Loading...
HomeMy WebLinkAboutAgency Comments CC& .. ~ ~~~ 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 J~[n3~ary 27, 201 4 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 CttyOl`Merldtal] SHOP: Nampa 208-466-0663 City Clerk's Off ce 33 E Broadway Avenue, Suite 102 Meridian, ID 83642-2619 RE: FP 14-001/Zebulon Commons Dear Jaycee: Nampa & Meridian Irrigation District (NMID) has no comment on the above-referenced application as it lies outside of our district boundaries All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian irrigation District (NMID) must review drainage plans. Sincerely, Andy adsen Asst. Water Superintendent Nampa&'Meri'dian Irrigation District AM/dbg PC: G. Curtis, Water Superintendent Office!file ~ - ~_ ,. ., ,.~.. ;. .. ,t APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 CENTRAL •• DISTRICT pRHEALTH DEPARTMENT Rezone # CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division Return to: ^ ACZ ^ Boise ^ Eagle ^ Garden City Conditional Use # _ ^ Kuna Preliminary /Final /Short Plat ~'P ~~-`' t7D~Meridian ~e~~ ~~ 0.1M, c S - ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. C~,8. After written approval from appropriate entities are submitted, we can approve this proposal for: // central sewage ^ community sewage system ^ community water well interim sewage central water ^ individual sewage individual water ~9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: central sewage ^ community sewage system ^ community water sewage dry lines '~ central water ^ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 12. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store `~l 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ^ 14. Reviewed By: Dater/~/ ~- Review Sheet 15726-001EH1111