HomeMy WebLinkAboutAIA Agreement with Lacy Mechanical for WWTP Admin Bldg and Lab Design~ ~ TM ==_ Document A132 - 2009 Standard Form of Agreement Between Owner and Contractor,Construcrion Manager as Adviser Edifion AGREEMENT made as of the 1st day of November in the year 2013 (hr 11~ords, indicate day, nrorvh and }•ear:) BETWEEN the Owner: (Name, legal staters, address and outer irrforlrratiorr) City of Meridian 33 E. Broadway Meridian, iD 83642 and the Contractor: (Name, legal status, address and outer it fornratiorr) Lacy Mechanical 9974 W. Fairview Ave. Boise, ID 83704 for the following Project: (Name, location and detailed description) City of Meridian Waste Water Treatment Plant Improvements 3401 N. Ten Mile Road Meridian, ID 83642 The Construction Manager: (Nance, legal status, address and other ir~ormation) Beniton Construction Co., Inc. P.O. Box 838 Meridian, ID 83680 The Architect: (Nance, legal status, address acrd otlrer• information) SPF Water Engineering LLC 300 E. Mallard Drive, Suite 350 Boise, ID 83706 For the purposes of this Agreement, the term Engineer and Architect may be used interchangeably. SPF Water Engineering, LLC is the prime consultant upon execution of the Prime Agreement with the City of Meridian. For the purposes of this Agreement only, the use of the term Architect shall refer to SPF Water Engineering, LLC as the firm will bear all rights and responsibilities to perform the services provided herein per the terms and conditions of the Prime Agreement. Johnson Architects, PC is the Architect of Record for the project upon execution of Consultant Agreement with SPF Water Engineering, LLC. The Owner and Contractor agree as follows. ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. This document is intended to be used in conjunction with AIA Documents A232'TM-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; 8132^"-2009, Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition; and C132TM'-2009, Standard Form of Agreement Between Owner and Construction Manager as Adviser. AIA Document A232TM'--2009 is adopted in this document by reference. Do not use with other general conditions unless this document is modified. Init. AIA Document A132TM - 20D9 ~formeriy A101 TMCINa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible ! under the law. This document was produced by AIA software at 10:19:26 on 1 1/05I20i3 under Order No.1005957857 1 which expires on 01!1412014, and is not for resale. User Notes: (1315366167) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND 5UBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Bid Package #23 -Provide all labor, materials, tools and equipment necessary to complete the Plumbing in accordance with Project Plans, Specifications, Addendum No. 1, Addendum No. 2, Addendum No. 3 and the Bid Form for BP #23. Note: All required forms, information and insurances must be completed and submitted to Beniton Construction before commencement of any work including but not limited to the Request for Contract Information, MSDS, safety program, a list of suppliers and subcontractors, and any additional forms as requested in the specifications. Provide submittals electronically if available, or one {1) clean copy {able to scan); some exceptions may apply. Samples and color charts must be provided separately. Contractor shall provide (2) full size copies of approved shop drawings to Beniton. Contractor is responsible to pay all applicable taxes, which are included in the contract price. Contractor is required to provide three (3) hard copies and one (I }electronic copy of closeout information (O&M Manuals, Warranties, etc.) and one {1) complete set of Record Drawings, as requested prior to substantial completion. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Lfsert the date ofcannfencement, if it differs fi•an the date of this Agreenrerlt or, if applicable, state iha~ iJ~e date wiJ! be fixed in a notice to pl•oceed.) If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: Init. AIA Document A132T" - 2009 (formerly A107TM'CMa -1992). Copyright ©1975, 198{7, 7992 and 2009 by The American Institute of Architects. AU rights reserved. WARNING: This AIA Document is protected by U. S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible ~ under the law. This document was produced by AIA software at 10:19:215 on 11145!2013 under Order No.1005957857. 1 which expires on 011 1 41201 4, and is not for resale. User Notes: (131538fi167) NSA § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( )days from the date of commencement, or as follows: (Insert rltrmber of calendar dais. glter•natii~el}•, a calendar date naa)~ be used wllerl coordinated with the date of corrzmencemerat. If appropriate, insert requirenre-tts for earlier Srrbstanlial Complefiorr of ceryain porliorls of Nte Work.) Per Exhibit "C" Portion of tfte Work Substantial Completion Date BP #23 -Plumbing Lab Building -August 1, 2014 Admin Building September 19, 2014 , subject to adjustments of this Contract Tirne as provided in the Contract Documents. (Insert provisions, if any, fa• liquidated damages relathlg to failu! e to achieve Substa»tial Canpletiorr ot1 time ot• for bonus payments for early completion of the Wor•k.) Per Supplementary Conditions ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the following: (Check the appropriate box.) [ X ] Stipulated Sum, in accordance with Section 4.2 below [ ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below [ ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maxirnurn Price, in accordance with Section 4.4 below (Based on the selection above, complete Sec7ian 4.2, 4.3 or 4.4 below. Based orr the selec7iorl above, also complete either SectiorT 5.1.4, S. LS or 5.1.6 belo~+~.) § 4.2 Stipulated Sum § 4.2.1 The Stipulated Sum shall be Five Hundred Forty Three Thousand and No~ 100 Dollars ($ 543,000.00 }, subject to additions and deletions as provided in the Contract Documents. Breakdown is as follows: * New Administration Building & Operations Tenant ]mprovernent - $!93,000.00 * New Laboratory Building $350,000.00 § 4,2,2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers ar• other ider7tifrcatio~l of accepted alternates. If the bidding or proposal docarments permit the Owner to accept other alternates subsequent to the execution of this Agreenlent, attach a schedule of such outer alternates showing the amoanat for each and the date when that amount e~-pir•es.) N~'A § 4,2,3 Unit prices, if any: (Identif•1~ and state the omit price, and state the quantit~~ limitations, if ar?v, to x~hiclr the anrit price }till be applicable.) Ittlt. AIA Document A132T" - 2009 formerly A101 T"CMa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. Al] rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible ! under the law. This document was produced by AIA software at 10:19:26 on 11/05!2013 under Order No.1005957857 1 which expires on 0111 4 /20 1 4, and is not for resale. User Notes: (1315386167} Item NA Units and Limitations Price per Unit ($0,00) § 4.2.4 Allowances included in the Stipulated Sum, if any: (Identify allola~ance a+rd state exclusions, if a+ry, fi'an the a((olnance price.) Item NA Allowance § 4.3 Cost of the Work Plus Contractor's Fee without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 4.2) (Paragraph deleted) (Table deleted) (Paragraphs deleted) § 4,4 Cost of the Work Plus Contractor's Fee with a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Surn" contract (See Paragraph 4.2) (Paragraphs deleted) (Table deleted) (Paragraphs deleted) (Ta61e deleted) (Paragraphs deleted) ARTICLE 5 PAYMENTS § 5,1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Construction Manager by the Contractor, and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. § 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the 25th day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the Contractor not later than the 30th day of the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than sixty (60) days after the Construction Manager receives the Application for Payment. (Federal, state or IocaJ !alts may reguh•e payment ~•ithr+7 a certain period of thne.) § 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum § 5.1.4.1 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, unless objected to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of five percent ( 5 Init. A]A Document A132^' - 2009 4formerly A101 T"CMa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 10:19:26 on 11/0512013 under Order No.1005957857_1 which expires on 01!14!2014, and is not for resale. User Notes: (1315386167) °'o). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute maybe included as provided in Section 7.3.9 of the General Conditions; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location ageed upon in writing), less retainage of five percent (5 ° °); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions. § 5.1.4,4 The progress payment amount determined in accordance with Section 5.1.4,3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to ninety-five percent { 95 ° °) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete Work and unsettled claims; and .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions. § 3.1.4,5 Reduction or limitation of retainage, if any, shall be as follows: (If it is ilatended, prior to Substantia( Canpletion of the entire Wog k, to reduce or limit the retainage resulthlg from the pet centages inserted rn Sections 5.1.4.3. I and 5.1.4.3.2 above, and this is ~1ot explained elselt~here ira the Contract Documents, insert here provisions for such reduction or limitation.) NIA § 5.1.5 Progress Payments Where the Contract Sum is Based on the Gost of the Work without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 5.1.4) (Paragraphs deleted) § 5.1.6 Progress Payments Where the Contract Sum is Based on the Cost of the Work with a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract {See Paragraph 5.1.4) (Paragraphs deleted) § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Surn, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232-2009, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cost of the Work, pursuant to Exhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of t11e Work, with or without a Guaranteed Maximum payment; and .3 a final Certificate for Payment or Project Certificate for Payment 11as been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232 2009, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If the par7ies nvutuallt~ agree, insert the name, address and other caatact it formation of the blitial Decision Maker, if other thm~ the Architect.) AIA Document A132TM - 2009 formerly Al D1 T"CMa - 19921. Copyright ©1975, '1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible ~ under the law. This document was produced by AIA software at 10x9:26 on 11 Nbf20i3 under Order No.1005957857_1 which expires on 01l14~2014, and is not for resale. User Notes: (13153861671 § 8.2 Binding pispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section l 5.3 of AIA Document A232 2009, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the 01t•ner acrd Cattractor do not select a method of birzdirzg dispute resolution belola, or• do not subseguentl>> agree in x-viting to a binding dispute resolution method other than litigation, Claims will be resolved b1• litigation in a court of competent jurisdictiaz.) [ J Arbitration pursuant to Section l 5.4 of AIA Document A232-2009. [ X ] Litigation in a court of competent jurisdiction. [ ] Other: (Spec•if ~) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009. § 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232-2009. § 7.2 Where the Contract Sum is Based on the Cost of the Work with or without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 7.1) (Paragraphs deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from t11e date payment is due at t11e rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is 1 ocated. (Insert rate of interest agreed upon, if any.) Zero percent (0 °'o) § 8.3 The Owner's representative; (Name, address and other information) Beniton Construction Co., Inc. Bryce Parker P.O. Box 838 Meridian, ID 83680 § 8.4 The Contractor's representative: (Name, address and other i,formation) Lacy Mechanical $rent Lacy 9974 W. Fairview Ave. Boise, ID 83704 § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: Init. AIA Document A132T'" -1009 ~forrnerly A101 T"CMa -1991). Copyright GFi 1975, 198D, 1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AfA Document is protected by U. S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AfA~ Document, or any portion oT il, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible i under the law. This document was produced by AIA software at 10:19:26 on 11105/2013 under Order No.1005957857_t which expires on 01114!2014, and is not for resale. User Notes: (1315386167) NA ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document A132-2009, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. § 9,1.2 The General Conditions are, AIA Document A232 2009, Genera] Conditions of the Contract for Construction, Construction Manager as Adviser Edition. § 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, per attached Exhibit "A". (Table deleted) § 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Per Exhibit "A" (Table deleted) § 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Per Exhibit "B" (Table deleted) § 9,1.6 The Addenda, if any: Number Date Pages Per Exhibit "A" Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents are: .1 (Paragraphs deleted) Other documents, if any, listed below: (List here any additional doczunerrts 1t•hich are intended to form part of the Contract Documents. AIA Document A232-2009 provides that bidding requirements such as adi~ertisement or bn•itatior~ to bid. Instructions to Bidders, sample, forms a»d the Contractor's bid are not part of the Contract Docamzer7ls tnzless ernunerated in this Agreement. Tlrey shotr/d be listed here onli~ if intended to be part of the Contract Documents.) * Exhibit "I" and Sample Certificate -Insurance Requirements * Request for Contract Information * WH-5 Form * Affidavit Concerning Taxes * Application for Payment and Schedule of Values ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article l 1 of AIA Document A232--2009. (State bonding requirements, if any, and Iinuts ojliabilih• fol• insurance required itt Article 11 of AIA Docarnaent A231-2009.) Type of Insurance or Bond Limit of Liability or Bond Amount Insurance per attached Exhibit "I" Payment & Performance Bonds 100° o of the Contract Amount (see Supplementary AIA Document A132T° - 2009 `formerly A101 T" CMa -1992j. Copyright O 1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights init. reserved. WARNING: This AIA+ Document is protected by V.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extenE possible / under the law. This document was produced by AIA software at 10:19:26 on 11!05!2013 under Order No.1 D05957857. 1 which expires on 01!14/2014, and is not for resale. User Notes: (1315366167} Instructions to Bidders for delivery requirement) This Agreement is entered. into as of the day and year first written above. .~„-. ~. OWNER (Signat e C RAC R (Si ature _ ~+---- ~ fir. ., y _ _ _ ... (Printed me and title) (Printed name a d ti le) AIA Document A132T"' - 2009 formerly A101 T"'CMa -1992). Copyright ©1975,1980,1992 and 2009 by The American Institute of Architects. All rights Inst. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 8 this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible ~ under the law. This document was produced by AIA software at 10:19:26 on 11/0512013 under Order No.1005957857_1 which expires on 0111412014, and is not for resale. User Notes: (1315386167) CITY OF MERIDIAN WASTEWATER TREATMENT PLANT ADMIN., LAB 8~ CONTROL BUILDINGS PACKAGE EXHIBIT "A" SPECIFICATIONS & ADDENDA Invitation to Bid 1 Notice to Bidders 4 AIA A701 Instructions to Bidders 6 Supplementary Instructions to Bidders 4 Bid Forms Table of Contents 1 Bid Forms 51 Project Schedule 4 AIA A132 Standard Form of Agreement Between Owner and Contractor 8 Supplement to Agreement 2 AIA A232 General Conditions of the Contract 43 Supplementary Conditions 5 Exhibit I -Insurance Requirements & Sample Certificate 2 Contractor's Affidavit Concerning Taxes 1 Public Works Contract Tax Report (WH-5) 2 DIVISION 1 -GENERAL REQUIREMENTS 011000 Summary of Work 1 012900 Price and Payment Procedures 4 013100 Project Management and Coordination 4 013300 Submittal Procedures 2 Submittal Farm 1 014200 References 4 014500 Quality Control 4 015000 Temporary Facilities and Controls 9 016000 Product Requirements 2 FORM Substitution Request Farm 1 017300 Execution 6 017320 Cutting and Patching 3 017700 Closeout Procedures 4 O&M Instruction Form 1 DIVISION 2 -EXISTING CONDITIONS 024116 Structure Demolition 024119 Selective Demolition DIVISION 3 -CONCRETE 033000 Cast-In-Place Concrete 26 033510 Ground Concrete Finishing 3 DIVISION 4 -MASONRY 042000 Unit Masonry 8 042613 Masonry Veneer 14 Page 1 of 4 DIVISION 5 -METALS 051200 Structural Steel Framing 11 053100 Steel Decking 7 054000 Cold-Formed Metal Framing 12 054400 Cold-Formed Metal Trusses 6 055000 Metal Fabrications 13 055113 Metal Pan Stairs 9 055213 Pipe and Tube Railings 10 057313 Glazed Decorative Metal Railings 8 DIVISION 6 - WODDS, PLASTICS, AND COMPOSITES 061053 Miscellaneous Rough Carpentry 061600 Sheathing 064116 Plastic-Laminate-Faced Architectural Cabinets DIVISION 7 -THERMAL AND MOISTURE PROTECTION 072100 Thermallnsulation 8 072413 Cementitious Finish Over Exterior Insulation System 16 072414 Pre-Coated Foam Architectural Details 6 072500 Weather Barriers 3 072726 Fluid-Applied Membrane Air Barriers 10 074113.16 Standing-Seam Metal Roof Panels 12 074213.13 Formed Metal Wall Panels 10 074213.53 Metal Soffit Panels 9 075423 Thermoplastic Polyolefin (TPO) Roofing 14 076200 Sheet Metal Flashing and Trim 14 077200 Roof Accessories 9 078413 Penetration Firestopping 7 078446 Fire-Resistive Joint Systems 5 079200 Joint Sealants 11 079219 Acoustical Joint Sealants 4 VOLUME 2 OF 2 DIVISION 8 -OPENINGS 081113 Hollow Metal Doors and Frames 10 081125 Aluminum Frames 4 081416 Flush Wood Doors 8 083323 Overhead Coiling Doors 7 083326 Overhead Coiling Grilles 7 083483 Elevator Door Smoke Containment System 5 084113 Aluminum-Framed Entrances and Storefront 15 0$5113 Aluminum Windows 8 087100 Door Hardware 29 088000 Glazing 12 088300 Mirrors 6 089119 Fixed Louvers 7 Page 2 of 4 DIVISION 9 -FINISHES 092116.23 Gypsum Board Shaft Wall Assemblies 6 092216 Non-Structural Metal Framing 8 092900 Gypsum Board 12 093013 Ceramic Tiling 11 095113 Acoustical Panel Ceilings 10 095423 Linear Metal Ceilings 10 096513 Resilient Base and Accessories 6 096543 Linoleum Flooring 6 096723 Resinous Flooring 7 096813 Tile Carpeting 6 099110 Painting 10 DIVISION 10 -SPECIALTIES 101419 Dimensional Letter Signage 6 101423 Panel Signage 10 102113.13 Metal Toilet Compartments 7 102239 Folding Panel Partitions 10 102600 Wall and Door Protection 6 102800 Toilet, Bath, and Laundry Accessories 6 104413 Fire Protection Cabinets 5 104416 Fire Extinguishers 3 105113 Metal Lockers 9 107516 Ground-Set Flagpoles 3 DIVISION 11 -EQUIPMENT 115313 Laboratory Fume Hoods 14 DIVISION 12 -FURNISHINGS 122413 Roller Window Shades 6 123623.13 Plastic Laminate -Clad Countertops 6 123653 Laboratory Countertops 4 123661 Simulated Stone Countertops 3 129300 Site Furnishings 2 DIVISION 13 -SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 -CONVEYING EQUIPMENT 142400 Hydraulic Elevators 14 DIVISION 27 -FIRE SUPPRESSION 210000 Fire Suppression Page 3 of 4 DIVISION 22 -PLUMBING 220000 P{umbing General Requirements 7 220100 Plumbing 12 DIVISION 23 -HEATING VENTILATION AND AIR CONDITIONING 230000 HVAC General Requirement 9 230100 HVAC 74 230350 Laboratory Ventilation Control 16 230900 Instrumentation and Controls 10 DIVISION 26 -ELECTRICAL 260500 Electrical General Provisions 5 280501 Field Test and Operational Check 6 260502 Short-Circuit-Coordination Study-Arc F{ash Hazard Analysis $ 260519 Conductors and Cables 4 260526 Grounding 6 260533 Raceways and Boxes 9 260543 Underslab and Underground E{ectrical Work 2 260923 Lighting