Plant Optimization Desktop Analysis
City of Meridian
INTRODUCTION
This scope of work is the second in a series of tasks that will constitute a plant optimization
study for the City of Meridian Ustick Wastewater Treatment Plant (UWWTP). The first task
order included coordination with regulatory agencies and a desktop analysis that evaluated
existing unit plant capacities. We anticipate completion of this task in mid-February.
This task order scope includes a model calibration, review and development of costs for
Chemically Enhanced Primary Treatment (CEPT) and Bioaugmentation, updated flow growth
estimates, recommendations for capital projects for fiscal year 2008 including a recommendation
for plant expansion if needed, and a schedule for recommended improvements. We anticipate
this task order to be completed by the end of March.
The third task will conduct field testing, review of field test results, and review of the step feed
and other treatment processes. We anticipate this to be done by the end of May.
SCOPE OF WORK
Task 1 Model Calibration
This task provides for calibration of the hydraulic model using field water level measurements to
be done in one day.
Task 2 Development of Costs for CEPT and Bioaugmentation
CEPT and bioaugmentation are considered leading candidates for plant optimization. Based on
the Pro2D results, initial sizing of new CEPT and bioaugmentation treatment facilities will be
performed to support conceptual level construction cost estimates.
Task 3 Update Flow Growth Estimates
Using recent flow data, existing COMPASS and previous master plan estimates will be updated
so that anticipated future flows can be matched with plant optimization and plant capacity
rerating work to support facility planning and near term budgeting.
Page 1 of 3
Task 4 Recommendations for Capital Improvement Projects
Based on the results of tasks 1-3, and the parallel filtration study, recommended capital
improvements plan will be developed for fiscal year 2008 budgeting, and conceptually, for the
next five years.
Task 5 - Project Management and Quality Assurance/Quality Control
CH2MHILL will be responsible for planning, managing, and executing the work in accordance
with the schedule, budget, and established quality expectations. The project management tasks
include the following work activities:
• Coordinate between tasks and team members. Document meeting decisions and action items,
assign activities to team members, and follow up to ensure timely resolution.
• Monitor project progress, including work completed, work remaining, budget expended,
schedule, estimated cost of work remaining, and estimated cost at completion.
• Monitor project activities for potential changes, anticipate changes when possible, and with
City approval, modify project tasks, task budgets, and approach.
• Manage the quality control review of work activities and project deliverables.
• Prepare and submit a monthly invoice.
FEE ARRANGEMENT
As consideration for providing the services enumerated under the Statement of Work, the CITY
shall pay CH2MHILL the amount shown in the table below in accordance with the
AGREEMENT. The fee shall be based on time and materials, 3.2 RLM. The cost for performing
the Scope of Work shall not exceed this amount without a formal amendment to this task order
that increases the Scope of Work.
Task
Fee
1.0 Model Calibration
$ 6,303
2.0 Development of Cost for CEPT and
Bioaugmentation
$ 4,388
3.0 Update Flow Growth Estimates
$ 5,534
4.0 Recommendations for Capital
Improvement Projects
$ 11,400
5.0 Project Management
$ 6,375
Total
$ 34,000
SCHEDULE
This task will be completed by March 30, 2007.
OTHER PROVISIONS
Page 2 of 3
This Statement of Work will become part of the referenced AGREEMENT when executed by
both parties.
Page 3 of 3
TASK ORDER NO. 2.2
UNDER THE
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN AND C112M HILL, INC:
This Task order is entered into by and between City of MERIDIAN (OWNER) and C112M HILL, Inc.
(ENGINEER), according to the terms and conditions of the Master Agreement (AGREEMENT) for
Professional Services, dated January 1, 2007.
See Attachment A for the Scope and Fee for Task 2.2.
All other terms and conditions of the original agreement will remain in full force and effect.
IN WITNESS WHEREOF, the parties execute below:
For CH2M HILL, Inc.
dated this. day of , 2007.
W.
Name Title
For City of Meridian
dated this da of 2007u,,,���
OF
r
By:-
Attest:
Y:Attest:
William G. Berg, Jr. City
Approved By City Council: �ar�?.cx�'� �AVTY
/1"111 tllN�+���\
e
Attachment A
Scope of Services
Project Understanding
The Plant Optimization effort identified Chemically Enhanced Primary Treatment (CEPT) as
a project the City of Meridian wanted to move forward on early. Ferric Chloride would be
fed into the influent junction box upstream of the influent screens by flow -paced, metering
pumps housed in a small storage shed. Secondary containment pallets will be provided
under the pumps. Dosage rates would be determined by jar testing. A top entry mixer or
mixing pump will be provided in the influent junction box to flash mix the solution. The
chemical will be stored in a 5,000 gallon insulated, double -walled, cross-linked polyethylene
tank on a concrete pad.
The project will be constructed as a change order to an existing construction contract.
Deliverables will be a change order package and not public bid documents.
Scope of Work
CH2M HILL will perform the tasks for design of the Ferric Chloride feed facilities as
outlined below.
Task 1—Project Management
Project management includes project scoping, staff management, task coordination,
monitoring project progress, preparing invoices, and ensuring project quality control..
Task 2—Preliminary Design
CH2M HILL will perform jar testing on-site to determine the optimum chemical dosage. A
five paddle stirrer will be rented locally for one day and jar testing will occur in the City's
laboratory.
A brief engineering report will be submitted to IDEQ which includes the results of the jar
testing, a discussion of the effects on the biosolids system such as additional phosphorus
loading and biosolids generationin.
Task 3—Design
3.1 Equipment Sizing and Selection
The flash mixing equipment and chemical feed pumps will be sized and selected based on
the results of the jar testing.
