AIA Agreement with Mountain Steel for WWTP Admin Bldg and Lab Design
. ` ~ ~ rtn ~~~ ~ocu~nen~ A132 -~ 2009 Standard Form of Agreement Between Owner and Confracfor,Consfructitan 1Vtanager as Adviser Edition AGREEMENT made as of the 1st day of November in the year 2013 (IIa ta-oa•ds, itadicate day, naontla arad yea?:) BETWEEN the Owner: (Name, ]egal staters, add7•ess and other il~or•naatroaa) City of Meridian 33 E. Broadway Meridian, ID 83642 and the Contractor: (Name, legal staters, RddreSS arad OtlaL'1' llafOr77aatIDr7~ ~ Mountain Steel 71 ~ E. Access Street Kuna, ID 83634 for the following Project: (Name, locatio7a acrd detailed descri~tioaaJ City of Meridian Waste Water Treatment Platit Improvements 3401 N. Ten Mile Raad Meridian, ID 83642 The Construction Manager: (Nance, legal status, address grad other inforl7aatio7~) Beniton Construction Co., Inc. P.O. Box $38 Meridian, ID 83680 The Architect: (Naraae, legal statars, address acrd ather• i7afornaatiora) SPF Water Engineering LLC 300 E. Mallard Drive, Suite 350 Boise, ID $3706 For the purposes of this Agreement, the term Engineer and Architect maybe used interchangeably. SPF Water Engineering, LLC is the prime consultant upon execution of floe Pritne Agt•eentent with the City of Meridian. For the purposes of this Agreement only, the use of the term Architect shall refer to SPF Water Engineering, LLC as the firm will bear all rights and t•esponsibilities to perform the services provided herein per the terms and conditions of the Prime Agreement. Johnson Architects, PC is the Architect of Record for the project upon execution of Consultant Agreetnent with SPF Water Engineering, LLC. Tl~e Owner and Contractor agt•ee as follows. ADDITIONS AND DI=LETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and detetions Report that Hates added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. This document is intended to be used in conjunction with AIA Documents A232rM-201}9, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; 6132n^--2009, Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition; and C132TM--2009, Standard Form of Agreement Between Owner and Construction Manager as Adviser. AIA Document A232T"'--2009 is adapted in this document by reference. Da not use wish other general conditions unless this document is modified. AfA Document A132"" - 2DD9 formerly A101 T""CMa -1992). Copyright m 1975, 198D, 1992 and 2009 by The American Institute of Architects. All rights trait' reserved. WARNING: This AtA Document is protected by U.S. Copyright t_aw and International Treaties. l3nauthorized teproductipn pr distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and wit[ be prosecuted tp the maximum extent possible t under the law. This document was produced By AIA software at 09:10:14 on 11/D5/2013 under Order No.1 D05957857_i which expires on 01t14/2D14, and is not for resale. User Notes: {1354063412) TABLE OF ARTfCLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 1Q INSURANCE AND I30NL}S ARTICLE 1 THE CONTRACT DOCUMENTS 'The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplententary and other Conditions}, Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which forth the Contract, and are as fully a part of the Contract as if attached to this Ab •eement or repeated herein. The Contract represents the entire and integrated agreement between the patties hereto and supersedes prior negotiations, representations or agreements, either written or ora1..An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THIr WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. Bid Package #6 -Provide all Labor, materials, tools and equipment necessary to complete the Stt•uctural & Miscellaneous Steel in accordance with Project Plans, Specifications, Addendum Na. 1, Addendum No. 2, Addendum No. 3 and the Bid Form for BP #6. Note: All required forms, information and instuances must be completed and submitted to Beniton Construction before commencement of any work including but not Limited to the Request for Contract Information, MSDS, safety program, a list of suppliers and subcontractors, and any additional forms as requested in the specifications. Provide submittals electronically if available, or one (1) clean copy (able to scan); some exceptions may apply. Samples and color charts must be provided separately. Contractor shall provide {2) full size copies of approved shop drawings to Beniton. Contractor is responsible to pay all applicable taxes, which at•e included in the cantt•act price. Cant~•actor is required to provide three (3) hard copies and one (1) eLect~•onic copy of closeout information (0&M Manuals, Warranties, etc.} and one (l) complete set of Record Drawings, as requested prior to substantial completion. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of conan~eneen~ent, if it d f fer s, fi•onr the date of thrs Rg~•eenlerat ar, if applicable, state drat t1~e date wr11 be fixed in a notice to proceed.) If, prior to the commencement of the Work, the Owner requires time to file mortgages, mechanics' liens and other security interests, the Ovmer's tune requirement shall be as follows: AIA Document A132*" - 2009 formerly A101 T'"CMa -1992). Copyright ®1975, 1980, 1992 and 2009 by She American institute of Architects. Atl rights Init. reserved. WARNING: This AlA~ Document is protected by U.S, Copyright Law and International Treaties. Unauthorized reproduttion or distribution of this A!A° Document, or any portion of it, may result in severe civil and criminal penalties, and will 6e prosecuted to the maximum extent possible t under the law. This document was produced by AIA software at 09:10:14 on 11105!2013 under Order No.1005957857_1 which expires on 01!14!2014, and is not for resale. User Notes: (1350063412) N/A § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Canlpletion of the entire Work not later than { }days from the date of commencement, or as follows: (lllsel•1 number of calendar days. Alter•llatively, acalendar date rllap 8e Irsed ti~llen cool•dillated ti>>itll the date of colntnerlcerllent. If apps opr•iate, ilasert regllirernerats for earlier Substantial Cornpletian of certain portions of the Warlc ) Per Exhibit "C" Portion of the Work Substantial Completion Date BP #6 -Structural & Misc. Steel Lab Building -August 1, 2014 Adtnin Building -September 19, 2014 subject to adjustments afthis Contract Time as provided in the Contract Documents. (hlsert provisions, if aray, foI• liquidated damages relating is faillne to achieve Su6stalltia! Carnpletion olI time or• fol• bonus payments for eal•ly corllpletiarl of t11e Work.) Per Supplementary Conditions ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be one of the fallowing: (Clleck t/re appropriate box.) [ X ] Stipulated Sum, il~ accordance with Section 4.2 below [ ] Cost of the Work plus the Contractor's Fee without a Guaranteed Maximum Price, in accordance with Section 4.3 below [ ] Cost of the Work plus the Contractor's Fee with a Guaranteed Maximum Price, in accordance with Section 4.4 below (Based olI t11e selection above, complete Sectioll 4.2, 4.3 0l• 4.4 beloti~~ Based on the selectiolr above, also complete eit/ler Section 5.1.4, 5.1.5 ar• 5.1.6 beloi+~) § 4.2 Stipulated Sum § 4.2.'1 The Stipulated Sum shall be Four Hundred Seventy Three Thousand Two Hundred Fifty and No/100 Dollars ($ 473,250.00 ), subject to additions and deletions as provided in the Contract Documents. Breakdown is as follows: '" New Administration Building & Operations Tenant Improvement - $340,650.00 * New Laboratory Building - $ 132,600.00 § 4.2.2 The Stipulated Sum is based on the following alterlates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the number s or atller identification of accepted alternates. If the bidding or• proposal daczrlalellts permit the Owller to accept otlrel• alternates sllbsequellt to the execution of this ~igreenlent, attach a sclredule of sore!! other- atternates showing tlae amount for each acrd t/le date w~llen that aniaurat expires.) N/A § 4.2.3 Unit prices, if any: (Identify and state the zlnit price, alld state the glrarztitj~ hnlitatrarls, if any, to ~a~/1ic19 the unit pl•ice toil! be applicable.) AEA Document A132T'" - 2009 formerly A101 T'"CNla -1992). Copyright ©9875, 9980, 1992 and 2009 by The American Institute of Architects. All rights Init• reserved. WARNING This A!A Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted fo the maximum extent possible ~ under the law, This document was produced by AIA software at 09:10:14 on 1 1 /0512 0 1 3 under Order No.1005957857 1 which expires on 01!14!2014, and is not for resale. User Notes: (9350063412) Item N/A Units and Limitations Price per Unit {$0.00) § 4.2.4 Allowances included in the Stipulated Sum, if any: (Idef~t~~ alloiaar~ce and state exclusions, ifan~~,.fr•om the allowance price.) Item N/A Allowance § 4.3 Cost of fhe Work Plus Contractor's Fee without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract {See Paragraph 4.2) (Paragraph deleted) ('!'able deleted) (Paragraphs deleted) § 4.4 Cost of the Work Plus Contractor's Fee with a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sun-t" contract (See Paragraph 4.2) (Paragraphs deleted) (Table deleted) (Pm-ab •aplrs deleted) (Table deleted) (Paiagraplts deleted) ARTICLE 5 PAYMENT'S § 5.1 Progress Payments § 5.1.1 Based upon Applications for Paytment submitted to the Construction Manager by the Contractor, and upon certification of the Project Application and Project Certificate for Payment or Application for Payment and Certificate for Payment by the Construction Manager and Architect and issuance by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Paytment shall be one calendar month ending on the last day of the month. § 5.9.3 Provided that an Application for Payment is received by the Construction Manager not later than the 25th day of a month, the Owner shall make payment of the certified an,omlt in the Application for Payment to the Contractor not later than the 3©th day of the fallowing month. if an Application far Pa}nnent is received by the Construction Manager after the application date fixed above, payment shall be made by the Owner Itot later than sixty (6b) days after the Cons~uction Manager receives the Application for