Control Devices 5 262416 Panelboards 7 262726 Wiring Devices 4 262815 Disconnect Switches 2 265100 Interior Lighting $ 266000 Electrical Demolition and Repair 2 271101 Telecom Raceway Systems 2 271500 Telecommunications Cabling 12 283111 Fire Alarm System 13 DIVISION 31 -EARTHWORK 311000 Site Clearing 7 312000 Earth Moving 17 312319 Dewatering 5 DIVISION 32 -EXTERIOR IMPROVEMENTS 321313 Concrete Paving 13 321373 Concrete Paving Joint Sealants 4 321400 Concrete Unit Paving 4 321500 Paver Pedestal System 7 321726 Tactile Warning Surfacing 4 328400 Planting Irrigation 13 329200 Turf and Grasses 4 329300 Plants 7 ADDENDA Addendum No. 1, dated 10/4/2013 27 Addendum No. 2, dated 10/9/2013 29 Addendum No. 3, dated 10/14/2013 41 Page 4 of 4 City of Meridian -Waste Water Treatment Plant improvements 3401 N. Ten Mife Road, Meridian, ID 83642 Exhibit "B" CONSTRUCTION DRAWINGS SHEET # DESCRIPTION DATED Admin A0.0 A0.0 Cover Sheet 09/09/2013 Admin A0.1 A0.1 Ener Com liance 09/09/2013 Admin A0.2A A0.2A Code Anal sis 09/09/2013 Admin A0.2B A0.2B Code Anal sis 09/09/2013 Admin A0.3A A0.3A Accessibili Access & Si na a Plan 09/09/2013 Admin A0.3B A0.3B Accessibili Access & Si na a Plan 09/09/2013 Admin A0.4A A0.4A Assemblies 09/09/2013 Admin A0.4B A0.4B Assemblies 09/09/2013 Admin A1.1 A1.1 Site Plan 09/09!2013 Admin A1.2 A1.2 Exterior Ram & Ste s 09/09/2013 Admin A1.3 A1.3 Site Details 09/09/2013 Admin A10.1 A10.1 Millwork Details 09!09/2013 Admin A10.2 A10.2 Millwork Details 09!09/2013 Admin A10.3 A10.3 Millwork Details 09/09/2013 Admin A2.1 A2.1 Floor Plan -First Level 09/09/2013 Admin A2.2 A2.2 Floor Plan -Second Level 09/09/2013 Admin A2.3 A2.3 Floor Plan -Third Level 09/09/2013 Admin A2.4 A2.4 Roof Plan 09/09/2013 Admin A3.1 A3.1 Door & Frame Schedule 09/09/2013 Admin A3.2 A3.2 Window Schedule 09/09!2013 Admin A3.3 A3.3 Fixture Schedule 09/09/2013 Admin A3.6 A3.6 Enlar ed Plans -Restrooms 09/09/2013 Admin A3.7 A3.7 Enlar ed Floor Plans -Stair #1 09!09/2013 Admin A3.8 A3.8 Enlar ed Plans -Stair #2 09!09/2013 Admin A4.1 A4.1 Finish Plan -First Level 10/04/2013 Admin A4.2 A4.2 Finish Plan -Second Level 10/04/2013 Admin A4.3 A4.3 Finish Plan -Third Level 09/09/2013 Admin A5.1 A5.1 Reflected Ceilin Plan -First Level 09/09/2013 Admin A5.2 A5.2 Reflected Ceilin Plan -Second Level 10/14/2013 Admin A5.3 A5.3 Reflected Ceilin Plan -Third Level 10/14/2013 Admin A6.1 A6.1 Exterior Elevations 09/09!2013 Admin A6.2 A6.2 Exterior Elevations 09/09!2013 Admin A7.1 A7.1 Buildin Sections 09/09/2013 Admin A7.2 A7.2 Buildin Sections 09!09/2013 Admin A7.3 A7.3 Buildin Sections 09!09/2013 Admin A7.6 A7.6 Stair Sections -Stair #1 09/09/2013 Admin A7.7 A7.7 Stair Sections -Stair #2 09/09/2013 Admin A8.1 A8.1 Interior Elevations -Restrooms 09/09/2013 Admin A8.2 A8.2 lnterior Elevations -Restrooms 09/09/2013 Admin A8.3 A8.3 Interior Elevations -Restrooms 09/09/2013 Admin A8.4 A8.4 Interior Elevations 09/09/2013 Admin A9.1 A9.1 Details 1-19 09/09/2013 Page 1 of 7 Admin A9.2 A9.2 Details 20-32 09/09/2013 Admin A9.3 A9.3 Details 33-51 09109!2013 Admin A9.4 A9.4 Details 52-71 09/09!2013 Admin A9.5 A9.5 Details 72-90 09!09!2013 Admin A9.6 A9.6 Details 91-160 09!09/2013 Admin A9.7 A9.7 Details 107-123 09/09/2013 Admin A9.8 A9.8 Details 124-140 09/09/2013 Admin E0.0 E0.0 Electrical Coversheet 09/09/2013 Admin E0.1 E0.1 Li htin Com liance Re ort 09/09/2013 Admin E1.0 E1.0 Electrical Site Plan 09/09/2013 Admin E2.1.1 E2.1.1 Fire Alarm Plan -First Floor 09/09/2013 Admin E2.1.2 E2.1.2 Li htin Plan -First Level 09/09/2013 Admin E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09/09/2013 Admin E2.1.4 E2.1.4 Power Plan -First Level 09/09/2013 Admin E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/09/2013 Admin E2.2.1 E2.2.1 Fire Alarm Plan -Second Level 09/09!2013 Admin E2.2.2 E2.2.2 Li htin Plan -Second Level 09109!2013 Admin E2.2.3 E2.2.3 Mechanical Power Plan -Second Level 09!09!2013 Admin E2.2.4 E2.2.4 Power Plan -Second Level 09!0912013 Admin E2.2.5 E2.2.5 S ecial S stems Plan -Second Level 09!09/2013 Admin E2.3.1 E2.3.1 Fire Alarm Plan -Third Level 09/09/2013 Admin E2.3.2 E2.3.2 Li htin Plan -Third Level 09/09/2013 Admin E2.3.3 E2.3.3 Mechanical Power Plan -Third Level 09/09/2013 Admin E2.3.4 E2.3.4 Power Plan -Third Level 09/09/2013 Admin E2.3.5 E2.3.5 S ecial S stems Plan -Third Level 09/09/2013 Admin E3.1 E3.1 Electrical Roof Plan 09/09/2013 Admin E4.1 E4.1 One-Line Dia ram 09/09/2013 Admin E5.1 E5.1 Electrical Schedules 09/09/2013 Admin E5.2 E5.2 Electrical Schedules 09/09/2013 Admin E6.1 E6.1 Electrical Details 09/09/2013 Admin L1.1 L1.1 Landsca a Plan 09109!2013 Admin L2.1 L2.1 Irra ation Plan 09!09!2013 Admin L2.2 L2.2 Irra ation Notes/Details 09!09!2013 Admin L2.3 L2.3 Irra ation Details 09!09/2013 Admin LG0.01 LG0.01 Structural Cover Sheet 10!02/2013 Admin LG0.02 LG0.02 Structural Desi n Notes 10!02/2013 Admin LG0.03 LG0.03 Structural Desi n Notes 10/02/2013 Admin LG1.01 LG1.01 Li ht Gau a Floor Plan 10/02/2013 Admin LG2.01 LG2.01 Elevations 10/02/2013 Admin LG2.02 LG2.02 Elevations 10/02/2013 Admin LG3.01 LG3.01 Sections 10/02/2013 Admin LG3.02 LG3.02 Sections 10/02/2013 Admin LG3.03 LG3.03 Sections 10!02/2013 Admin LG3.04 LG3.04 Sections 10/02/2013 Admin LG3.05 LG3.05 Sections 10/02/2013 Admin LG5.01 LG5.01 Exterior Li ht Gau e T ical Details 10/02/2013 Admin LG5.02 LG5.02 Exterior Li ht Gau e T ical Details 10/02/2013 Admin LG5.03 LG5.03 Exterior Li ht Gau e T ical Details 10102!2013 Page 2 of 7 Admin LG5.04 LG5.04 Exterior Li ht Gau e T ical Details 10102!2013 Admin M1.1 M1.1 HVAC Plan -First Level 09109!2013 Admin M1.2 M1.2 HVAC Plan -Second Level 09/09/2013 Admin M1.3 M1.3 HVAC Plan -Third Level 09!09/2013 Admin M1.4 M1.4 HVAC Plan -Roof 09!09/2013 Admin M2.1 M2.1 H dronic Plan -First Level 09/09/2013 Admin M2.2 M2.2 H dronic Plan -Second Level 09/09/2013 Admin M2.3 M2.3 H dronic Plan -Third Level 09/09/2013 Admin M3.1 M3.1 3D HVAC S stem 09/09/2013 Admin M4.1 M4.1 Pi in Schematic 09/09/2013 Admin M5.1 M5.1 Control Schematics 09/09/2013 Admin M5.2 M5.2 Controls Schematics 09/09/2013 Admin M6.1 M6.1 HVAC Details 09/09/2013 Admin M6.2 M6.2 HVAC Details 09109!2013 Admin M7.1 M7.1 HVAC Schedules 09109!2013 Admin M7.2 M7.2 HVAC Schedules 09/09/2013 Admin MC1.0 MC1.0 Mechanical Cover Sheet 09!09/2013 Admin MC1.1 MC1.1 Mechanical Comcheck 09!09/2013 Admin MC1.2 MC1.2 HVAC Zone Plans 09!09/2013 Admin P1.0 P1.0 Plumbin Plan -Foundation 09/09/2013 Admin P1.1 P1.1 Plumbin Plan -First Level 09/09/2013 Admin P1.2 P1.2 Plumbin Plan -Second Level 09/09/2013 Admin P1.3 P1.3 Plumbin Plan -Third Level 09/09/2013 Admin P2.1 P2.1 Plumbin Riser Dia rams 09/09/2013 Admin P3.1 P3.1 Plumbin Details 09/09/2013 Admin P4.1 P4.1 Plumbin Schedules 09/09/2013 Admin S0.01 S0.01 Structural Cover Sheet 10/02/2013 