Loading...
HomeMy WebLinkAboutAgency Comments CCCENTRAL •® DISTRICT WHEA L H DEPARTMENT MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE, ID 83704-0825 • (208) 375-5211 • FAX 327-8500 "To improve the health of otrr conrtntenities by identifying sustainable solutiotrs to conununity health issues, developing partnerships for irnplenrentation ofstrategies, and denronstrating our success through measurement ofoutconres. " 14-0415. June 10, 2014 Christopher D. Rich Ada County Recorder 200 West Front Street Boise, ID 83702 RE: The Village at Cold Creek Subdivision Dear Mr. Rich: Central District Health Department has reviewed and does approve the final plat for this subdivision for central water and central sewer facilities. Final approval was given June 10, 2014. Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based on a review by a Qualified Licensed Professional Engineer (QLPE) representing City of Meridian and the QLPE approval of the design plans and specifications and the conditions imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is cautioned that at the time of this approval, no drinking water extensions or sewer extensions were constructed. Building construction can be allowed with appropriate building permits if drinking water extensions or sewer extensions have since been constructed or if the developer is simultaneously constructing those facilities. If the developer fails to construct facilities then sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by the issuance of a certificate of disapproval, and no construction of any building or shelter requiring drinking water or sewer/septic facilities shall be allowed. Serving Valley, Elmore, Boise, and Ada Counties Ada /'Boise County Office Elmore County Office Valley County Office 707 N. Armstrong Pl. 520 E 8th St. North 703 N. 1st St. Boise, ID 83704 - Mountain Home, ID 83647 McCall, ID 83638 Enviro, Health: 327-7499 Enviro. Health: 587-9225 Ph, 634-7194 Reproductive Health: 327-7400. Family Health: 587-4407 FAX: 634-2174 Immunizations: 327-7450 WIC: 587-4409 Senior Nutrition: 327-7460 FAX: 587-3521 WIC: 327-7488 FAX: 327-8500 If you have any questions, please call 327-8517 Sincerely, Lori Badigian, R.E.H.S. Senior Environmental Health Specialist cc: Hayden Homes Idaho, LLC c/o Bill Duffey Erickson Civil, Inc. City of Meridian CDISTRAL RICT CENTRAL DISTRICT HEALTH DEPARTMENT HEALTH Environmental Health Division DEPARTMENT Rezone # Conditional Use # Preliminary / Final / Short Plat `�1 Uuk!i ❑ 1. We have No Objections to this Proposal. Return to: ❑ ACZ ❑ Boise ❑ Eagle ❑ Garden City ❑ Kuna Meridian Star ❑ 2. We recommend Denial of this Proposal. ❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ❑ high seasonal ground water ❑ waste flow characteristics ❑ bedrock from original grade ❑ other ❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. After written approval from appropriate entities are submitted, we can approve this proposal for: central sewage ❑ community sewage system ❑ community water well ❑ interim sewage 1* central water ❑ individual sewage ❑ individual water 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: entral sewage ❑ community sewage system ❑ community water ❑ sewage dry lines central water ❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ❑ 12. We will require plans be submitted for a plan review for any: L3 food establishment ❑ swimming pools or spas L3 child care center ❑ beverage establishment ❑ grocery store ❑ 14. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. Reviewed By: Date.: --22— LL4-1 y Review Sheet 15726-OOIEHl111 City of Meridian City Clerk's Office 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RE: FP 14-006/Village @ Cold Creek Dear Jaycee: 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 SHOP: Nampa 208-466-0663 Nampa & Meridian Irrigation District (NMID) has a Land Use Change Application currently on file it is reviewing. Therefore NMID withholds any further comments until we have finished our review. 'the 5 Mile Drain is on the north boundary and has an easement of one andreci feet ("100' ); fifty feet (50')minimum each side of centerline. This easement must be protected. Any encroachment without a signed License Agreement and approved plan before any construction is started is unacceptable. Sincerely, Andy Madsen Asst. Water Superintendent Nampa & Meridian Irrigation District AM/dbg PC: G. Curtis, Water Superintendent Office/file APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 RICHARD DURRANT CHAIRMAN OF THE BOARD BOISE PROJECT BOARD OF CONTROL OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING GRAHAM PATERSON IRRIGATION DISTRICTS VICE CHAIRMAN OF THE BOARD (FORMERLY BOISE U.S. RECLAMATION PROJECT) TIMOTHY M. PAGE 2465 OVERLAND ROAD PROJECT MANAGER BOISE, IDAHO 83705-3155 NAMPA-MERIDIAN DISTRICT ROBERT D. CARTER BOISE-KUNA DISTRICT ASSISTANT PROJECT MANAGER WILDER DISTRICT NEW YORK DISTRICT APRYL GARDNER BIG BEND DISTRICT SECRETARY -TREASURER r k e F,fklrF% i JERRI FLOYD ASSISTANT SECRETARY- TREASURER TEL: (208) 3-1141 44 FAX: (208) 344-1437 08 April 2014 City of Meridian City Clerk's Office 33 W. Broadway Avenue Meridian, Idaho 83642 RE: Cindy K. Lewis Trust & T & M Holdings, L.L.C. File No: FP 14-015 Whitebark Subdivision 2135 E. Amity Road New York Irrigation District NY-236-002-00 Beasley Lateral 24+40 Sec. 32, T3N, R1E, BM. Jaycee Holman, City Clerk: The United States' Beasley Lateral lies along the boundary of the above -mentioned location. The easement for this lateral is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert this federal easement 15 feet westerly and 10 feet easterly of the lateral's centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. Wording on the preliminary and final recorded plat needs to state that any proposed and/or future usage of the Boise Project Board of Control facilities are subject to Idaho Statues, Title 42-1209. Fencing (as may be required) must be constructed just off the lateral easement. Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be approved by Boise Project Board of Control prior to construction. The construction of any roadway crossings must be conducted only during the non - irrigation season when the canal is dewatered. In any case no work shall take place within the easement before the proper crossing agreements have been secured through the Bureau of Reclamation and the Boise Project Board of Control. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case no work shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Storm Drainage and/or Street Runoff must be retained on site. Local irrigation/drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement. Whereas this property lies within the New York Irrigation District it is important that representatives of this development contact the NYID office as soon as possible to discuss the pressure system prior to any costly design work. If applicable, the irrigation system will have to be built to specific specifications as set by the District / Project. Boise Project Board of Control must receive a written response from the New York Irrigation District as to who will own and operate the pressure irrigation system prior to review and approval of an irrigation plan by Boise Project Board of Control. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting any copies of the irrigation and drainage plans. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to review plans and require changes when our easements and/or facilities are affected by unknown factors. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sincerely, Bob Carter Assistant Project Manager- BPBC bdc/bc cc: Phil Comegys Watermaster, Div; 2 BPBC Velta Harwood Secretary -Treasurer, NYID File