AIA Agreement with Contractor Schindler for WWTP Admin Bldg and Lab Design (2)
~~ ® TM -_ Document A132 - 2009 Standard Form of Agreement Between Owner and Contractor,Construction Manager as Adviser Edition AGREEMENT madc as of the 1st day of November in the ycar 2013 (br 1t~ords, irrdicute dct1~, nroratlr and>>ear) BETWEEN the Owner: (Name, legal status, address urrd other infornratiorr) City of Meridian 33 E. Broadway Meridian, ID 83642 and the Contractor: (Name, legal status, address and other irrfornratiorr) Schindler Elevator Corp. 743 McGregor Court, Suite 140 Boise, ID 83705 for the following Project: (Name, location and detailed descri~tiorr) City of Meridian Waste Water Treatment Plant Intproventcttts 3401 N. Tett Mile Road Meridian, ID 83642 The Construction Manager: (Name, legal status, address cuzd other irtformatiorr) Beniton Consh~tction C'o., Inc. P.o. Box 838 Meridian, ID 83680 The Architect: (1Vanre, legal status, address arld outer it formation) SPF Water Engineering LLC 300 E. Mallard Drive, Suitc 350 Boise, ID 83706 For the purposes of this Agreement, the term Engineer and Architect may be used interchangeably. SPF Water Enginecring, LLC is the prune consultant upon execution of the Prime Agreement with the City of Mcridian. For the purposes of this Agreement only, the use of the term Architect shall refer to SPF Water Engineering, LLC as the firm will bear all rights and responsibilities to perform the services provided herein per the terms and conditions of the Printc A~•eement. Jolutson ,Architects, PC is the Architect of Record for the project upon execution of Consultant Agreement with SPF Water Engineering, LLC. The Owner and Contractor agree as follows, ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. This document is intended to be used in conjunction wish AIA Documents A232TM'-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; B132T'•'-2009, Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition; and C132T^'-2009, Standard Form of Agreement Between Owner and Construction Manager as Adviser. AIA Document A232T"-2009 is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA Document A132'"' - 20D9 (formerly A101 T"'CMa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA" Document is rotected b U.S. Co p y pyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA ` Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software al 10:15:35 on 1 1 /0 5120 1 3 under Order No.1005957857_1 which expires on 01/14!2014, and is not for resale. User Notes: (1432771181) ~s TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Ag1eement, all of which forth the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fi111y execute the Work described in the Conh•act Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Bid Package #21 -Provide all labor, materials, tools and equipment accessary to complete the Elevators in accordance with Project Plans, Specifications, Addendum No. I, Addendum No. 2, Addendum No. 3 and the Bid Form for BP #21. Note: All required forms, information and insurances must be completed and submitted to Beniton Construction before commencement of any work including but not limited to the Request for Contract hlformation, MSDS, safety program, a list of suppliers and subcontractors, and any additional forms as requested in the specifications. Provide submittals clectronieally if available, or one (1) clean copy (able to scan); some exceptions may apply. Samples and color charts must be provided separately. Contractor shall provide (2) full size copies of approved shop drawings to Beniton. Contractor is responsible to pay all applicable taxes, which are included in the contract price. Contractor is required to provide three (3) hard copies and one (I) clcch•onic copy of closeout information (O&M Manuals, Warranties, etc.) and one (I) complete set of Record Drawings, as requested prior to substantial completion. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (b~sert the elate of con7n~eiu•enteltt, if it cfif~ers fi•ani the c/crle rf this Agreement or, if ap~licctble, state that the date 11~i11 be-Tied i/~ a notice to pirocee~l) It; prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: AIA Document A132T"' - 2009 (formerly A101 T"'CMa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Archifecis. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA` Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 10:15:35 on 11/05!2013 under Order No.1005957857_1 which expires on 0111 4/20 1 4, and is not for resale. User Notes: (1432771181) ~~ N/A § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( )days fionl the date of comnlcnccnlent, or as follows: (Lzsert ntrnrber of calendar dcrvs. fllter•nativelp, n c•alerzdat• dale nzay he tcsed ivlrerz coorrlirrated frith the date of corrunencement. Ifappropriate, insert r•egtrirentezrts for earlier Substantial Completion of certain portions of the Work.) . Per Exhibit "C" Portion of the Work Substantial Completion Date BP #21 -Elevators Lab Building -August 1, 2014 Adnlin Building -September 19, 2014 subject to adjustments of this Contract Time as provided in tllc Contract Documents. (Lrsert provisions, if crr>.y, for liquidated dcoranges relutirrg> to.faihn-e to nchiere Substantial Conrpletiorr orz time or. for hwrtrs pcrynrerlts for earh~ conrpleNon of the id~ork.) Per Supplementary Conditions ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Conh•actor the Contract Sum iu current fitnds for the Contractor's performance of the Contract. The Contract Sure shall be one of the following: (Check the appropriate bo.r.J [ X ] Stipulated Sum, in accordance with Section 4.2 below [ ] Cost of the Work plus the Contractw•'s Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below [ ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below (Hosed orr Ilre selection above, complete Scctiorz 4.2, 4.3 or 4.4 heloly. Based on the se(ec•tiorz Whore, also complete either Section 5.1.4, 5.1.5 or 5.1.6 below.) § 4.2 Stipulated Sum § 4.2.1 The Stipulated Sum shall be One Hundred Forty Thousand One Hundred and No/100 Dollars ($ 140,100.00 ), subject to additions and deletions as provided in the Contract Documents. Breakdown is as follows: * New Administration Building & Operations Tenant Improvement - $74,600.00 * New Laboratory Building - $65,500.00 § 4.2.2 The Stipulated Sum is based ou the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the rnnuhens• or other ldertti_Jic•crtiorr of accepted nlterrrcrtes. If the bidding or proposal docanrrents permit the 01t~rrer to accept other crlternntes srrbsequerzt to the execution oJ'this Ag>reeruent, nttaeh cr sc•hedule of such other alternates sltolt~irzg the amotnrt.for euclr nrzd the date at~hen that unzouzrt e.~lrires.) N/A § 4.2.3 Unit prices, if any: (Identify cuzd stale the [mil price, cuzd s•tcrte the qucnrtitt~ limitatiaze•, if ntrp, to tt~hrclt the rnrit price will be applicable.) AIA Document A732T'^ - 2009 (formerly A701 T'"CMa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA' Document is rotected b U.S. Co p y pyright Law and International Treaties. Unauthorized reproduction or distribution o- this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced byAlA software al 10:15:35 on 1 1 /0 51201 3 under Order No.1005957857_1 which expires on 01/14!2014, and is not for resale. User Notes: (14327 711 8 1) ~~ Item N/A Units and Limitations Price per Unit ($0.00) § 4.2.4 Allowances included in the Stipulated Sunt, if any: (Iderrtif)~ alloftcrnce crud state erclrrsions, i~~ara>>, from the alloit~nrrce price.) Item NIA Allowance § 4.3 Cost of the Work Plus Contractor's Fee without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 4.2) (Paragraph deleted) (Table deleted) (Paragraphs deleted) § 4.4 Cost of the Work Plus Contractor's Fee with a Guaranteed Maximum Price This section has been deleted as it dots not apply to this "Stipulated Sunt" contract (See Paragraph 4.2) (Paragraphs delc>ted) (Table deleted) (Pai•agrcrphs deleted) (Table deleted) (Prn•agraphs deleted) ARTICLE 5 PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Construction Manager by the Contractor, and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Paytncnt by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress paytncnts on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contact Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar mouth ending on the last day of the month. § 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the 25th day of a month, the Owtter shall make payment of the certified amount in the Application for Payment to the Conh•actor not later than the 30th day of the following month. Tf an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than sixty (CO) days after the Construction Manager receives the Application for Payment. (Federal, s•tcrte or local latts nta>> require pcrpmertt tt~ithin a certain period o~'time.J § 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum § 5.1.4,1 )/ach Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contact Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, unless objected to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.4,2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.4.3 Subject to the provisions of the Contract Docuntcnts, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contact Sum allocated to that portion of the Work in the schedule of values, less retainage of five percent ( 5 Init. '0`IA Document A132T"' - 2009 Sformerly A101 TMCMa -19921. Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: 'this AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA` Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under ttie law. This document was produced 6y AIA software at 10:15:35 on 11/05!2013 under Order No.'1005957857_i which expires on 01/14/2014, and is not for resale. User Notes: (1432771181) ~f %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be iucludcd as provided in Scction 7.3.9 of the Gcneral Conditions; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of five percent (5 %); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Paytncnt as provided in Section 9.5 of the Gcneral Conditions. § 5.1.4.4 The progress payment amount determined in accordance with Scction 5.1.4.3 shall be fiu•ther modified under the following circumstances: .1 Add, upon Substantial Completion of tltc Work, a sum sufficient to increase the total payments to ninety-five percent (95 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the P.rchitect determines for incomplete Work and unsettled claims; and .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Conri•actor, any additional amounts payable in accordance with Scction 9.10.3 of the Gcneral Conditions. § 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows: (If it is inteudec~ privy to Sufistcrratial Completion of the entire i~i'or•lr, ro reduce or lintil the r-etniunge resaltblg front the percerrtrrges inserted in Sections 5.1.4.3.1 nud 5.1.4.3.2 above, arad thLs• is• not esp/niued elseta~/!ere itt t/te Contract Doc•tmterets, insert here provisions fvr such redtrctivu yr limitation.) N/A § 5.1.5 Progress Payments Where the Contract Sum is Based on the Cost of the Work without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 5.1.4) (Par•agrnphs deleted) § 5.1.6 Progress Payments Where the Contract Sum is Based on the Cost of the Work with a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 5.1.4) (Pcrragrnplrs deleted) § 5.2 Final Payment § 5,2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Conh'actor when .1 the Conh•actor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to l;xhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a final Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Certificate for Payment or Prgjcct Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6,1 Initial Decision Maker The Architect will serve as htitial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If the parties nnrtunll>> agree, itts•ert the !!ante, crddr•ess rntd other contact it fot•ntntivrt ~f the Iuiticrl Dec•ia•iott A1alcer, i f other than the Architect.) Init. AIA Document A132T" - 20D9 (formerly A101 TMCMa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA°` Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA` Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 10:15:35 on 11/05!2013 under Order No.1005957857_1 which expires on 01!1412014, and is not for resale. User Notes: (1432771181) ~~ § 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2009, the method of binding dispute resolution shall be as follows: (Check the appropriate boti-. 1~'tlze Ott~ner and Contractor do riot select cr method of bindbzg dispute resolrriion belon; or do not subsecluerztlp agree irz writing to a binding dispute resolution method other than litigation, Clcrinrs 1vi11 be resoll~ed hp litigation in n court of conrpeterrt jtn•is~hctiwz.) [ ] Arbitration pursuant to Section 15.4 of AIA Document A232-2009 [ X ] Litigation in a court of competent jurisdiction. [ ] Other: (SpecilS~) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009. § 7.1.2 The Work may be suspended by the Owner as provided in At•ticle 14 of AIA Document A232-2009. § 7.2 Where the Contract Sum is Based on the Cost of the Work with or without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragt•aph 7.1) (Paragraplzs deletecl~ ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agt•eement to a provision of AIA Document A232-2009 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. • (Insert rate of interest agreed upon, iJ'arzv.) Zero percent (0 %) § 8.3 The Owner's representative: (Name, address and other it formation) Beniton Construction Co., inc. Bryce Parker P.O. Box 838 Meridian, ID 83680 § 8,4 The Conh•actor's representative: (Ncnrre, address and other itzforrnation) Schindler I/levator Corp. Pete Skow 743 McGregor Court, Suite 140 Boise, ID 83705 § 8.5 Neither the Owner's nor the Cond•actor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: AIA Document A132'"' - 2009 (rformerly A101 TMCMa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIAt Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA` Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 10:15:35 on 11I05l2o13 under Order No.1005957857_1 which expires on 01/14/2014, and is not for resale. User Notes: (1432771181) ~l NIA ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued aRer execution of this Agreement, arc enumerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document A132-2009, Standard Form of Agreement Betwccn Owner and Contractor, Construction Manager as Adviser Edition. § 9.1.2 The General Conditions arc, AIA Document A232-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. § 9.1.3 The Supplementary and other Conditions of the Contract arc those contained in the Project Manual, per attached Exhibit "A". (Table deleted) § 9.1.4 The Specifications: (Either list the Specifrccrtiarzs here or refer to crrz exhibit attached to this Ag~reemerzt.) Per Exhibit "A" (Table deleted) § 9.1.5 The Drawings: (Either list the Drcnt~irrgs Isere or refer to crrr e~-hibit attached to this Agreement.) Per Exhibit "B" (Table deleted) § 9.1.6 The Addenda, if any: Number Date Pages Pcr Exhibit "A" Portions of Addenda relating to bidding requirements are not pals of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents are: .1 (Pm•agraphs deleted) Other documents, if any, listed below: (List here crap additional docanrertls• mlrich are irzteuded fn form part of the Cwztracl Documents. AIA Dncunrent A232-2009 pr•anides that bidding requirements such as adner•tisenrerzt or• irzvitatiorr to bier' hzsh•tretiorzs to Bidders, sunrple.fornrs and the Cnrztrac•tor's bid crre unt part of the Corztrcret Docunrerzts unless enumerated irr this Agreenrertt. Thep should be listed Isere orr1P if intended to be punt <~f the Contract Dncunrerzts.) * Exhibit "I" and Sample Cet•tificatc -Insurance Requirements * Request for Contract Information * WI1-5 Form * Affidavit Concerning Taxes * Application for Payment and Schedule of Values ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A232-2009. (State bonding requirenreuts, if rn7p, and limits of IiabiNtt~• for irrsurcnzce required iu Article U ofAIA Docunzerrt A232-2009.) Type of Insurance or Bond Limit of Liability or Bond Amount Insurance per attached Exhibit "T" Payment & Performance Bonds 100% of the Contract Amount (see Supplementary Inst. AIA Document A132'" - 2009 formerly A101 T~"CMa - 1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA` Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible I under the law. This document was produced by AIA software al 10:15:35 on 11!05/2013 under Order No.1o05957857_1 which expires on 01714!2014, and is nolforresale. User Notes: (1432771181) ~j Instructions to Bidders for delivery requirement) This Agreement is entered into as of the day and year first written above. OWNE Signature) m ~ ~ ~ ~~e~~~ a~ ~". (Printed name and title) CONTRACT4~''`~'igna '/` ~+ .,~~~ p (Printed name and title) Init. AIA Document A132T"' - 2009 ~fonnerly A101 T""CMa -1992). Copyright ©1975,1980,1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible 8 ~ under the law. This document was produced by AIA software at 10:15:35 on 1110512013 under Order No.1005957857 1 which expires on 01114!2014, and is not for resale. - UserNotes: (1432771181) jS CITY OF MERIDIAN WASTEWATER TREATMENT PLANT ADMIN., LAB & CONTROL BUILDINGS PACKAGE EXHIBIT "A" SPECIFICATIONS & ADDENDA Invitation to Bid 1 Notice to Bidders 4 AIA A701 Instructions to Bidders 6 Supplementary Instructions to Bidders 4 Bid Forms Table of Contents 1 Bid Forms 51 Project Schedule 4 AIA A132 Standard Form of Agreement Between Owner and Contractor 8 Supplement to Agreement 2 AIA A232 General Conditions of the Contract 43 Supplementary Conditions 5 Exhibit I -Insurance Requirements & Sample Certificate 2 Contractor's Affidavit Concerning Taxes 1 Public Works Contract Tax Report (WH-5) 2 DIVISION 1 -GENERAL REQUIREMENTS 011000 Summary of Work 1 012900 Price and Payment Procedures 4 013100 Project Management and Coordination 4 013300 Submittal Procedures 2 Submittal Form 1 014200 References 4 014500 Quality Control 4 015000 Temporary Facilities and Controls 9 016000 Product Requirements 2 FORM Substitution Request Form 1 017300 Execution 6 017320 Cutting and Patching 3 017700 Closeout Procedures 4 O&M Instruction Form 1 DIVISION 2 -EXISTING CONDITIONS 024116 Structure Demolition 024119 Selective Demolition DIVISION 3 -CONCRETE 033000 Cast-In-Place Concrete 26 033510 Ground Concrete Finishing 3 DIVISION 4 -MASONRY 042000 Unit Masonry 8 042613 Masonry Veneer 14 Page 1 of 4 ~~ DIVISION 5 -METALS 051200 Structural Steel Framing 11 053100 Steel Decking 7 054000 Cold-Formed Metal Framing 12 054400 Cold-Formed Metal Trusses 6 055000 Metal Fabrications 13 055113 Metal Pan Stairs 9 055213 Pipe and Tube Railings 10 057313 Glazed Decorative Metal Railings 8 DIVISION 6 -WOODS, PLASTICS, AND COMPOSITES 061053 Miscellaneous Rough Carpentry 061600 Sheathing 064116 Plastic-Laminate-Faced Architectural Cabinets DIVISION 7 -THERMAL AND MOISTURE PROTECTION 072100 Thermallnsulation 8 072413 Cementitious Finish Over Exterior Insulation System 16 072414 Pre-Coated Foam Architectural Details 6 072500 Weather Barriers 3 072726 Fluid-Applied Membrane Air Barriers 10 074113.16 Standing-Seam Metal Roof Panels 12 