HomeMy WebLinkAboutCedar Springs Professional PPRECEIVED
MAR Q 4 200
City UPbl~ridian
C'itw Clerk Of~'ice
STAFF SUMMARY
OF
PLANNING AND ZONING COMMISSION
RECOMMENDATION TO CITY COUNCIL
P%ject Name:
Case No(s).:
Applicant:
Cedar Springs Professional Center
RZ-03-013';~PP-03-044, CUP-03-067
Kevin Howell
P&Z Commission Hearing Date: February 5, 2004
Recommendation: Approve with conditions (all ayes)
Summary of Public Hearing:
• Daren Fluke, representing the applicant, testified in favor of the application,
submitted a written response to the staff report, and answered several questions posed
by the Commission.
• Joe Siminich, property owner on the south side of Ustick Road, testified his
opposition to a fuel station next to an elementary school. He also stated his preference
for residential uses and that a carwash is not needed in this area of the city.
• Other key points of discussion included the width and location of the driveways
serving the carwash/fueUcoffee kiosk lot, the landscape buffer on the east boundary,
the proposed striping of landscape islands and a potential bike lane on Venable Ln.
Key Commission Changes to Staff Recommendation:
• Remove the requiremern for a bike lane on Venable Lane and the requirement for a
fencing plan.
• Add a condition to the PP that a new, 25-foot wide cross access easemern be shown
on the plat to the outparcel to the east.
Outstanding Issues for City Council:
• None
BEFORE THE PLANNING ANl) ZONING COMMISSION
IN THE MATTER OF THE ) Case No. PP-03-044
REQUEST FOR PRELIMINARY )
PLAT APPROVAL OF 5 ) RECOMMENDATION TO CITY
BUILDABLE LOTS AND 1 ) COUNCIL
COMMON/OTHER LOT ON 5.51 )
ACRES IN A PROPOSED C-N ZONE )
FOR CEDAR SPRINGS
PROFESSIONAL CENTER
Kevin Howell, Applicant
The property is approximately 5.5 acres in size and is generally located at the
northeast corner of Ustick Road and Venable Lane. The property is designated as
Mixed Use-Community with a Neighborhood Center on the Future Land Use Map
of the 2002 Comprehensive Plan.
2. Howell-Murdoch Development Corp. is the current property owner, who has
provided notarized consent for the subject application.
The Applicant is Kevin Howell.
4. The subject property is currently zoned R-4. There is, however, an accompanying
application for a rezone to C-N. The zoning district of C-N is defined within the
City ofMeridian Zoning and Development Ordinance, Section 11-7-2.
The subject property is within the city limits of the City of Meridian.
6. The entire parcel is included within the Meridian Urban Service Planning Area as
defined in the Meridian Comprehensive Plan.
The Applicant proposes to develop the subject property in the following manner:
a five (5) lot commercial subdivision including four (4) office buildings, car wash,
two fuel pumps and adrive-through coffee stand.
8. There are no significant or scenic features of major importance that affect the
consideration of this application.
9. The Planning and Zoning Commission recognized the concerns of Mr. Joe
Siminich expressed as verbal testimony at the 2-5-04 public hearing.
RECOMMENDATION TO CITY COUNCIL FOR PRELIMINARY PLAT APPROVAL OF 5
BUILDABLE LOTS AND 1 COMMON/OTHER LOT ON 5.51 ACRES IN A PROPOSED C-N ZONE
FOR CEDAR SPRINGS PROFESSIONAL CENTER, BY KEVIN HOWELL - PP-03-044 -Page 1
RECOMMENDATION
The Meridian Planning and Zoning Commission hereby recommends to the City
Council of the City of Meridian that they approve the requested Preliminary Plat as
requested by the Applicant for the property described in the application, subject to the
following:
A. Adopt the Comments and Recommendations of the Meridian Planning & Zoning
and Engineering Departments as follows:
SITE SPECIFIC CONDITIONS (PRELIMINARY PLATT
All conditions of the accompanying Rezone (RZ-03-013) application shall
also be considered conditions of the Preliminary Plat (PP-03-044).