Admin S0.02 S0.02 Structural Desi n Notes 10102!2013 Admin S0.03 S0.03 Structural Desi n Notes 10102!2013 Admin S0.04 S0.04 Structural Desi n Notes 10!02/2013 Admin S0.05 S0.05 Structural Desi n Notes 10!02/2013 Admin S1.01 S1.01 Foundation Plan 10!02/2013 Admin S1.02 S1.02 Second Level Framin Plan 10/02/2013 Admin S1.03 S1.03 Low Roof Framin Plan 10/02/2013 Admin S1.04 S1.04 Third Level Framin Plan 10/02/2013 Admin S1.04A S1.04A Shearwall And Holddown Plan 10/02/2013 Admin S1.05 S1.05 Hi h Roof Framin Plan 10/02/2013 Admin S2.01 S2.01 Enlar ed Plans 10/02/2013 Admin S2.02 S2.02 Stair Framin T ical Details 10/02/2013 Admin S3.01 S3.01 Elevations 10/02/2013 Admin S3.51 S3.51 Brace Frame Schedules 10/02/2013 Admin S4.01 S4.01 Schedules 10/02/2013 Admin S4.02 S4.02 Schedules 10102!2013 Admin S5.01 S5.01 Foundation T ical Details 10/02/2013 Admin S5.02 S5.02 Foundation T ical Details 10!02/2013 Admin S5.03 S5.03 Concrete T ical Details 10!02/2013 Admin S5.21 S5.21 Structural Steel T ical Details 10!02/2013 Admin S5.22 S5.22 Structural Steel T ical Details 10/02/2013 Page 3 of 7 Admin S5.31 S5.31 Steel Stud T ical Details 10/02/2013 Admin S5.32 S5.32 Steel Stud T ical Details 10/02/2013 Admin S5.33 S5.33 Steel Stud T ical Details 10/02/2013 Admin S6.01 S6.01 Foundation Details 10/02/2013 Admin S6.02 S6.02 Foundation Details 10/02/2013 Admin S7.01 S7.01 Floor Framin Details 10/02/2013 Admin S7.02 S7.02 Floor Framin Details 10/02/2013 Admin S8.01 S8.01 Roof Framin Details 10/02/2013 Admin S8.02 S8.02 Roof Framin Details 10/02/2013 Controls A0.0 A0.0 Cover Sheet 09/09/2013 Controls A0.1 A0.1 Ener Com liance 09/09/2013 Controls A0.2 A0.2 Code Anal sis 09/09/2013 Controls A0.3 A0.3 Accessibilit Access & Si na a Plan 09/09/2013 Controls A0.4 A0.4 Assemblies 09!09/2013 Controls A10.1 A10.1 Millwork Details 09/09/2013 Controls A2.0 A2.0 Demolition Plan 09/09/2013 Controls A2.1 A2.1 Floor Plan 09/09/2013 Controls A3.1 A3.1 Schedules 09/09/2013 Controls A3.6 A3.6 Enlar ed Floor Plans 09/09/2013 Controls A4.1 A4.1 Finish Plan -First Level 09/09/2013 Controls A5.1 A5.1 Reflected Ceilin Plan 09/09/2013 Controls A8.1 A8.1 Interior Elevations 09/09/2013 Controls A8.2 A8.2 Interior Elevations 0 910 912 0 1 3 Controls A9.1 A9.1 Details 09/09/2013 Controls E0.0 E0.0 Electrical Cover Sheet 09/09!2013 Controls E1.1 E1.1 Electrical Demolition Plan 10/09/2013 Controls E2.1 E2.1 Fire Alarm Plan 09/09/2013 Controls E2.2 E2.2 Li htin Plan 09/09/2013 Controls E2.3 E2.3 Mechanical Power Plan 09!09/2013 Controls E2.4 E2.4 Power Plan 09!09/2013 Controls E2.5 E2.5 S ecial S stems Plan 10!0912013 Controls E3.1 E3.1 One-Line Dia ram/Electrical Details/Schedules 09/09/2013 Controls M1.1 M1.1 HVAC Demolition Plan 09/09/2013 Controls M2.1 M2.1 New HVAC Floor Plan 09/09/2013 Controls M3.1 M3.1 HVAC Details 09/09/2013 Controls M4.1 M4.1 HVAC Schedules 09/09/2013 Controls MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Controls P1.1 P1.1 Plumbin Demolition Plan 09/09/2013 Controls P2.1 P2.1 New Plumbin Floor Plan 09/09/2013 Controls P3.1 P3.1 Plumbin Schedules And Details 09/09/2013 Controls P4.1 P4.1 Plumbin Schedules And Details 09/09/2013 Lab A0.0 A0.0 Cover Sheet 09109!2013 Lab A0.1 A0.1 Ener Com liance 09/09!2013 Lab A0.2 A0.2 Code Anal sis 09/09/2013 Lab A0.3A A0.3A Accessibili Access & Si na a Plan 09/09/2013 Lab A0.3B A0.3B Accessibili Access & Si na a Plan 09/09/2013 Lab A0.4A A0.4A Assemblies 09!09/2013 Lab A0.4B A0.4B Assemblies 09!0912013 Page 4 of 7 Lab A1.1 A1.1 Site Plan 09/09/2013 Lab A10.1 A10.1 Millwork Details 09!09/2013 Lab A10.2 A10.2 Millwork Details 09!0912013 Lab A10.3 A10.3 Millwork Details 09!09/2013 Lab A2.1 A2.1 Floor Plan -First Level 09/09/2013 Lab A2.2 A2.2 Floor Plan -Second Level 09/09/2013 Lab A2.3 A2.3 Roof Plan 09/09/2013 Lab A3.1 A3.1 Door & Frame Schedule 09/09/2013 Lab A3.2 A3.2 Window Schedule 09/09/2013 Lab A3.3 A3.3 Fixture Schedule 09/09/2013 Lab A3.6 A3.6 Enlar ed Plans - Restrooms 09/09/2013 Lab A3.7 A3.7 Enlar ed Floor Plans -Stair #1 09/09!2013 Lab A3.8 A3.8 Enlar ed Floor Plans -Stair #2 09/09!2013 Lab A3.9 A3.9 Enlar ed Floor Plan -Lab 09109!2013 Lab A4.1 A4.1 Finish Plan -First Level 10!04/2013 Lab A4.2 A4.2 Finish Plan -Second Level 09!0912013 Lab A5.1 A5.1 Reflected Ceilin Plan -First Level 09!0912013 Lab A5.2 A5.2 Reflected Ceilin Plan -Second Level 09!09/2013 Lab A6.1 A6.1 Exterior Elevations 09/09/2013 Lab A6.2 A6.2 Exterior Elevations 09/09/2013 Lab A7.1 A7.1 Buildin Sections 09/09/2013 Lab A7.2 A7.2 Buildin Sections 09/09/2013 Lab A7.3 A7.3 Buildin Sections 09/09/2013 Lab A7.6 A7.6 Stair Sections -Stair #1 09/09/2013 Lab A7.7 A7.7 Stair Sections -Stair #2 09/09/2013 Lab A8.1 A8.1 lnterior Elevations 09/09!2013 Lab A8.2 A8.2 Interior Elevations 09/09/2013 Lab A8.3 A8.3 Interior Elevations 09/09/2013 Lab A8.4 A8.4 Interior Elevations 09!0912013 Lab A8.5 A8.5 Interior Elevations - Restrooms 09!09/2013 Lab A9.1 A9.1 Details 1-19 09!09/2013 Lab A9.2 A9.2 Details 20-32 09/09/2013 Lab A9.3 A9.3 Details 33-51 09/09/2013 Lab A9.4 A9.4 Details 52-71 09/09/2013 Lab A9.5 A9.5 Details 72-90 09/09/2013 Lab A9.6 A9.6 Details 91-105 09/09/2013 Lab A9.7 A9.7 Details 106-123 09/09/2013 Lab A9.8 A9.8 Details 124-140 09/09/2013 Lab E0.0 E0.0 Electrical Cover Sheet 09/09/2013 Lab E0.1 E0.1 Li htin Com liance Re ort 09/09!2013 Lab E1.0 E1.0 Electrical Site Plan 09/09!2013 Lab E2.1.1 E2.1.1 Fire Alarm Plan -First Level 09109!2013 Lab E2.1.2 E2.1.2 Li htin Plan -First Level 09!09/2013 Lab E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09!0912013 Lab E2.1.4 E2.1.4 Power Plan -First Level 09!09/2013 Lab E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/09/2013 Lab E2.2.1 E2.2.1 Fire Alarm Plan -Second Floor 09/09/2013 Lab E2.2.2 E2.2.2 Li htin Plan -Second Floor 09/09/2013 Page 5 of 7 Lab E2.2.3 E2.2.3 Mechanical Power Plan -Second Floor 09/09/2013 Lab E2.2.4 E2.2.4 Power Plan -Second Floor 09/09/2013 Lab E2.2.5 E2.2.5 S ecial S stems Plan -Second Floor 09/09/2013 Lab E3.1 E3.1 Electrical Roof Plan 09/09/2013 Lab E4.1 E4.1 One-Line Dia ram 09/09/2013 Lab E5.1 E5.1 Electrical Schedules 09/09/2013 Lab E6.1 E6.1 Electrical Details 09/09/2013 Lab L1.1 L1.1 Landsca a Plan 09/09!2013 Lab L2.1 L2.1 Landsca a Plan 09/09/2013 Lab L2.2 L2.2 Irri ation Details 09/09/2013 Lab M0.1 M0.1 HVAC Demolition Plan 09/09/2013 Lab M1.1 M1.1 HVAC Plan -First Level 09!09/2013 Lab M1.2 M1.2 HVAC Plan -Second Level 09!09/2013 Lab M1.3 M1.3 HVAC Roof Plan 09/09/2013 Lab M2.1 M2.1 H dronic Plan -First Level 09/09/2013 Lab M2.2 M2.2 H dronic Plan -Second Level 09/09/2013 Lab M3.1 M3.1 3D HVAC S stem 09/09/2013 Lab M4.1 M4.1 Mechanical Pi in Schematic 09/09/2013 Lab M5.1 M5.1 HVAC Controls 09/09/2013 Lab M5.2 M5.2 HVAC Controls 09/09/2013 Lab M5.3 M5.3 HVAC Controls 09/09/2013 Lab