074213.13 Formed Metal Wall Panels 10 074213.53 Metal Soffit Panels 9 075423 Thermoplastic Polyolefin (TPO) Roofing 14 076200 Sheet Metal Flashing and Trim 14 077200 Roof Accessories 9 078413 Penetration Firestopping 7 078446 Fire-Resistive Joint Systems 5 079200 Joint Sealants 11 079219 Acoustical Joint Sealants 4 VOLUME2OF2 DIVISION 8 -OPENINGS 081113 Hollow Metal Doors and Frames 081125 Aluminum Frames 081416 Flush Wood Doors 083323 Overhead Coiling Doors 083326 Overhead Coiling Grilles 083483 Elevator Door Smoke Containment System 084113 Aluminum-Framed Entrances and Storefront 085113 Aluminum Windows 087100 Door Hardware 088000 Glazing 088300 Mirrors 089119 Fixed Louvers 10 4 15 8 29 12 6 7 Page 2 of 4 DIVISION 9 -FINISHES 092116.23 Gypsum Board Shaft Wall Assemblies 092216 Non-Structural Metal Framing 092900 Gypsum Board 093013 Ceramic Tiling 095113 Acoustical Panel Ceilings 095423 Linear Metal Ceilings 096513 Resilient Base and Accessories 096543 Linoleum Flooring 096723 Resinous Flooring 096813 Tile Carpeting 099110 Painting DIVISION 10 -SPECIALTIES 101419 Dimensional Letter Signage 101423 Panel Signage 102113.13 Metal Toilet Compartments 102239 Folding Panel Partitions 102600 Wall and Door Protection 102800 Toilet, Bath, and Laundry Accessories 104413 Fire Protection Cabinets 104416 Fire Extinguishers 105113 Metal Lockers 107516 Ground-Set Flagpoles DIVISION 11 -EQUIPMENT 115313 Laboratory Fume Hoods DIVISION 12 -FURNISHINGS 122413 Roller Window Shades 123623.13 Plastic Laminate -Clad Countertops 123653 Laboratory Countertops 123661 Simulated Stone Countertops 129300 Site Furnishings DIVISION 13 -SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 -CONVEYING EQUIPMENT 142400 Hydraulic Elevators DIVISION 21 -FIRE SUPPRESSION 210000 Fire Suppression 8 12 11 10 10 6 6 7 6 10 10 7 10 6 14 4 3 14 Page 3 of 4 -O f DIVISION 22 -PLUMBING 220000 Plumbing General Requirements 7 220100 Plumbing 12 DIVISION 23 -HEATING VENTILATION AND AIR CONDITIONING 230000 HVAC General Requirement 9 230100 HVAC 74 230350 Laboratory Ventilation Control 16 230900 Instrumentation and Controls 10 DIVISION 26 -ELECTRICAL 260500 Electrical General Provisions 5 260501 Field Test and Operational Check 6 260502 Short-Circuit-Coordination Study-Arc Flash Hazard Analysis 8 260519 Conductors and Cables 4 260526 Grounding 6 260533 Raceways and Boxes 9 260543 Underslab and Underground Electrical Work 2 260923 Lighting Control Devices 5 262416 Panelboards 7 262726 Wiring Devices 4 262815 Disconnect Switches 2 265100 Interior Lighting 8 266000 Electrical Demolition and Repair 2 271101 Telecom Raceway Systems 2 271500 Telecommunications Cabling 12 283111 Fire Alarm System 13 DIVISION 31 -EARTHWORK 311000 Site Clearing 7 312000 Earth Moving 17 312319 Dewatering 5 DIVISION 32 -EXTERIOR IMPROVEMENTS 321313 Concrete Paving 13 321373 Concrete Paving Joint Sealants 4 321400 Concrete Unit Paving 4 321500 Paver Pedestal System 7 321726 Tactile Warning Surfacing 4 328400 Planting Irrigation 13 329200 TurFand Grasses 4 329300 Plants 7 ADDENDA Addendum No. 1, dated 10!4/2013 27 Addendum No. 2, dated 10/9/2013 29 Addendum No. 3, dated 10/14/2013 41 Page 4 of 4 ly City of Meridian -Waste Water Treatment Plant Improvements 3401 N. Ten Mile Road, Meridian, ID 83642 Exhibit "B" CONSTRUCTION DRAWINGS SHEET # DESCRIPTION DATED Admin A0.0 A0.0 Cover Sheet 09/09/2013 Admin A0.1 A0.1 Ener Com liance 09/09/2013 Admin A0.2A A0.2A Code Anal sis 09/09/2013 Admin A0.2B A0.2B Code Anal sis 09/09/2013 Admin A0.3A A0.3A Accessibilit Access & Si na a Plan 09/09/2013 Admin A0.36 A0.3B Accessibilit Access & Si na a Plan 09/09/2013 Admin A0.4A A0.4A Assemblies 09/09/2013 Admin A0.4B A0.4B Assemblies 09/09/2013 Admin A1.1 A1.1 Site Plan 09/09/2013 Admin A1.2 A1.2 Exterior Ram & Ste s 09/09/2013 Admin A1.3 A1.3 Site Details 09/09/2013 Admin A10.1 A10.1 Millwork Details 09/09/2013 Admin A10.2 A10.2 Millwork Details 09/09/2013 Admin A10.3 A10.3 Millwork Details 09/09/2013 Admin A2.1 A2.1 Floor Plan -First Level 09/09/2013 Admin A2.2 A2.2 Floor Plan -Second Level 09/09/2013 Admin A2.3 A2.3 Floor Plan -Third Level 09/09/2013 Admin A2.4 A2.4 Roof Plan 09/09/2013 Admin A3.1 A3.1 Door & Frame Schedule 09/09/2013 Admin A3.2 A3.2 Window Schedule 09/09/2013 Admin A3.3 A3.3 Fixture Schedule 09/09/2013 Admin A3.li A3.6 Enlar ed Plans -Restrooms 09/09/2013 Admin A3.7 A3.7 Enlar ed Floor Plans -Stair #1 09/09/2013 Admin A3.8 A3.8 Enlar ed Plans -Stair #2 09/09/2013 Admin A4.1 A4.1 Finish Plan -First Level 10/04/2013 Admin A4.2 A4.2 Finish Plan -Second Level 10/04/2013 Admin A4.3 A4.3 Finish Plan -Third Level 09/09/2013 Admin A5.1 A5.1 Reflected Ceilin Plan -First Level 09/09/2013 Admin A5.2 A5.2 Reflected Ceilin Plan -Second Level 10/14/2013 Admin A5.3 A5.3 Reflected Ceilin Plan -Third Level 10/14/2013 Admin A6.1 A6.1 Exterior Elevations 09/09/2013 Admin A6.2 A6.2 Exterior Elevations 09/09/2013 Admin A7.1 A7.1 Buildin Sections 09/09/2013 Admin A7.2 A7.2 Buildin Sections 09/09/2013 Admin A7.3 A7.3 Buildin Sections 09/09/2013 Admin A7.6 A7.6 Stair Sections -Stair #1 09/09/2013 Admin A7.7 A7.7 Stair Sections -Stair #2 09/09/2013 Admin A8.1 A8.1 Interior Elevations -Restrooms 09/09/2013 Admin A8.2 A8.2 Interior Elevations -Restrooms 09/09/2013 Admin A8.3 A8.3 Interior Elevations -Restrooms 09/09/2013 Admin A8.4 A8.4 Interior Elevations 09/09/2013 Admin A9.1 A9.1 Details 1-19 09/09/2013 Page 1 of 7 ~~ Admin A9.2 A9.2 Details 20-32 09/09/2013 Admin A9.3 A9.3 Details 33-51 09/09/2013 Admin A9.4 A9.4 Details 52-71 09/09/2013 Admin A9.5 A9.5 Details 72-90 09/09/2013 Admin A9.6 A9.6 Details 91-160 09/09/2013 Admin A9.7 A9.7 Details 107-123 09/09/2013 Admin A9.8 A9.8 Details 124-140 09/09/2013 Admin E0.0 E0.0 Electrical Coversheet 09/09/2013 Admin E0.1 E0.1 Li htin Com liance Re ort 09/09/2013 Admin E1.0 E1.0 Electrical Site Plan 09/09/2013 Admin E2.1.1 E2.1.1 Fire Alarm Plan -First Floor 09/09/2013 Admin E2.1.2 E2.1.2 Li htin Plan -First Level 09/09/2013 Admin E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09/09/2013 Admin E2.1.4 E2.1.4 Power Plan -First Level 09/09/2013 Admin E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/09/2013 Admin E2.2.1 E2.2.1 Fire Alarm Plan -Second Level 09/09/2013 Admin E2.2.2 E2.2.2 Li htin Plan -Second Level 09/09/2013 Admin E2.2.3 E2.2.3 Mechanical Power Plan -Second Level 09/09/2013 Admin E2.2.4 E2.2.4 Power Plan -Second Level 09/09/2013 Admin E2.2.5 E2.2.5 S ecial S stems Plan -Second Level 09/09/2013 Admin E2.3.1 E2.3.1 Fire Alarm Plan -Third Level 09/09/2013 Admin E2.3.2 E2.3.2 Li htin Plan -Third Level 09/09/2013 Admin E2.3.3 E2.3.3 Mechanical Power Plan -Third Level 09/09/2013 Admin E2.3.4 E2.3.4 Power Plan -Third Level 09/09/2013 Admin E2.3.5 E2.3.5 S ecial S stems Plan -Third Level 09/09/2013 Admin E3.1 E3.1 Electrical Roof Plan 09/09/2013 Admin E4.1 E4.1 One-Line Dia ram 09/09/2013 Admin E5.1 E5.1 Electrical Schedules 09/09/2013 Admin E5.2 E5.2 Electrical Schedules 09/09/2013 Admin Eti.1 E6.1 Electrical Details 09/09/2013 Admin L1.1 L1.1 Landsca a Plan 09/09/2013 Admin L2.1 L2.1 Irra ation Plan 09/09/2013 Admin L2.2 L2.2 Irra ation Notes/Details 09/09/2013 Admin L2.3 L2.3 Irra ation Details 0 9/0 912 0 1 3 Admin LG0.01 LG0.01 Structural Cover Sheet 10/02/2013 Admin LG0.02 LG0.02 Structural Desi n Notes 10/02/2013 Admin LG0.03 LG0.03 Structural Desi n Notes 10/02/2013 Admin LG1.01 LG1.01 Li ht Gau a Floor Plan 10/02/2013 Admin LG2.01 LG2.01 Elevations 10/02/2013 Admin LG2.02 LG2.02 Elevations 10/02/2013 Admin LG3.01 LG3.01 Sections 10/02/2013 Admin LG3.02 LG3.02 Sections 10/02/2013 Admin LG3.03 LG3.03 Sections 10/02/2013 Admin LG3.04 LG3.04 Sections 10/02/2013 Admin LG3.05 LG3.05 Sections 10/02/2013 Admin LG5.01 LG5.01 Exterior Li ht Gau e T ical Details 10/02/2013 Admin LG5.02 LG5.02 Exterior Li ht Gau e T ical Details 10/02/2013 Admin LG5.03 LG5.03 Exterior Li ht Gau e T ical Details 10/02/2013 Page 2 of 7 {~1 Admin LG5.04 LG5.04 Exterior Li ht Gau e T ical Details 10/02/2013 Admin M1.1 M1.1 HVAC Plan -First Level 09/09/2013 Admin M1.2 M1.2 HVAC Plan -Second Level 09/09/2013 Admin M1.3 M1.3 HVAC Plan -Third Level 09/09/2013 Admin M1.4 M1.4 HVAC Plan -Roof 09/09/2013 Admin M2.1 M2.1 H dronic Plan -First Level 09/09/2013 Admin M2.2 M2.2 H dronic Plan -Second Level 09/09/2013 Admin M2.3 M2.3 H dronic Plan -Third Level 09/09/2013 Admin M3.1 M3.1 3D HVAC S stem 09/09/2013 Admin M4.1 M4.1 Pi in Schematic 09/09/2013 Admin M5.1 M5.1 Control Schematics 09!09/2013 Admin M5.2 M5.2 Controls Schematics 09/09/2013 Admin M6.1 M6.1 HVAC Details 09/09/2013 Admin M6.2 M6.2 HVAC Details 09/09/2013 Admin M7.1 M7.1 HVAC Schedules 09/09/2013 Admin M7.2 M7.2 HVAC Schedules 09/09/2013 Admin MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Admin MC1.1 MC1.1 Mechanical Comcheck 09/09/2013 Admin MC1.2 MC1.2 HVAC Zone Plans 09/09/2013 Admin P1.0 P1.0 Plumbin Plan -Foundation 09/09/2013 Admin P1.1 P1.1 Plumbin Plan -First Level 09/09/2013 Admin P1.2 P1.2 Plumbin Plan -Second Level 09/09/2013 Admin P1.3 P1.3 Plumbin Plan -Third Level 09/09/2013 Admin P2.1 P2.1 Plumbin Riser Dia rams 09/09/2013 Admin P3.1 P3.1 Plumbin Details 09/09/2013 Admin P4.1 P4.1 Plumbin Schedules 09/09/2013 Admin S0.01 S0.01 Structural Cover Sheet 10/02/2013 Admin S0.02 S0.02 Structural Desi n Notes 10/02/2013 Admin S0.03 S0.03 Structural Desi n Notes 10/02/2013 Admin S0.04 S0.04 Structural Desi n Notes 10/02/2013 Admin S0.05 S0.05 Structural Desi n Notes 10/02/2013 Admin S1.01 S1.01 Foundation Plan 10/02/2013 Admin S1.02 S1.02 Second Level Framin Plan 10/02/2013 Admin S1.03 S1.03 Low Roof Framin Plan 10/02/2013 Admin S1.04 S1.04 Third Level Framin Plan 10/02/2013 Admin S1.04A S1.04A Shearwall And Holddown Plan 10/02/2013 Admin S1.05 S1.05 