Loading...
HomeMy WebLinkAboutAIA Agreement with Designer Floors for WWTP Admin Bldg and Lab Designa r = Document A~32T~ - 2009 Standard Form of Agreement Between Owner and Contractor,Construcfion Manager as Adviser Edition AGREEMENT made as of the 1st day of November in the year 2013 (hz ti+~a•ds, i,zdicate day, month and year.) BETWEEN the Owner: (Name, legal status, address and other nzfo,~natiaz) City of Meridian 33 E. Broadway Meridian, ID 83642 and the Contractor: (Name, legal staters, address and other infa-znatiozr) Designer Floors, Inc. 1400 Front Street Boise, ID 83702 for the following Project: (Name, locatiaz a,zd detailed desc,•iption) City of Meridian Waste Water Treatment Plant Improvements 3401 N. Ten Mile Raad Meridian, ID 83642 The Construction Manager: (Name, legal status, address and other information) Beniton Construction Co., Inc. P.O. Box 838 Meridian, ID 83680 The Architect: (Name, legal status, address and other information) SPF Water Engineering LLC 300 E. Mallard Drive, Suite 350 Boise, ID 83706 For the purposes of this Agreement, the term Engineer and Architect may be used interchangeably. SPF Water Engineering, LLC is the prime consultant upon execution of the Prime Agreement with the City of Meridian. For the purposes of this Agreement only, the use of the teml Architect shall refer to SPF Water Engineering, LLC as the firm will bear all rights and responsibilities to perform the services provided herein per the terms and conditions of the Prime Agreement. Johnson Architects, PC is the Architect of Record for the project upon execution of Consultant Agreement with SPF Water Engineering, LLC. The Owner and Contractor agree as follows. ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. This document is intended to be used in conjunction with AIA Documents A232'TM-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; 6132'T"-2009, Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition; and C132T"'-2009, Standard Form of Agreement Between Owner and Construction Manager as Adviser. AIA Document A232TM'-2009 is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA Document A132T° - 2009 formerly A101 T"'CMa -1892). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible i under the law. This document was produced by AIA software at 09:57:14 on 11/OSI2013 under Order No.1005957857_1 which expires on 01i14Y2014, and is not forresaie. User Notes: (1684302387) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE Z THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Bid Package #IS -Provide all labor, materials, tools and equipment necessary to complete the Floor Covering in accordance with Project Plans, Specifications, Addendum No. 1, Addendum No. 2, Addendum No. 3 and the Bid Form for BP # 15. Note: All required forms, information and insurances must be completed and submitted to Beniton Construction before commencement of any work including but not limited to the Request for Contract Information, MSDS, safety program, a list of suppliers and subcontractors, and any additional forms as requested in the specifications. Provide submittals electronically if available, or one (1) clean copy (able to scan); some exceptions may apply. Samples and cal or charts must be provided separately. Contractor shall provide (2) full size copies of approved shop drawings to Beniton. Contractor is responsible to pay all applicable taxes, which are included in the contract price. Contractor is required to provide three (3) hard copies and one (1) electronic copy of closeout information (O&M Manuals, Warranties, etc.) and one (I) complete set of Record Drawings, as requested prior to substantial completion. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date ofconamenceaateaat, if it d ffeas,fi•om the date of this Agreement or, if applicable, state that tlae date will be fired in a notice to proc•eed.) If, prior to the commencement of the Work, the Owner requires time to fife mortgages, mechanics' liens and other security interests, the Owner's time requirement shall be as follows: AIA Document A132T" - 2009 formerly A181 TMCMa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. A!I rights Inlt, reserved. WARNING: This AIA Document is protected by U. S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under fhe law. This document was produced by AtA software at 09:57:14 on 11105!2013 under Order No.1005957857_ 1 which expires on 01I14I2014, and is not forresa'e. User Notes: (1684302387) ~ wa § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than ( )days from the date of commencement, or as follows: (htser•t number of calendar- days. Alternativeh•, a calendar date ma>• be zrsed irhen coordinated wit{t the date of commencement. If appr•opr•iate, insert r•eguirements for earlier Szrbstantial Completion of cer7airr portions of the Wor•k.) Per lxhibit "C" Portion of the Work Substantial Completion Date BP #15 - Floor Covering Lab Building -August I, 2014 Admin Building -September 19, 2014 subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if an}•, for liquidated damages relating to faihu•e to achieve Substantial Con:pletiort on time or• for bonus pcr}~ments for early completion of the Wor•k.) Per Supplementary Conditions ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the following: (CJteck the appropriate bor.) [ X ] Stipulated Sum, in accordance with Section 4.2 below [ ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4,3 below [ ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below (Based on the selection above, complete Section 4.2, 4.3 or 4.4 belolr. Based ora the selection above, also complete either Sectiar 5.1.4, 5.1.5 or 5.1.6 6elox•.) § 4.2 Stipulated Sum § 4.2.1 The Stipulated Sum shall be Ninety Four Thousand Five Hundred and No ] 00 Dollars ($ 94,500.00 ), subject to additions and deletions as provided in the Contract Documents. Breakdown is as follows: * New Administration Building & Operations Tenant Improvement - $71,650.00 * New Laboratory Building $22,850.00 § 4.2.2 The Stipulated Sum is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alter~7ates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such outer alternates showing the amount for each and the date when that amount expires.) NSA § 4,2.3 Unit prices, if any: (Identij5~ andstate the unitprice, and state the quaruin~ limitations, ifatry, to which the unitprice tit•i/l be applicable.) AIA Document A132TM - 2009 formerly A101TMCMa - 19921. Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights 11111. reserved. WARNING: This AIA Document is protected by U. S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent passible t under the law. This document was produced by AIA software at 14:17:25 on 11 /05!2013 under Order No.1005957857 1 which expires on 01/14!2014, and is not for resale. User Notes: (1446211896) Item NA Units and Limitations Price per Unit ($D.DD) § 4.2.4 Allowances included in the Stipulated Sum, if any: (Iderttifi~ allolrance acrd state exclusioi7s, if aia)~, fi•an the allolaa»ce price.) Item NA Allowance § 4.3 Cost of the Work Plus Contractor's Fee without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 4.2) (Paragraph deleted) (Table deleted) (Paragraphs deleted) § 4.4 Cost of the Work Plus Contractor's Fee with a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 4.2) (Paragraphs deleted) (Table deleted) (Paragraphs deleted) (Table deleted) (Paragraphs deleted/ ARTICLE 5 PAYMENTS § 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Construction Manager by the Contractor, and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as proe ided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. § 5.1.3 Provided that an Application for Payment is received by the Construction Manager not later than the 25th day of a month, the Owner shall make payment of the certified amount in the Application for Payment to the Contractor not later than the 30th day of the following month. If an Application for Payment is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner not later than sixty (60) days after the Construction Manager receives the Application for Payment. {Federal, state a• local lax~s naai• require pat•rneirJ x•ithirr a certain period of tirlte.) § 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum § 5.1.4.1 Each Application for Fayment shall be based on the most recent schedule ofvalues submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Construction Manager and Architect may require. This schedule, unless objected to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of five percent ( 5 Init. AIA Document A132TM - 2009 ~tormerly A101 TMCMa - 1992). Copyright ©1975, 1960, 1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U. S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA'~ Document, ar any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. Thls document was produced by AIA software at 09:57:14 on 11!05!2013 under Order No.1005957857 1 which expires on 01!1412014, and is not for resale. User Notes: (1684302387) °o). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 7.3.9 of the General Conditions; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored offthe site at a location agreed upon in writing), less retainage of five percent (5 ° o); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Construction Manager or Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions. § 5,1.4.4 The progress payment amount deterntined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to ninety-five percent (95 ° o) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines far incomplete Work and unsettled claims; and .2 Add, if final completion of the Work is thereafter materially delayed through no fault of fire Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions. § 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows: (If it rs inteaaded, prior to Sirbstantia! Caaapletion of tlae entire Work, to reduce or limit tlae retainage resulting fi•ona the percentages insea7ed in Sectiaas 5.1.4.3.1 and 5.1.4.3.? abore, and this is not explaiated elsewhere ita t/ae Coaatract Docume»ts, insert here prorisiaas for such redtrctiaa or limitation.) NIA § 5.1.5 Progress Payments Where the Contract Sum is Based on the Gost of the Work without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 5.1.4) (Paragraphs deleted) § 5.1.6 Progress Payments Where the Contract Sum is Based on the Cost of the Work with a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 5.1.4) (Paragraphs deleted) § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except far the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232 2009, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cast of the Work, pursuant to exhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a final Certificate far Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6.1 Initial Decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232 2009, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If the paa7ies mutually agree, insert the name, address and other caatact infa•mation of the Initial Decision Maker, if atlaer Haan tlae Architect) Init, AIA Document A132T" - 2009 4formerly A101 "'CMa -1992). Copyright C~J 1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.5. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA` Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. Thls document was produced by AIA software at 09:57:14 on 11!0512013 under Order No.1005957857 1 which expires on 01/14!2014, and is not for resale. User Notes: (1664302387) § 8.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section ] 5.3 of AIA Document A232 -2009, the method of binding dispute resolution shall be as follows: (Check the app,•opriate bor. If the l~+~rer and Contractor do not select a method of binding dispute resolution belox~, or do not sn6seguently agree in t~n•iting to a binding dispute resohrtion method ot{7er than litigation, Gaims will be resolved bP litigation in a court of canpetent jtn•isdictio,r.) [ ] Arbitration pursuant to Section 15.4 of AIA Daeurnent A232 2009 [ X ] Litigation in a court of competent jurisdiction. [ ] Other: (Specif ARTICLE 7 TERM1NATfON OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009. § 7.1.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A232-2009. § 7.2 Where the Contract Sum is Based on the Cost of the Work with or without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 7.1) (Par•ag,•aplrs deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if ar?v.) Zero percent (0 °~o) § 8.3 The Owner's representative: (Name, address and other it for,natiortl Beniton Construction Co., Inc. Bryce Parker P.O. Box 838 Meridian, ID 83680 § 8.4 The Contractor's representative: (Name, address and other ir~formatio,r) Designer Floors, Inc. Tyler Brown 1400 Front Street Boise, ID 83702 § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: Init. AIA Document A132T*' - 2009 (formerly A141T°CMa -1992). Copyright O 1975, 1980, 1992 and 2DD9 by The American Institute of Architects. A!I rights reserved. WARNING: This AIA' Document is protected by U. S. Copyright l_aw and International Treaties. Unauthorized reproduction ar distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. Thls document was produced by AIA software at 09:57:14 on i 1!0512013 under Order No.1005957857 1 which expires on 01114!2014, and is not for resa'e. User Notes: (1684342387) NA ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9,1.1 The Agreement is this executed AIA Document A132-2009, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. § 9.1.2 The General Conditions are, AIA Document A232-2009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition. § 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, per attached