2. If the future Ustick Road right-of--way is not being dedicated to ACHD at
the time of plat recordation, locate said future right-of way on a separate
common lot in the subdivision. These common lots shall be shown on the
final plat. Whether dedicated or not, said land shall be landscaped in
accordance with MCC 12-13-10-9. The Ustick Road sidewalk shall be
detached and constructed in conformance with MCC 12-13-10-8.
In accordance with MCC 12-13-12, the subdivider shall provide a
minimum 20-foot wide landscape buffer along the north property line
adjacent to the future school property. For the landscape buffer on the east
property line, the subdivider shall comply with one of the following
conditions:
a. If the owner of Ada County Pazce150436438801 (Brinegar)
submits a written statement to the City that the proposed buffer
width is acceptable, no modifications to the Site Plan or Landscape
Plan need to be made.
b. Otherwise, to comply with MCC 12-13-12-4, the landscape
buffer adjacent to Building "B" must be widened to at least 20 feet
between the property line and the building.
4. Construct a minimum 25-foot wide landscape buffer/common lot along
Ustick Road. Said landscape buffer shall be located beyond any future
street right-of--way, as proposed. Construct a landscape buffer on Venable
Lane, north of Ustick Road, as approved through the companion CUP/PD
application (CUP-03-067).
RECOMMENDATION TO CITY COUNCIL FOR PRELIMINARY PLAT APPROVAL OF 5
BUILDABLE LOTS AND 1 COMMON/OTHER LOT ON 5.51 ACRES IN A PROPOSED C-N ZONE
FOR CEDAR SPRINGS PROFESSIONAL CENTER, BY KEVIN HOWELL - PP-03-044 -Page 2
5. All buildable lots shall utilize a common driveway to access adjacent
public streets. Said common driveway shall be constructed a minimum 25-
feet wide and designed to ACHD construction standards. A permanent,
non-exclusive ingress/egress easement shall be provided for all lots within
the subdivision across the common driveway. The Applicant shall also
record anon-exclusive cross parking/cross access easement for Lots 12-
15.
6. Construct a median planter island in the center of the commercial
driveway off Ustick Road, as proposed. Said planter shall be fully within
Lot 17.
7. Revise the preliminary plat to provide a minimum 7-foot wide, attached,
concrete sidewalk on the east side of Venable Lane.
8. The submitted landscape plan prepared by JensenBelts Associates., and
dated 11-14-03, shall be modified to reflect the following:
a. Street buffer along Ustick Road shall be modified to reflect the
required detached sidewalk, per condition #2 above.
b. Modify the plan to show a 10-foot wide gravel shoulder along Ustick
Road (MCC 12-13-10-9). The remainder of the unimproved right-of--way
shall be landscaped with grass/sod, as proposed. A license agreement from
ACHD for landscaping within the right-of--way will be required.
c. Add a note that states any tree over 4" in caliper that is removed from
the property shall be replaced by installing additional trees, being the
equivalent number of caliper inches of trees that were removed. Required
landscaping trees will not be considered as replacement trees for those
trees that are removed.
d. The new micropath/pathway between Lots 13 and 14 shall be
designed in accordance with MCC 12-13-15 "Micropath Landscaping"
and MCC 12-4-3 "Pedestrian Walkways." Micropath fencing shall be
shown per MCC 12-13-15-9.
e. Said revisions shall be reflected on the detailed landscape plan to be
submitted with the final plat application.
9. Revise the preliminary plat to reflect all existing easements of record that
may impact the property. All irrigation ditches, laterals or canals,
exclusive of natural waterways, intersecting, crossing or lying adjacent
and contiguous to the azea being subdivided shall be tiled per City
Ordinance 12-4-13. Plans will need to be approved by the appropriate
irrigation/drainage district, or lateral users association (ditch owners), with
written approval or non-approval submitted to the Public Works
Department. If lateral users association approval can't be obtained, plans
RECOMMENDATION TO CITY COUNCIL FOR PRELIMINARY PLAT APPROVAL OF 5
BUILDABLE LOTS AND 1 COMMON/OTHER LOT ON 5.51 ACRES IN A PROPOSED C-N ZONE
FOR CEDAR SPRINGS PROFESSIONAL CENTER, BY KEVIN HOWELL - PP-03-044 -Page 3
will be reviewed and approved by the Meridian City Engineer prior to
final plat signature.