Payment. (Federal, state or local laia~s ma~~ require paymes~t wit/ris4 a certart4 period of time.) § 5.1.4 Progress Payments Where the Contract Sum is Based on a Stipulated Sum § 5.1.4.1 Loch Application for Payment shall be based on the most recent schedule of values submitted by the ConU•actor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Const9•uetion Manager and Architect may require. This schedule, unless objected to by the Construction Manager or Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. § 5.1.4.2 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application far Payment. § 5.1.4.3 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of five percent ( 5 ............. AIA Document A132~" -- 2009 formerly A404'"'CtNa --1992). Copyright p 4975, 198Q 9992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Documenf is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any portion of it, may result in severe civil and crimirtaT penalties, and will be prosecuted to the maximum extent passible ! under the law. This document was produced by AIA software at 69:10:14 on 11!05!2013 under Order No.1005957857 1 which expires on 0 111 4/20 1 4, and is not for resale. User Notes: (4350063412) %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Section 73.9 of the General Conditions; .2 Add that portion of the Contract Sum properly allocable to materials and equipmezlt delivered and suitably stored at the site for subsequent incorporation in the completed constructiau {ar, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of five percent { 5 °/©}; .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Construction Manager ar Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Canditians. § 5.1.4.4 "The progress payment amount determined in accordance with Section 5.1.4.3 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to ninety-five percent { 95 %) of the Contract Sum, less such amounts as the Construction Manager recommends and the Architect determines for incomplete Work aztd unsettled claims; and .2 Add, if final completion of the Work is thereafter znaterialIy delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of the General Conditions. § 5.1.4.5 Reduction or limitation of retainage, if any, shall be as follows: (If it is il~teladed, pl ior' to Salbstalatial Ca117pletion of the e~rtire Work, to reduce ar limit the retainage resL)ltrlag jF•p)lf the percentages ilaserted ila Sectiol~s 5.1.4.3.1 alzd 5.1.4.3.2 above, clad tlirs is not explailaed elsewlrer•e il~ the Caleb act Daculner)ts, ilisert here pl ovisiorls for SLiCh J'edZ1Ct1R1? OJ' II1177tC1t7011.~ N/A § 5.1.5 Progress Payments Where the Contract Sum is Based on fhe Cost of the Work withaut a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Surn" eontz•act {See Paragraph 5.1.4} (Paragraphs deleted) § 5.1.6 Progress Payments Where fhe Contract Sum is Based an the Cast of fhe Wark wifh a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Suzn" contract (See Paragraph 5.1.4) (Paragraphs deleted) § 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractar when .1 the Contractor has fully performed the Contract except far the Contractor's responsibility to correct Work as provided in Section 12.2 of AIA Document A232--2009, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Contractor has submitted a final accounting for the Cast of the Work, pursuant to 1/xhibit A, Determination of the Cost of the Work when payment is on the basis of the Cost of the Work, with or without a Guaranteed Maximum payment; and .3 a fit1a1 Certificate for Payment or Project Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the final Certificate for Payment or Project Certificate for Payment, or as follows: ARTICLE 6 dISPUTE RESflLUTiflN § fi.1 Initial decision Maker The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A232-2009, unless the parties appoint below another individual, not a party to this Agz•eement, to serve as Initial Decision Maker. (If the parties nar)tarally agree, insert t{re rrarr~e, address and other contact irrfor•rriatiolr of the Initiat Decisionr Maker, if ether lharr the .fll clritect.) AIA Document A132T" - 2009 formerly A101 T'"CMa _ 1932). Copyright ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright I_aw and International Treaties. Unauthorized reproduction or distribution of this AlA° Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible r wader the law. This document was produced by AIA software at 09:10:14 an 11!0512013 under Rrder No.1005957857_7 which expires on 01(14!2014, and is not for resale. User Notes: (1350063412) § 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A232-2409, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the Orvrrer and Contractor do not select a metlrad of binding dispute r•esoluzion below, or• do not st~bsegarer7tly agree rra writing to a binding dispute resolzrtlorr rnetlaod other t17an litigation, Claims wilt be resolved by Iltigatiora zrr a cnarr•t of contpeterrt jan•rsdretiorr.) [ ] Arbitration pursuant to Section 15.4 of AIA Document A232-2009. [ X ] Litigation in a court of competent jurisdiction. [ ] Other: (Specify) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 Where the Contract Sum is a Stipulated Sum § 7.1.