Exhibit "A". (Table deleted) § 9.1.4 The Specifications: (Either list the Specifrcations her e or refer to art exhibit attached to this Agreement.) Per Exhibit "A" (Table deleted) § 9.1.5 The Drawings: (Either list the Drawings here or• refer to an exhibit attached to this Agreenrerrt.) Per Exhibit "B" (Table deleted) § 9.1.6 The Addenda, if any: Number Date Pages Per Exhibit "A" Portions of Addenda relating to bidding requirements are nat part of fire Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.T Additional documents, if any, farming part of the Contract Documents are: .1 (Par•agr•aphs deleted) Other documents, if any, listed below: (List here any additional documents trhich are intended to form part of the Contract Documents. AI,4 Document A232-2009 provides t{rat bidding requirements such as adre•+•tisement or im~itatiorr to bid. Inst+zrctions to Bidders, sample. farms and the Contractor's bid are Trot part of the Contract Docurments unless ernnnerated in this Agreement. The>> should be listed here only if nrtended to be part of the Contract Docun7errts.) * Exhibit "I" and Sample Certificate Insurance Requirements * Request for Contract Information * WH-5 Form * Affidavit Concerning Taxes * Application for Payment and Schedule of Values ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 1 ] of AIA Document A232--2009. (State bonding requrire+nents, if anl~, and limits of liabilitt~ for insurance regutired in Article I1 of AIA Doctmrent A23 2-2009.) Type of Insurance or Bond Limit of Liability or Bond Amount Insurance per attached Exhibit "I" Payment & Performance Bonds 100°,0 of the Contract Amount (see Supplementary AIA Document A132TM - 2009 ~formeriy A101 T" CMa -1992). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Irtlt. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction ordislribulion of this AIA' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 09:57:14 on 11!05!2013 under Order No.1005957857_1 which expires on 01114!2014, and is not for resa'e. User Notes: (1684302387) I Instructions to Bidders for delivery requirement) This Agreement is entered into as of the day and year first written above. ~~~~~ ~'" ,. OWNER (Signa ~r TRACTOR (Signature) ..~- Tyler Brown,. Vice President (Printed na and title) (Printed name and title) RCE-2303 Inlt. AIA Document A132T"" - 2009 formerly A101 T""CMa -1992). Copyright ©1975,1980,1992 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIAR Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of 8 this AIA` Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible ~ under the law. This document was produced by AIA software at 09:57:14 on 11/05/2013 under Order No.1005957857_1 which expires on 0111412014, and is not for resale. User Notes: (1684302387) CITY OF MERIDIAN WASTEWATER TREATMENT PLANT ADMIN., LAB ~ CONTROL BUILDINGS PACKAGE EXHIBIT "A" SPECIFICATIONS & ADDENDA Invitation to Bid Notice to Bidders AIA A701 Instructions to Bidders Supplementary Instructions to Bidders Bid Forms Table of Contents Bid Forms Project Schedule AIA A132 Standard Form of Agreement Between Owner and Contractor Supplement to Agreement AIA A232 General Conditions of the Contract Supplementary Conditions Exhibit I -Insurance Requirements & Sample Certificate Contractor's Affidavit Concerning Taxes Public Works Contract Tax Report (WH-5) DIVISION 1 -GENERAL REQUIREMENTS 011000 Summary of Work 012900 Price and Payment Procedures 013100 Project Management and Coordination 013300 Submittal Procedures Submittal Form 014200 References 014500 Quality Control 015000 Temporary Facilities and Controls 016000 Product Requirements FORM Substitution Request Form 017300 Execution 017320 Cutting and Patching 017700 Closeout Procedures O&M Instruction Form DIVISION 2 -EXISTING CONDITIONS 024116 Structure Demolition 024119 Selective Demolition DIVISION 3 -CONCRETE 033000 Cast-In-Place Concrete 033510 Ground Concrete Finishing DIVISION 4 -MASONRY 042000 Unit Masonry 042613 Masonry Veneer 51 4 8 2 43 5 2 1 2 4 4 2 1 4 4 9 2 1 6 3 4 8 8 26 3 8 14 Page 1 of 4 DIVISION 5 -METALS 051200 Structural Steel Framing 11 053100 Steel Decking 7 054000 Cold-Formed Metal Framing 12 054400 Cold-Formed Metal Trusses 6 055000 Metal Fabrications 13 055113 Metal Pan Stairs 9 055213 Pipe and Tube Railings 10 057313 Glazed Decorative Metal Railings 8 DIVISION 6 -WOODS, PLASTICS, AND COMPOSITES 061053 Miscellaneous Rough Carpentry 8 061600 Sheathing 8 064116 Plastic-Laminate-Faced Architectural Cabinets 7 DIVISION 7 -THERMAL AND MOISTURE PROTECTION 072100 Thermallnsulation 8 072413 Cementitious Finish Over Exterior Insulation System 16 072414 Pre-Coated Foam Architectural Details 6 072500 Weather Barriers 3 072726 Fluid-Applied Membrane Air Barriers 10 074113.16 Standing-Seam Metal Roof Panels 12 074213.13 Formed Metal Wall Panels 10 074213.53 Metal Soffit Panels 9 075423 Thermoplastic Polyolefin (TPO) Roofing 14 076200 Sheet Metal Flashing and Trim 14 077200 Roof Accessories 9 078413 Penetration Firestopping 7 078446 Fire-Resistive Joint Systems 5 079200 Joint Sealants 11 079219 Acoustical Joint Sealants 4 VOLUME 2 OF 2 DIVISION 8 -OPENINGS 081113 Hallow Metal Doors and Frames 081125 Aluminum Frames 081416 Flush Wood Doors 083323 Overhead Coiling Doors 083326 Overhead Coiling Grilles 083483 Elevator Door Smoke Containment System 084113 Aluminum-Framed Entrances and Storefront 085113 Aluminum Windows 087100 Door Hardware 088000 Glazing 088300 Mirrors 089119 Fixed Louvers 10 5 15 8 29 12 6 7 Page 2 of 4 DIVISION 9 -FINISHES 092116.23 Gypsum Board Shaft Wall Assemblies 6 092216 Non-Structural Metal Framing 8 092900 Gypsum Board 12 093013 Ceramic Tiling 11 095113 Acoustical Panel Ceilings 10 095423 Linear Metal Ceilings 10 096513 Resilient Base and Accessories 6 096543 Linoleum Flooring 6 096723 Resinous Flooring 7 096813 Tile Carpeting 6 099110 Painting 10 DIVISION 10 -SPECIALTIES 101419 Dimensional Letter Signage 6 101423 Panel Signage 10 102113.13 Metal Toilet Compartments 7 102239 Folding Panel Partitions 10 102600 Wall and Door Protection 6 102800 Toilet, Bath, and Laundry Accessories 6 104413 Fire Protection Cabinets 5 104416 Fire Extinguishers 3 105113 Metal Lockers 9 107516 Ground-Set Flagpoles 3 DIVISION 11 -EQUIPMENT 115313 Laboratory Fume Hoods 14 DIVISION 12 -FURNISHINGS 122413 Roller Window Shades 123623.13 Plastic Laminate -Clad Countertops 123653 Laboratory Countertops 123661 Simulated Stone Countertops 129300 Site Furnishings DIVISION 13 -SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 -CONVEYING EQUIPMENT 142400 Hydraulic Elevators 14 DIVISION 21 -FIRE SUPPRESSION 210000 Fire Suppression Page 3 of 4 DIVISION 22 -PLUMBING 220000 Plumbing General Requirements 7 220100 Plumbing 12 DIVISION 23 -HEATING VENTILATION AND AIR CONDITIONING 230000 HVAC Generaf Requirement 9 230100 HVAC 74 230350 Laboratory Ventilation Control 16 230900 Instrumentation and