Loading...
HomeMy WebLinkAboutStaff CommentsMAYOR Tammy de Weerd CITY COUNCIL MEMBERS Keifh Bird William L.M. Nary Shaun Wardle Charles M. Rountree Cn Y HALL (208) 888-4433 -Fax 887813 PUBLIC WORKS BUILDING DEPARTMENT (208) 887-2211 -Fax 898-9551 LEGAL DEPARTMENT (208) 466-9272 -FAX 466-4405 MEMORANDUM: Hearing Date: February 17, 2004 To: Mayor&CityCouncil RECEIVED ~ MAR U ~ 2004 From: Sonya Allen, Assistant City Planner Bruce Freckleton, Engineering Tech III City Of Meridian City Clerk Office Re: LOCHSA FALLS SUBDIVISION N0.9 Request for Final Plat Approval of Lochsa Falls Subdivision No. 9, Consisting of Fifty-six (56) Single-family Residential Building Lots and Two (2) Common Lots on 17.8 Acres in an R-4 Zone by Lochsa Falls, LLC (File No. FP-04-008). We have reviewed this submittal and offer the following comments, as conditions of the applicant. These conditions shall be considered in full, unless .expressly modified or deleted by motion of the Meridian City Council: APPLICATION SUMMARY & LOCATION This is the ninth phase of Lochsa Falls Subdivision and consists of 56 single-family residential building lots and 2 common (landscaping/open space/drainage) lots on 17.8 acres. The gross density of Phase No. 9 is approximately 3.08 dwelling units/acre. The net density is approximately 3.8 dwelling units/acre. The subdivision was approved as a Planned Development which allowed for a reduction to development standards including reduced setbacks (front 20', non-front entry garage 15' , 5' side single story, 7' side two-story), reduced lot sizes (min. 6,500 s.f.), reduced frontages (min. 60'), reduced house sizes (min. 1,201 s.f.) and to allow the Applicant' s request to exceed minimum block length requirements. The reduced setbacks that were requested at the time this subdivision was approved are now allowed under current city ordinance. The final plat for this phase complies with the approved preliminary plat. Mayor & City Council Hearing Date: February 17, 2004 Page 2 of 5 Staff recommends approval for Lochsa Falls Subdivision No. 9 with the comments and conditions stated in this report. LOCATION This phase of Lochsa Falls Subdivision is located on the west side of N. Linder Road, approximately Ya mile south of W. Chinden Blvd.~n the NE Ya oSection 26, T.4N., R.1W. SITE SPECIFIC REQUIREMENTS 1. Applicant shall meet all terms of the approved Preliminary Plat (PP-02-009), Conditional Use Permit (CUP-02-012), and the recorded Development Agreement (Inst. No. 103012598). 2. The pressurized irrigation system within this development is to be owned and maintained by the Settlers Imgation District. The City of Meridian requires that pressurized imgation systems be supplied by a year-round source of water. If a creek or well source is not available, asingle-point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the fmal plat by the Meridian City Engineer. Street signs are to be in place, water system shall be approved and activated, pressurized irrigation system approved and activated, drainage lots constructed, fencing installed, and road base approved by the Ada County Highway District prior to applying for building permits. All development improvements, including fencing, micro-paths, irrigation, and landscaping shall be installed and approved prior to obtaining certificates of occupancy. A letter of credit or cash surety in the amount of 110% will be required for all fencing, landscaping, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the final plat. 4. Temporary construction fencing to contain debris shall be installed along the boundaries of this phase unless fencing already exists at the subdivision boundaries. 5. Fencing within 20 feet of all public right of ways shall be no taller than 3-feet in height if sight obscuring material is used or 4-feet in height if non-sight obscuring material is used. 6. Please add or revise the following plat notes: (9.) Add "Lot 11, Block 24" as anon-buildable lot FP-04-008 Lochsa Falls Suh9.FP.doc Mayor & City Council Hearing Date: February 17, 2004 Page 3 of 5 Add note: "Bui lding setbacks and dimensional standards in this subdivision shall be in compliance with Title 11 and Title 12 of the Meridian City Code unless otherwise modified by Conditional Use Permit (CUP-02-012) which allowed for reduced setbacks lot sizes, lot frontases, and minimum house size." 7. Applicant shall construct detached sidewalks adjacent to N. Linder Road per Preliminary Plat Finding No. 2. The minimum width of the parkway area between the curb and sidewalk is five feet. 8. Show a 40-foot landscape easement on the face of the plat adjacent to N. Linder Road for Lot 42, Block 1 (Fire Station Lot). 9. Sanitary sewer service and municipal water to this site shall be via extensions from existing mains. Applicant will be responsible to construct the sewer and water mains to and through this proposed development, thereby making them available to adjacent properties. Subdivision designer to coordinate main sizing and routing with the Public Works Department. Applicant shall execute City of Meridian standard forms of easements, for any mains that are required to provide service. 10. Graphically depict a 8-foot wide public utilities, drainage and irrigation easement along the east side of Lot 2, Block 42, Lot 13, Block 24, Lot 2, Block 41, Lot 2, Block 40, and Lot 37, Block 1. These modifications are required because of pressurized irrigation mains. 11. Graphically depict an 8-foot wide easement along the north side of Lot 32, Block 1 for a sanitary sewer service to Lot 42, Block 1. 12. Lot 51, Block 1 shall remain un-buildable until such time as N. Gertie Place is extended in the future. Applicant shall provide an actual building footprint as evidence that Lot 51, block 1 is buildable. 13. Please describe the point on the section line that is tied to the RPOB. If this is a calculated point please call out as such. 14. Please remove the reference to a point; "of reverse curvature" for curve C1 in the legal description. 15. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat per Resolution 02-374. 16. Any drainage areas (detention/retention basins) must be designed to ensure that water will percolate or discharge within a period of time not to exceed 24 hours for all storms FP-04-008 Lochsa Falls Sub9.FP.doc Mayor & City Council Hearing Date: February 17, 2004 Page 4 of 5 up to and including a 100-yeaz storm event. (All areas being counted toward the 10% open space amenity shall be free of "wet ponds" or other such nuisances.) 17. Staff s failure to cite specific ordinance provisions or terms of the approved preliminary plat, conditional use permit or development agreement does not relieve Applicant of responsibility for compliance. GENERAL REQUIREMENTS All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per City Ordinance 12-4-13. Plans will need to be approved by the appropriate irrigation drainage district, or lateral users association, with written confirmation of said approval submitted to the Public Works Department. 2. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells maybe used for non-domestic purposes such as landscape irrigation. 3. One-Hundred watt (100w), high-pressure sodium streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at subdivider's expense. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity aze determined after power designs are completed by Idaho Power Company. Street light contractor to obtain design and permit from the Public Works Department prior commencing installations. 4. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 5. Sewer and water mains shall be extended to and through the proposed development, thereby making the available for adjacent properties. 6. Applicant's engineer will be required to submit a signed, stamped statement certifying that all street finish centerline elevations are set a minimum of three feet above the highest established normal groundwater elevation. Coordinate fire hydrant placement with the City of Meridian's Water Deputy Fire Chief and the Public Works Department. 8. Provide sidewalks in accordance with the MCC. STAFF RECOMMENDATION FP-04-008 Lochsa Falls Sub9.FP.doc Mayor & City Council Hearing Date: February 17, 2004 Page 5 of 5 Staff recommends approval of the final plat for Lochsa Falls Subdivision No. 9 with the above stated comments & conditions. FP-04-008 Lochsa Falls Sub9.FP.doc