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A232-2009. § 7.1.2 The Work maybe suspended by the Owner as provided in Article 14 of AIA Document A232--2009. § 7.2 Where the Contract Sum is Based on the Cost of the Work with or without a Guaranteed Maximum Price This section has been deleted as it does not apply to this "Stipulated Sum" contract (See Paragraph 7.1) (Paragraphs deleted) ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A232-2009 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under die Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing froth time to time at the place where the Project is located. (I~rsert Tate of interest agreed upotr, if any.) Zero percent (0 %) § 8.3 The Owner's representative: (Nance, address• acrd otl~er infornratlorr) Beniton Constt•uction Ca., Inc. Bryce Parker P.O. Box 838 Meridian, ID 83680 § 8.4 The Contractor's representative: (Name, address and other- informatiol?) Mountain Steel Allen Puckett 712 E. Access Street Kuria, 1D 83634 § $.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other patty. § 8.6 Other provisions: AIA Document A932t" - 2003 formerly A'l01 T"'CMa -19921. Copyr'ght ©1975, 1980, 1992 and 2009 by The American Institute of Architects. All rights Init. reserved. WARNING: This AIA Document is protected by U.S. Copyright t_aw and [nternatior~al Treaties. Unauthorized reproduction or distribution of this AIAe Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possi6te t under the taw. This document was produced by AtA software at 09:16:14 on 1 1 10 5/201 3 under Order No.1005957857_1 which expires on 0 111 4/20 1 4, and is hat for relate. User Notes: (1350653412) N/A ARTICLE 9 ENUMIrRATION OF CONTf2ACT I}OCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9.1.1 The Agr•eernent is this executed AIA Document A 132-2409, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition. § 9.1.2 The General Conditions are, AIA Document A232--2009, General Conditions of the Contract for Construction, Construction Manager as Adviser 1~dition. § 9.1.3 The Supplementary and other Conditions of the Conhact are those contained in the Project Manual, per attached Exhibit "A". (?'able deleted) § 9.1.4 The Specifications: (Either list the SPecifrcatioizsbere or refer to era exlzibit attached to this Agreement.) Per Exhibit "A" (Table deleted) § 9.1.5 The Drawings: (L'ither• list the Dratvirzgs Ize7•e or refer to a7z exhibit attached to this Agreeizzent.) Per Exhibit "B" (Table deleted) § 9.1.6 The Addenda, if any: Number Date Pages Per Exhibit "A„ Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents are: .1 (Pa7 agraplrs deleted) Other documents, if any, listed below: (List lzere aizy additional docinzzerzts 11~lzich are iizterzded to for»7 Part of the Contract Doclrmerrts. AIA Docunzerzt A232-2009 Provides that 6iddi7zg r•egziir•erzze~zts suc17 as advertisernerzt or• irzritatiorr to bicl, Instr•a7etiorrs to Bidders, sample for ~zrs arzd the Contractor's bid ar a izot pars o}•the Corztr•act Docurrzerzts unless erzurizerated irz this Agreenze7zt. T{zey should be listed lzere orrlyrf i7zterzded to be Part of the Contract Documents.) * Exhibit "I" and Sample Certificate -Insurance Requirements * Request for Contract Information * WH-5 Form Affidavit Concerning Taxes * Application for Payment and Schedule of Values ARTICLE 1U INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set Earth in At•#icle l 1 of AIA Document A232-2009. (State ba7zdizzg requi7•eiizerzts, if arty, aizd lrnzits of tiabilitt~ for irzstlrarrce required irz Article I i of AIA Docznnerzt A232-2009.) Type of Insurance or Bond Limp of liability or Band Amount Insurance per attached Exhibit "I" Payment & Performance Bonds l00% of the Contract Amount {see Supplementary AIA Document A132T"" - 2009 former]y Ai01 T"CMa -1992). Copyright ~ 1975, 1980, 1992 and 2009 by The American institute of Architects. All rights [nit. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, ar any portion of it, may result in severe civil and criminal penalties, and will be prasecufed to the maximum extent possible ~ under the law. This document was produced by AIA software at 09:10:14 on 11!05!2013 under Qrder No.1005957857_1 which expires on 01714!2094, and is not for resale. Erser Notes: (1350063412) Instructions to Bidders for delivery requirement) This Agreement is entered into as of the day and year first written above. 