Controls 10 DIVISION 26 -ELECTRICAL 260500 Electrical Generaf Provisions 5 260501 Field Test and Operational Check 6 260502 Short-Circuit-Coordination Study-Arc Flash Hazard Analysis 8 260519 Conductors and Cables 4 260526 Grounding 6 260533 Raceways and Boxes 9 260543 Underslab and Underground Electrical Work Z 260923 Lighting Control Devices 5 262416 Panelboards 7 262726 Wiring Devices 4 262815 Disconnect Switches 2 265100 interior Lighting 8 266000 Electrical Demolition and Repair 2 271101 Telecom Raceway Systems 2 271500 Telecommunications Cabling 12 283111 Fire Alarm System 13 DIVISION 31 -EARTHWORK 311000 Site Clearing 7 312000 Earth Moving 17 312319 Dewatering 5 DIVISION 32 -EXTERIOR IMPROVEMENTS 321313 Concrete Paving 13 321373 Concrete Paving Joint Sealants 4 321400 Concrete Unit Paving 4 321500 Paver Pedestal System 7 321726 Tactile Warning Surfacing 4 328400 Planting Irrigation 13 329200 Turf and Grasses 4 329300 Plants 7 ADDENDA Addendum No. 1, dated 10/4/2013 27 Addendum No. 2, dated 10/9/2013 29 Addendum No. 3, dated 10/14/2013 41 Page 4 of 4 City of Meridian -Waste Water Treatment Plant Improvements 3401 N. Ten Mile Road, Meridian, ID 83642 Exhibit "B" CONSTRUCTION DRAWINGS SHEET # DESCRIPTION DATED Admin A0.0 A0.0 Cover Sheet 09/09/2013 Admin A0.1 A0.1 Ener Com liance 09/09/2013 Admin A0.2A A0.2A Code Anal sis 09/09/2013 Admin A0.2B A0.2B Code Anal sis 09/09/2013 Admin A0.3A A0.3A Accessibili Access & Si na a Plan 09/09/2013 Admin A0.3B A0.3B Accessibili Access & Si na a Plan 09/09/2013 Admin A0.4A A0.4A Assemblies 09/09/2013 Admin A0.4B A0.4B Assemblies 09/09/2013 Admin A1.1 A1.1 Site Plan 09/09/2013 Admin A1.2 A1.2 Exterior Ram & Ste s 09/09/2013 Admin A1.3 A1.3 Site Details 09/09/2013 Admin A10.1 A10.1 Millwork Details 09/09/2013 Admin A10.2 A10.2 Millwork Details 09/09/2013 Admin A10.3 A10.3 Millwork Details 09/09/2013 Admin A2.1 A2.1 Floor Plan -First Level 09/09/2013 Admin A2.2 A2.2 Floor Plan -Second Level 09/09/2013 Admin A2.3 A2.3 Floor Plan -Third Level 09/09/2013 Admin A2.4 A2.4 Roof Plan 09/09/2013 Admin A3.1 A3.1 Door & Frame Schedule 09/09!2013 Admin A3.2 A3.2 Window Schedule 09/09/2013 Admin A3.3 A3.3 Fixture Schedule 09/09/2013 Admin A3.6 A3.6 En[ar ed Plans -Restrooms 09/09/2013 Admin A3.7 A3.7 Enlar ed Floor Plans -Stair #1 09/09/2013 Admin A3.8 A3.8 En1ar ed Plans -Stair #2 09/09/2013 Admin A4.1 A4.1 Finish Plan -First Level 10/04/2013 Admin A4.2 A4.2 Finish Plan -Second Level 10/04/2013 Admin A4.3 A4.3 Finish Plan -Third Level 09/09/2013 Admin A5.1 A5.1 Reflected Ceilin Plan -First Level 09/09/2013 Admin A5.2 A5.2 Reflected Ceilin Plan -Second Level 10/14/2013 Admin A5.3 A5.3 Reflected Ceilin Plan -Third Level 10/14/2013 Admin A6.1 A6.1 Exterior Elevations 09/09/2013 Admin A6.2 A6.2 Exterior Elevations 09/09/2013 Admin A7.1 A7.1 Buildin Sections 09/09/2013 Admin A7.2 A7.2 Buildin Sections 09/09/2013 Admin A7.3 A7.3 Buildin Sections 09/09/2013 Admin A7.6 A7.6 Stair Sections -Stair #1 09/09/2013 Admin A7.7 A7.7 Stair Sections -Stair #2 09/09/2013 Admin A8.1 A8.1 Interior Elevations -Restrooms 09/09/2013 Admin A8.2 A8.2 Interior Elevations -Restrooms 09/09/2013 Admin A8.3 A8.3 Interior Elevations -Restrooms 09/09/2013 Admin A8.4 A8.4 Interior Elevations 09/09/2013 Admin A9.1 A9.1 Details 1-19 09/09/2013 Page 1 of 7 Admin A9.2 A9.2 Details 20-32 09/09/2013 Admin A9.3 A9.3 Details 33-51 09/09/2013 Admin A9.4 A9.4 Details 52-71 09/09/2013 Admin A9.5 A9.5 Details 72-90 09/09/2013 Admin A9.6 A9.6 Details 91-160 09/09/2013 Admin A9.7 A9.7 Details 107-123 09!09/2013 Admin A9.8 A9.8 Details 124-140 09/09/2013 Admin E0.0 E0.0 Electrical Coversheet 09/09/2013 Admin E0.1 E0.1 Li htin Com liance Re ort 09/09/2013 Admin E1.0 E1.0 Electrical Site Plan 09/09/2013 Admin E2.1.1 E2.1.1 Fire Alarm Plan -First Floor 09/09/2013 Admin E2.1.2 E2.1.2 Li htin Plan -First Level 09/09/2013 Admin E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09/09/2013 Admin E2.1.4 E2.1.4 Power Plan -First Level 09/09/2013 Admin E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/09/2013 Admin E2.2.1 E2.2.1 Fire Alarm Plan -Second Level 09/09/2013 Admin E2.2.2 E2.2.2 Li htin Plan -Second Level 09/09/2013 Admin E2.2.3 E2.2.3 Mechanical Power Plan -Second Level 09/09/2013 Admin E2.2.4 E2.2.4 Power Plan -Second Level 09/09/2013 Admin E2.2.5 E2.2.5 S ecial S stems Plan -Second Level 09/09/2013 Admin E2.3.1 E2.3.1 Fire Alarm Plan -Third Level 09/09/2013 Admin E2.3.2 E2.3.2 Li htin Plan -Third Level 09/09/2013 Admin E2.3.3 E2.3.3 Mechanical Power Plan -Third Level 09/09/2013 Admin E2.3.4 E2.3.4 Power Plan -Third Level 09/09!2013 Admin E2.3.5 E2.3.5 S ecial S stems Plan -Third Level 09/09/2013 Admin E3.1 E3.1 Electrical Roof Plan 09/09!2013 Admin E4.1 E4.1 One-Line Dia ram 09/09/2013 Admin E5.1 E5.1 Electrical Schedules 09/09/2013 Admin E5.2 E5.2 Electrical Schedules 09/09/2013 Admin E6.1 E6.1 Electrical Details 09/09/2013 Admin L1.1 L1.1 Landsca a Plan 09/09/2013 Admin L2.1 L2.1 Irra ation Plan 09/09/2013 Admin L2.2 L2.2 Irra ation Notes/Details 09/09/2013 Admin L2.3 L2.3 Irra ation Details 09!09/2013 Admin LG0.01 LG0.01 Structural Cover Sheet 10/02/2013 Admin LG0.02 LG0.02 Structural Desi n Notes 10/02/2013 Admin LG0.03 LG0.03 Structural Desi n Notes 10/02/2013 Admin LG1.01 LG1.01 Li ht Gau a Floor Plan 10/02/2013 Admin LG2.01 LG2.01 Elevations 10/02/2013 Admin LG2.02 LG2.02 Elevations 10/02/2013 Admin LG3.01 LG3.01 Sections 10/02/2013 Admin LG3.02 LG3.02 Sections 10/02/2013 Admin LG3.03 LG3.03 Sections 10/02/2013 Admin LG3.04 LG3.04 Sections 10/02/2013 Admin LG3.05 LG3.05 Sections 10/02/2013 Admin LG5.01 LG5.01 Exterior Li ht Gau e T ical Details 10/02/2013 Admin LG5.02 LG5.02 Exterior Li ht Gau e T ical Details 10/02/2013 Admin LG5.03 LG5.03 Exterior Li ht Gau e T ical Details 10/02/2013 Page 2 of 7 Admin LG5.04 LG5.04 Exterior Li ht Gau e T ica/ Details 10/02/2013 Admin M1.1 M1.1 HVAC Plan -First Level 0 910 912 0 1 3 Admin M1.2 M1.2 HVAC Plan -Second Level 09/09/2013 Admin M1.3 M1.3 HVAC Plan -Third Level 09/09/2013 Admin M1.4 M1.4 HVAC Plan -Roof 09/09/2013 Admin M2.1 M2.1 H dronic Plan -First Level 09/09!2013 Admin M2.2 M2.2 H dronic Plan -Second Level 09/09/2013 Admin M2.3 M2.3 H dronic Plan -Third Level 09/09/2013 Admin M3.1 M3.1 3D HVAC S stem 09/09/2013 Admin M4.1 M4.1 Pi in Schematic 09/09/2013 Admin M5.1 M5.1 Control Schematics 09/09/2013 Admin M5.2 M5.2 Controls Schematics 09/09/2013 Admin M6.1 M6.1 HVAC Details 09!09/2013 Admin M6.2 M6.2 HVAC Details 09/09/2013 Admin M7.1 M7.1 HVAC Schedules 09/09/2013 Admin M7.2 M7.2 HVAC Schedules 09/09/2013 Admin MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Admin MC1.1 MC1.1 Mechanical Comcheck 09/09/2013 Admin MC1.2 MC1.2 HVAC Zone Plans 09/09/2013 Admin P1.0 P1.0 Plumbin Plan -Foundation 09/09/2013 Admin P1.1 P1.1 Plumbin Plan -First Level 09/09/2013 Admin P1.2 P1.2 Plumbin Plan -Second Level 09/09/2013 Admin P1.3 P1.3 