M5.4 M5.4 HVAC Controls 09/09/2013 Lab M5.5 M5.5 HVAC Controls 09/09/2013 Lab M5.6 M5.6 HVAC Controls 09/09!2013 Lab M5.7 M5.7 HVAC Controls 09109!2013 Lab M6.1 M6.1 HVAC Details 09/09/2013 Lab M6.2 M6.2 HVAC Details 09!0912013 Lab M6.3 M6.3 HVAC Details 09!09/2013 Lab M6.4 M6.4 HVAC Details 09!09/2013 Lab M7.1 M7.1 HVAC Schedules 09/09/2013 Lab M7.2 M7.2 HVAC Schedules 09/09/2013 Lab M7.3 M7.3 HVAC Schedules 09/09/2013 Lab M7.4 M7.4 HVAC Schedules 09/09/2013 Lab M7.5 M7.5 HVAC Schedules 09/09/2013 Lab MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Lab MC1.1 MC1.1 Mechanical COMCheck 09/09/2013 Lab P1.0 P1.0 Plumbin Plan -Foundation 09/09/2013 Lab P1.1 P1.1 Plumbin Plan -First Level 09/09/2013 Lab P1.2 P1.2 Plumbin Plan -Second Level 09/09/2013 Lab P3.1 P3.1 Plumbin Details 09/09!2013 Lab P4.1 P4.1 Plumbin Schedules 09/09!2013 Lab S0.01 S0.01 Structural Cover Sheet 10/02/2013 Lab S0.02 S0.02 Structural Desi n Notes 10/02/2013 Lab S0.03 S0.03 Structural Desi n Notes 10!0212013 Lab S0.04 S0.04 Structural Desi n Notes 10!0212013 Lab S0.05 S0.05 Structural Desi n Notes 10/02/2013 Lab S1.01 S1.01 Foundation Plan 10/02/2013 Lab S1.01A S1.01A First Floor Shearwall And Holdown Plan 10/02/2013 Page6of7 Lab S1.02 S1.02 Second Level & Lowwer Roof Framin 10/02/2013 Lab S1.02A S1.02A Second Level Shearwall & Holdown Plan 10/02/2013 Lab S1.03 S1.03 U er Roof Framin Plan 10/02/2013 Lab S2.01 S2.01 Enlar ed Plans 10/02/2013 Lab S2.02 S2.02 Stair Framin T ical Details 10/02/2013 Lab S4.01 S4.01 Schedules 10/02/2013 Lab S4.02 S4.02 Schedules 10/02/2013 Lab S5.01 S5.01 Foundation T ical Details 10/02/2013 Lab S5.02 S5.02 Foundation T ical Details 10102!2013 Lab S5.03 S5.03 Concrete T ical Details 10102!2013 Lab S5.21 S5.21 Structural Steel T ical Details 10/02/2013 Lab S5.22 S5.22 Structural Steel T ical Details 10/02/2013 Lab S5.23 S5.23 Structural Steel T ical Details 10/02/2013 Lab S5.31 S5.31 Steel Stud T ical Details 10!02/2013 Lab S5.32 S5.32 Steel Stud T ical Details 10/02/2013 Lab S5.33 S5.33 Steel Stud T ical Details 10/02/2013 Lab S5.34 S5.34 Steel Stud T ical Details 10/02/2013 Lab S6.01 S6.01 Foundation Details 10/02/2013 Lab S6.02 S6.02 Foundation Details 10102!2013 Lab S7.01 S7.01 Framin Details 10102!2013 Lab S7.02 S7.02 Framin Details 10/02/2013 Lab S7.03 S7.03 Framin Details 10/02/2013 Site A0.0 A0.0 Cover Sheet 08/19/2013 Site C1.1 C1.1 Construction Notes & Abbreviations 07!19/2013 Site C1.2 C1.2 Overall Site Plan And Le end 07/19/2013 Site C1.3 C1.3 Existin Conditions & Demo Plan -Lab Buildin 07/19/2013 Site C1.4 C1.4 Existin Conditions & Demo Plan -Admin. Buildin 07/19/2013 Site C2.1 C2.1 Dimensioned Site Plan -Lab Buildin 07/19/2013 Site C2.2 C2.2 Dimensioned Site Plan -Admin. Buildin 07119!2013 Site C3.1 C3.1 Gradin Plan -Lab Buildin 0 711 912 0 1 3 Site C3.2 C3.2 Gradin Plan -Lab Buildin 07/19/2013 Site C3.3 C3.3 Gradin Plan -Admin. Buildin 07/19/2013 Site C3.4 C3.4 Gradin Plan -Admin. Buildin 07!19/2013 Site C3.5 C3.5 Draina a Pond Details 07/19/2013 Site C4.1 C4.1 Utili Plan -Lab Buildin 07/19/2013 Site C4.2 C4.2 Utilit Plan -Admin. Buildin 07/19/2013 Site C5.1 C5.1 Civil Details 07/19/2013 Site C5.2 C5.2 Civil Details 07/19/2013 Site C5.3 C5.3 Civil Details 07/19/2013 Site ESC1 ESC1 SWPPP Site Ma 08119!2013 Site S1.01 S1.01 Lab Foundation Plan 08/19/2013 Site S1.02 S1.02 Admin. Foundation Plan 08/19/2013 Site V1.1 V1.1 Existin To o ra h -Lab Buildin 08/19/2013 Site V1.2 V1.2 Existin To o ra h -Admin. Buildin 08/19/2013 Page 7 of 7 N N o U - ~ y -1n CL N O ~ U .O N i~ w ~ ~ O S~ ~ ~ C~ v C m ~ ~_ '° , ~ 3 ~ C7 a ~ ~ ~ n U c m ~'? 0 ~ •c ~ ~ w p = a ~ as m o m ~- . O o `~ c ~ ~ r ~ V m a ~ U w o ~~ ° .-, o U ~ ', E ~ .S m c a E C N L cA ~- ----- --- -- ------- ---T us- r-- a- ~ F ar- ~- ---- ~- ~- w ^^^- U ~- vr-a r--'d~ ~-- --- ---- --- -- - -~- ~, • -- ~- -- -~- ~ +,, ~ ,, m ~ o O C ~ L m m a~ n- ~- U 'v - U C ~ m ~ ~,' ~ 7 O) c fn T °a U O ~ O ' C ' y ~ ~ C O U ~ ~ •¢ 3 c U ~ ~ ro m ~ 19 O ~ ro c m i ~ Z' ro O r °' o m ~ cn m d r r ~ c c N y ~ ¢ cv J > a a ~ m ~ ~ m ' ° n~ ~ ~ o w c ~ a a c ~ ° ~ 0 c~n O ~ o cn ,tf c m ~' m m oa - ~~ i D a ~ ~ ~ ~ ~ ~ o ~ ~ rn c ~ v7 ~ rn ^ o M ~ o f f ` - a -~- o y -E•- ---- z _ - ~ w Q__p}- ^ - 1- ~ •- 4- ~- - ~ `Rl- ~' -fsl- 3 -4i - --'- --- -- a -~- Q T r !j ~ ` -0, fl ~ ~ ` z c+~ ~ co ~. fir ~ c~ ^ a? r ~ w (n C7 ~ C7 o~ U C7 --- ---- - - - ~ -- - d V `d cv d c+i Q ~,~ co C7 CYJ a co ~,~ d a ~.,~ M C7 C7 C7 C7 c7 CO d d t0 T ~ d ~ ~ a ~ a~ v ~ >, ~ ro m ~ > o > 0 > 0 > T 0 ~ i, ro ~ > i~ o > 0 > 0 > o ~ m > o > o i, ro i, m j ~ ~ r o O • ~ m O - ~ •~^ O z z z z 0 ~ O z z z z ^ z z ~ ~ z r~ o ao ~ ~ ~ o ~n ao ~n ~ ao o + ~n co c~[ r~ r a ~ o c%~ ~n N C7 O N C'J r N O O O O r ( ) N ~ ~ N O r N O N a a a s a a a a s c~ co r co co r co c*) m d M co r io co Y co r co r c~ r cs r .a. d co Il • • m U a^ ~ O ~ O ~ Z ~ 0 r r 0 0 a ~ r a 0• T O Z Z z Z Z a ro ~ • o z d O ~ • C] Q) O d N N r O N CO f~ r Crl N frl m O O co O O CO T h N C'7 r m r d N CD T ~ O d O V N ~ 0 \ \ 0 0 ~ o v ° O o ~ o o ~ o ° O ~ o ~ ° o O \ O ~ o \° a ~ a ~ o ~ a ~ a \° o ~ v ~ 01 Ry O O O 0 0 r N O N N 0 0 O h O O O O O O O O O a• f+ V C ~ ~ O O O O N N Ln to N tfj M 1.C) ~ ~ ~ N ~ M M ~ M t1~ tl') O o v ~ N _ "v ai s I ro . ±+ ~ N m ~ ~ _ ~ U °~ a ~ ~' ~_ r aEi cQ1 a} 0 l11 W ~ ~ ~ RS E W 5 Q a Q ~ m °' .c ~ E 3 O cn a ~ o ' p ~ o f U o U ~ c ~' ~ ~f b ~ c m E I ~ '3 ¢ ~ m ~ 'I •~ ~ m ~ " m m ~E i a C '~ 4 m ro 'C E N N .0. 4_ O1 Y O rn CC -p ~ w ' ~^ d) C Q E C O7 c ~ m O: E Y Q w ro ~ ,c o c ro o ~ ~ U ~ ro 0 •N m e ~ o 0 0 o 'o c ~ m S ~ ~ 3 U _ ~ o m d -- m ~ m c 0. LL c U ~ ~ c m c _ m _ _ a~ m m o a i c ,~ ~ a p O . ~ o ~ . ~ ~~ a a a o~ ~ ~ ~ n °o ~ ~ , o o - ~ ~ ~ E E E E ~~ c cca ~ [C ro I rn J vi H a a ai E « = ° _ ~ ~ o °' Ol I E °' a m C OJ ;._. ~ ~ C C C ro ~ O j vZS N O I ~ O E O ~ Q n C Cy ~ ~ ~ U ~ /~, ro ~ ro o D : J ~ ~ ~ o^ ~ ~~ ^ m ~ 1 c ~ l c ( ~ ~ ro ~ c ~ W N Ul U) _ N ~ ~ O i O ' ^ W -O -O ~ ¢ C .O ~ _ ` A ~ m 41 ip ~ f4 `3 a c4 w A , ~ (1~ (n Ln f- C.~ ^ U~ J ^ (~ Q ~ ~, Q LL fn C~ m ~ Z a • c.7 W ~ ~ • • . O L Q , ~ ~ Y N d a ' . ~ ~ `'~ ~ ~ ~ o o_ o u~ o 0 0 0 , , o ~c O O lO cn v u7 • O O O O O M O d O ~ In O ~ CC O h ~ ~ ~ ' a ~ d sY a a a N N N ~ : C _ o 0 ° • ~ o o O o 0 0 0 0 ~ ~ C7 C7 C7 C7 C7 C7 C7 C7 C'3 ,Q} a ~ ~ 0 c°n o con ron ~ F C7 C7 C7 C7 C7 C7 C7 C7 • ~ ~ E ~ '`rs ~ • ~ ~ ~ ' • fn Q ~ • ~ • - --- - - -- - - O .r U - C V 3 N C C m d a s t/! V L /~ V U t W ~ a v1 o 4l ~ C7 C_ ro m (n ~ otS a C C ~ O ~+ m m e ° ` C .tq ~ X w ~ Q. n ~ t~ ~ ° ro D ~ cn G E `~ W w ~ 01 c a ~ C Ql O .C C ~ ~ a (7 c~ ~ .E c I m m M r :p rn j a ~¢ o ro t~ -o - __ •~ o -p_ ~ p ~ m m~ G w o c E c N ~~ ---- •C -?