HomeMy WebLinkAboutAgency Comments CC& .. ~ ~~~
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
J~[n3~ary 27, 201 4 FAX #208-463-0092 nmid.org
OFFICE: Nampa 208-466-7861
CttyOl`Merldtal] SHOP: Nampa 208-466-0663
City Clerk's Off ce
33 E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
RE: FP 14-001/Zebulon Commons
Dear Jaycee:
Nampa & Meridian Irrigation District (NMID) has no comment on the above-referenced
application as it lies outside of our district boundaries
All laterals and waste ways must be protected. All municipal surface drainage must be
retained on-site. If any surface drainage leaves the site, Nampa & Meridian irrigation District
(NMID) must review drainage plans.
Sincerely,
Andy adsen
Asst. Water Superintendent
Nampa&'Meri'dian Irrigation District
AM/dbg
PC: G. Curtis, Water Superintendent
Office!file ~ -
~_
,.
., ,.~..
;. .. ,t
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
CENTRAL
•• DISTRICT
pRHEALTH
DEPARTMENT
Rezone #
CENTRAL DISTRICT HEALTH DEPARTMENT
Environmental Health Division
Return to:
^ ACZ
^ Boise
^ Eagle
^ Garden City
Conditional Use # _ ^ Kuna
Preliminary /Final /Short Plat ~'P ~~-`' t7D~Meridian
~e~~ ~~ 0.1M, c S - ^ Star
^ 1. We have No Objections to this Proposal.
^ 2. We recommend Denial of this Proposal.
^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
^ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ bedrock from original grade ^ other
^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
C~,8. After written approval from appropriate entities are submitted, we can approve this proposal for:
// central sewage ^ community sewage system ^ community water well
interim sewage central water
^ individual sewage individual water
~9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
central sewage ^ community sewage system ^ community water
sewage dry lines '~ central water
^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^ 12. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas ^ child care center
^ beverage establishment ^ grocery store
`~l 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
^ 14.
Reviewed By:
Dater/~/ ~-
Review Sheet
15726-001EH1111