Plumbin Plan -Third Level 09/09/2013 Admin P2.1 P2.1 Plumbin Riser Dia rams 09/09/2013 Admin P3.1 P3.1 Plumbin Details 09/09/2013 Admin P4.1 P4.1 Plumbin Schedules 09/09/2013 Admin S0.01 S0.01 Structural Cover Sheet 10/02/2013 Admin S0.02 S0.02 Structural Desi n Notes 10/02/2013 Admin S0.03 S0.03 Structural Desi n Notes 10/02!2013 Admin S0.04 S0.04 Structural Desi n Notes 10/02/2013 Admin S0.05 S0.05 Structural Desi n Notes 10/02/2013 Admin S1.01 S1.01 Foundation Plan 10/02!2013 Admin S1.02 S1.02 Second Level Framin Plan 10/02/2013 Admin S1.03 S1.03 Low Roof Framin Plan 10/02/2013 Admin S1.04 S1.04 Third Level Framin Plan 10/02/2013 Admin S1.04A S1.04A Shearwall And Holddown Plan 10/02/2013 Admin S1.05 S1.05 Hi h Roof Framin Plan 10/02/2013 Admin S2.01 S2.01 Enlar ed Plans 10/02/2013 Admin S2.02 S2.02 Stair Framin T ica/ Details 10/02/2013 Admin S3.01 S3.01 Elevations 10/02/2013 Admin S3.51 S3.51 Brace Frame Schedules 10/02/2013 Admin S4.01 54.01 Schedules 10/02/2013 Admin S4.02 S4.02 Schedules 10/02/2013 Admin S5.01 S5.01 Foundation T ica/ Details 10/02/2013 Admin S5.02 S5.02 Foundation T ica! Details 10/02/2013 Admin S5.03 S5.03 Concrete T ica/ Details 10/02/2013 Admin S5.21 S5.21 Structural Steel T ica/ Details 10/02/2013 Admin S5.22 S5.22 Structural Steel T ica/ Details 10/02/2013 Page 3 of 7 Admin S5.31 S5.31 Steel Stud T ical Details 10/02/2013 Admin S5.32 S5.32 Steel Stud T ical Details 10/02/2013 Admin S5.33 S5.33 Steel Stud T ical Details 10/02/2013 Admin S6.01 S6.01 Foundation Details 1 0/02120 1 3 Admin S6.02 S6.02 Foundation Details 10/02/2013 Admin S7.01 S7.01 Floor Framin Details 10/02!2013 Admin S7.02 S7.02 Floor Framin Details 10/02/2013 Admin S8.01 S8.01 Roof Framin Details 10/02/2013 Admin S8.02 S8.02 Roof Framin Details 10/02/2013 Controls A0.0 A0.0 Cover Sheet 09/09/2013 Controls A0.1 A0.1 Ener Com liance 09/09/2013 Controls A0.2 A0.2 Code Anal sis 09/09/2013 Controls A0.3 A0.3 Accessibili Access & Si na a Plan 09!09/2013 Controls A0.4 A0.4 Assemblies 09/09/2013 Controls A10.1 A10.1 Millwork Details 09/09/2013 Controls A2.0 A2.0 Demolition Plan 09/09/2013 Controls A2.1 A2.1 Floor Plan 09/09/2013 Controls A3.1 A3.1 Schedules 09/09/2013 Controls A3.6 A3.6 Enlar ed Floor Plans 09/09/2013 Controls A4.1 A4.1 Finish Plan -First Level 09/09/2013 Controls A5.1 A5.1 Reflected Ceilin Plan 09/09/2013 Controls A8.1 A8.1 Interior Elevations 09/09/2013 Controls A8.2 A8.2 Interior Elevations 09/09/2013 Controls A9.1 A9.1 Details 09/09/2013 Controls E0.0 E0.0 Electrical Cover Sheet 09/09/2013 Controls E1.1 E1.1 Electrical Demolition Plan 10/09/2013 Controls E2.1 E2.1 Fire Alarm Plan 09/09/2013 Controls E2.2 E2.2 Li htin Plan 09/09/2013 Controls E2.3 E2.3 Mechanical Power Plan 09/09/2013 Controls E2.4 E2.4 Power Plan 09/09/2013 Controls E2.5 E2.5 S ecial S stems Plan 10/09/2013 Controls E3.1 E3.1 One-Line Dia ram/Electrical Details/Schedules 09/09/2013 Controls M1.1 M1.1 HVAC Demolition Plan 09/09/2013 Controls M2.1 M2.1 New HVAC Floor Plan 09/09/2013 Controls M3.1 M3.1 HVAC Details 09/09/2013 Controls M4.1 M4.1 HVAC Schedules 09/09/2013 Controls MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Controls P1.1 P1.1 Plumbin Demolition Plan 09/09/2013 Controls P2.1 P2.1 New Plumbin Floor Plan 09/09/2013 Controls P3.1 P3.1 Plumbin Schedules And Details 09/09/2013 Controls P4.1 P4.1 Plumbin Schedules And Details 09/09/2013 Lab A0.0 A0.0 Cover Sheet 09/09/2013 Lab A0.1 A0.1 Ener Com liance 09/09/2013 Lab A0.2 A0.2 Code Anal sis 09/09/2013 Lab A0.3A A0.3A Accessibili Access & Si na a Plan 09/09/2013 Lab A0.3B A0.3B Accessibili Access & Si na a Plan 09/09!2013 Lab A0.4A A0.4A Assemblies 09/09/2013 Lab A0.4B A0.46 Assemblies 09/09/2013 Page 4 of 7 Lab A1.1 A1.1 Site Plan 09/09/2013 Lab A10.1 A10.1 Millwork Details 09/09/2013 Lab A10.2 A10.2 Millwork Details 09/09/2013 Lab A10.3 A10.3 Millwork Details 09/09/2013 Lab A2.1 A2.1 Floor Plan -First Level 09/09/2013 Lab A2.2 A2.2 Floor Plan -Second Level 09/09/2013 Lab A2.3 A2.3 Roof Plan 09/09!2013 Lab A3.1 A3.1 Door & Frame Schedule 09109!2013 Lab A3.2 A3.2 Window Schedule 09/09/2013 Lab A3.3 A3.3 Fixture Schedule 09/09/2013 Lab A3.6 A3.6 Enlar ed Plans -Restrooms 09/09/2013 Lab A3.7 A3.7 Enlar ed Floor Plans -Stair #1 09/09/2013 Lab A3.8 A3.8 Enlar ed Floor Plans -Stair #2 09!09/2013 Lab A3.9 A3.9 Enlar ed Floor Plan -Lab 09/09/2013 Lab A4.1 A4.1 Finish Plan -First Level 10/04/2013 Lab A4.2 A4.2 Finish Plan -Second Level 09/09/2013 Lab A5.1 A5.1 Reflected Ceilin Plan -First Level 09/09/2013 Lab A5.2 A5.2 Reflected Ceilin Plan -Second Level 09/09/2013 Lab A6.1 A6.1 Exterior Elevations 09/09/2013 Lab A6.2 A6.2 Exterior Elevations 09/09/2013 Lab A7.1 A7.1 Buildin Sections 09/09/2013 Lab A7.2 A7,2 Buildin Sections 09/09/2013 Lab A7.3 A7.3 Buildin Sections 09/09/2013 Lab A7.6 A7.6 Stair Sections -Stair #1 09/09/2013 Lab A7.7 A7.7 Stair Sections -Stair #2 09/09/2013 Lab A8.1 A8.1 interior Elevations 09/09/2013 Lab A8.2 A8.2 Interior Elevations 09/09/2013 Lab A8.3 A8.3 Interior Elevations 09/09/2013 Lab A8.4 A8.4 Interior Elevations 09!09/2013 Lab A8.5 A8.5 Interior Elevations -Restrooms 09/09/2013 Lab A9.1 A9.1 Details 1-19 09/09/2013 Lab A9.2 A9.2 Details 20-32 09/09/2013 Lab A9.3 A9.3 Details 33-51 09/09/2013 Lab A9.4 A9.4 Details 52-71 09/09/2013 Lab A9.5 A9.5 Details 72-90 09/09/2013 Lab A9.6 A9.6 Details 91-105 09/09/2013 Lab A9.7 A9.7 Details 106-123 09/09/2013 Lab A9.8 A9.8 Details 124-140 09/09/2013 Lab E0.0 E0.0 Electrical Cover Sheet 09/09/2013 Lab E0.1 E0.1 Li htin Com liance Re ort 09/09/2013 Lab E1.0 E1.0 Electrical Site Plan 09/09/2013 Lab E2.1.1 E2.1.1 Fire Alarm Plan -First Level 09/09/2013 Lab E2.1.2 E2.1.2 Li htin Plan -First Level 09/09!2013 Lab E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09/09/2013 Lab E2.1.4 E2.1,4 Power Plan -First Level 09/09/2013 Lab E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/09/2013 Lab E2.2.1 E2.2.1 Fire Alarm Plan -Second Floor 09/09/2013 Lab E2.2.2 E2.2.2 Li htin Plan -Second Floor 09!09/2013 Page 5 of 7 Lab E2.2.3 E2.2.3 Mechanical Power Plan -Second Floor 09/09/2013 Lab E2.2.4 E2.2.4 Power Plan -Second Floor 09/09/2013 Lab E2.2.5 E2.2.5 S ecial S stems Plan -Second Floor 09/09/2013 Lab E3.1 E3.1 Electrical Roof Plan 09/09/2013 Lab E4.1 E4.1 One-Line Dia ram D9/09I2013 Lab E5.1 E5.1 Electrical Schedules 09/09/2013 Lab E6.1 E6.1 Electrical Details 09/09/2013 Lab L1.1 L1.1 Landsca a Plan 09/09/2013 Lab L2.1 L2.1 Landsca a Plan 09/09/2013 Lab L2.2 L2.2 lrri ation Details 09/09/2013 Lab M0.1 M0.1 HVAC Demolition Plan 09/09/2013 Lab M1.1 M1.1 HVAC Plan -First Level 09/09/2013 Lab M1.2 M1.2 HVAC Plan -Second Level 09/09/2013 Lab M1.3 M1.3 HVAC Roof Plan 09/09/2013 Lab M2.1 M2.1 H dronic Plan -First Level D9/09/2013 Lab M2.2 M2.2 H dronic Plan -Second Level 09/09/2013 Lab M3.1 M3.1 3D HVAC S stem 09/09/2013 Lab M4.1 M4.1 Mechanical Pi in Schematic 09/09/2013 Lab M5.1 M5.1 HVAC