-- ---- U -~----- ~ ~- 0I ~ W -~3------~- ~ -~ ---- ~ ro -ta--~ O N -m--ti--- C E - -b- - (0 -~ ~ -~- U~ U ~ ~ t N O - -a--ro-- - ~-- -w- -L~-'~ -~- ~ ~ ro T y L a ~1 o LL Q Q ' ~ ~ O E ro U c -- t a n ~ ~ ~ w F m i t~ ° ~ m a~ >, O ~ ~ N ~ C D ~ J ~ V p0 ~ ~ (n Ql C fp ~ ~ c ro W o m ro ~~ ro ~ r 0 ~ u? o o c°a a °~ E j ~-rr-~-~---{=~ ' ° ~ °- ~ °~ a a d d m d c o rn `° m ~ ~ N ul •- - ~ `° ~ ° C7 ¢ c ~ ~° Y N N 0~5 ~ ' ~o --~ - -_~ .E ~-ro--t+--6f ~ CO ~ p ¢ a J ,~ N ~, 'O 67 ro ~ V ~ j w ~ r N N _ a ~ m ~~ t N ~ ~ a c o ^ m ~ a rn q' °_' ~ ~~ ~ O ro v ~ ,o E ~ ~ N cd C ~ LL N .~ ~ ~; rn r?n ~ J z 3' ~ ~ 'Z ~~ m~ a ro ~ i~ - a ~ 2 ~~ ~ - ---------------- ------- z ~ L ,~ ~, ro ~ ~° ; cn °O a o ~ r - ~ ~ ~ cn m ~ a~ a a' X m m . > ~, , ~ ._ m ~ 0 0 .-. c'~~ c =a w E~m_-~- ro _~i$~___ ~ ___________ 3 __ _ _ __- ___.-_-__- --___-___-___. ~___ ----------------------------- ~ CC _ _ ! r-r m________ __ __ _ __._ ('7 M > > 0 0 z z N h N N M > 0 z In N M > 0 z N r M r ~ O M M > o z V O M U m a V O ~ ~ n ¢ V N M ~ o z In r V' >' ro ~ CO r ~ V' ~^ m ro° ~ ¢ c7 V' N p M U m ~ c~ N M U m a I~ N ~ r ~ a n7 r ~ r ~ ~ cD •- '~. ~ r ~ ~ cf7 N V' r ~ LL cD O V r ~ ~ f~ N ~ r `m j~ cD O ~ r `m ~ +-- V r ~ c`a' ~ 'f~ N V r a ¢ O V' r a a 1~ r V t}' r r a a ¢ ¢ n N r N ~ r a ¢ O d' r a ¢ ap O [t ` n ¢ OD O ~ ~ ro ~ ~ O ¢ M M M M M , M M_ ~ _M ~ ~ M M M_ _M ~ ~ ~ V V ~ V' ~ ~ V' ~ V V ~ ~ > > > > {' T > T > T T U U U U i ~ i ~ ~ i ~ i ~ ~ i ~ i ~ r r 0 0 0 0 ~ ~ a Q o ro ro m m m m ~ ~ ~ ~ ~ a $ a o. Z Z Z Z O O Z ¢ Z ~ ~ D . ,~ ~ ~ ~ ~ a li ~ ~ ~ ;¢ ~ ~ ¢ ~ ~ ¢ ¢ v N N [D O l[7 O N (O O) • OS M i~ m O M O o h (O (O c7 1~ n ~ O V 0 O N N O N M N r •- O r O • O N N O N N N O O ~ O N N r O N ~ N 0 0 0 o ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a s o 0 o a o 0 o O ~ o o a ~ o a o 0 o a o 0 o a o 0 0 0 0 o a- o a a- a~ o 0 0 ~ 0 0 o a ~ o 0 0 0 0 0 o a o 0 0 0 0 0 0 o i o 0 0 0 0 0 0 0 ~ r M N M N l27 ~ M 6 l17 CO ~ O N ~ 1!'l ~ In ~ l!] lt] M ~ ~® ~ ~ ~ r M Qi 7 r .N- l17 O v G ~~ o J 41 ~ m m ~ ~ ~ m ~ m m ~ d ~ ~ ro LL ~ O ¢ N 7 ° a d ~ ~ O C - U !L O Q7 ~ O m 4,. m .c m U m ~ ~ °- -'' ~ °' ~a m~ ~ W U W ~ C (!J ~ F- m ~ N otI ~ E ~ N `~ w ~ ro p ~ Q7 ro 3 m o ro ~ ¢ ~ _N C N 'O O O U COJ Q) `7 W O ~ N N ~ U] a O C ~ ~ ~ ~ o ro rn N a m r a m ~ ro a ~ Z ~ >O ~ C ~ O C~ IC6 O7 N C m ~ O N m ¢ m ~ d o ~ ~ I E ~ ~ ~ ~ O) y C O L C C O O ~ L o y 'x ~ C o cn m ° c ~ a m ~; C ~ ~ C ~ C ro .C ~ y 01 m ~ o ° ro ~ m cn ~ 3° E ~ c7 O ~ LL ~ O ~ ~ ~ o C ~ a d a Y ~ W - a I ~ Q> cO C ~ O7 ~ ac o ° ~ E m 0 ~ ~ I.~ LL ° _ 'c o o I i E U ° ~ ° ~ ~ , a i ~ W c a ~ ~ W v - E a C E E ~ 07 N f4 (!~ ~ y O 01 n ~ 7 ~ L C E C ~ N C O7 ~ w d CC O C O C c O ~ O N ~ O 7 C ` i O ~ ro ~ ro N ~ dl t O c W N O m~ O ~ ~ s U « m ti n ~a m m a E c~ ~ w - w y v, m ~ w ~ U ~ n d Q L • I E C U ~ L d = ~ ° N ~ _ ~ _ ~ _ ~ ' Z o O in O N In N ~ M O ~ ~ t l!') t O ~ O O O ~ • J N O h O 00 O • O L!7 M O cr N ~ ~ a CD ~ CD • O O ~ O ~ O O f • O p ~ C O O O X ~ N N N N N ~ N N s N N M ~'`~ 0 0 O Cp ~ t O p O r O Q~ _ ' _ _ _ _ _ _ _ _ ~ •• N N N N " ( 7 c ') ' c ') M M M ~• ~ ~ ~ ~ ~~ ~ .c a U C7 C7 C'7 C7 C7 C`3 C7 C7 C7 C7 m C7 C7 C7 C7 C7 C 3 C'3 C'3 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 ~~ ~ as a ~ Q o ~ a C 0 V V U C O C m V ~+ V L 0 V /1 V ~+ W .~ 0 E ~ ~ m ~ ~ ~ . m .~ - ~ o- ~ ~ ~ ~ o to m ~~ o c E ~ U ~ E a ` ~ Q1 ~° ~ " ~ m U ° ~ ~ ~ M ~ a c ~ C3 ( 3 ~c ~ o o ~ o o :~ m ~ o ;~ C LL - ~ ~ O Q `- c r O O ¢ N 0_ ~ ~ - 0.1 v y O O t ~ w o~ C ~ i C t ~ m _ y O N _ ~~ ~--~- _ _ - - _ ~--Of N _ ~C C Q ~ ~ U tS3 - O jC U _ U U ISf O) ~ ~ ~ C U U ~ C C i - - r N C C O L1'~ ~ w U -O ` 41 ~ ~ ~ dl w L1J = ; -O ~ N ~ C o ~ Q ` US NT "j e m ar ; ?j ~ E ---- c (n ' ~ ~- r- Q7 ~--~ L a1 . ~ m v RS ti G g Q 01 s m ; ~ ~ ~ .~ ~ C ' a23 _ M .E , U ~; ~ LL o ~ ~ o ~ ~ € ~ ~ - -- Z ~ m ~ ozs m a ~ ------ - N x m -.1L i r ~ 0_ ~ ~ N 7 ~ 7 V C ~ V ~ 7 V 7 V 7 V 7 V 7 V ~ V 3 ~ N ~ f~ ~ ~ I~ N ~ (U • V V V U7 N d '`Y ~ ~ V' ~ Q tG d ~ ~ ~ ~ W f0 ~ a ~ LL ~ ~ ~ ¢ ~ ~ ~ ~ ~ ~ ~ cn ~ ~ ~ ~ LL ~ a ~ ¢ ~ Q ~ ~ ~ c%) ~ N N o N ch ~ o N ao N a O m N m N O v r t~ O ao N o (~7 ao O o~ O a r o~ O N o c~ ~ N r O o [`7 v cb o N •- r ~ o~ O O f ~ ~ ~' d ~' ~' V V V ~ ~ 'ct ~ ~ V ch .- M r ~ ~ ~ 7 V V T V' ~ ~' r 7 ~ ~ r ~ n ~ Q ~ tL ~ ~ ~ ~ ~ ~ 7 ~ 7 ~ 7 ? 7 ~ ~ ~ 7 7 7 ~ 7 7 U C] ~ ~ N O f~ ~ ~ ~ (C ~ ~ N O ~ LL LL ~ Q Q d N d Q ~ Q r d Q r d d Q Q ~ D1 ~ r O [7 r O C7 C7 +-- C7 .- tt ~ (D r fV O N O O N N 00 N C7 N Cr] N ~ O O N O V r • ~D O M O N r [r! 4 O Ch +- O O O r C7 O O r Q Ch 0 0 d~ d~ O O 0 3- O ~ a ~ o ~ 0 O ~ o ~ a ~ o ~ 0 O ~ 0 O ~ 0 O ~ 0 O ~ o ~ ~° a ~ o ~ 0 O o 8` O o ~ . o 3- o d~ O .. o o• ~ ~ ~ 0 0 0 \ ~ 0 o ~ ~ o Ol cp O O O O O O O O O O O O O O O O O p„ w O ~ I ~ O r ~ ~ ~ O (~7 ', fit] r OD lJ7 t~ UD O r L17 N O CO O VJ In l!] O tf1 ~!'1 O C O O ~ ~ - O O N N ~ r r r r , E ~ Z ~ C ~ m E ~ ~ ~ N L C C wC+ N ~ V! f9 N ~ N C N ~ C L UI N O ~ y O ~ ._ a - U N O Q N ~~ ~ C _ o~ 67 C N C ~ cn N m C7 C E ~ ~ ~ D w ' L .N N ~ ~ O ~ ~ ~ v c o • s m o ro ~ ~~ ~ C ~ ~ Y ~ cC ~ U LL ~ °7 ~ `~ a a U C Or ~ = L.L U ¢ C7 ` ~ in LL ~ °1 ~ w C m ~ c ro m ~ ~ a r c Q on ~ ~ aNi o c~a ~ m ~ ~ o ~ m ~ o ~ m E LL rn c n E c w ~ m G o o ~ O ~ a i ' ~ ° c ~ Q C7 • 7 ~ C7 ~ ~ ~ w o .Y ~ ~ ~ m c °~ a ~ ~ _ ~ cU ~ a _ m a i _ o o [C w? E W ' ~ t ~ ~ ~ m m ro o E c ~ ~ E ` `~ m ~ a~ ~ in m c ° cn o E . c a~ 2 6 w 0 ~ Q, c E O a c a C m U ~, a ~ Q N _ 6J > ~ ~ N ~ c N O U o C U LL f6 ~ d C ~ y ~ °' U ~ d 0 ~ ~ ~ ~ O _ LL ' 7 p ~ N ~ ~ C 7 _ ~ N fA ~ Q :: N d ¢ o$ °' ~ an U o o U o ca ro w o ~ ~, ~ E w a S a o ~ o 0 3~ C m c w ~ j g ~ = C - 3 °' ~ ` O C C (~ U ~ °1n °B w ~ CS ' ~ c . L :p C3 a2S ~ n ;~ E :B u , E o ~ ~ ~ '¢ c o o ~ 'a a ?- L ~ ~ E r E c 'L ~ c6 ~ ~~ 'c d N c t0 U C a U u. c0 m U w N w ~ 2 41 2 0` ~ _ K ~ w cC m ~ ~ a Ql in ~ ~ m` C 7 d ¢ U~ ;d m ~ QI J~ 00 -~ 0 o N C7 N ~n o N 0 p o r m r o N 0 c~ 0 ~ 0 47 o (D m CD Z ~ o O 0 N 0 c~ 0 CD „ u, o cn N C*~ V ~ o ~ o 0 o o N „ o a0 O O ,~ o -,S O O O ~ O O O O O O p O _ N c O O O r] O O O U ~ V ~ c~ c~ '~ CD c~ CD c~ (D c~ tD c7 (D c~ CD c~ tD c~ CO c7 [O c~ tp c~ (D ca CD ~ N ~ N t7 N c~ N c~ C7 t7 t7 c~ c7 ~ L[7 c~ ~ tfi LL~ c~ c~ c~ tf1 c~ V V c7 c7 ~ •C • 3 ~ ~ - - z - a ~ C 0 V 3 L V .~ Q~ Q~ ._ V N f+ V C V V ~_ W C .~ O c = T ~ ~ ^ ~ a ~ ~ Y ~ ~ ..Ci m ~ 1~ d ~~ O (!~ +~ ~ 67 ~ UJ ~i a rn n C Ul N N ~ ~ 'C ~ ~ ~ LL N ~ N O O ~t~~Y~~ M 0 N V Q Z ~ r Q a ~ ~ ~ T ~ ~ 6~ O ~ ~ T r ~ 7 ~~ O h C7 N ~ ~ ~ w 1~ N '~}' r ~ ~ ~ N d r 7 ~ ~ N V e1' ~ r 7 7 a~ ~ a ~ ~' r 7 ~ ~ N d r 7 ~ ~ C~ V V Q7 QS 7 7 a a ~ ~ r O V Q U m o~ O V V ~ QS Q r 7 Q1 U a cn O lfi ~ i~ N O N V d 47 m. l17 •- ~ ~ ~ U O h N V ~ ~ m ~ • N V I d Ql i m ~ ~ d N m O~ N d' Q N cn O~ N ~ d ~ m N N V d N m Q~ N V' d aJ m ~ N d. R ~ V ~ ' V ~ ~ ~ st C' V ~ V V V V V V ~ V ~_ ~ ~ a j~ f~ T ld a ~ [6 , ~ N ~ r ~ C r ,- r r_ Ol 7 al Q~ 0. 