Hi h Roof Framin Plan 10/02/2013 Admin S2.01 S2.01 Enlar ed Plans 10/02/2013 Admin S2.02 S2.02 Stair Framin T ical Details 10/02/2013 Admin S3.01 S3.01 Elevations 10/02/2013 Admin S3.51 S3.51 Brace Frame Schedules 10/02/2013 Admin S4.01 S4.01 Schedules 10/02/2013 Admin S4.02 S4.02 Schedules 10/02/2013 Admin S5.01 S5.01 Foundation T ical Details 10/02/2013 Admin S5.02 S5.02 Foundation T ical Details 10/02/2013 Admin S5.03 S5.03 Concrete T ical Details 10/02/2013 Admin S5.21 S5.21 Structural Steel T ical Details 10/02/2013 Admin S5.22 S5.22 Structural Steel T ical Details 10/02/2013 Page 3 of 7 I f Admin S5.31 S5.31 Steel Stud T ical Details 10/02/2013 Admin S5.32 S5.32 Steel Stud T ical Details 10/02/2013 Admin S5.33 S5.33 Steel Stud T ical Details 10/02/2013 Admin S6.01 S6.01 Foundation Details 10/02/2013 Admin S6.02 S8.02 Foundation Details 10/02/2013 Admin S7.01 S7.01 Floor Framin Details 10/02/2013 Admin S7.02 S7.02 Floor Framin Details 10/02/2013 Admin S8.01 S8.01 Roof Framin Details 10/02/2013 Admin S8.02 S8.02 Roof Framin Details 10/02/2013 Controls A0.0 A0.0 Cover Sheet 09/09/2013 Controls A0.1 A0.1 Ener Com liance 09/09/2013 Controls A0.2 A0.2 Code Anal sis 09/09/2013 Controls A0.3 A0.3 Accessibilit Access & Si na a Plan 09/09/2013 Controls A0.4 A0.4 Assemblies 09/09/2013 Controls A10.1 A10.1 Millwork Details 09/09/2013 Controls A2.0 A2.0 Demolition Plan 09/09/2013 Controls A2.1 A2.1 Floor Plan 09/09/2013 Controls A3.1 A3.1 Schedules 09/09/2013 Controls A3.6 A3.6 Enlar ed Floor Plans 09/09/2013 Controls A4.1 A4.1 Finish Plan -First Level 09/09/2013 Controls A5.1 A5.1 Reflected Ceilin Plan 09/09/2013 Controls A8.1 A8.1 Interior Elevations 09/09/2013 Controls A8.2 A8.2 Interior Elevations 09/09/2013 Controls A9.1 A9.1 Details 09/09/2013 Controls E0.0 E0.0 Electrical Cover Sheet 09/09/2013 Controls E1.1 E1.1 Electrical Demolition Plan 10/09/2013 Controls E2.1 E2.1 Fire Alarm Plan 09/09/2013 Controls E2.2 E2.2 Li htin Plan 09/09/2013 Controls E2.3 E2.3 Mechanical Power Plan 09/09/2013 Controls E2.4 E2.4 Power Plan 09/09/2013 Controls E2.5 E2.5 S ecial S stems Plan 10/09/2013 Controls E3.1 E3.1 One-Line Dia ram/Electrical Details/Schedules 09/09/2013 Controls M1.1 M1.1 HVAC Demolition Plan 09/09/2013 Controls M2.1 M2.1 New HVAC Floor Plan 09/09/2013 Controls M3.1 M3.1 HVAC Details 09/09/2013 Controls M4.1 M4.1 HVAC Schedules 09/09/2013 Controls MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Controls P1.1 P1.1 Plumbin Demolition Plan 09/09/2013 Controls P2.1 P2.1 New Plumbin Floor Plan 09/09!2013 Controls P3.1 P3.1 Plumbin Schedules And Details 09/09/2013 Controls P4.1 P4.1 Plumbin Schedules And Details 09/09/2013 Lab A0.0 A0.0 Cover Sheet 09/09/2013 Lab A0.1 A0.1 Ener Com liance 09/09/2013 Lab A0.2 A0.2 Code Anal sis 09/09/2013 Lab A0.3A A0.3A Accessibilit Access & Si na a Plan 09/09/2013 Lab A0.3B A0.36 Accessibilit Access & Si na a Plan 09/09/2013 Lab A0.4A A0.4A Assemblies 09/09/2013 Lab A0.4B A0.46 Assemblies 09/09/2013 Page 4 of 7 ~~ Lab A1.1 A1.1 Site Plan 09/09/2013 Lab A10.1 A10.1 Millwork Details 09/09/2013 Lab A10.2 A10.2 Millwork Details 09/09/2013 Lab A10.3 A10.3 Millwork Details 09/09/2013 Lab A2.1 A2.1 Floor Plan -First Level 09/09/2013 Lab A2.2 A2.2 Floor Plan -Second Level 09/09/2013 Lab A2.3 A2.3 Roof Plan 09/09/2013 Lab A3.1 A3.1 Door & Frame Schedule 09/09/2013 Lab A3.2 A3.2 Window Schedule 09/09/2013 Lab A3.3 A3.3 Fixture Schedule 09/09/2013 Lab A3.6 A3.6 Enlar ed Plans -Restrooms 09/09/2013 Lab A3.7 A3.7 Enlar ed Floor Plans -Stair #1 .09/09/2013 Lab A3.8 A3.8 Enlar ed Floor Plans -Stair #2 09/09/2013 Lab A3.9 A3.9 Enlar ed Floor Plan -Lab 09/09/2013 Lab A4.1 A4.1 Finish Plan -First Level 10/04/2013 Lab A4.2 A4.2 Finish Plan -Second Level 09/09/2013 Lab A5.1 A5.1 Reflected Ceilin Plan -First Level 09/09/2013 Lab A5.2 A5.2 Reflected Ceilin Plan -Second Level 09/09/2013 Lab A6.1 A8.1 Exterior Elevations 09/09/2013 Lab A6.2 A8.2 Exterior Elevations 09/09/2013 Lab A7.1 A7.1 Buildin Sections 09/09/2013 Lab A7.2 A7.2 Buildin Sections 09/09/2013 Lab A7.3 A7.3 Buildin Sections 09/09/2013 Lab A7.6 A7.6 Stair Sections -Stair #1 09/09/2013 Lab A7.7 A7.7 Stair Sections -Stair #2 09/09/2013 Lab A8.1 A8.1 Interior Elevations 09/09/2013 Lab A8.2 A8.2 Interior Elevations 09/09/2013 Lab A8.3 A8.3 Interior Elevations 09/09/2013 Lab A8.4 A8.4 Interior Elevations 09/09/2013 Lab A8.5 A8.5 Interior Elevations -Restrooms 09/09/2013 Lab A9.1 A9.1 Details 1-19 09/09/2013 Lab A9.2 A9.2 Details 20-32 09/09/2013 Lab A9.3 A9.3 Details 33-51 09/09/2013 Lab A9.4 A9.4 Details 52-71 09/09/2013 Lab A9.5 A9.5 Details 72-90 09/09/2013 Lab A9.6 A9.6 Details 91-105 09/09/2013 Lab A9.7 A9.7 Details 106-123 09/09/2013 Lab A9.8 A9.8 Details 124-140 09/09/2013 Lab E0.0 E0.0 Electrical Cover Sheet 09!09/2013 Lab E0.1 E0.1 Li htin Com liance Re ort 09/09/2013 Lab E1.0 E1.0 Electrical Site Plan 09/09/2013 Lab E2.1.1 E2.1.1 Fire Alarm Plan -First Level 09/09/2013 Lab E2.1.2 E2.1.2 Li htin Plan -First Level 09/09/2013 Lab E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09/09/2013 Lab E2.1.4 E2.1.4 Power Plan -First Level 09!09/2013 Lab E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/09/2013 Lab E2.2.1 E2.2.1 Fire Alarm Plan -Second Floor 09/09/2013 Lab E2.2.2 E2.2.2 Li htin Plan -Second Floor 09/09/2013 Page 5 of 7 ~" Lab E2.2.3 E2.2.3 Mechanical Power Plan -Second Floor 09/09/2013 Lab E2.2.4 E2.2.4 Power Plan -Second Floor 09/09/2013 Lab E2.2.5 E2.2.5 S ecial S stems Plan -Second Floor 09/09/2013 Lab E3.1 E3.1 Electrical Roof Plan 09/09/2013 Lab E4.1 E4.1 One-Line Dia ram 09/09/2013 Lab E5.1 E5.1 Electrical Schedules 09/09/2013 Lab E6.1 E6.1 Electrical Details 09/09/2013 Lab L1.1 L1.1 Landsca a Plan 09/09/2013 Lab L2.1 L2.1 Landsca a Plan 09/09/2013 Lab L2.2 L2.2 Irri ation Details 09/09/2013 Lab M0.1 M0.1 HVAC Demolition Plan 09/09/2013 Lab M1.1 M1.1 HVAC Plan -First Level 09/09/2013 Lab M1.2 M1.2 HVAC Plan -Second Level 09/09/2013 Lab M1.3 M1.3 HVAC Roof Plan 09/09/2013 Lab M2.1 M2.1 H dronic Plan -First Level 0 910 9/2 0 1 3 Lab M2.2 M2.2 H dronic Plan -Second Level 09/09/2013 Lab M3.1 M3.1 3D HVAC S stem 09/09/2013 Lab M4.1 M4.1 Mechanical Pi in Schematic 09/09/2013 Lab M5.1 M5.1 HVAC Controls 09/09/2013 Lab M5.2 M5.2 HVAC Controls 09/09/2013 Lab M5.3 M5.3 HVAC Controls 09/09/2013 Lab M5.4 M5.4 HVAC Controls 09/09/2013 Lab M5.5 M5.5 HVAC Controls 0 9109/2 01 3 Lab M5.6 M5.6 HVAC Controls 09/09/2013 Lab M5.7 M5.7 HVAC Controls 09/09/2013 Lab Mti.1 M6.1 HVAC Details 09/09/2013 Lab M6.2 M6.2 HVAC Details 09/09/2013 Lab M6.3 M6.3 HVAC Details 09/09/2013 Lab M6.4 M6.4 HVAC Details 09/09/2013 Lab M7.1 M7.1 HVAC Schedules 09/09/2013 Lab M7.2 M7.2 HVAC Schedules 09/09/2013 Lab M7.3 M7.3 HVAC Schedules 09/09/2013 Lab M7.4 M7.4 HVAC Schedules 09/09/2013 Lab M7.5 M7.5 HVAC Schedules 09/09/2013 Lab MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Lab MC1.1 MC1.1 Mechanical COMCheck 0 910 912 0 1 3 Lab P1.0 P1.0 Plumbin Plan -Foundation 09/09/2013 Lab P1.1 P1.1 Plumbin Plan -First Level 09/09/2013 Lab P1.2 P1.2 Plumbin Plan -Second Level 09/09/2013 Lab P3.1 P3.1 Plumbin Details 09/09/2013 Lab P4.1 P4.1 Plumbin Schedules 09/09/2013 Lab S0.01 S0.01 Structural Cover Sheet 10/02/2013 Lab S0.02 S0.02 Structural Desi n Notes 10/02/2013 Lab S0.03 S0.03 Structural Desi n Notes 10/02/2013 Lab S0.04 S0.04 Structural Desi n Notes 10/02/2013 Lab S0.05 S0.05 Structural Desi n Notes 10/02/2013 Lab S1.01 S1.01 Foundation Plan 10/02/2013 Lab S1.01A S1.01A First Floor Shearwall And Holdown Plan 10/02/2013 Page 6 of 7 ~S Lab S1.02 S1.02 Second Level & Lowwer Roof Framin 10/02/2013 Lab S1.02A S1.02A Second Level Shearwall & Holdown Plan 10/02/2013 Lab S1.03 S1.03 U er Roof Framin Plan 10/02/2013 Lab S2.01 S2.01 Enlar ed Plans 10/02/2013 Lab S2.02 S2.02 Stair Framin T ical Details 10/02/2013 Lab S4.01 S4.01 Schedules 10/02/2013 Lab S4.02 S4.02 Schedules 10/02/2013 Lab S5.01 S5.01 Foundation T ical Details 10/02/2013 Lab S5.02 S5.02 Foundation T ical Details 10/02/2013 Lab S5.03 S5.03 Concrete T ical Details 10/02/2013 Lab S5.21 S5.21 Structural Steel T ical Details 10/02/2013 Lab S5.22 S5.22 Structural Steel T ical Details 10/02/2013 Lab S5.23 S5.23 Structural Steel T ical Details 10/02/2013 Lab S5.31 S5.31 Steel Stud T ical Details 10/02/2013 Lab S5.32 S5.32 Steel Stud T ical Details 10/02/2013 Lab S5.33 S5.33 Steel Stud T ical Details 10/02/2013 Lab S5.34 S5.34 Steel Stud T ical Details 10/02/2013 Lab S6.01 S6.01 Foundation Details 10/02/2013 Lab S6.02 S6.02 Foundation Details 10/02/2013 Lab S7.01 S7.01 Framin Details 10/02/2013 Lab S7.02 S7.02 Framin Details 10/02/2013 Lab S7.03 S7.03 Framin Details 10/02/2013 Site A0.0 A0.0 Cover Sheet 08/19/2013 Site C1.1 C1.1 Construction Notes & Abbreviations 07/19/2013 Site C1.2 C1.2 Overall Site Plan And Le end 07/19/2013 Site C1.3 C1.3 Existin Conditions & Demo Plan -Lab Buildin 07/19/2013 Site C1.4 C1.4 Existin Conditions & Demo Plan -Admin. Buildin 07/19/2013 Site C2.1 C2.1 Dimensioned Site Plan -Lab Buildin 0 7/1 912 0 1 3 Site C2.2 C2.2 Dimensioned Site Plan -Admin. Buildin 07/19/2013 Site C3.1 C3.1 Gradin Plan -Lab Buildin 07/19/2013 Site C3.2 C3.2 Gradin Plan -Lab Buildin 07/19/2013 Site C3.3 C3.3 Gradin Plan -Admin. Buildin 07/19/2013 Site C3.4 C3.4 Gradin Plan -Admin. Buildin 07/19/2013 Site C3.5 C3.5 Draina a Pond Details 07/19/2013 Site C4.1 C4.1 Utilit Plan -Lab Buildin 07/19/2013 Site C4.2 C4.2 Utilit Plan -Admin. Buildin 07/19/2013 Site C5.1 C5.1 Civil Details 07/19/2013 Site C5.2 C5.2 Civil Details 07/19/2013 Site C5.3 C5.3 Civil Details 07/19/2013 Site ESC1 ESC1 SWPPP Site Ma 08/19/2013 Site S1.01 S1.01 Lab Foundation Plan 08/19/2013 Site S1.02 S1.02 Admin. Foundation Plan 08/19/2013 Site V1.1 V1.1 Existin To o ra h -Lab Buildin 08/19/2013 Site V1.2 V1.2 Existin To o ra h -Admin. Buildin 08/19/2013 Page 7 of 7 ~~ ~f C O V L Q m L ~ ro ~ a O c -o U ii - d ~ U ~ a C Q C ~_, o _~ O ro ~ ~ V U ~ m O N - (IS ~~.