4 ~ OWNER (Sign e) TRACTOR Signature) ~~N (Printed me and title) (Printed name and title) AIA Document A132T"" - 2009 formerly A101 TMCMa -1992. Copyright ©1975,1980,1992 and 2009 by The American Institute of Architects. All rights Inst. reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA`'' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible ~ under the law. This document was produced by AIA software at 09:10:14 on 11!0512013 under Order No.1005957857_1 which expires on 01/14!2014, and is not for resale. User Notes: (1350063412) CITY OF MERIDIAN WASTEWATER TREATMENT PLANT ADMIN,, LAB & CONTROL BUILDINGS PACKAGE EXHIBIT "A" SPECIFICATIONS & ADDENDA Invitation to Bid 1 No#ice #a Bidders 4 AlAA701 !ns#ructionstoBidders 8 Supplementary Instructions to Bidders 4 Bid Forms Table of Contents 1 Bid Farms 51 Project Schedule 4 AIA A132 Standard Form of Agreement Between Owner and Contrac#or 8 Supplement to Agreement 2 AIA A232 General Conditions of the Contract 43 Supplementary Conditions 5 Exhibit 1-Insurance Requirements & Sample Certificate 2 Contractor's Affidavit Concerning Taxes 1 Public Works Gantrac# Tax Report (WH-5) 2 DIVISION 1 -GENERAL REQUIREMENTS 011000 Summary of Work 1 012900 Price and Payment Procedures 4 013100 Project Management and Coordination 4 013300 Submittal Procedures 2 Submittal Form 1 014200 References 4 014500 Quality Control 4 015000 Temporary Facilities and Controls g 018000 Product Requirements 2 FORM Substitution Request Form 1 017300 Execution 8 017320 Cutting and Pa#ching 3 017700 Closeout Procedures 4 O&M Instruction Fnrm 1 DIVISION 2 -EXISTING CONDITIONS 024118 Structure Demolition 024119 Selective Demolition DIVISION 3 -CONCRETE 033000 Cast-In-Place Concrete 26 033510 Ground Concre#e Finishing 3 DIVISION 4 -MASONRY 042000 Unit Masonry g 042613 Masonry Veneer 14 Page 1 of 4 DIVISION 5 -METALS 051200 Structural Steel Framing 11 053100 Steel Decking 7 054000 Cold-Formed Metal Framing 12 054400 Cold-Formed Metal Trusses 6 055000 Metal Fabricafiions 13 055113 Metal Pan Stairs g 055213 Pipe and Tube Railings 10 057313 Glazed Decorative Metal Railings 8 DIVISION 6 -WOODS, PLASTICS, AND COMPOSITES 061053 Miscellaneous Rough Carpentry 061600 Sheathing 064116 Plastic-Laminate-Faced Architectural Cabinets DIVISION 7 -- THERMAL AND MOISTURE PROTECTION 072100 Thermallnsulation 8 072413 Cementitious Finish Over Exterior insulation System 16 072414 Pre-Coated Foam Architectural Details 6 072500 Weather Barriers 3 072726 Fluid-Applied Membrane Air Barriers 10 074113.16 Standing-Seam Metal Roof Panels 12 074213.13 Formed Metal Wall Panels 10 074213.53 Metal Soffit Panels g 075423 Thermoplastic Polyolefin {TPO) Roofing 14 076200 Sheet Me#al Flashing and Trim 14 077200 Roof Accessories g 078413 Penetration Firestopping 7 078446 Fire-Resistive Joint Systems 5 079200 Joint Sealants 11 079219 Acoustical Joint Sealants 4 VOLUME 2 OF 2 DIVISION 8 -OPENINGS 081113 Hollow Metal Doors and Frames 081125 Aluminum Frames 081416 Flush Wood Doars 083323 Overhead Coiiing Doors 083326 Overhead Coiling Grilles 083483 Elevator Door Smoke Containment System 084113 Aluminum-Framed Entrances and Storefront 085113 Aluminum Windows 087100 Door Hardware 088000 Glazing 088300 Mirrors 089119 Fixed Louvers 10 4 7 5 15 8 29 12 6 7 Page 2 of 4 DIVISION 9 -FINISHES 092116.23 Gypsum Board Shaft Wall Assemblies 092216 Non-Structural Metal Framing 092900 Gypsum Board 093013 Ceramic Tiling 095113 Acoustical Panel Ceilings 095423 Linear Metal Ceilings 096513 Resilient Base and Accessories 096843 Linoleum Flooring 096723 Resinous Flooring 096813 Tiie Carpeting 099110 Painting DIVISION 1 p -SPECIALTIES 101419 I]imensional Letter Signage 101423 Panel Signage 102113.13 Metal Toilet Compartments 102239 Folding Panel Partitions 102600 Wall and Door Protection 102800 Toilet, Bath, and Laundry Accessories 104413 Fire Pratection Cabinets 104416 lire Extinguishers 105113 Metal Lockers 107516 Ground-Set Flagpoles DIVISION 11 -EQUIPMENT 115313 Laboratory Fume Hoods DIVISION 12 - FURNISHCNGS 122413 Railer Window Shades 123623.13 Plastic Laminate -Clad Countertops 123653 Laboratory Countertops 123661 Simulated Stone Countertops 129300 Site Furnishings DIVISION 13 -SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 -CONVEYING EQUIPMENT 142400 Hydraulic Elevators DIVISION 21 -FIRE SUPPRESSION 210000 Fire Suppression 8 12 11 10 1a 10 10 7 10 6 6 5 3 9 3 14 14 Page 3 of 4 DIVISION 22 -PLUMBING 220000 Plumbing General Requirements 220100 Plumbing DIVISION 23 -HEATING VENTILATION AND AIR CONDITIONING 230000 HVAC General Requirement 230100 HVAC 230350 Laboratory Ventilation Control 230900 Instrumentation and Controls DIVISION 26 - ELECTRICAL 260500 Electrical General Provisions 260501 Field Test and operational Check 260502 Short-Circuit-Coordination Study-Arc Flash Hazard Analysis 260519 Conductors and Cables 260526 Grounding 260533 Raceways and Boxes 260543 Underslab and Underground Electrical Wark 260923 Lighting Control Devices 262416 Panelboards 262726 Wiring Devices 262815 Disconnect Switches 265100 Interior Lighting 266000 Electrical Demolition and Repair 271101 Telecom Raceway Systems 271500 Telecommunications Cabling 283111 Fire Alarm System DIVISION 31 -EARTHWORK 311000 Site Clearing 312000 Earth Moving 312319 Dewatering DIVISION 32 -- EXTERIOR IMPROVEMENTS 12 74 16 10 2 12 13 7 17 5 321313 Concrete Paving 13 321373 Concrete Paving Joint Sealants 4 321400 Concrete Unit Paving 4 321500 Paver Pedestal System 7 321726 Tactile Warning Surtacing 4 328400 Planting Irrigation 13 329200 Turf and Grasses 4 329300 Plants 7 ADDENDA Addendum No. 1, dated 10/4!2013 27 Addendum No. 2, dated 10/9!2013 29 Addendum No. 3, da#ed 10!14/2013 41 Page 4 of 4 City of Meridian -Waste Wafer Treatment Plant Improvements 