Loading...
HomeMy WebLinkAbout3-4-04 Memo from Len GradyR_EC~EIVEI~ M~F: f' ~ 264 Caty OCTVleridian Cit,-y Clerk Office Memo 7ilx Brad Watson tom: Lenard GYady CC: Gary Smith Dabo: 3/4/2004 Re: Capital Development, Ina I have a few comments with regard ib the fax from Dave Yorgason an 3!312004 as summarized betouv: • The number of PRV's required for the "Altemalhre Supply' renge from 1 to 3. ff the cast of the °Akemali~re Supply' exceeds $2bAgta, we will have to fannally bid the job. This wAl add approximatey one month to the timeline. + The City did not discuss Pel~n® far the "Akemetive Source". We ere proceeding with design. + The number of well sites required long term is two. If we Implement the °Aftemative Source", the number of well sites required may decxease. This wiU be confirmed by modeling. lert Fmm 8red~k oC.. I.nrd Grtdy SffinFnpoea Meridian Puhlic Wads D~Iment 660 C. Wale,hwna Suih 100 Maidien, Idaho 83642 [108)898.5500 Yax: (108)898-9531 • Fie 1 endyl~mnidiarrciryorg