10. The Applicant has indicated that the pressurized irrigation system within
this development is to be owned and operated by the Nampa Meridian
Irrigation District (see Note #6). Underground year-round pressurized
irrigation must be provided to all lots within this development (MCC 12-
5-2.N). The City of Meridian requires that pressurized imgation systems
be supplied by ayear-round source of water (MCC 12-13-8.3). The
Applicant shall be required to utilize any existing surface or well water for
the primazy source. If a surface or well source is not available, asingle-
point connection to the culinary water system shall be required If a single-
point connection is utilized, the developer shall be responsible for the
payment of assessments for the common azeas prior to signature on the
final plat by the City Engineer. A draft copy of the pressurized irrigation
system O&M manual must be submitted prior to development plan
approval.
11. Sanitary sewer service to this subdivision shall be via a main trunk
extension to the existing White Drain Trunk in the Cedar Springs
Subdivision. The applicant will be responsible to construct the sewer
mains through this proposed development. Subdivision designer to
coordinate main sizing and routing with the Public Works Deparhnent.
Applicant shall execute City of Meridian standard forms of easements, for
any mains that are required to provide service.
12. Municipal water to this site shall be via extensions from existing mains in
Ustick Road. Applicant will be responsible to construct the water mains to
and through this proposed development. Subdivision designer to
coordinate main sizing and routing with the Public Works Department.
Applicant shall execute City of Meridian standazd forms of easements, for
any mains that are required to provide service.
13. Maintenance of all common azeas shall be the responsibility of the Cedar
Springs Professional Center owner's association.
14. Please submit all updated groundwater/soils monitoring data to the Public
Works Department for review. Any drainage areas (detention/retention
basins) must be designed to ensure that water will percolate or discharge
within a period of time not to exceed 24-hours for all storms up to and
including a 100-year storm events. Side slopes within drainage areas shall
not exceed 3:1. Any portion of a drainage area not improved with
sod/grass seed (or other approved landscaping) shall not count towards the
required open space area. The project engineer should pay close attention
to the results of field studies determining the groundwater, soil type & and
characteristics during the design and construction phases. The engineer
shall be required to certify that the street centerline elevations are set a
minimum of 3-feet above the highest established normal groundwater
RECOMMENDATION TO CITY COUNCIL FOR PRELIMINARY PLAT APPROVAL OF 5
BUILDABLE LOTS AND 1 COMMON/OTHER LOT ON 5.51 ACRES IN A PROPOSED C-N ZONE
FOR CEDAR SPRINGS PROFESSIONAL CENTER, BY KEVIN HOWELL - PP-03-044 -Page 4
elevation. This is to ensure that the bottom elevation of the crawl spaces
of homes is at least 1-foot above groundwater.
15. A 25-foot vehicular cross-access easement aexeement shall be provided
for the roronertv owner to the east (Ada Co. Parcel No SO4364388011
located somewhere between Buildines A and B
GENERAL REQUIREMENTS-PRELIMINARY PLAT
1. Coordinate fire hydrant placement with the City of Meridian Public Works
Department.
2. Prior to signature of the final plat(s) by the City Engineer, a letter of credit
or cash surety in the amount of 110% will be required for all fencing,
landscaping, pressurized irrigation, sanitary sewer, water, etc. that has not
been completed.
3. A detailed landscape plan, in compliance with the Landscape Ordinance,
shall be submitted for the subdivision with the final plat(s) application.
4. Unless otherwise approved, all sidewalks shall be constructed in
accordance with MCC 12-5-2.K. Prior to signature of the final plat(s), all
sidewalks shall be constructed or a fmancial guarantee that said
improvements will be completed shall be provided (MCC 12-5-3).
5. Streetlights will be required at locations designated by the Public Works
Department. All streetlights shall be installed at subdivider's expense.
Typical locations are at street intersections and/or fire hydrants. Final
design locations and quantity are determined after power designs are
completed by Idaho Power Company. The street light contractor shall
obtain design and permit from the Public Works Department prior
commencing installations.
6. Any existing domestic wells and/or septic systems within this project will
have to be removed from their domestic service per City Ordinance
Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes
such as landscape irrigation.
7. Compaction test results must be submitted to the Meridian Building
Department for all building pads receiving engineered backfill, where
footing would sit atop fill material.