3401 N. Ten Mile Road, Meridian, ID 83642 Exhibit "B" CONSTRUCTION DRAWINGS SHEET # DESCRIPTION DATED Admin A0.0 A0.0 Cover Sheet 09/09!2013 Admin A0.1 A0.1 Ener Com !fiance 09/09/2013 Admin A0.2A A0.2A Code Anal sis 09/09/2013 Admin A0.2B A0.2B Code Anal sis 09!0912013 Admin A0.3A A0.3A Accessibilit Access & Si na a Plan 09/0912013 Admin A0.3B A0.3B Accessibili Access & Si na a Plan 09/0912013 Admin A0.4A A0.4A Assemblies 09/0912013 Admin A0.4B A0.4B Assemblies 09/09!2013 Admin A1.1 A1.1 Site Plan 09/09/2013 Admin A1.2 A1.2 Exterior Ram & Ste s 09/09/2013 Admin A1.3 A1.3 Site Details 09/09/2013 Admin A10.1 A10.1 Millwork Details 09/09/2013 Admin A10.2 A10.2 Millwork Details 09/09/2013 Admin A10.3 A10.3 Millwork Details 09/09/2013 Admin A2.1 A2.1 Floor Plan -First Level 09109/2013 Admin A2.2 A2.2 Floor Plan -Second Level 09/09/2013 Admin A2.3 A2.3 Floor Plan -Third Level 09!09/2013 Admin A2.4 A2.4 Roof Plan 09/09/2013 Admin A3.1 A3.1 Door & Frame Schedule 09/09/2013 Admin A3.2 A3.2 Window Schedule 09/09!2013 Admin A3.3 A3.3 Fixture Schedule 09/09!2013 Admin A3.6 A3.6 Enlar ed Plans -Restrooms 09109/2013 Admin A3.7 A3.7 Enlar ed Floor Plans -Stair #1 09/09!2013 Admin A3.8 A3.8 Enlar ed Plans -Stair #2 09/09!2013 Admin A4.1 A4.1 1=finish Plan -First Level 10/04/2013 Admin A4.2 A4.2 Finish Plan -Second Level 10/04/2013 Admin A4.3 A4.3 Finish Pfan -Third Levei 09/09/2013 Admin A5.1 A0.1 Reflected Ceilin Plan -First Level 09/09/2013 Admin A5.2 A5.2 Reflected Ceilin Plan -Second Level 1 011 412 0 1 3 Admin A5.3 A0.3 Reflected Ceilin Plan -Third Level 1 011 412 0 1 3 Admin A6.1 A6.1 Exterior Elevations 09109/2013 Admin A6.2 A6.2 Ex#erior Elevations 09109!2013 Admin A7.1 A7.1 Buildin Sections 09!09/2013 Admin A7.2 A7.2 Buildin Sections 09/09/2013 Admin A7.3 A7.3 Buildin Sections 0 910 912 0 1 3 Admin A7.6 A7.6 Stair Sections -Stair #1 09/09/2013 Admin A7.7 A7.7 Stair Sections -Stair #2 09/09!2013 Admin A8.1 A8.1 Interior Elevations -Restrooms 09/09/2013 Admin A8.2 A8.2 Interior Elevations -Restrooms 09/09/2013 Admin A8.3 A8.3 Interior Elevations -Restrooms 09/09/2013 Admin A8.4 A8.4 Interior Elevations 09!09/2013 Admin A9.1 A9.1 Details 1-19 09/09/2013 Page 1 of 7 Admin A9.2 A9.2 Details 20-32 09/09/2013 Admin A9.3 A9.3 Details 33-51 09/09/2013 Admin A9.4 A9.4 Details 52-71 09/09/2013 Admin A9.5 A9.5 Details 72-90 09/0912013 Admin A9.6 A9.6 Details 91-160 09/09/2013 Admin A9.7 A9.7 Details 107-123 09/09/2013 Admin A9.8 A9.8 Details 124-140 09/09/2013 Admin E0.0 E0.0 Electrical Coversheet 09/09/2013 Admin E0.1 E0.1 Li htin Com fiance Re ort 0 910 912 0 1 3 Admin E1.0 E1.0 Electrical Site Plan 09/09/2013 Admin E2.1.1 E2.1.1 Fire Alarm Plan -First Floor 09/09/2013 Admin E2.1.2 E2.1.2 Li htin Plan -First Level 09/09/2013 Admin E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09109/2013 Admin E2.1.4 E2.1.4 Power Plan -First Levef 09/09/2013 Admin E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/09/2013 Admin E2.2.1 E2.2.1 Fire Alarm Plan -Second Level 09/09/2013 Admin E2.2.2 E2.2.2 Li htin Plan _ Second Level 09/09/2013 Admin E2.2.3 EZ.2.3 Mechanical Power Plan -Second Level 09/09/2013 Admin E2.2.4 E2.2.4 Power Plan -Second Level 09/09/2013 Admin E2.2.5 E2.2.5 5 ecial S stems Plan -Second Level 09/09/2013 Admin E2.3.1 E2.3.1 Fire Alarm Plan -Third Level 09/09/2013 Admin E2.3.2 E2.3.2 Li htin Plan -Third Leve( 09109/2013 Admin E2.3.3 E2.3.3 Mechanical Power Plan -Third Level 09/09/2013 Admin E2.3.4 E2.3.4 Power Plan -Third Level 0 910 9/2 0 1 3 Admin E2.3.5 E2.3.5 S ecial S stems Plan -Third Levef 09/09/2013 Admin E3.1 E3.1 Electrical Roof Plan 09/09/2013 Admin E4.1 E4.1 One-Line Dia ram 09109/2013 Admin E5.1 E5.1 Electrical Schedules 09/09/2013 Admin E5.2 E5.2 Electrical Schedules 09/0912013 Admin E6.1 E6.1 Electrical Details 09/09/2013 Admin L1.1 L1.1 Landsca e Plan 09/09!2013 Admin L2.1 L2.1 !rra ation Plan 09/09/2013 Admin L2.2 L2.2 !rra ation Notes/Details 09/09/2013 Admin L2.3 L2.3 !rra ation Details 09/09/2013 Admin LG0.01 LG0.01 Structural Cover Sheet 10102/2013 Admin LG0.02 LG0.02 Structural Desi n Notes 10/02/2013 Admin LG0.03 LG0.03 Structural Desi n Notes 10/02/2013 Admin LG1.01 LG1.01 Li ht Gau a Floor Plan 10/02/2013 Admin LG2.01 LG2.01 Elevations 10!02/2013 Admin LG2.02 LG2.02 Elevations 10/02/2013 Admin LG3.01 LG3.01 Sections 10/02/2013 Admin LG3.02 LG3.02 Sections 10!0212013 Admin LG3.03 LG3.03 Sections 10/02/2013 Admin LG3.04 LG3.04 Sections 10/02/2013 Admin LG3.05 LG3.05 Sections 10102/2013 Admin LG5.01 LG5.01 Exterior Li ht Gau e T ical Details 10/02/2013 Admin LG5.02 LG5.02 Exterior Li ht Gau e T ical Details 10/02/2013 Admin LG5.03 LG5.03 Exterior Li ht Gau e T ical Details 10102!2013 t'age 2 of 7 Admin LG5.04 LG5.04 Exterior Li ht Gau e T ical Details 10/02/2013 Admin M1.1 M1.1 HVAC Plan -First Level 09/09/2013 Admin M1.2 M1.2 HVAC Plan -Second Level 09/09/2013 Admin M1.3 M1.3 HVAC Plan -Third Leve! 09/09/2013 Admin M1.4 M1.4 HVAC Plan -Roof 09/09!2013 Admin M2.1 M2.1 H dronic Plan ~ First Level 09!09!2013 Admin M2.2 M2.2 H dronic Plan -Second Level 09/09/2013 Admin M2.3 M2.3 H dronic Plan -Third Level 09/09/2013 Admin M3.1 M3.1 3D HVAC S