3.2 Prepare Plans and Specifications
Plans will be produced to allow the Contractor to price the work. Equipment specifications
will be noted on the drawings. The following is the anticipated list of drawings:
• Site Plan/Yard Piping
• Section and Details
• Structural Notes, and Details
• Electrical Schedules & Diagrams
3.3 Project Review Meetings
Four copies of 90% complete project documents will be provided for City review and
comment. City Comments will be incorporated into the final documents.
3.4 Cost Estimates
Updated cost estimates will be provided with the drawing submittal
Attachment B
Compensation
Level of Effort
The task level of effort estimates are summarized in the following table. CH2M HILL has
developed this level of effort estimate based on the work plan presented herein and
assumptions stated previously. The fees will be billed as time and material, and will not
exceed the total amount below without prior approval by the City.
Level of Effort
Task
Description
Total Task
1
Project Management
$1702
2
Preliminary Design
$4073
3
Final Design
$13374
Summary - All Tasks
$19,149
Schedule
The schedule is listed below:
• 90% design - 4 weeks after NTP
0 Final Documents will take 1 week after receipt of City comments
TASK ORDER NO. 2.5
UNDER THE
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN AND C112M HILL, INC.
This Task order is entered into by and between City of MERIDIAN (OWNER) and CH2M HILL, Inc.
(ENGINEER), according to the terms and conditions of the Master Agreement (AGREEMENT) for
Professional Services, dated January 1, 2007.
See Attachments A and B for the Scope and Fee for Task 2.5
All other terms and conditions of the original agreement will remain in full force and effect.
IN WITNESS WHEREOF, the parties execute below:
For C112M HILL, Inc.
l
dated t ' day of , 2008.
B e
Name Title
For City of Meridian
dated this
LE
Mayor
Jaycee Hol&an City
Approved By City Council:
11:
BEAL
9Q �.ST 13-1.
COON"
1111111,1\
TASK ORDER NO. 2.7
UNDER THE
MASTER AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
CITY OF MERIDIAN AND C112M HILL, INC.
This Task order is entered into by and between City of MERIDIAN (OWNER) and CH2M HILL, Inc.
(ENGINEER), according to the terms and conditions of the Master Agreement (AGREEMENT) for
Professional Services, dated January 1, 2007.
See Attachments A and B for the Scope and Fee for Task 2.7
All other terms and conditions of the original agreement will remain in full force and effect.
IN WITNESS WHEREOF, the parties execute below:
For CH2M HILL, Inc.
d,
B
For City of Meridian
date�thisba�oL-
y.
mammy eerd, Mayor
Attest:
Jaycee HoVan City C erk
Approved By City Council:
Name Title
rte:
PO�-Y
BEAL
cou
��rJrrrrrM nNtt+t��
Task Order 2.7
Attachment A
Chemically Enhanced Primary Treatment (CEPT) Chemical Feed
and Centrate Drain Revisions
Project Understanding
Based on the meeting held on August 22, 2008, CH2M HILL is to provide a technical
memorandum outlining the path forward for chemical feed to support the CEPT process. In
addition, the centrate drain bypass is not working properly and needs redesign for it to
properly drain.
Scope of Work
CH2M HILL will perform the three tasks as outlined below. SCADA programming is not
part of this contract.
Task 1 Prepare the CEPT Chemical Feed Technical Memorandum
The technical memorandum will recap the ferric chloride test results. Two chemical feed
options will be analyzed:
• Use Aluminum Sulfate (alum) for CEPT, with Ferric Chloride for H2S control in the
digesters
• Use Aluminum Sulfate for CEPT, with Ferric Chloride for H2S control in the digesters,
and a nominal dosage of Ferric Chloride in the headworks for H2S control
Both options will jointly use alum for filter coagulation. The advantages and disadvantages
of each option will be discussed. These include:
• Costs, capital and Operations and Maintenance (O&M),
• ability to control odors,
• safety of handling and storage,
• ability to remove phosphorus and control struvite.
Recommendations will be made regarding pilot testing requirements, chemical dosage
points, and benefits expected from each chemical feed option.
Once reviewed and approved by the City, this memorandum should be submitted to IDEQ
for approval.
Task 2 Centrate Drain Revisions
CH2M HILL will verify field elevations of the existing centrate drain and bypass system,
and a hydraulic profile will be developed. A determination will be made if the drain system
can be drained by gravity, or if a pumped system is required. Improvements will be
designed, and the design will consist of 1 to 2 sheets in order to obtain a quote from a
contractor on site.
Task 3—Project Management
Project management will consist of:
• Supervising project staff,
• holding consultant staff coordination meetings as required,
• documenting meeting decisions and action items,
• assigning activities to team members,
• monitoring project progress, including work completed, work remaining, budget
expended, schedule, estimated cost of work remaining, and estimated cost at
completion,
• monitoring project activities for potential changes, anticipating changes when possible,
and with Owner approval, modifying project tasks, budgets, and approach,
• preparing and submitting a monthly billing with backup documentation,
• performing project quality control reviews of deliverables on this project.
Attachment B
Compensation
Level of Effort
The task level of effort estimates are summarized in the following table. CH2M HILL has
developed this level of effort estimate based on the work plan presented herein and
assumptions stated previously. The fees will be billed as time and material, and will not
exceed the total amount below without prior approval by the City.
Level of Effort
Task Description
d
Total Task
1 Chemical Feed memorandum
$6,065
2 Centrate Drain Revisions
$2,184
3 Project Management
$7,937
Summary - All Tasks
$16,186
All work willbe 1-4--A
comp an an costs will be billed in accordance with the Master Service
Agreement dated January 1, 2007.
Schedule
Task One and Two can be completed in parallel and within 2 weeks of the notice to proceed.
CH2M HILL is prepared to proceed without a signed contract if written authorization (letter
or e-mail) to proceed is received.