~~ ~ .~ m = ^ ~ Z ~ .c °~ (n o - i (n N d .,i. 1] _C ~ O C!1 ~ 'X Q N N ro ~ ~ ._ ~ w ~ ~ in d ~ u cd O ( U U O. (~ L ro ~ " 'O C ` L V ~- ~ U) N ' L O ~ ro '~ ', ro p ~ ~ ~ ~ ~ 4? p U cd Q O~ ~ ~ '~ L a n. a an d c m ro ~ uJ oC ~' o Q ~;~ Y ~ °~ N O J ~ 'a ~ U ~ U 7 o2S m (n m -U ~ O ~ RS r' ~ > d U- U Q; O - N ro > J _ .-~ .-~ .- ~ --- - Ir i r U Q7 U ro ~ .C ~ L11 m C ~ = M .- .o r O ~' N ~ E c ~ N o ~ _~_~__ro O O U O ~---r=~ E ~ ~; ro -~--_,~ ~ ~„ -------1.~=~~--------------------------------- - s V V L ~+ 0 U U .Q .~ x W •L Q~ 0 M M M M M M M ~ M ~ ~ ~ M M ~ ~ I~ ~ ~ ~ ~ .~ ~ ~ ~ r ~ ~ ~ ~ ~ ~ 0 z N N 0 z I~ N 0 z u'1 N 0 z N r ~ o C7 o z V O aUi o V' O a ¢ d N o z u7 r ro ~ cD r m ~ c'~ N D1 ~ a ~ 0 U a~ o ri N U m o f~ N 'C ro ~ c~ r 'C ro ~ CO r ~ C ro ~ ch N ~ v w cp O ~' o ~ h N r ro ~ cD O ro ~ r r ro ~ h N r n a O Q a f~ r r a ¢ h r r oa ¢ N N ` a ¢ O r a ¢ c0 O r Q ¢ 0~ O ro ~ O) O tl7 G7 O') C7 c*l C7 C7 d. M d' d' M C~ ~ (+~ ~} ~} ~ cl' ti' d' d' ~ ~ 7 'd' V ~ ~ ~ > > > > ~ T' > r > >. >. U U U U C C C Q Q ,-- r .-- r r r. r r r r O O O O U U O O. O ro ro z z z z O O z ¢ z ~ ~ Q . Q Q ^ ~ ~ ~ w w ~ ~ ¢ ~ ~ ¢ ~ ~ Q _ _ _ d' N N 00 00 ~ O N CD ~ . Q~ M I~ d1 O C7 O I~ (D (fl C7 h h h 00 r ~ 0 O N N O N ('7 N r r O r O • O N N O N N N O O O N N ~-- r O N r N 0 0 0 0 ~ 0 0 0 0 0 0 0 0 0 o Igo 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d r (~! r N CJ N ~ ~ M ~ ~[7 CNO ®~ N ~ ~ ~ ~ ~ In to M to ~ LC1 ~ tl') M ®r N ~ O Y I C (:. ro U i J N N ro ~ I Q Q N (n i N L U O m ~ Q. •~ v O i ! ~ L I pJ ~ LL ~ ~ Q ~ ~ U C O ro I O U c a ~ ro c c N Q c L U Il m ~ U O •p O x O (n U w ~ N ~ ~ Q% ~- (n d) ~ L N C ~ ~ ~ ~ O m m Y m ~ ~ O v W ~ ~c ~~ o ~ ~ ~ ~ ~ -o U ~- ~ m ~ U °' ~ a a~ c cn m o o ~S ~ ro -o `~ -c Q ° ~ E ro Q ro ~ ~ li ~ ro ~~ `m ~~~~ m c ~ C m o o E o ~, ~~ -o o a~ ,~ m_ 'c'o cn a~oi c a _o a~ a~oi U ~ ~ E ~ ~ c4 ~ m m rn ~ c E m c ~ ii ro ~ °i ~ W o p Z~ cn -o co ~ `o a a m ~ m~ ~ a~ ~ ~ ro ~ o g o 0 3 -o ~ ~ o -o ~ ro d m ~ o ~ m ~ U cn lA ~° coo ~ d cn aroi w m ~ o° .ro U aNi N Z L N ~ d O U m O ~ N LL w d ~ (d (tl w ~ ~ E O C C . (6 Q =' - ~ - U o ro c CC o c_ ro °' > ~. o2f d3 > > o ~ ot5 C7 ' c ~ > ° (7 ~ ~ ~ U ~ d - ~ m _ _ ~~ a ~~ ro x co ~ b ~ m > ~ o o> a~ m N C m aC co cv m Q m a a ~ w m~ m m in in ~ d ~ Q~ m` cn ~~ cn m _Z o O ~fi O to N O d' ~ O O O ~ tf') O O O tf) O N d' cD c0 O O O O O tf) O O Y N N ('~ ~ ~ ~ Lf) O r J h 00 m CJ V V V' _~ CO ; d' Ln (O h CO CO O r l0 O) _N N_ N_ N_ N _N N N N ('9 P7 O O O O O O O O O O O O O ~ C ~ ~~ N N N N " 07 C+7 (h ch C7 M " ~ ~ to to ~~ ~ C7 C7 C7 C7 C7 C7 (.7 C7 (7 C7 C7 m U C7 C7 C'3 C7 C7 C7 C7 C3 C7 C7 C7 U` (.~ C3 C7 C7 C7 ~ -~ m 7 Q U N J Q ~ -- I ~~ C O V 7 O O O O m O Q~ .~ V •+ V L ~F+ O U V :~ x W ~L CO G O ~ ' m a J ~ d~ ' ' ~ m p ~ m j- '- ~ m Q ~ ~ ~ .~ ~- n .~ E c m _~ '~ d' ~ U iv' J o ' ~ `-' v U LL rr O rn^Nf ~~ - ~.~-. W .O N ro N W >~ ojS [1 ~ c '. ~ in ~ o iii =~ d' ~' ~ ~, ~ d' c} <t ?' ~ 9 C C ~ ~ r r r r r r r ~ i i i r ~ ~ i (`~ ~Y O C7 O OD V CO 00 d' I~ M O N N • N r N N O N N O r O N C7 ~ ~ • ~ ~ C C r r r C r C r r 7 7 7 7 7 7 7 7 7 7 Sc Q L.L cG -] ~ "7 "7 ~ ~ ~ O ? ~ (A ~ C7 O T r ~ O O O M O M N N O N N N \o \° \ ~ \ \o \° \o \° \ \o \° \° 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O ~ Ln ~~ In ~ l1~ ('7 r O in ~ W ~ In N a i c - ro ~ N ~ C ~ N ~ C N o 'o m ° ° ~ a ~~ p U a~ OC ~ `' N ~ ~ 0 n m C7 E Q r ° o 3 c ~ ~ W ,~ ~ ~ p '~ ° ~ c a ' E u) _ a~ i c of ~ ai ro ro u7i N 'O m _ 7 7 ~ U t _U (~ U ~ E . ~ ~ ~ W ~ as o m ~ c ,~ • (7 (} (~ ~ IL N J ~ ~ a O J N p~ C p O E C (6 W N ~ d n . ~ m C U ro d ~~ ~ ~ N ~ ~ ~ ~ C LL Q m atf U o` c o o ~ ~ W ° ~w ~S > ~ - 3 :o U ° ~ ~ ~ U ~ ~ E ~ ° ° U ro ~ ~ . ` in ~ o ~ a i m j ~ o ~ cn ~ a 5 U a ~ m w w = = D O O N U7 O O O 00 O O O O O 00 N_ M O O O O T CJ ~ ti') CO (O d' V " CO (p CD (D (D cD (D (O (O (O CO (O C7 C7 C7 C3 C'3 C7 C7 (7 C7 C7 C7 C7 C7 C`3 .° w c °' c ° ``° m c ° o ~ E -° ii M c 7 o - ~ u- ~E ~ ~ o Q N c r -a - o m m m Y 7 ~ N °~ ~- - ~ - -- E- ~ -~- m N ~ ~ 0 ~ 7 c ~- ° ' 7 v r ° c ° ~ ~ - _ "- ~ c 7 o Ln ~ N [[ C 'O (n ~ ~ i ?i ~ U1~ ~ 61 L m LC ~ C ~ d ~ d7 U 7 i lV ~~ p C i olf Q ~ N c ~ O ~ ~ c~ , m C L ~: ~-~r __~'____ . E ~ ~ O a~ ;~ a6 cn a ~ cn a ~ U 7 ~ °~ ~ G) ~ ~ ° C 'O ~ U Q ro ~ ~ ~ ~ ¢; ~ ~~ -~ 9 ~Y O LL 7 C f~ Ch O L 7 ~ J ~ O O _ - -- otS n ~ N X m ~ ~ GL ~r v ~r ~r e' ~ a' rr AI d ~ ~' ~ a' e v a l E E ~ 7 ~ L ~ C ro ~' .C I O Ln fp ro c a~ ~ C 7 _ ~ rn ° -a ~ ~ ~ c .E d c `~ ~ ~ o LL O ac ~ C7 i in (6 ~ ~ ~ C w ~ m o ~, ~ -c o ~ ~ C O ~ ~ W , c n- o2S N C o 7 ~ p .Q U O O 7 U ~ U 7 U S' ` N ~ c O O ~ O - U C ~N ~ E , ~ ~ N ~ ~ (n N U N p i (n ~ - ~ C o (n O E ~ ~ C - ~ ~ 7 ~ C O ~ C p ~ UJ fUd , . ~ - ~ Ol N ~ ~ - ~ N (n , ~ ~ .U O rn N iV LL - W d ~ ~ ~ UC7 7 (Q 3 cd .. ~ i ~ W ._ U N ° ° E x m - ~ 2 m o, ~ ~ i a m m ~- W m ~ d (!) ~ J m _ Q U ~ (n J Y O O O N O C7 O ~~ (D Ltd N O C7 Cp ~~ V O O O O N O Ch N ~~ [+~ O O CO O ` D O N O N O N O N O C] O CJ c~ O N O N O ~ O N O N O ~ O ~ O ~ p~ C C.7 C7 C7 (~ C7 C7 C7 C7 C'3 C7 C7 C7 C7 C7 C •~ _ _ ~ I Q ~ ~~ l EXHIBIT "I" INSURANCE REQUIREMENTS FOR WORKING WITH BENITON CONSTRUCTION COMPANY AND CITY OF MERIDIAN Contractors and Subcontractors shall provide evidence that the following minimum coverage is provided. Commercial General Liability (ISO Form CG0001 (10/01) or Equivalent) • $2,000,000 General Aggregate • $2,000,000 Products/Completed Operations Aggregate • $1,000,000 Each Occurrence • $1,000,000 Personal Injury and Advertising Injury • $ 100,000 Fire Damage Liability • $ 5,000 Medical Expenses -Each Person o Limits must be on a "Per Project Aggregate'. o City of Meridian and Beniton Construction Company must be listed as additional insured (ISO Form CG2010 (11/85), or CG2010 (10/01) and CG2037 (10/01), or Equivalent). A copy of the endorsement adding Beniton Construction Company shall be included with the certificate of insurance. o Completed operations coverage will remain in effect for 2 years after project completion. Business Automobile Liabilitv • $1,000,000 Each Occurrence Worker's Compensation and Emplovers Liabilitv Insurance • Statutory Limits • Employers Liability o $100,000 Each Accident o $500,000 Policy Limits o $100,000 Each Employee Excess Liabilitv • $1,000,000 (An Umbrella policy may be used in combination with other policies to provide coverage specified) For Architects, Engineers, Surveyors, & Testing Firms: Professional Liabilitv (Errors and Omissions) -Continued for Two (2) Years After Proiect Completion • $1,000,000 per claim and $2,000,000 aggregate for annual claims made coverage OR • $1,000,000 project coverage - Certificate of Insurance must be project specific. - Please provide written documentation in regards to your insurance contract(s) cancellation terms. - Insurance is to be Primary &Non-Contributory to any liability insurance carried by Beniton Construction Co., Inc. and City of Meridian. - Waiver of Subrogation applies in favor of Beniton Construction Co., Inc. and City of Meridian. ~j •~~~~~~ ~~~~~~~6°$ II ®F L~~ YA~B 8 6 'I~~C~&~~ I C ""TE lmmloonrYVl THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFI ATE HOLDER. ThIIS CERTIFICATE DOES NOT AFFIRMATIVEI.V OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITU7~E A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: if the certificate holder is an ADDITIONAL INSURED, thD policy(ies) must be nndorsed. if SUBROGATION IS WAWED, subJoct to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights 4o tho certificate holder' In lieu of such endorsement(sj. PRODUCER GONTAOT NAME: PHONE _.-_....l HS. - _-______-_ _ . /C Nu ExD: INC Na): _ -- Protlucer's name and address EanAIL AppRE55: -_ INSURERISI AFFORDING COVERAGE I NAICA _. _ __._ INSURER A ISSUIng Company AM. BE$T A VJhor BCttef ~ E INSURED INSURER e: ~';' _ _. _. INSURER C ~ ~~ ' Subcontractor name and address IN9URER D: ~ / ,'r ~' ~~ _ / n, INSURER E:. °=v ~3, _ _ _ INSURER F ~ ~~~ ~ rf COVERAGES CERTIFICATE NUMBER: REV~$`1,~5D1>NUMBER THIS IS TO CERTIFY THAT THE POLIf;lES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED N! f,yr,(•},BOrJ FCC?„TYiE °r LICY PERIOD INUICA7 EU. NO'I VN IHSIANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMEftTv >n/JTH T{ESAECT TO WHICH THIS , CERTIFICATE MAV BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED RY THE POLICIES DESCRIBED HEREIN 1$,$Uk1J~C7 TO ALL THE TERMS, E%CLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN PdAY HAVE BEEN REDUGED~"f~ D CLAIMS. ~~ ,' , ~ INSR .fDDL 5U6R. _._____.---____ ~ _ LlR TYPE OF NSVRANCE PO ICY LEF 'lr R9 CY EXP W D i POLICY NUMBER MYID /YYYY jyM/yyY~y ; „ LIMITS LLIAUILITY ENE CACH OGG' RCN E 51000 000 dMERQA G NriiN. llah iV X'GGI i ~ e~ , DAM/) E>RENTED PREAjJ~ E5 (Fa wctn rc j 5 100000 9rdS MADI x ~Cl 'i ' ~ ~ ^ ') ~ __... , . . Or C U f u-- ., MDT%P (Ary oro Pascnl ~ 10000 ~- Currontpollcy# 09107/2p3~ 09IOV2012 RERSGNAtsAGVlwuev ~s 1,000000 ~. ~GLTIERnL AGGRL6ATE 6 2,UOp,pDO GFti'LAGGREGATE 1h11'APP_LIE6 PER s ~ M ~' PRODUCTS-COMW PAG i'2_000.OOO POt ICY ~ X PST LG[, ~, ~ 5 AUTOIriORILE LIABILITY ''- \ I C.OUd M1 7 S 14LE L 1111 fEfi dLq.1E 11 I 7 aD~ D~0 \ x hNY AUT -,'i aOD L51NJ6"t (P~r Pes IS I I ItlLOVJNCn ~ SCIIPGUI ~D f ",~ i Auros AUTO, ~ Y 1Q~Ip1/2011 09/0172012' ~P1 pho # ~C 90D lY INJUZ (Pr, nfdJ~Pij _ I NGN UrnuEn C FRO~Nrr Dn6~ncE 5 r I , HueeD AU os I nuu>s . Pel auu uam "- ~ I5 ~~x UMDRELiA LIAR X , pGCUF ~ ~ + :~ EACH OCCURREIJGE 5 1,OOD OHO i ess UA CLWUS VA E3~y ~T Current po6cy~, 09/01/2011 09/01/2012 i __ _ _ __ _ AcGRPCr`rE s 1,000000 _ RErENTIgVS oeo 'D.. z xr. a. I ,_ WORKERb COMPENSATION x '~ '~~ r xI CRY INIT OER ANU EMPLOYERS LIABILITY YIN f '>„'a ,, - - ll Y PNOPH!ETUH~PARTNEH FAECJIIVE l Cdffont poiicy# 09/Ot/2011 09(01/2012 oF - GCTiLMRLR CXGIIWCU~ 'NIA P I rAG I ACC D-RT 5 1 _- .,000,000 ~ . . (M tl t ryIn M1HI ,~ A U;~~.