Controls 09/09/2013 Lab M5.2 M5.2 HVAC Controls 09/09/2013 Lab M5.3 M5.3 HVAC Controls 09/09/2013 Lab M5.4 M5.4 HVAC Controls 09/09/2013 Lab M5.5 M5.5 HVAC Controls 09/09/2013 Lab M5.6 M5.6 HVAC Controls 09/09/2013 Lab M5.7 M5.7 HVAC Controls 09/09/2013 Lab M6.1 M6.1 HVAC Details 09/09/2013 Lab M6.2 M6.2 HVAC Details 09/09/2013 Lab M6.3 M6.3 HVAC Details 09/09/2013 Lab M6.4 M6.4 HVAC Details 09/09/2013 Lab M7.1 M7.1 HVAC Schedules 09!09/2013 Lab M7.2 M7.2 HVAC Schedules 09/09/2013 Lab M7.3 M7.3 HVAC Schedules 09/09/2013 Lab M7.4 M7.4 HVAC Schedules 09/09/2013 Lab M7.5 M7.5 HVAC Schedules 09/09/2013 Lab MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Lab MC1.1 MC1.1 Mechanical COMCheck 09/09/2013 Lab P1.0 P1.0 Plumbin Plan -Foundation 09/09/2013 Lab P1.1 P1.1 Plumbin Plan -First Level 09/09/2013 Lab P1.2 P1.2 Plumbin Plan -Second Level 09/09/2013 Lab P3.1 P3.1 Plumbin Details 09/09/2013 Lab P4.1 P4.1 Plumbin Schedules 09/09/2013 Lab S0.01 S0.01 Structural Cover Sheet 10/02/2013 Lab S0.02 S0.02 Structural Desi n Notes 10/02/2013 Lab S0.03 S0.03 Structural Desi n Notes 10/02/2013 Lab S0.04 S0.04 Structural Desi n Notes 10/02/2013 Lab S0.05 S0.05 Structural Desi n Notes 10/02/2D13 Lab S1.01 S1.01 Foundation Plan 10/02/2013 Lab S1.01A S1.01A First Floor Shearwall And Holdown Plan 10/02/2013 Page 6 of 7 Lab S1.02 S1.02 Second Level & Lowwer Roof Framin 10/02/2013 Lab S1.02A S1.02A Second Level Shearwall & Holdown Plan 10102!2013 Lab S1.03 S1.03 U er Roof Framin Plan 10/02/2013 Lab S2.01 S2.01 Enlar ed Plans 10/02/2013 Lab S2.02 S2.02 Stair Framin T ical Details 10/02/2013 Lab S4.01 S4.01 Schedules 10/02/2013 Lab S4.02 S4.02 Schedules 10!02/2013 Lab S5.01 S5.01 Foundation T ical Details 10/02/2013 Lab S5.02 S5.02 Foundation T ical Details 10/02/2013 Lab S5.03 S5.03 Concrete T ical Details 10/02/2013 Lab S5.21 S5.21 Structural Steel T ical Details 10/02/2013 Lab S5.22 S5.22 Structural Steel T ical Details 10/02/2013 Lab S5.23 S5.23 Structural Steel T ical Details 10/02/2013 Lab S5.31 S5.31 Steel Stud T ical Details 10/02/2013 Lab S5.32 S5.32 Steel Stud T ical Details 10/02/2013 Lab S5.33 S5.33 Steel Stud T ical Details 10/02/2013 Lab S5.34 S5.34 Steel Stud T ical Details 10/02/2013 Lab S6.01 S6.01 Foundation Details 10/02!2013 Lab S6.02 S6.02 Foundation Details 10/02/2013 Lab S7.01 S7.01 Framin Details 10/02/2013 Lab S7.02 S7.02 Framin Details 10/02/2013 Lab S7.03 S7.03 Framin Details 10/02/2013 Site A0.0 A0.0 Cover Sheet 08/19/2013 Site C1.1 C1.1 Construction Notes & Abbreviations 07/19/2013 Site C1.2 C1.2 Overall Site Plan And Le end 07/19/2013 Site C1.3 C1.3 Existin Conditions & Demo Plan -Lab Buildin 07/19/2013 Site C1.4 C1.4 Existin Conditions & Demo Plan -Admin. Buildin 07/19/2013 Site C2.1 C2.1 Dimensioned Site Plan -Lab Buildin 07/19/2013 Site C2.2 C2.2 Dimensioned Site Plan -Admin. Buildin 07/19/2013 Site C3.1 C3.1 Gradin Plan -Lab Buildin 07/19/2013 Site C3.2 C3.2 Gradin Plan -Lab Buildin 07/19/2013 Site C3.3 C3.3 Gradin Plan -Admin. Buildin 07/19/2013 Site C3.4 C3.4 Gradin Plan -Admin. Buildin 07/19!2013 Site C3.5 C3.5 Draina a Pond Details 07/19/2013 Site C4.1 C4.1 Utili Plan -Lab Buildin 07/19/2013 Site C4.2 C4.2 Uti[it Plan -Admin. Buildin 07/19/2013 Site C5.1 C5.1 Civil Details 07/19/2013 Site C5.2 C5.2 Civil Details 07/19/2D13 Site C5.3 C5.3 Civil Details 07/19/2013 Site ESC1 ESC1 SWPPP Site Ma 08!19/2013 Site S1.01 S1.01 Lab Foundation Plan 08/19/2013 Site S1.02 S1.02 Admin. Foundation Plan 08!19/2013 Site V1.1 V1.1 Existin To o ra h -Lab Buildin 08/19/2013 Site V1.2 V1.2 Existin To o ra h -Admin. Buildin 08/19/2013 Page 7 of 7 ~ is ° - ~ ' is ~ ~ ~, w in ~ ° in n N N V ~ ~ {/7 N ?O N ~ [0 ~ ~ ~ N m C .a _.' l6 Oi ? ~ ~ O ¢ ~ ~ ~ a V C m O ~ •~ ~~ W O _ a ~ of m °o N~ O N ~ ~ O ~ .p ~ o ~ m' c ro N V ~ _ U ~ oa ~ ~ o o U ~ E m •- o C¢ E ~ fn ~__________________ ____T _ ~ _ ~______~_____~_~__.~_ ~ _~_a _r__~__o _ c_________~__Q _~__t,,,__?_ ~f'~ a ~c LL ~ ~' o '3 a c ~ ° ~ a N o~ ~ ~ m ~' ° ,~ ~ ~ ° F- ,° m m m ~ W ~ m C ~ °i ~_ °~~ o ~ o a _c_ O U o •~ ~ .a 3 c ~? `` ~ ~ m ai ~ ~ p ¢~ ~ ~ ° v a~~ LL N ~ Z o ~ ~ ~ - ~ z m a ~'`~ `m ~ c N m t m ~ O a d ~' ° ~ a ~ to W a _ p ~ [A c ~ in m ~ `° o c m¢~ R o cv ~ O o ~ °~ Z ~' m ~ a o R ~ ¢ vy .- cn ~ ~f ~ m m as .- ._ •_ M ~ .- c r ~ o= Or` J d N ~~ W (q C7 _ ~'S 2 Or o~ ~ C'3 co --- ---- - - --- - ~ a ~' ~ ~ ~ Ch CY] C~7 M C7 C~7 CY] ~ Ch M M M M M M M ~' ~ [7 ~ Q T T U r > > > > r T T J > > ? U ? > ?~ ~. U ~ Q7 U ~ ~i tB N U O O O O U O U O O O O N O O ~ ~ O O • ~ cn O- . • ~ n O z z z z 0~ O z z z z n z z~~ z f~ O ap i~ O N N 47 h W O ~ CO N c'~ n ~ ~ O [h ~ N co O N • c+7 r N O O O O r c~7 N r r N O f N O N ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ co c*~ c~ c~ c7 M c'7 c7 c7 r ch c+~ c~7 M r m r m ~ ~ ~ 41 7 Ul U U O U U U W ~ O U U O O O O O d O O ~ Il ¢^ O O z 0 0 0~ ¢ O• O z Z Z Z z¢~• z ~ V .. (~ m ~ ~ (O !~ R] CY] m O (D C7 h Ch m ~ CD • ~ O + • O N N O N r +-- N O [7 O ~ N ~ r N O 0 0 0 0 0 ~ o ~ ~ o a 0 ~ 0 0 0 0 0 0 0 0 o m 3~ o d~ o O o° 0 °° ~ O o O °O o o a a a a a o 0 O O O O O N O N N O O O r O O O O O O O O O d t+ r ~ i T ~ +~~+ ~ ~ ~ O O O ~ Q N N to ~ N tt7 C7 is'~ ~ c°D ~ ~ ~7 ~ M f*) M 47 4~ ~ O V ~ N _ ~ ~ V i V n C ~_ O ~ m U O ¢ C1 ~' ~_ i N N _~ ~O ~j W ~ ~ E ~ "O d. ~ 'p ~ m 3 ^ °~ O N N LJ.I ¢ ~' .C 3 N ~ p o E V ~ W O ~ rn~ E O a o ~ U o ~' xJ ~ o c -o ~ ~ ~ ~ rn U ~ ~ ~ E ~ ¢ m ro E ° [0 m i U m m ff~ .~ m > O •p > ~ c c a -a a~ s 3 a N E ¢ o 9 E m ' a~~i ~ ~ ~ ~ _° ~ ~' ~ E c rn ~' ~ E Y m ~ a~ C C C ~ ~ __ 0.S O ~ ~ O` ~ m ~ d x C .fl' ~ ~ ~ ~ ~ ~ W p ~ o 0 0 0 ~ ~° a 3 ~ w °' d ~ ~ca ~ ° U~ ' 'c •c "~ ~~ '~ ~ d m m a m z ~ ~ 'a a s o. c m 'a ~ ca ~ o C7 O .o O p° ~ ~~~ n ~~ o .= ~ E E E ~ c~~ m rn ~ uNi Q~ ~~= °~~~ E ~ m U U U li ~ a.~i ~ a > ~ v ~ ~ H ~ t ~ ,~ UJ m c ~ ~ o c c c ~ ~ o ~ •tf ~ ¢~ m ~ ~ E o ~ ~ ~ m ~ ~ C ro m m o= J~ ~ o n m ~~ °' c~ c ~ m~ c U g A` ~ w N a~ o ~ m o..c ~ ~ .O ~ CO ~ O ~ N [rOd O ~ m ~ [6 .O ~ fII ~ U7 ~ tQ u] U] U1 ~ U ~ (7 J ^ (7 Q Q W cA C7 ~ CB ~ Z a d (] • ~ ~ 0 • • L N ~ o Q ~ C . • Q ~ d o ° r°~ rani °v °n °o ° ~. °o Y ~ ~_ ~ •, p o 0 0 0 0 ~n o o ?~ ?~ v v v v v ~_ ~n u~ N ° °' r~ v u~ a m tt ~n ~n cD ~ " ~ c ~ a o 0 0 • W o_ o_ o_ o o_ 0 0 0 ~ ~ C7 C7 C7 C7 C7 C7 C7 C7 C7 ~ •E . `° .d ~ ~ c°n [°A [°n ~ U C7 '' C7 C7 C7 C7 C7 C7 • v aEi O ~ l ~. O ~ m ~ ` m C 'cu LJ) °p J d! c ~ m ~ a fa a C W 'E ~ o C ~ ~ c ~ t71 ro y rn O •- LL 0- O (~ N ~ ~ ~ c ~ W ~ 47 U] W ._ C m ~ c ro r a ~ ~ ~ ~ - a~ ~ ~ ~ ~ ~ ~- ' ~ ~ p ~- ~ ~ m ~ o ~ N U ~ ~ ~ ~ ~ E ~ ~ ~ r m o ~ --~- ---- q- - CC F`'` E ~--~ -- Al Uy '~ > : {Q ~ (A ~ ~ ° W ~ f L ~ `° U C d J to O ~ W C 7 ~ L G a o~ °' T L tv c c -° o J° _ ' ~ v ~~ °' c `° m° o m ~ p O7 = C W ~ ~ d m V ~ ~ ~ ~ r 0 ~ ~ ° ~ ro a C i b ~ d i ~_ _ 7 _ {}}. _ ~ r_ ~ V ~ ~p flJ Q O ~, CL L Q d C rn i ~ m ~ ~ ~ C7 a C__ E `- Y - d' - - __SZ_'a ' - T~ ~ m ~ ~ C H U ~ Qa i9 ~ p C ¢ D J ~+ O f0 O7 U u (lJ N cL' '~ ~ ~ W a °6 ~ L N y 7 ~ ~ v ~' ~ ,,, r ~ .G (,!) .... ~ : ~ N C 67 - E -p C U r U f6 7 ° Q. _RI a i i d ~ Ifl ~ O (b U ~ O ~ ~ ~ N td 7 ~ d ~ J J ' Z C 7' a ~ 0. ~ ~ o; ~ - ~. > _ ~ m ... «, ~~ ir N ; Z ~ L °~ cn m. o ~ ~ ~ ro a cp U ~ ~ ~ ~. ~ ~ ------ ---- -- ~ ~ ` W m. _ ~a_E_~CC__ E_ m ~ ~ E' _ • m~ Z 0 ____j _ ____ ___ __ _ _ __ _ _ ___ ____ ___ ____ ___ ______ _________ ___ ______ _________ ____ __ N ' ~ L m _~ _ ~ _ N ~ ' _--- _ _ _ _ Cr] r r r ~'7 C7 T ~ ~ V ~ ~ C7 C7 C V V ~ ~ V V T V ~ ~ ~ ~ ~ ~ ~ > ? ? > r > U T > >+ >+ O) U ~' U C C C L L r r r r r r r T Z Z Z Z O Z O ¢ Z ~ ~ Q ~ Q p ~ ~ ~ ii LL ~ ~ ~- Q Q Q ¢ ¢¢ Q ~ N f~ N N N N N r C7 V O V O V N ~ r CO r C~7 ~ N O C7 N ^ N C7 •- CD r C7 N (O O I~ N c0 O r !