HomeMy WebLinkAbout3-4-04 Memo from Len GradyR_EC~EIVEI~
M~F: f' ~ 264
Caty OCTVleridian
Cit,-y Clerk Office
Memo
7ilx Brad Watson
tom: Lenard GYady
CC: Gary Smith
Dabo: 3/4/2004
Re: Capital Development, Ina
I have a few comments with regard ib the fax from Dave Yorgason an 3!312004 as
summarized betouv:
• The number of PRV's required for the "Altemalhre Supply' renge from 1 to 3.
ff the cast of the °Akemali~re Supply' exceeds $2bAgta, we will have to fannally bid the job.
This wAl add approximatey one month to the timeline.
+ The City did not discuss Pel~n® far the "Akemetive Source". We ere proceeding with design.
+ The number of well sites required long term is two. If we Implement the °Aftemative
Source", the number of well sites required may decxease. This wiU be confirmed by
modeling.
lert
Fmm 8red~k oC..
I.nrd Grtdy
SffinFnpoea
Meridian Puhlic Wads D~Iment
660 C. Wale,hwna Suih 100
Maidien, Idaho 83642
[108)898.5500
Yax: (108)898-9531
• Fie 1 endyl~mnidiarrciryorg