~ ' ~ EL ISEAS FEN OYLr 5 1,000 ODO a ; Ly tl zcabo J~ ' ' '~ i ` ' r r i • ~' cW , --- _IC IdIT 51.000p00 EL DSJ~SE~PO r; v~ i / j I ~ ~ -~ ~ ~ \f ' ~ __ . . . DESCRIPTION OP OPERATIONS 140 a~J2nUNa I VEHICLES, -each AGORO 101, Atltl Hional Rematl(5 ScM1aGVle, II more ePHCe I5 reyulreaj ' `-,, Re: City of Meridian Wastg Water ~~atment Plant Improvements. City of Meridian and Beniton Construction are listed as Adtlilional Insured pe7 CIJ~~gtiiY»erclal General Liability coverage on a prtrnary and non-contributory basis regarding above prD)ect provided by loon CG2010 10!01 and CG2037 10(01 (or equivalenp. Waiver of Subrogation applies in favor of the Beniton Construction Company. Inc. and owner (except WC:). Beniton Construction Company, Inc. P.O. Box 838 Meridian, ID 83680 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE NlITH THE POLICY PROVISIONS. AUTHORIZED HEPRESF.NTATIVE Original Signature n 1968-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010!05) The ACORD name and logo are registered marks of ACORD ~" uncmea rage Login Public Contractor Search PERMITS LICENSE PUBLIC WORKS VIOLATIONS ELEVATORS ~~~~s~o„ of 13vi1dinr~., 5a f~fi~ Public Works Search a ~ Search Aoain Download Results Printable View rage t of 1 Comoanv Name License Number Work Cateoorv(sl License Tvne License Class Statu. Schindler Elevator Corporation PWC-C-11439 14200,10800 4 AAA ACTI\ .. ..- Pe9e: 1 of 1 ~... ~ , ,. Details -License Number: PWC-C-11439 Registration#: PWC-C-11439 Issue: 7/15/2013 Expire: 6/30/2014 Type: PUBLIC WORKS Sub-Type: AAA Status: ACTIVE Comp/Name: Schindler Elevator Corporation Addfe551: 20 Whippany Rd Address2: PO fiox 1935 City, State, Zip: MORRISTOWN, NJ 07962 Phone: (973)397-6306 Cell: Pager: F2X: (973)397-6142 Owner Name: Home i CONTACT US Pane~eAaV r~~~~~~5VSTP415 https://data.dbs.idaho.gov/etrakit2/Idaho_PublicWorksSearchRslts.aspx 1/8/2014 °~Y iF t a~'kY ~ `s dQ`b. ~.~ ~ ~, P /y~~ ~~+ a'; ~~~ , ~.. n~~ ~~~; IDAHO SECRETARY OF STATE Viewing business Entity Ben Ysursa, Secretary of State [ New Search ] [Back to Summary ] [ Get a certificate of existence for SCHINDLER ELEVATOR CORPORATION ] 20 WHIPPANY ROAD MORRISTOWN, NJ 4539 Current Registered Agent: C T CORPORATION SYSTEM 921 S ORCHARD ST STE G BOISE, ID 83705 Organizational ID /Filing C60571 Number: Number of Authorized Stock Shares: Date of Last Annual Report: 22 Mar 2013 State of Origin: DELAWARE Date of OS Mar 1979 Origination/Authorization: Type of Business: CORPORATION, GENERAL BUSINESS Status: GOODSTANDING, ANREPT SENT 08 Jan 2014 ~rigina! Filing: [ Help Me Print/View TIFF ] Filed O5 Mar 1979 CERTIFICATE OF AUTHORITY AtnenCifnentS: Amendment Filed O5 Mar 1979 OTHER - DA Amendment Filed 26 Mar 1979 STOCK CHANGE [ Help Me Print/View TIFF ] Amendment Filed 20 May NAME CHANGED TO SCHINDLER ELEVATOR 1985 CORPORATION Annual Report§: Report for year 2013 ANNUAL REPORT Report for year 2012 ANNUAL REPORT Report for year 2011 ANNUAL REPORT Report for year 2010 ANNUAL REPORT Report for year 2009 ANNUAL REPORT Report for year 2008 ANNUAL REPORT Report for year 2007 ANNUAL REPORT Report for year 2006 ANNUAL [ Help Me Print/View TIFF ] View Document Online View Document Online View Document Online View Document Online View Document Online View Imaae (PDF format) View Imaae (TIFF format) View Imaae (PDF format) View Imaae (TIFF format) View Imaae (PDF format) View http://www.accessidaho.org/public/sos/core/C60571.htm1 I /8/2014 THE AMERICAN 1N~TITUTE ®F ARCI~ITECTS ~`' I i~ Bond No. PRF9143131 AIA Document A392 ~~~/111G'll$ BA11~ Any singular reference to Contractor, Surety, Owner ar other party shall be considered plural where applicable. CONTRACTOR (Name and Address): Schindler Elevator Corporation 743 McGregor Court, Suite140 Boise, ID 83705 OWNER (Name and Address): City of Meridian 33 E. Broadway Meridian, ID 83642 SURETY (Name and Principal Place of Business): Fidelity and Deposit Company of Maryland 1400 American Lane, Tower I, 18th Floor Schaumburg, IL 60196-1056 CONSTRUCTION CONTRACT Date: November 1, 2013 Amount: $14D,1DO.D0 One Hundred Forty Thousand One Hundred Dollars and 001100 Description (Name and Location};Provide and install two elevators for the City of Meridian WWTP Improvements BOND Date (Not earlier than Construction Contract Date): November 19, 2013 Amount: $140,100.00 One Hundred Forty Thousand One Hundred Dollars and 00/100 Modifications to this Bond: ^ None ®See Page 6 CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: Corparat eal} Schindler Elevator Corporation Fidelity and posit mp y of a '~ dDEPp•~~ ~;~+-or r Signature: ~ Signa re: ~ ° ~ Name and ~ Z ~~~ ~j J M` ~ Name and Title: Aiza Lopez ~ b a r ~~ " ~'"~ Attorney-in- ct~r ~s~ 4~ (Any additional signatures appear an page 6) ,~„~I,ao (FOR INFORMATION ONLY- Name, Address and Telephone) OWNER'S REPRESENTATIVE (Architect Engineer or other AGENT or BROKER: n$~v) Willis of New York, inc. One World Financial Center, 200 Liberty Street New York, NY 10281 212-915-8888 ' AIA DOCUMENT A312. PERFORMANCE BOND AND PAYMENT BOND . bECEMBER 1964 Eb. • A!A THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.G, 2D006 THIRD PRINTING • MARCH 1987 A312.1964 nk 9 The Contractor and the Surety, jointly and seveeally. bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the Constmction Contract, which is incorporated here(n by reference. 2 With respect to the Owner, this obligation shall be null and void 'rf the Contractor: 2,9 Promptly makes payment, directly or Indirectly, for aIi sums due Claimants, and 2.2 Defends, indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity whose claim, demand, lien or suit is for the payment for labor, materials or equipment furnished toe use in the pertormance of the Construction Contract, provided the Owner has promptly notfied the Contractor and the Surety (at the address descrbed in Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety, and provided there is no Owner Default. 3 With respect to Claimants, this obligation shall be null and void if the Contractor promptly makes payment, directly or Indirectly, for all sums due. 4. The Surety shall have no obligation to Claimants under this Bond until: 4.9 Claimants who aee employed by or have a direct contract with the Contractor have given notice to the Surety (at the address described In Paragraph 92) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim. 4.2 Claimants who do not have a direct contract with the Contractor. .1 Have furnished written notice to the Contractoe and sent a copy, or notice thereof, to the Owner, within 90 days after having last pertorened labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or peformed; and .2 Have either received a rejection in whole or in part from the Contractor, or not received within 30 days of fumishing the above notice any communication from the Contractor by which the Contractor has indicated the claim will be pa(d directly or indirectly; and .3 Not having been paid within the above 30 days, have sent a wdtten notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the Conteactor. 5 If a notice required by Paragraph 4 is given by the Owner to the Contractor oe to the Surety, that is sufficient compliance. 6 When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions: 6.9 Send an answer to the Claimant, with a copy to 4he Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis foe challenging any amounts that are disputed. 6.2 Pay or arrange for payment of any undisputed amounts, 7 The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. t3 Amounts owed by the Owner to the Contractoe under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any Construction Performance Bond. ey 4he Conteactor fumishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contrail are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's priority Yo use the funds for the completion of the work. 9 The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, glue notices on behalf of, or otherwise have obligations to Claimants under this Bond. 90 The Surety hereby valves notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. 91 No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction In the location in which the work or part of the work is located or after the expiration of one year from the date (1) on which the Claiman4 gave the notice required by Subparagraph 4.1 or Clause 4.2.3, or (2) on which the last labor or service was performed by anyone oe 4he last materials or equipment were furnished by anyone under the Construction Contract, whichever of (9) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sweeties as a defense in the jurisdiction of the suit shall be applicable. 