7 7 N Cl U7 ~ Q N Q QI d N d Q1 ~• O_ . N d N d N a ~ ~ ~ LL 7 "~ 7 ~ 7 ~ 7 ~ 7 ~ 7 ~ 7 7 ~ ~ a a a Cn (n ~ (n cn !A [IJ f!1 (n (n ~ O r O ~ O O M O N O N I~ O a r n N a r N C7 N lf7 N In r N U O ~ lI) W O ~ ~ O N r t!] N N N N ~ I ~ a` o o ~` a` o ° o ° a ° o o ° o ° a' a` o a o a` a` o N ~Q O O O O O O Q O p O O O Q Q O Q O O O O O O O O d N N ~ N® N N ~ O N O in O O O O O u7 ~ O ~,Oj ~ ~i l27 O O® ~ to ~ c td i C m V1 ~ ~ ~, L ~° N a ~ ~ N c ~ ~ ~ °' o ii pp m m E ~ w N ° 3 L ~ °~ _ ~ ~ ~ ~ - ~ U ~ ^ ~ o O) ~ ~ ~ .~. fd U ~ j N = d c E cn E - a ~ m ~ ~ ~ ~ ~~ [%~ ~ ~ p m a ~ ca o ~ ~' C7 ~ C7 ~ C7 ~ ~ > 'u. ~ ~ J ^ ~ c ~ N °' C .o ~E 7 ~ ~ ~ a ~ ~ ' a ~ U o ^ ~ c ~ i~ ~ a - .~ ~ E ~ w o ~ ~ c ~~ ~ ^ ' m ~ c > ~ ~ a3 H ~ U o 3 w ~ oo o ~ ~ U U ~ ~ . U r n ~ ~ ~ 7 ~ a~ a~ ~ ~ o o ~ o c ~ m H ~ a ~ U ~ m w w 2 2 ~ ^ m cn DC Z_ • 0 0 0 0 ~ m o 0 0 0 0 0 0 o m m a o ~ o ° c*~ ~ ~n n o o c*~ a ~ ca ~ ao rn rn o (g o o • o ~ a ~ o 0 v v 0 cD 0 cD 0 CD 0 cD 0 [D 0 cD 0 cD 0 c0 0 cD 0 cD 0 cD c0 Z 0 • U7 U C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C'3 C7 C7 C7 C7 }- m ^ , z H m C_ t .~ w `m c O 0 0 0 0 ~ o 0 °0 0 0 0 0 J J J IL N ~ ~ ~ d' H O O E E 7 `o O7 c 'c .~ m y ~ ~ 0 U V1 U x `o x ~ Q ~ .c c ~ E U N a ~ EXHIBIT "I" INSURANCE REQUIREMENTS FOR WORKING WITH BENITON CONSTRUCTION COMPANY AND CITY OF MERIDIAN Contractors and Subcontractors shall provide evidence that the following minimum coverage is provided. Commercial General Liability (ISO Form CG0001 (10101) or Equivalent) • $2,000,000 General Aggregate • $2,000,000 Products/Completed Operations Aggregate • $1,000,000 Each Occurrence • $1,000,000 Personal Injury and Advertising Injury • $ 100,000 Fire Damage Liability • $ 5,000 Medical Expenses -Each Person o Limits must be on a "Per Project Aggregate". o City of Meridian and Beniton Construction Company must be listed as additional insured (ISO Form CG2010 (11/85), or CG2010 (10101) and CG2037 (10101), or Equivalent). A copy of the endorsement adding Beniton Construction Company shall be included with the certificate of insurance. o Completed operations coverage will remain in effect for 2 years after project completion. Business Automobile Liability • $1,000,000 Each Occurrence Worker's Compensation and Employers Liability Insurance • Statutory Limits • Employers Liability o $100,000 Each Accident o $500,000 Policy Limits o $100,000 Each Employee Excess Liability $1,000,000 (An Umbrella policy may be used in combination with other policies to provide coverage specified) For Architects, Engineers, Surveyors, & Testing Firms: Professional Liability (Errors and Omissions) -Continued for Two (2) Years After Proiect Completio_n_ • $1,000,000 per claim and $2,000,000 aggregate for annual claims made coverage OR • $1,000,000 project coverage - Certificate of Insurance must be project specific. - Please provide written documentation in regards to your insurance contract(s) cancellation terms. - Insurance is to be Primary &Non-Contributory to any liability insurance carried by Beniton Construction Co., Inc. and City of Meridian. - Waiver of Subrogation applies in favor of Beniton Construction Co., Inc. and City of Meridian. ~~ ° CEI~T'IFIC~4TE ~F LIA-~ILITY INSURANCI~ ~ DATEIMMIDDrYYYY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORiVIATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE ROES Np7 AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CDNSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IAAPORTANT: If the certificate holder is an ADDITIONAL INSURED, iho policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditians of the policy, certain policies may require an endorsement A statement on this cert~cate does not confer rights to the certificate holder in lieu of such endorsement{sj. PRODUCER CONTACT NAME: PHONE F v_ Exil: 1 C Nod: Producer's name and address E~t+tAIL" _ INSURERtSI AFFORDING COVERAGE NAIC 0 _ __ INSURER A : Issuing Company: AM BEST AFB or Better , INSURED INSURER B , r.-~ INSURER C Subcontractor name and address INSURER D : i INSURER E: ~ .______l ___!~ COVERAGES CERTIFICATE NUMBER: REVJSI~N AJiIMF3ER• THIS IS TO CERTIFY THAT THE POLIC ES OF INSURANCE LISTED BELO'.N HAVE BEEN ISSUED TO THE INSURED NF "S; D ~~L" . - FpR TkE ICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRAST OR DTHER DOCUMFTIT VYtTH j(£SIrCT TO WHICH THIS CERTIFICATE NIAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POI,tCI6 S DESCR(BEO HEREIN 'S SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE SEEN REDUCED B,Y *T1D CLAIMS. INSR ADOL SUER ~ POLICY EFF' -pOCICY EXP TR TYPE OF INSURANCE ~ ~ ~,~ POLICY NUMBER ~ MMlpt,. _ ~M4WF~(YYr~ LIMITS - - GENERAL LIAaILITY EACH qi:t,'t~IRENCE S 1 OOD ODO x COM1IMFR IA G NERA I A81 TY ~ r-- ~' -DAMJ~£TG REMED S ~ j X i X N,pR~AI$~S (Ea occunrincnf 10O,DD~ CLAMS-MADE x OCCUP ~ ~ME4-EXP (Any oroa pcrscnl 5 1D.DDD Current policy # 09/01/2(111 09/D112012 sRSeNAL s ADV NJURY s 1 DOOAOD GENERALAGGREGATE : 2,OOD,D00 1 GEN L AGGREGATE ltd' APPL ES PER f PRODUCTS - COMPIOP AGG 5 Z,000,DOO PO ICY X PRO- OC --^ S I AUTOM081LE LJABILITY ~ l~ ~_ -ei}='v,~ VG;e LI I ~ S 1,D~~ DQ Ea awdent X ANY AU O aODILY INJURY {Par par9on) 5 ALL OVsvCD SCI DVLEO AUTOS AUTOS ~-, , I NJN-0vtwED `AUR el11 ~~ # ,y~' {)97tH /2011 90DlLY INJURY (~Cr aCO dCnI 5 09101/2012 ~-piiO~caTY DAMAG HIREDA S E S O AUT05 Pei aCCidenA )( UMBRELLA UAB X OCCUP, ~ ~ ~ EACH OCCURRENCE 5 1 DOD ODD ~- EXCESS LIAR CLAIMS-MAOEd f Current poI1LX # 09!0112011 0910VZ012 AGGREGATE 1,DD0,000 , j DED RETEN7 ON 5 '_ WORKERS COMPENSATION `S =L~T~ OE H• OC l! I AND EMPLOYERS' LIABILITY Y I N ' ~ S -~ AIJY PROPRIE70RiPARTNEWEXEC'JTIVE )/~nt pOTtL'~l* D9/D1/2D11 R 09/D1/2D12 E L EACH AGC D`NT 5 ',DDD,DDD ~ OPFICEOdGA18CR EXCLU7ED7 ^ N I tMantlatvry in NHI ( E L DISEASE EA EMP_OYEc S ,ODQ ODD I! yes, tlescnbc under 1 r ~ E L D15 EASE • PO_ CY LIM T 5 ~ ,000,ODO I -- - I ~ - .-t i i DESCRIPTION OP OPERA710NS``GLQt.~TtONS 1 VEHICLES (Alfa ch ACORD 101, Addltltlnal RamaTks Schetlule, It moB apaoe Ic nAulredJ Re: City of Meridian Waste Water ~'reatment Plant improvements. City of Meridian and Beniton Construction are listed as Additional Insured pL~r the Cgmmercial General Liability coverage on a primary and non- contributory basis regarding above project provided by form CG2D1D 10101 and CG2D37 10/01 (or equivalent). Waiver of Subrogation applies in favor of the Beniton Construction Company Inc and owner (except WC) f`FRTlFIf'ATF 41fT1 f1FR relurl=1 I ennr~ SHOULD ANY OF THE ABOVE DESCRIED POLICIES $E CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Beniton Construction Company, InC. ACCORDANCE WITH THE POLICY PROVISIONS. P.O. Box 838 AUTHORIZED REPRESENTATIVE Meridian, ID 83684 Original Signature ACORD 25 (2010145) ~~ 1988-2010 ACORD CORPORATION. All rights reserved. The ACORt7 name and logo are registered marks of ACORD