~ N O ~ r ~ r N N 00 O O W O m O I ~ a "~ ~ r ~ M ~^ r v T ~ ~ cq r r r r ~ v v v v T ~ ~r v v ~ ~' v v Q~ 7 > > O O O ? O U U ? O ~ a ? O T tC T cC U U7 ~ U 01 U N U Ul C C C .a .B N ~ t6 ~ cE ~ ~ a «T ~ tE ~ d ~ ~ tG N ~ p ~ p ~ z z z z o o z a z ~ ~ o ~ a a o N ¢f ~ c6 U ~ ~ ~ ~ a ~ ~ a ~ ~ _ a _ a N N m m N O N [O m • m [+7 f~ ~ Q1 '~ (O ~ C7 O - I~ I tD (D ~ [+J [~ ~ ~ m ~ ~ 0 O N N O N C7 N r r O r O w O N N O r N N N O O O N N r r r O N S N V IA 3~ 0 0 0 ~ a o o a o 0 0 0 0 0 0 0 o o 0 0 ~~ o a o 3° a o o N ~ V/ 0 0 o • a ~ 0 0 0 o a o 0 0 0 0 0 0 0 0 0 4 o o a o 0 0 0 o a wy V ~ ~ ~ C7 '~. r N M N Lf7 ~ M ~ ~ CAD ~ N ~ ~ ~ ~ lf7 I l!') C'] r lA r r C'7 ~ r l!] O G O U U Y ~~ J N ~ ° ~' ^ ~ .G o ~ m ~ ma ' E n X W m ~ d ~ ~ ~ ~_ L c ~ ~ m ° ¢ ° = o ° ~ O O c ~ ~ '~ is c c '`~ O c US L N d C m .~ > ° U ' O id C x W ~ O '~ ~ I ~ ~~ ~ d d ~ ~ ~ c ~ ~ ~ .~ o m m -~ U c °~ m ~ ~ C O C N ~ O ~ fC ?' 01 ' .a LL O IL ~ ( ~ 47 ` p~ C ~ ~ - Y ~ L ~ E (~ O m N ~ ~ ~ LL ~ ~ ~ O . _ a p ~ L C Ol C c 0 c ~ ID ~ ' ` m a~ ~ ot1 7 C7 `~ E a m ~ o ° E E m E ~ ~ ~ ~ ~ ~ w ~ `° 2 'c m ~~ N Q t° o ri a i m d o o ~ a i ii U c a v ~~ v N ° S E ~ E 3 m o m ~ ~ . ~ ~ a, m D a ? L~ c ~~ L m e ~ tD aoi 3 a U °~ N U ~ ~ E ~ m (n ~ m m rn ~ ~ v m , I C ~ a LL c ~ o N W _ ~ ~ 'n U1 ) td O G ~ Q~ :~ U 47 7 O O 7 c0 N G C • o O O ~ ~ 3 ry U7 UJ ~ p ~ V N ~ d ~ LL 7 O C ~ U ca : U (/J U] OC L7 m Ul rn , d cA 7 a~ W O rn~ o m U : N m ~ ~ 3 c ~ d o v a ~ U m LL W ~ ' co ~ ~a W a `° 7 E O~ c c • m W D 7 . -c z L ~ ~ O p (6 ~ ¢ O O '. C C O ~ > __ ~ ~ 7 7 7 ot1 ~ O 7 C C_ ::D U ~ O 7 (~ oZS 2 V7 C U .~ n. ~ O E ~ Z ~-° a -° I a ' ca ~` ~ n a °' ,~ E c Y a~ ~ 2 ~ in oC N ~ a~ ~ .~ s .E C i m x • ~ ~ ~ ~ 2 2 ~ ~ m J • 7 m ( .~ 0 o rn J ~ a~ ro C~ w ap N fII a f~ I d d W m ~ CA (n (/) d ~ Q ; 1J 7 (n Cn CD ~ p O l!7 O N tti N to co O a d' a' In b' pp t!7 O O O _ 0 J ~ • O n I O M O O) ~!'1 • [~] O a N ~ ~ ~' CR u'~ CD cD O O • ~ to O cfl O I~ O lf) • cp c0 O O O T Y (~ N N N N N N N N N C7 CO _ ' O ~ N O N O N O N ~ O ~ ('] O C7 O C'J C7 C J M ~ O O ~ In In O In O In ` O O ~ ~ d' V ~' ~ .C a ~ ~ c~ ~ c~ ~ c~ c~ c~ ~ ~ m c~ c~ c~ c~ c~ c~ c~ c~ c~ c~ c~ c~ c~ c~ c~ c~ c~ c~ •~ m U a N ~ ~ ,~ O A ~_ U C O it V 7 L C ~_ N m r.+ .O L K W a .~ Q ~ ~ ~ ~ ~ d 2E E ~ ~ " m ~ " m ~ m ~ a ~ ~ ~ m ~ ~ ° ~ ~ a ~ ~ w • ~ c ( C7 a, Y c' o E ° ~- a $ 'v ~ o ~ i w m a ¢ c r O a ' ° m '-- ~--~ ~ - -- - ~- - N c " p _ ro ~ U m o - m ~ v U ~ ~ t~ ~ rn ro = v ~ v ~ _ ~ _ ro ~ o ~j ea w U C E f/1 ~ w w = i ~ fy ~ C 'O O Q _ (I} ~ .`~ c x i ~ [[ _ C r ~ ' ~ _ 231 ~__ L _ C ~ m ~ ~ d a. ~ t l , 47 7 i ,f -0 ~~ ~ r~ _ --1-a " °, - _ _ _____________ C ° ° m ~ ~ N ~ ~- E rk ~ ¢ E `° Q m cco r ~ Q ' ~ ~ J > ' ~ ~' ~ ° ~ ~ ~ ~ ch O ~ _ °' ~ J ~ ~ - -- O Z ~ i c ~ .. lL _ W ~ ` ~ -' m ~ 021 ~ d d U7 ______ _ N X N -- ~ ___________ • ___ ___ ____ ____ ___ ____ ____ ___ ____ ___ ___ ____ _ _ _ _ _ ~ ~ ~ ~ ~ ~ r st ~ ~ st tt V V r d' d 'cY ~_ ~' T ~" ~ c{ ~" t{ 'r r ~ T T ~ C C r ~ ~ ~ r r r r r 'n C C C C .O ~ ~ 67 T T T ' T ?, ?, ~ ¢ 1i ~ ~ ~ ¢ ~ ~ ~ ~ ~ ~ ~ cn ~ ~ ~ ~ . ~ ¢ u ~ a ~ Q ~ ~ ~ r%~ v o c%~ o m v m m v ~ m o m d~ v o~ o c%~ cb o v co o d~ N N N r N N O N N O ~ O N M O O r O N ' N r O ; M N r r O O O ~ ~ ~ ~ i ~ V V ~ ~" a. ~ CF ~ 7 V ~ (rJ ~ d' V V ~ V d ~ d" ~ d d V T d m ~ , ~ T ca ~ C ° C ~ r ~ r ~ r ~ C 7 r ~ C ~ r ~ ~ ~ U a~ U ° C m C m C m .n ~ r m m '~ ~ r a T ~ a~ a r s r a r n. Q 0 n tL " O ~ ~ r ~ ~ D - ~ ~ O ~ ~ O ~ ~ D 0 r O ' ~ W ~ ~ lL lL 0 O 7 Q 7 Q ~ Q h O Q O Q ~ Q O d. 7 O ~ l f C7 [~ J [ ~ [Y ~ C ~ N N O N N a N 7 N c i N O N O ~ ~ o c O N • c O c r O O c O r ~ d` ~ 0 0 ~ 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 e 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o ~a o 0 a 0 o 0 0 0 0 0 0 0 0 0 0 o t7 N ~ r1 • O U7 ~fJ O lf7 ~,Oj ~ 00 4] 2~ W ~ tf7 N GD O 07 47 ~ O N ~!] r O O O ~ Y ~ N N ~ ~ r ~ r E Z' ~ E 'D m ~' E ~ ~ m c °~ ~ ~ L m 0'23 c N m U c rn O7 N w c m s ~ ~ m m N N ~ a O U v ~ m 'ro c a> °~ ~ ai 2n ' C7 E ~ ~ o ~ w t a °m N ,~ ° ~ c ~ r m ~ ~ c' ~ " ~ c ~ .x o _ ~ ° O lL C ~ ~ v N o a t6 O ~ ~ cd E ~ f0 ~ ~ C i c ~ ~ ~ ° ~ d Q ~ a = ~ ~ C7 cn w ~ w m ~ ~ m ~ C ~. (n = d N C 4'1 _ ~ N YO ~ t6 C O Y ro C ~ C try N ~ "O m ~ ~ _ LL Vi ~ "j I (n c CL ~ ~ ~ ~ U O U p 3 ~ 0I ° N C ~fp i "_ ~ L~ . .~ W ~ o ~ c "~ ~ c ~ ~ ~ v1 c "m ro! d o ~ E ~ E .= m m ° ~ °' o ~ I u. ~ a v ~ ° ~ a~ a~ ~ ~ rn - a~i ~° ~ - ~ m cn ~ a, ~ p°C v o `~ tL ¢ ~ ~ V o ~ o o U U ~ w o "-y ~ u. w a m~~ ~ ~ 3~ m ~ w U g 021 ~ ~ ._ ~ 17 C> O Q U ~ = 023 02S ~ N C7 ~ c .c ~ ~ (.7 023 ro ~ ° ~ ° ~ ° (~ _ ~ ~ 21 ~ ~ m "E m ~ ~ o ~ a i a i j ~ ° x m E i m ~ ~`-' ` ~ m m ai ~ m s a 5 U a ~T m w w z z o ~ ~ 3 w m ~ rL ~ in ~ ~ m Q U A cn ~ ~ ~ m ~ O O ~ N In O N O O O CA O O ( O ~ O lA O D OD D Z ~' , O O • O O 7 O ~ O • ~ O (O ~ (' ~ O O O O O 7 N [ ~• O O W Y ° N C J ~ V ~~ O CO O CO O CO CD r (D r (D N (D ~ (O (D CO ( (D ( CD Q O N N O N C O N C O N N J V O O C~J C7 ('J O ~ _ N e O O O L(7 L(7 ~ 7 O LCJ O V O O ~ ~ ~ Q~ C ~~ ~ ~ c~ ~ c~ c~ c~ ~ ~ c~ c~ c~ c~ c~ c~ c~ c~c~~ c~ c~c~c~ c~ c~ c~ C ~ 3 ~ ~ • W Z - -- - ~ Q ~ fL - - -- - - - --- - --- -- - I C V 7 N 0 0 .~ M~ W Z V V L M U U ~_ ~_ t iC W C .~ w O ~ z ~ '- a u C7 ~ w 'r o ~ o, ~ ~ = N r- •o, ? ~ ° ni ~ a ~ ~ 5 a c a a~ ~ (~ c 4~ N N ~ ~ ro ~ n p U N N ~ N f11 C~ a q m~ :c c.!) c c ai c r cn ~ c o uy a Q rn U m a~ m d•, E q c m d~ 3 3 Cr! «. ~ N ~ i 0. '~ cC •` W c .., a uj ¢~ N N U Q w N H N O O f a-~ - ~--~ - --- o--E -g--~- ~ -L --~ -w--j ----- ~ ~ ~ e N ., •- n ~__ -_ __Q~_ __ _ " U .- __~._____~ _ ~- _~ -_ _- _____ ____ N W ~,--~-- --~-- ----- i L (~-~r•••_-~ ~~ _ __ ___ ~._~~~ --ter E gin; ~~ o ~~ z C~ ~. ~ V' ~ e}' ~ ~ ~ V ~ ~ ~. ~ ~ R R R 7 V V V T ~ ~ ~ ~ ~ _ a a ~ T T T o~ o~ a o~ a T a ~ a a a a a a a a m ~ ~ ~ ~ ~ LL > > > ¢ > > > > ¢ > ¢ m cn ~ ¢ m ~ m O m (!1 • ~ O m ~ cn o cn m m m ~ m ~ m ~ m a~ cn a~ cn ~ Q1 ~ O h 1~ ~ ~ ~ V ~ ~ V 'ct ~ LL] h t.C) h ~ • t.[) Q7 01 I N • 01 01 r O C7 N N N N r r N C'7 r O O N O N N N N N N N N ~ ~ ~ V V r} ~ '' '4' ~' ~' V R R V R R R ~~ R C' r 7 ~ ~ ~ ~ ~ i T T ?