stem 09!09/2013 Admin M4.1 M4.1 Pi in Schematic 09!09/2013 Admin M5.1 M5.1 Control Schematics 09/09/2013 Admin M5.2 M5.2 Controls Schematics 09/09/2013 Admin M6.1 M6.1 HVAC Details 09/09/2013 Admin M6.2 M62 HVAC Details 09!09/2093 Admin M7.1 M7.1 HVAC Schedules 09109!2013 Admin M7.2 M7.2 HVAC Schedules 09/09/2013 Admin MC1.0 MC1.0 Mechanical Cover Sheet 0 9/0 912 0 1 3 Admin MC1.1 MC1.1 Mechanical Comeheek 09/09/2013 Admin MC1.2 MC1.2 HVAC Zone Plans 09/09/2013 Admin P1.0 P1.0 Plumbin Plan -Foundation 09!09/2013 Admin P1.1 P1.1 Plumbin Plan -First Level 09!09/2013 Admin P1.2 P1.2 Plumbin Pfan -Second Level 09!09!2013 Admin P1.3 P1.3 Plumbin Plan -Third Level 09109!2013 Admin P2.1 P2.1 Plumbin Riser Dia rams 09/09!2013 Admin P3.1 P3.1 Plumbin Details 09/09/2013 Admin P4.1 P4.1 Plumbin Schedules 09!09!2013 Admin S0.01 S0.01 Structural Cover Sheet 10102!2013 Admin 50.02 S0.02 Structural Desi n Notes 10!02!2013 Admin S0.03 S0.03 Structural Desi n Notes 10/0212013 Admin 50.04 S0.04 Structural Desi n Notes 10/02/2013 Admin S0.05 S0.05 Structural Desi n Notes 10/02/2013 Admin S1.01 51.01 Foundation Plan 10/02/2013 Admin S9.02 S1.02 Second Level Framin Plan 10/02/2013 Admin S1.03 S1.03 Law Roof Framin Plan 10!02!2013 Admin S1.04 S1.04 Third Level Framin Plan 10/02!2013 Admin S1,04A S1.04A Shearwall And Holddown Plan 10/02/2013 Admin S1.05 S1.05 Hi h Roof Framin Pfan 10/02/2013 Admin S2.01 S2.01 Enlar ed Plans 10!02/2013 Admin S2.02 S2.02 Stair Framin T ical Details 10/02/2013 Admin S3.01 53.01 Elevations 10!02/2013 Admin S3.51 S3.51 Brace Frame Schedules 10/02/2013 Admin S4.01 S4.01 Schedules 10/02/2013 Admin S4.02 S4.02 Schedules 1 0/02120 9 3 Admin S5.01 S5.01 Foundation T ical Details 10/02!2013 Admin S5.02 S5.02 Foundation T ical Details 10/02!2013 Admin S5.03 S5.03 Concrete T ical Details 10/02/2013 Admin S5.21 S5.21 Structural Steel T ical Details 10/02/2013 Admin S5.22 55.22 Structural Steel T ical Details 10/02/2013 Page 3 of 7 Admin S5.31 S5.31 Steel Stud T ical Details 10/02/2013 Admin S5.32 S5.32 Steel Stud T ical Details 10/02/2013 Admin S5.33 S5.33 Steel Stud T ical Details 10102/2013 Admin S6.01 S6.01 Foundation Details 10/02/2013 Admin S6.02 S6.02 Foundation Details 10/02/2013 Admin S7.01 57.01 Floor Framin Details 10/02/2013 Admin S7.02 S7.02 Floor Framin Details 10/02/2013 Admin S8.01 S8.01 Roof Framin Details 10/0212013 Admin S8.02 S8.02 Raof Framin Details 10/02/2013 Cantrols A0.0 A0.0 Cover Sheet 09/09/2013 Controls A0.1 A0.1 Ener Com liance 09/09!2013 Cantrols A0.2 A0.2 Code Anal sis 09/09/2013 Controls A0.3 A0.3 Accessibilit Access & Si na a Plan 09/09!2013 Controls A0.4 A0.4 Assemblies 09/09/2013 Controls A10.1 A10.1 Millwork Details 09/09/2013 Controls A2A A2.0 Demolition Plan 09/09/2013 Controls A2.1 A2.1 Floor Plan 09/09/2013 Controls A3.1 A3.1 Schedules 09109/2013 Controls A3.6 A3.6 Enlar ed Floor Plans 0 910 912 0 1 3 Controls A4.1 A4.1 Finish Plan -First Level 0 910 912 0 1 3 Controls A5.1 A5.1 Reflected Ceilin Plan 09/09/2013 Controls A8.1 A8.1 Interior Elevations 09/09/2013 Controls A8.2 A8.2 Interior Elevations 09/09/2013 Controls A9.1 A9.1 Details 09/09/2013 Controls E0.0 E0.0 Electrical Cover Sheet 09/09!2013 Controls E1.1 E1.1 Electrical Demolition Plan 1 010 912 0 1 3 Controls E2.1 E2.1 Fire Alarm Plan 09109/2013 Controls E2.2 E2.2 Li htin Plan 09109/2013 Controls E2.3 E2.3 Mechanical Power Plan 09/09/2013 Cantrols E2.4 E2.4 Power Plan 09/09/2013 Controls E2.5 E2.5 S ecial S stems Plan 10/09/2013 Controls E3.1 E3.1 Une-Line Dia ram/Electrical Details/Schedules 09!09/2013 Controls M1.1 M1.1 HVAC Demolition Plan 09!09/2013 Controls M2.1 M2.1 New HVAC Floor Plan 09/09/2013 Cantrols M3.1 M3.1 HVAC Details 09/09/2013 Controls M4.1 M4.1 HVAC Schedules 0 910 912 0 1 3 Controls MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Cantrols P1.1 P1.1 Plumbin Demolition Plan 09/09/2013 Cantrols P2.1 P2.1 New Plumbin Floor Plan 09/09!2013 Controls P3.1 P3.1 Plumbin Schedules And Details 09/09/2013 Controls P4.1 P4.1 Plumbin Schedules And Details 0 910 912 0 1 3 Lab A0.0 A0.0 Cover Sheet 09109/2013 Lab A0.1 A0.1 Ener Com liance 09/09/2013 Lab A0.2 A0.2 Code Anal sis 09/09/2013 Lab A0.3A A0.3A Accessibilit Access & Si na e Plan 09/09/2013 Lab A0.3B A0.3B Accessibilit Access & Si na a Plan 09/09/2013 Lab A0.4A A0.4A Assemblies 09!09/2013 Lab A0.4B A0.4B Assemblies 09/09!2013 Page 4 of 7 Lab A1.1 A9.9 Site Plan 09/09/2013 Lab A10.9 A10.1 Millwork Details 09/09/2013 Lab A10.2 A10.2 Millwork Details 09!0912093 Lab A10.3 A10.3 Millwork Details 09/09/2013 Lab A2.1 A2.1 Floor Plan -First Level 0 910 912 0 1 3 Lab A2.2 A2.2 Floor Plan -Second Level 09/0912013 Lab A2.3 A2.3 Roof Plan 09/0912013 Lab A3.1 A3.1 Door & Frame Schedule 09/09/2013 Lab A3.2 A3.2 Window Schedule 09/09/2013 Lab A3.3 A3.3 Fixture Schedule 09/09/2013 Lab A3.6 A3.6 Enlar ed Plans - Restrooms 0 9/0 912 0 1 3 Lab A3.7 A3.7 Enlar ed Floor Plans -Stair #1 09/09/2013 Lab A3.8 A3.8 Enlar ed Floor Plans -Stair #2 09/09/2013 Lab A3.9 A3.9 Enlar ed Floor Plan -Lab 0 910 9/2 0 1 3 Lab A4.1 A4.1 Finish Plan -First Level 10/04/2013 Lab A4.2 A4.2 Finish Plan -Second Level 09/09/2013 Lab A5.1 