92 Notice to the Surety, the Owner oe the Contractor shall be mailed or delivered 4o the address shown on the signature page. Actual receipt of notice by Surety, the Owner or the Contractor, however accomplished, shall be sufficient compliance as of the date received al the address shown on the signature page. 93 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond AIA DOCUMENT A392 a PERFORMANCE BOND AND PAYMENT BONDm DECEMBER 1984 ED. m AV1® THE AMERICAN INSTITUTE OF ARCHITECTS, 17J5 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A312-9984 THIRD PRINTING o MARCH 1987 confilicting with said statutory or.legal,requirement she]) be .deemed deleted herefirom and provisions confomung to such stataatony or otfier legal, requirer+nerit shall be deemed lncasporated herein. The intent !s that Phis Bond shall be construei~ as a statutory band and not as a common law Band. f4 Upon request by any person ar $nfrty appearing #a be a potent{a! beneficiary ni` this Bond, ~h'e Contractor shall promptly fun-iiSh,a copy of this Band or~sftall permit:a copy to be made, _ 15 QI~Fi1~17`It~NS' X5.1 Cfairnant Ate Ind'nElduat oc entJty having a direct contract with the Cantradxir or wr~h a subaantractor of the Gonfracdar~to fumtsh labor, materials or~,quipmer:t for use •in the performance qfi the CarT>r'act,• Thesnterit of this F3r~nd shat[ be to include wiffaout fimJtation in the Terms `labor, materials or equipmertY' that. part nfi water, gas, power,_iighf, heat, oil, gasoline, fslephQne llllnt3[F1G/~`i°iDtetS TQ THtS 801Vt] ARC AS t°OLLAVYS~: P~raQ~a+~a x h anwndsd to fnswi aub-p•re9~ 1], wfi'.sli :~4=s sen+ice or rental equipment used in the Construction Contract, arctiite,rhlral and engineering services rdquired far perfiarmance ot'the work of the Contactor and the Contractotas subcontractors, and alt 'Other itbms,for ~,vhlch a mechanic`,s lien may be asserted In the Jurisdiction where the labor; materials ;or equipment were famished. . 't 5:2 C,flnstru>;tion >'antracb Th'e egreerrlent between fho. flwger and the Contractor iderrifiect on tine signature. page,. Including all ~ontrabt Documents and dranges fhersrta. -15.3 C••~ntner QEt'ault Failute ~of the.Qwnert w}iich has neither (teen. terneded nor waned; to pay the Contactor as required by the Constructio~l Contract or to parfarrrt and complete or ~camply with the other farms ttrerea~, A.] Clelrtlrntshaa~tumhdmdto3u{atypronfofdahndulyaxamlobyClaiM1SUdcedthid•gvidaauppodfr~dxnnss+~etfanpnvl~ylMvncuatrkhnadhduemdpgya6lw Panpraph5 shall be ~amsndsd to dalotatha aoat'nt'sral ia•stl the t4oid'•nd' M Hp plag. Paraprap6 d and Itr sdb~par•~ha G,i and 5,4 sheRla• ddat•d En'tha{rentLaiy eaod rapl•catre}Eh fiw fagowJn~ ;'Th•a the dalaaan! hna 8a9sAed ti» eaadAlonaat?snprap{, A, pw Suety a{,nll~ eeNldn !tl daya vt ifa d~domh•n dairmMitrtnily~wnnj }dad @s •nthiactlaria at4ta aaraf@loeis alPvegnphdvollfy au~CinS~W of the. smnurds that u• undlqudad aisd the beds tar~chaII•nptnp ~+Y amomrts thzt an dFr,=xd•d, tncbtdLng ludaot itamadta tho bct ot~ dncniriontaUm lampportth• daLn ae to amfH•amut earunoud, end the Surety ahatl rmyor mak:utuiQalnmas laiytlyfnald of any undi•putad amoartl- prodded,'lnvistm . Shatd7ateltue~aiffw SunAytolfmdiy dis~arya ¢c otiQpdjons wttlirdd• pangrsph at9c dlapvb arideal{(yattd spacfFia tlahmn to aq a lay put ad • eldm chap not bs dsamad fA h• •n admisrian at W4IDry 6ui•ty ea is such Balm ar otleatt•Jir+ coneillniv • vmlvar olftra Coatrutot'• yr Stve4y'a dat•ma W ~ otri4!d to dWputQauch-dalid ~ R•IIm .the t:7airtntif s.eot• mened~ aled(6e Nv frmnoddfa rfpht,' W83wut fuHlssr neftca, to Lrfnq suk 1ha Svroty 40 •ntarn airy raaady awllab[a to B rfit~art$k Band, P~.agnsph'tZeibatl 6a eotreod•d M addlh• bllap9nQ pueptaptx Ci.~A'd bxfjlCE torth•~FWBJEYa11~CEf't?Sfr COt'dppttY t]K Ul~HYLAH0.ZOfi3gi AtdETdCriN R~-4t7RAIdCCF C01~dRANY 4:ULflt7LCLM5E~ICAN I:J1.Y1/~'J..TS"AtS! INSi1RANCE CDfAf'1WYsndForRBlSl1~:DN Ls!lMAI(TEL• NtD Li4ffiLiTY111'llRANG1:tLC.lPANY anmlba s•rdm the foDawkiD •+tdrasr» Zur(3 S+c•tyGha}nis, I'.[L Box l6tSRt; Sdsamnbur9, IL6015G.~~lUmtUoic Surety Chlm [SdparlmarR {Space ts. prgvidec~ 6elo.W for addifianal signatures~csf added .parties, other than those appearing an,the cover page,) Cfl1dTRACTAF2:AS. PRINGIP,AL. SURETY Cbmpar~y: ~Corparata Seafi} Company; (Corporate Seal}' Signafare; Signai:i.tre: Name arrct . e: ~~ ~ Name and Tlf{e: Address: y.l e< ,~b~~ .17,5, ~/~]~*~ address: ~J ~LG~~~~~r>t 51~~yo AlA1JOCl11YfET17 P.3'(2 ~ P~RFOf~vlANC£BONDA1d0 PAYNENT$ONl7. CJEC>=TAB+.~t 19134 ER. AIA~ THE AMERICAN Iht571TUTE OF ARCNi7~CTS,'1735 NEW YORKAVE, N.w., w~sHIN~rQN,. a.c. ~aons ,43`!21984. 6 'f!-pf2D PRINTING :N,ARCii 1989 ZURICH AMER%CAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY' AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: Thal the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State oC New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Maryland, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by THOMAS O. MCCLELLAN, Vice President, in pursuance of authority granted by Article V, SecQon S, of the By-Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to bz in fu[I force and effect on the date hereoL do hereby nominate, constitute, and appoint Jeannette PORRINI, Stacy RIVERA, Aiwa LOPEZ and Elana V. SANCHEP., all of Hartford, Connecticut, EACH its tine and lawful agent and Attorney-in-Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: uny and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and puryoses, as if they had been duly executed and acknowledged f,y the regularly elected officers oC the ZURICH AMERICAN INSURANCE COMPANY at its office in New York. Neta Y'orlc, the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings hfills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that [he extinct set lbrth on the reverse side hereof is a we copy of Article V, Ser_tian 8, of the By-Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice-President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZU&1ICIi AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY ANU SURETY COMPANY, and FIUELTTY AND DEPOSIT COMPANY OF MARYLAND, this 3rd day of December, A.D. 2012. ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTS' ANll SURETY COMPANY FIDELITY AND DEPOSIT CORIPANY OF 6iARYLAND voakb~ _ aa~rxaJS~r lYin ro'Va 6gpL ~ °b ~ aw ~ ~ 'tea ,~,w i~.l'xl-ti-~- ,~~~pNiNSp~y '~i ~~ lo= +~, rase ~': ~Ut~.~J!~~~~ Assistant Serretarp Vice Presiders Ertc U. Barnes Thorrras O. McCleilan State of Maryland City of Baltimore On the 3rd day of December, A.D. 2012, before the subscriber, a Notary Public of the Stale of Maryland, duly commissioned and qualihvd, THOMAS O. P.MCCLELLAN, Vice President, and E111C D. BARNPS, Assistant Secretary, of the Companies, (o me personally known m be the individuals and oifcrrs Aescdbed is and who execureJ the precedin instmment, and acknowted_ed use exzcutian of same, and being by me duly swam, depaseth and saint. that hersbe is the said officer of the Company aforesaid, and shat the seals affixed to rho pe•:reding tnstmntent are the Ccrpomtc Seals of said Companies, end that rte said Corporate Seals and the signmure as such officer were duly affixed and subscribed Io the said instmment by the authority and direction of dm said Corporations. IN TESTIMONY WHEREOF,1 have hereunto set my hood and affixed my Official Teal the day and year first above written. `v.l~iili;~~~~~~r4 1 `I:Oldttr~4~' t< EG'i.. ~ r . /r~lr N ~~~ ~~rl l,ll,ll~l"`` Mario D. Adamski, Notary Public My Commission Expires: July 8, 2015 POA-F 142-0587E ~%~7GL~Y I)~l'~~d~ C®iVL~~i' OF MARYLAND 600 Red Brook Blvd., Suite 600, Owings NII(]s, MD 21117 Statement ofFinaucial Condition As Of December 31, 2012 ASSETS Bonds ...............................................................................................................................................$ 157,177,826 Stocks ..................................................................................................:............................................ 23,000,311 Cash aad Short Term Invesnneats .................................................................................................... 119,155 Reinsurance Recoverable ................................................................................................................. 17,923,564 Other Accounts Receivable .............................................................................................................. 35,473,256 1'OTnLADturrrDAssETS ........................................................................................................$ 233,694,(13 LiAB1LFTIES, SURPLUS AIND OTHER II~ UNDS Reserve for Taxes and Fapenses ...................................................................................................... $ 74,782 Ceded Reinsurance Premimns Payable ............................................................................................ 48,323,524 Securities Lending Coliateral Liability ............................................................................................ 1,716,240 TorALLvsttrr~s .................................................................................................................... $ 50,114,546 Capital Stock, Paid Up ........................................................................................ $ 5,000,000 Surplus ................................................................................................................ 178,579,567 Surplus as regards Policyholders ...................................................................................................... 183,579,567 ToTaL ....................................................................................................................................... $ 233,b94,I13 Securities ca>ried at $59,468,OD2 in the above statement are deposited as required by ]aw. Securities carried on the basis prescribed by the National Association of Insurance Commissioners. On the basis of December 31, 2012 market quotations for all bonds end stocks owned, the Company`s total admixed assets would be $243,518,971 and surplus as regards policyholders $193,4D4,425. I, DENNIS F. ICERRIGAN, Corporate Secretary of the FID1iLITY AND D,^:POSIT COMPANY of MARYLAND, do hereby certify that the foregoing statement is a cosect ex-Iribit of the assets and liabilities of the said Company on the 31st day of December, 2012. State of Illinois City of Schaumburg ~ SS: Subscrbed and s<vom to, hcfos me, a Nolary Public ofthc State ofl0mols, in the City of Schsnmburg this 15th day offrtanh, 2013. 