8. Staffs failure to cite specific ordinance provisions or terms of the
approved annexation/conditional use does not relieve the Applicant of
responsibility for compliance.
9. Preliminary plat approval shall be subject to the expiration provisions set
forth in MCC 12-2-4.
RECOMMENDATION TO CITY COUNCII. FOR PRELIMINARY PLAT APPROVAL OF 5
BUILDABLE LOTS AND 1 COMMON/OTHER LOT ON 5.51 ACRES IN A PROPOSED C-N ZONE
FOR CEDAR SPRINGS PROFESSIONAL CENTER, BY KEVIN HOWELL - PP-03-044 -Page 5
B. Adopt the Recommendations of ACHD as follows:
Construct Venable Lane as one-half of a 40-foot street section with curb,
gutter, 5-foot concrete sidewalk on the east side of Venable Lane and a
minimum of 24-feet of pavement within 40-feet ofright-of--way.
2. Construct a 30-foot shared curb return type driveway that intersects
Venable Lane approximately 270-feet north of Ustick Road, as proposed.
Pave the driveway its full width and at least 30-feet into the site beyond
the edge of pavement of the roadway and install pavement tapers with 15-
foot radii abutting the exisfing roadway edge.
Construct a 48-foot shared curb return type driveway with an 8-foot center
island within it that intersects Ustick Road approximately 140-feet west of
the east property line, as proposed. Pave the driveway its full width and at
least 30-feet into the site beyond the edge of pavement of the roadway and
install pavement tapers with 15-foot radii abutting the existing roadway
edge.
4. Other than the Access point that is specifically approved with this
application, direct lot access to Ustick Road is prohibited. Access
restrictions will be required to be noted on the final plat.
5. Comply with all Standard Conditions of Approval.
ACHD Standard Conditions of Approval
1. Any existing irrigation facilities shall be relocated outside of the right-of-
way.
2. All utility relocation costs associated with improving street frontages
abutting the site shall be borne by the developer.
3. Replace any existing damaged curb, gutter and sidewalk and any that may
be damaged during the construction of the proposed development.
Contact Construction Services at 387-6280 (with file number) for details.
4. Utility street cuts in pavement less than five years old are not allowed
unless approved in writing by the District. Contact the District's Utility
Coordinator at 387-6258 (with file numbers) for details.
5. All design and construction shall be in accordance with the Ada County
Highway District Policy Manual, ISPWC Standards and approved
supplements, Construction Services procedures and all applicable ACHD
RECOMMENDATION TO CITY COUNCIL FOR PRELIMINARY PLAT APPROVAL OF 5
BUILDABLE LOTS AND 1 COMMON/OTHER LOT ON 5.51 ACRES IN A PROPOSED C-N ZONE
FOR CEDAR SPRINGS PROFESSIONAL CENTER, BY KEVIN HOWELL - PP-03-044 -Page 6
Ordinances unless specifically waived herein. An engineer registered in
the State of Idaho shall prepare and certify all improvement plans.
6. The applicant shall submit revised plans for staff approval, prior to
issuance of building permit (or other required permits), which incorporates
any required design changes.
Construction, use and property development shall be in conformance with
all applicable requirements of the Ada County Highway District prior to
District approval for occupancy.
8. Payment of applicable road impact fees are required prior to building
construction in accordance with Ordinance #198, also known as Ada
County Highway District Road hnpact Fee Ordinance.
9. It is the responsibility of the applicant to verify all existing utilities within
the right-of--way. The applicant at no cost to ACHD shall repair existing
utilities damaged by the applicant. The applicant shall be required to call
DIGLINE (1-800-342-1585) at least two full business days prior to
breaking ground within ACHD right-of--way. The applicant shall contact
ACHD Traffic Operations 387-6190 in the event any ACHD conduits
(spare or filled) are compromised during any phase of construction.
10. No change in the terms and conditions of this approval shall be valid
unless they are in writing and signed by the applicant or the applicant's
authorized representative and an authorized representative of the Ada
County Highway District. The burden shall be upon the applicant to
obtain written confirmation of any change from the Ada County Highway
District.