~ ~ ~' ~ r r C r r r r 01 01 m d d ~. Q • d d '~ d d ~ ~ ~ 7 7 ~ 7 7 C ~ 7 N ~ 47 U7 N ~ U7 ~ N ~ 4) Q7 Q ~ ~ ~ ~ w ~ -~ ~ ~ ~ ~ ~ ~ Q Q Q (A ' (/1 (n UJ (n (n (n UJ U] ~ O r O ~ O O C7 O N O N n O ~ r n N ~ r N C`1 N ~ N r L! 7 N O • O ~ (D C ~ d0 O ~ r LC7 N N N N ~ 'd' N o o ~ ~ 0 0 0 0 0 0 0 o ~, 0 0 0 ~ ~ 0 0 0 ~ ~~ o ~ O O O O O O O O O O O O O O O O O O O O O O O ~ O d N 4n ~ N r N N O N O r lf7 O O O O O In v0 O O ~ lf7 O O LC1 ~ In r r r r r i ~ r I E i ~ I I` E q ~ i o m ~ ~ ~ ~ c y N ~~ ~ m r y o ~ -° a m m m °~ UJ o N ~ ~ ~ m °~ m E Q i°n °~ 3 t °n d c Y 'S ~ ro .n ro -WO ai w d ~ 'a ~ ~ 0 . 0 C7 ~ o~ ~ ~ cn ~ _ ~ c m ~ ~ oa ~ 2 a ~ c c ~ zi ~ = ~ ~ ~ o ro rn C y ~ 7 O C `1 o!S ~ N f4 Y6 C w N ~ ~ C 07 ~ = fA q m aZS ~ VJ L -] Cn C ~ CO 0I ~ - N ~ N C ~lC SC ~ 0.'S ~ ~ ~ Ol .~- ~ ~ O C'3 C7 C7 > w ° d a~ ~ ~ °' p o ~ ~ ~ E E L ~ c N 61 a E ~ C O o ~ W p .O y ~ N C C7 ~ O d O .. ~ W C L Q .N ~ y0 Q = m o8 U o c o ~ ~ w ° a~ ~ ~ ~~ ~ m LLI u.. U ~ u i p ~ T 2 ~ a ~ E m ~ E s ~ ~ Q ~' o o 'O m ~' E q ~a c c c ~ _ ` in m ~ m ~ ~ > ctl p - ~ o o q c ~ 3 3 in w m H ~ a ~ U a jm w ~w = _ ~ ~ m m ~ U ¢ ii H 0 0 ~ ~ O ~ • s O O • O O ~ ~ a O O O O O O O O O O Q O Q ' O O O 7 ` y O O N O _ o • O O s O co O V O ~n f~ O O O O O O O (~ O ~t O ~n O cP O f~ O a~ O Ol O rn O O ( j O O ~ N N N N O O p ~ V' 'cY 'ct ~ (O (p (O (O (O (D (O (O (O (O (O Z (O ' l17 U J J J CC N N > 7 ' C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C7 C3 N ~ z ~ a a a ~ O O • C ~ ~ ~ ~ ~ - - -- - - - - - - - - - - x - w o a ~- - - - _ a cc EXHIBIT "I" INSURANCE REQUIREMENTS FOR WORKING WITH BENITON CONSTRUCTION COMPANY AND CITY OF MERIDIAN Contractors and Subcontractors shall provide evidence that the following minimum coverage is provided. Commercial General Liability (ISO Form CG0001 (10/01) or Eauivalent) • $2,000,000 General Aggregate • $2,000,000 Products/Completed Operations Aggregate • $1,000,000 Each Occurrence • $1,000,000 Personal Injury and Advertising Injury • $ 100,000 Fire Damage Liability • $ 5,000 Medical Expenses -Each Person o Limits must be on a "Per Project Aggregate". o City of Meridian and Beniton Construction Company must be listed as additional insured (ISO Form CG2010 (11/85), or CG2010 (10/01) and CG2037 (10/01), or Equivalent). A copy of the endorsement adding Beniton Construction Company shall be included with the certificate of insurance. o Completed operations coverage will remain in effect for 2 years after project completion. B_ us_ ine_ s_ s Automobile Liability • $1,000,000 Each Occurrence Worker's Compensation and Employers Liability Insurance • Statutory Limits • Employers Liability o $100,000 Each Accident o $500,000 Policy Limits o $100,000 Each Employee Excess Liability . $1,000,000 (An Umbrella policy may be used in combination with other policies to provide coverage specified) For Architecfs, Engineers, Surveyors, ~ Testing Firms: Professional Liabilit rL(Errors and Omissions} -Continued for Two (2) Years After Project Completion • $1,000,000 per claim and $2,000,000 aggregate for annual claims made coverage OR • $1,000,000 project coverage - Certificate of Insurance must be project specific. - Please provide written documentation in regards to your insurance contract(s) cancellation terms. - Insurance is to be Primary &Non-Contributory to any liability insurance carried by Beniton Construction Co., Inc. and City of Meridian. - Waiver of Subrogation applies in favor of Beniton Construction Co., Inc. and City of Meridian. A~ ~~ CE~~'IFIC~ITE OF LIABILITY INSURANCE DATEIMNU°°"""' THIS CERTIFICATE iS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERT!FICATE HOLDER. THIS CERTIFICATE pOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOE5 NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, tho policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certfficate does not confer rights to the Certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: __ ___ _ _ ~ F PHONE q Extl• ! Cam: PfOCIUCef'S name and address E-7fIAEL ADDRESS: INSURERS AFFORDING COVERAGE NAIC t: _ A INSURER A : Issuing company AM BEST A-~ff~ or Better , INSURED INSURER B ... _ ~ INSURER C / S b t t d dd 1NSURERO: u con rac or name an a ress IMS~ rpcR E . L___--_,._...--__ _ -. - COVERAGES CERTIFICATE NUMBER: Rf-VISION NUMBER: THIS IS TO CERTIFY THAT THE PGLIG ES OF INSURANCE LISTED BELOVJ HAVE BEEN ISSUED TO THE INSURED Nr' ADD •~B F;f~ THE CY PERIOD INDICATED NOl'wITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRA£ T OR OTHER DOCUMEf•Cr MATH jtESPECT TO WHICH THIS CERTIFICATE FRAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POI~It:lES DESCRIBED HEREIN IS SC+f3JE1"t TO F.LL THE TERM5 EXCLUSIONS ANG CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY NAVE BEEN REDUCED$Y PAID CLAIMS. INSR TR TYPE OF INSURANCE ADDL SUER ~ POLICY EFF POLICY EXP POLICY NUMBER MMI - IYYYY 'wiM! -W'ri LIMITS GENERAL LABILITY { EACH - UDR ENCC S 1 000 000 ( , DAM E'Tt; RENTED - X GUMMERCIAL GENERAL. l ABII. TY _ ^ (V"" (`r`" FPR~ 15~ (Eaoccurroncef S 100,000 1 ^ ^ ___~ CLAIMS•MADE X OCCUR ~ I I MEgrXP (Any ano pcrsenl S 1 O OOO I ~ Gurrent policy # 09101/2(J11 09101/2012 T+ERSONAL E ADV N URY S 1 000,000 ` i GENERAL AGGREGATE 5 ~ 000,000 ~ GEN'L AGGREGATE LIMIT 4PPLIES PER ~ PRODUCTS • COMPlOF AGG S 2 000 000 PR~ , , I S LOC I POLICY I l~ J AUTOMOBILE LSABILITY ~ ~ !~ -MU N?~ 1 NGLe : ~ ~ a accitlenl 1 000 OOG I ~ , X 1 ANY HUTO ~ , f30D Y INJURY (Pnr pQf90n S I ALL 0'A^:ED SCHEDULED ~ AUTOS AUTOS l ~ 1 I BOD Y INJURY Per aCGtlenl S _ . NON-DV~TIEU ~H?Fi1I2011 C1Urren{ policy # 09/01/2012 ~ PROPERrY DAMAGE S HIREDt.UT05 _ AUTOS ~ Fri acadenh I 1 5 )( UMBRELLA LIAR X OCCUP, ~ ~ I EACH OCCURRENCE ~ 5 1,000,000 ~ EXCESSLIAB C!AIMS-MADu r - Current policy# 09101/2011 0910112012 AGGREGAr=_ s 1,000,000 ---- DED .RETENTIONS ,_ wORKERS COMPENSATION yy ~~ >,hG STAT.;- 07ti- I " t TOEY E :lMLTS ~ ANDEMPLOYERS' LIABILITY YIN - - fdJY PROPRIETORIPAR7NEWEXECUTIVE ^ N I A ~ LrUlRbnt pollty~ 09/01/2011 09101/2012 ~ E.L_ EACH ACCID`cNT 5 ',000,000 "--"-'- -' OFFICFJIdCMeER EXGLU°CD7 (Mandatary in NHI 1 r E.L. DIS AS= • Esi E~41?_OY== 5 1,000,_000 I! yes, descn6c under c •-G• ~ n u , E.L. DIS_ASE • PO! ICY _LM T 5 ".000,000 i 'i DESCRIPTION OF OPERATIONS•IA~i'6N51 VEHICLES {Attach ACORD 107, AddltlOnai RamaTke SChedYla, Ir R10n: apaca is rvqulr.d) Re: City of Meridian Waste Water Treatment Plant Improvements. City of Meridian and Beniton Construction are listed as Additional Insured pPcihe Cgm mercia General Liability coverage on a primary and non-contributory basis regarding above project provided by Corm CG2010 10!01 and CG2037 10101 (or equivalent). Waiver of Subr°gafi°n applies in favor of the Beniton Construction Company. Inc. and owner (except WC) Beniton Construction Company, Inc. P.D. Box B38 Meridian, ID 83680 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POL]CY PROVISIONS. AUTHORIZED REPRESENTATIVE Signature 0 ACORD CORPORATION. All rights reserved. ACORD 25 (2010105) The ACORO name and logo are registered marks of ACORD