4Jcc, r 'r~g~ No(ary Public OFFICIAL SEAL DARRYL JOINER Nolary Public - Slale of Illinola My Commission Expires May 3, 2014 r9 ~:! Tf~E AMERICAN INSTITUTE ®F ARCi°iITECTS ,; c.:~' ~ Bond No. PRF9143131 AIA DocumentA3~12 P~rforrr~~~ Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): Schindler Elevator Corporation 743 McGregor Court, Suite140 Boise, ID 83705 OWNER (Name and Address): City of Meridian 33 E. Broadway Meridian, ID 83642 SURETY (Name and Principal Place of Business): Fidelity and Deposit Company of Maryland 1400 American Lane, Tower I, 18th Floor Schaumburg, IL 60196-1056 CONSTRUCTION CONTRACT Date: November 1, 2013 Amount: $140,100.00 One Hundred Forty Thousand One Hundred Dollars and 00/100 Description (Name and Location}: Provide and install two elevators for the City of Meridian WWTP Improvements BOND Date (Not earlier than Construction Contract Date): November 19, 2013 Amount: $140,100.00 One Hundred Farty Thousand One Hundred Dollars and 001100 Modifications to this Bond: ®None ^ See Page3 CONTFZ4CTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: Schindler Eleva Cor ati ~ Fidelity a Signature: Signa re: Name and ~ Name (Any additional signatures appear on page 3) of Seal) (FOR INFORMATION ONLY- Nama, Address and Telephone) OWNER'S REPRESENTATIVE (ArGhftect, E er AGENT or BROKER: Pa~Y1 Willis of New York, Inc. One World Financial Center, 200 Liberty Street New York, NY 10281 212-915-8888 ' AIA DOCUMENTA312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. •AIA® THE AMERICAN INSTrrUTE OF ARCHITECTS,1735 NEW YORK AVE., N.W., WASHINGTON, Q.C. 20005 THIRD PRINTING .MARCH 1987 A312=1984 9 ~X f The Contractor and the Surety, jointly and severally, bind themselves, theie heirs, executors, administrators, successors and assigns to the CM•nee for the performance otthet:onstrusionCoHtract, which is 6rttorporated herein by reference. 2 It the Contractor performs the Construction Contract, the Surely and the Contractor shall have na obligation under this goad, except 14 participato in ConfeeenCes as provided in Subparagraph 3.9. 3 if there is no thvnee Default, the Surety's obligation undee this Bond shall arise after: 3,1 The Oevner has notified the Contractor and the Surety at its addeess described in Paragraph to beloev that the tJ+vncr is considering dcdaring a Contractor Deiauh and has eequested and attempted to arrange a 6onference evith the Conteaetor and the Surety to be held not Later than fifteen days after receipt of such notice to discuss methods of performing the ConStnre- iron Contract. It the Owner, the Contractor and th@ Surety agree, the Conteaetor shall 6e alloeved a eeason• able time to podorm the Construction Contract, but such an agreement shall not waive the Owner's right, iT any, subsequently to declare a Contractor Default; and 3.2 The s3wnerhasdedaredaContrasor®efauhand formakly terminated the Contractor's righ4 to complete the eonteas. Such Contractor Default shall nos bed@- daredearlier than twenty days after the Contrador and the Surety have eoeeivod notice as provided in Sub= paragraph 3.9; and 3.3 The Owner has agreed to pay the Balartc@ of the Contract Price tD the Surety in accordance with the terms of the Construction COnteaet or to a eontractoe selected to perform the Constntcl'wn Conieas in accor- dance with the terms aP the eonteaet with the O+vner. 4 When the Owner has satisfied the ton$itions of Para• graph 3, the Surety shall promptly and ai the Surety's @tt- pense take one of the folioxrong actions: 4.9 Arrange far the Contractor, with consent of She Owner, to perform and complete the Construction COntraet; OP 4.2 Undertake to performandeompletetheConstrue- tion Contract itself, through its agentsor threugh inde- pendent eonteattoes; or 4.3 Obtain bids or negotiated proposals from qualified eontraetoes acceptable to the Owner for a contract for performance and completion of the Con- struction Contract, arrange for a contract to be pre• pared for execution by the Ownee and the contractor selected with the Owner's eoneurronce, to be secured with performance and paymon9 bands executed by a qualified surety equivalerN to the bonds issucad on eh@ ConSfiUCtt00 Contras, and pay to the Oevn@r Cho amount of damages as described in Paragraph 6 in t>x- cessofthe Balance of the Contract Price incurred by the Owner resetting from the Contractor's default; or 4.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: 9 After investigation, determine she amount fur which it may b@ liable to the Bemrot@e and, as soon as practicable after the amount is d@ter- mined, tender payment therefor to eh@ Ov,•ncr; oe .2 th+nyliabllityimvhol@orinpartandnotifythe Chvner citing reasons therefor. S IflheSuretydoesnolproceedasprovidedinParagraph 4 with reasonable promptness, the Suretysha9l be do@med to be In default on this Bond fifteen days after receipt of an additional written notice trom th@ Oeener to the Surely demanding that the Surety perform its obligations under this Bond, and the devner shag be emitted to enforce env eem@dy available to the Oavner. tf the Surety peoceeds as provided in Subparagraph 4.4, and the Oeevter eelusos the payment tendered or the Sur@ey has denied IFabiliiy, in whole Orin part, evithout (unbar notice the Oevner shalt be entitled to endoeee any remedy available to the Owweee. 6 After the Cnvner has 4erminated the Contractor's right to complete the Construction Contract, acrd i! Cho Surety sleets to act under Subparagraph 4,9, 4r, or 4.3 abov@, then the responsibilities of the Surety to the Oeveeer shall not bo greater than those' of the Contrador under the Construction Contract, and She responsibilities of she Ownee to the Surety shall not ts@ greater than those of the a~evn@r under the Consteue6on Conteacl. To the limit of the amount Of this Bond, but subject to commitment by 4lee Owner of the 8atanee of the Contract Pelee to mitigation of costs and damages on the Construction Contrast, She Sure• ty is obligated without duplication foe: 6.9 The responsibilities of the Contractor for eorree= Lion of defective work and completion of (h@ Construed Lion Contract; 6.2 Additional legal, design professional and delay costs resuhing from th@ Conteasae's t3efautt, and r@- sulting from the actions or failure to act of the Surey under Paragraph 4; and 6.3 liquidated damages, or if no liquidat@d damages are specified in the ConserusionContract, asual dam- altos caused by delayed performance or non•peefor- martee of the Contrador, S T9se5ueetyshaltnotbeliabletotheAevnerorotheesfor obligationsof theContractor that ace unrelated tothe Con- steuedon Contract, and the Balance of the Contras Pelee shall not be reduced or s@t oft on account of any such unrelated obligations. No right of action shall aeeeue on this Bond to any person or entity other than she ®eener or its heiPS, exeeU40P5, admini5tratOrS oP sueieS5or5. 8 The Surety herebyn~aives Holies of any change, include ing changes of time, to the Construcion Contract or to e@latbd subconreacts, purchase orders and other obliga- tions. J Any peoeeod'ong, legal oe equitable. under This Bond may be instituted in anyeODrt of Competent jurisdecNon in the locat'aon in esfiich the work or part of theevoek is located and shall be instituted within tevo years alter Contractor ®efault or within Iwo years alter Cho Conteaetor a@ased working ar+egthin two years of ter the Surely refuses or faits Bo perform its obligations order this Bond, whichevee oe= cues first. If the previsions oP Ibis Paragraph are void oe prohibited by law, the minimum period of timilation avaii- AIA DOCUMENT A3r2 . PERFORMANCE BOND AND PAYMENT BOND . DECEM9ER 1984 ED. • AIA THE AMERICAN INSTnt1TE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A392.1984 2 THIRD PRINTING. MARCH 1987 able to sureties as a defense in the jurisdiction of the suit shall be applicable. 1Q Notice to the Surety, theOwnerortheContractorshall be mailed or delivered to the address shown an the sig- nature page. ii When this Bond has been furnished to cornpty with a statutory or other legal requirement in the Location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions con- forming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is tP~at this Bond shall be construed as a statutory bond and not as a common law bond. 12 DEFINITIONS i2.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made, including allowance to the Con- MQDiFIt:ATtC+NS TO 'TI-tIS BAND ARE AS FOL[.OWS: tractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages !o which the Contractor is entitled, re- duced by all valid and proper payments made to or on behalf of the Contractor under the Construction Con- tract. 12.3 Construction Contract: The agreement between the Owner and the Contractor identified on the sig- nature page, including aft Contract Documents and changes thereto. 12.3 Contractor Default: failure of the Contractor, which has neither been remedied nor waived, to per- form or otherwise to comply with the terms of the Construction Contract. 12.4 OwnerOefault:FailureoftheOwner,whiehhas neither been remedied nor waived, to pay the Con- tractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. (Space is provided below far additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) Signature. Signature: Name an It ~ ~~ ~ ~~~ M~A~ Name and Addres l~ I ~r ~~ Address: 7~~ M G ors ~ ~ ~~ 5 ~'L J(/d ~~> as. Stj ~ja7b"3_ i"itle: AIA DOCUMENT A312 • AERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1964 ED. •AIA THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A312-1984 3 THIRD PRINTING • MARCH 1987