11. Any change by the applicant in the planned use of the property which is
the subject of this application, shall require the applicant to comply with
all rules, regulations, ordinances, plans, or other regulatory and legal
restrictions in force at the time the applicant or its successors in interest
advises the Highway District of its intent to change the planned use of the
subject property unless awaiver/variance of said requirements or other
legal relief is granted pursuant to the law in effect at the time the change in
use is sought.
C. Adopt the Meridian Fire Department Recommendations as follows:
1. That afire-flow as required by the International Fire Code is provided to service the
entire project. Fire hydrants shall be placed an average of 350' apart.
2. Acceptance of the water supply for fire protection will be by the Meridian Water
Department.
RECOMMENDATION TO CITY COUNCIL FOR PRELIMINARY PLAT APPROVAL OF 5
BUILDABLE LOTS AND 1 COMMON/OTHER LOT ON 5.51 ACRES IN A PROPOSED C-N ZONE
FOR CEDAR SPRINGS PROFESSIONAL CENTER, BY KEVIN HOWELL - PP-03-044 -Page 7
3. Final Approval of the fire hydrant locations shall be by the Meridian Fire
Deparhnent. Additionally, internal fire hydrants will be required for the project.
4. The phasing plan may require that any roadway greater than 150' in length that is
not provided with an outlet shall be required to have a turn around.
5. All entrances and internal roads shall have a turning radius of 28' inside and 48'
outside.
6. Operational fire hydrants and access roads are required before combustible
construction begins.
7. The proposed subdivision will have an unknown transient population and will
have an unknown impact Meridian Fire Deparhnent call volumes. According to
a report completed by Fire & Emergency Services Consulting Group in February
of 2000 our requests for service are projected to reach 2800 in the year 2005 and
3800 by the year 2010, this is up from 2069 responses in the year 2000.
8. All building uses and processes to comply with the fire code in effect at the time of
construction.
9. No vertical obstructions or mature landscaping which obstructions the outlets of the
fire hydrant within 10'.
10. Vertical clearance for driveways shall be 13'6", this may affect tree placement in
landscaping areas.
11. All fire lanes shall have a clear driving surface which is20' wide available at all
times.
D. Adopt the Recommendations of the Central District Health Department as
follows:
1. This proposal can be approved for central sewage & central water after written
approval from appropriate entities is submitted.
2. The Applicant's central sewage and central water plans must be submitted to and
approved by the Idaho Department of Health & Welfare, Division of
Environmental Quality.
3. Run-off is not to create a mosquito breeding problem.
4. Stormwater shall be pretreated through a grassy swale prior to discharge to the
subsurface to prevent impact to groundwater and surface water quality.
RECOMMENDATION TO CITY COUNCIL FOR PRELIMINARY PLAT APPROVAL OF 5
BUILDABLE LOTS AND ICOMMON/OTHER LOT ON 5.51 ACRES IN A PROPOSED C-N ZONE
FOR CEDAR SPRINGS PROFESSIONAL CENTER, BY KEVIN HOWELL - PP-03-044 -Page 8
5. The engineers and architects involved with the design of the subject project shall
obtain current best management practices for stormwater disposal and design a
stormwater management system that prevents groundwater and surface water
degradation.
E. Adopt the Recommendation of Nampa & Meridian Irrigation District as follows:
1. Applicant shall apply for a land use change application prior to final platting.
2. All laterals and waste ways must be protected.
3. All municipal surface drainage should be retained on site. If any surface drainage
leaves the site, the Nampa & Meridian Irrigation District must review drainage
plans.
4. The Developer must comply with Idaho Code 31-3805.
5. NMID recommends that irrigation water be made available to all developments
within the Nampa & Meridian Irrigation District.
F. Adopt the Recommendations/Comments of Joint School District No. 2 as follows:
1. Directly north of the rezone for Cedar Springs Professional Center is a future school site.
Joint School District No. 2 is in the progress of acquiring this site.
RECOMMENDATION TO CITY COUNCII-FOR PRELIMINARY PLAT APPROVAL OF 5
BUILDABLE LOTS AND 1 COMMONlOTHER LOT ON 5.51 ACRES IN A PROPOSED C-N ZONE
FOR CEDAR SPRINGS PROFESSIONAL CENTER, BY KEVIN HOWELL - PP-03-044 -Page 9