A5.1 Reflected Ceilin Plan -First Level 09109/2013 Lab A5.2 A5.2 Reflected Ceilin Plan -Second Level 09109/2013 Lab A6.9 A6.1 Exterior Elevations 0 910 912 0 1 3 Lab A6.2 A6.2 Exterior Elevations 0 910 912 0 1 3 Lab A7.1 A7.1 Buildin Sections 09/09/2013 Lab A7.2 A7.2 Buildin Sections 0 910 912 0 1 3 Lab A7.3 A7.3 Buildin Sections 09/09/2013 Lab A7.6 A7.6 Stair Sections -Stair #1 09/09/2013 Lab A7.7 A7.7 Stair Sections -Stair #2 09/09/2013 Lab A8.1 A8.1 Interior Elevations 09/09/2013 Lab A$.2 A8.2 Interior Elevations 09/09/2013 Lab A8.3 A8.3 Interior Elevations 09/09/2013 Lab A8.4 A8.4 interior Elevations Og/Og12013 Lab A8.5 A8.5 Interior Elevations - Restroams 09109!2013 Lab A9.1 A9.1 Details 1-19 09/09/2013 Lab A92 A9.2 Details 20-32 09109!2013 Lab A9.3 A9.3 Details 33-51 09/0912013 Lab A9.4 A9.4 Details 52-71 09/09/2013 Lab A9.5 A9.5 Details 72-90 09/09/2013 Lab A9.6 A9.6 Details 91-105 09!0912013 Lab A9.7 A9.7 Details 106-123 09/09/2013 Lab A9.8 A9.8 Details 124-140 09/09/2013 Lab E0.0 E0.0 Electrical Cover Sheet 0 910 912 0 1 3 Lab E0.1 E0.1 Li htin Com !lance Re ort 09!0912013 Lab E1.0 E1.0 Electrical Site Plan 0 910 912 0 1 3 Lab E2.1.1 E2.1,1 Fire Alarm Plan -First Level 09/09/2013 Lab E2.1.2 E2.1.2 Li htin Plan -First Level Og/pg12013 Lab E2.1.3 E2.1.3 Mechanical Power Plan -First Level 09/09/2013 Lab E2.1.4 E2.1.4 Power Plan -First Level 09/09/2013 Lab E2.1.5 E2.1.5 S ecial S stems Plan -First Level 09/0912013 Lab E2.2.1 E2.2.1 Fire Alarm Plan -Second Floor 09/0912013 Lab E2.2.2 E2.2.2 Li htin Plan -Second Floor 09!09/2013 Page 5 of 7 Lab E2.2.3 E2.2.3 Mechanical Power Plan w Second Floor 09109/2013 Lab E2,2,4 E2.2.4 Power Plan -Second Floor 09109/2013 Lab E2.2.5 E2.2.5 S ecial S stems Plan -Second Floor 09/09/2013 Lab E3.1 E3.1 Electrical Roof Plan 09/09/2013 Lab E4.1 E4,1 One-Line Dia ram 09!09/2013 Lab E5.1 E5.1 Electrical Schedules Og/Og/2p13 Lab E6.1 E6.1 Electrical Details 09/0912013 Lab L1.1 L1.1 Landsca a Plan 09/09/2013 Lab L2.1 L2.1 Landsca a Plan 09/09!2013 Lab L2.2 L2.2 lrri anon Details 09/09/2013 Lab M0.1 M0.1 HVAC Demolition Plan 09/09!2013 Lab M1.1 M1.1 HVAC Plan -First Level 09!09/2013 Lab M1.2 M1.2 HVAC Plan -Second Level 0910912013 Lab M1.3 M1.3 HVAC Roof Plan 09109/2013 Lab M2.1 M2.1 H drank Plan -First Level 09109!2013 Lab M2.2 M2.2 H dronic Plan -Second Level 09/09/2013 Lab M3.1 M3.1 3D HVAC S stern 09/09/2013 Lab M4.1 M4.1 Mechanical Pi in Schematic 09/09/2013 Lab M5.1 M5.1 HVAC Controls 09/09/2013 Lab M5.2 M5.2 HVAG Controls 09/09/2013 Lab M5.3 M5.3 HVAC Controls 09/09/2013 Lab M5.4 M5.4 HVAC Controls 09/09!2013 Lab M5.5 M5.5 HVAC Controls 09!09/2013 Lab M5.6 M5.6 HVAC Controls 09/09/2013 Lab M5.7 M5.7 HVAC Controls 09109/2013 Lab M6.1 M6.1 HVAC Details 09109/2013 Lab M6.2 M6.2 HVAC Details 09/09/2013 Lab M6.3 M6.3 HVAC Details Og/p9/2p13 Lab M6.4 M6.4 HVAC Details 0 910 912 0 1 3 Lab M7.1 M7.1 HVAC Schedules 0 910 912 0 1 3 Lab M7.2 M7.2 HVAC Schedules 09/09/2013 Lab M7.3 M7.3 HVAC Schedules 09/09/2013 Lab M7.4 M7.4 HVAC Schedules 09/09/2013 Lab M7.5 M7.5 HVAC Schedules 09/09/2013 Lab MC1.0 MC1.0 Mechanical Cover Sheet 09/09/2013 Lab MC1.1 MC1.1 Mechanical COMCheck 09/09/2013 Lab P1.0 P1.0 Piumbin Plan -Foundation 09(0912013 Lab P1.1 P1.1 Piumbin Plan -First Level 09/09!2013 Lab P1.2 P1.2 Piumbin Plan -Second Level 0 910 912 0 1 3 Lab P3.1 P3.1 Piumbin Details 09109!2013 Lab P4.1 P4.1 Piumbin Schedules 09/09/2013 Lab S0.01 S0.01 Structural Cover Sheet 10/02/2013 Lab S0.02 S0.02 Structura( Desi n Notes 10/02/2013 Lab 50.03 S0.03 Structura[ Desi n Notes 10/02/2013 Lab S0.04 S0.04 Structural Desi n Notes 10/02/2013 Lab S0.05 S0.05 Structural Desi n Notes 10/02/2013 Lab S1 Al S1.01 Foundation Plan 10/02/2013 Lab S1.01A S1.01A First Floor Shearwall And Holdown Plan 10/02/2013 Page 6 of 7 Lab S1.02 S1.02 Second Level & Lowwer Roof Framin 10102!2013 Lab S1.02A S1.02A Second Level Shearwall & Holdown Plan 10/02!2013 Lab S1.03 S1.03 U er Roof Framin Plan 10/02/2013 Lab S2.41 52.01 Enlar ed Plans 10/02/2013 Lab S2.02 S2.02 Stair Framin T icai Details 10/02/2013 Lab S4.01 54.01 Schedules 10!02/2013 Lab S4.02 S4.02 Schedules 10/02/2013 Lab S5.01 S5.01 Foundation T icai Details 10!02(2013 Lab S5.02 S5.02 Foundation T icai Details 10/02/2013 Lab S5.03 S5.03 Concrete T icai Details 10/02!2013 Lab S5.21 55.21 Structural Steel T icai Details 10/02/2013 Lab 55.22 S5.22 Structural Steel T ical Details 10/02/2013 Lab S5.23 S5.23 Structural Steel T icai Details 10/02/2013 Lab S5.31 S5.31 Steel Stud T ical Details 10/0212013 Lab S5.32 S5.32 Steel Stud T icai Details 10/02/2013 Lab S5.33 S5.33 Steel Stud T icai Details 10/0212013 Lab S5.34 S5.34 S#eel Stud T icai Details 1 0/0212 0 1 3 Lab S6.01 S6.01 Foundation Details 10/02/2013 Lab S6.02 S6.02 Foundation Details 10102!2013 Lab S7.01 57.01 Framin Details 10/02/2013 Lab S7.02 S7.02 Framin Details 10102(2013 Lab S7.03 S7.03 Framin Details 10!02!2013 Site AOA A0.0 Cover Sheet 08/1912013 Site C1.1 C1.1 Construction Notes & Abbreviations 07/19/2013 Site C1.2 C1.2 C?verall Site Plan And Le end 07/19/2013 Si#e C1.3 C1.3 Existin Conditions & Demo Plan -Lab Buildin 07/19/2013 Site C1.4 C1.4 Existin Conditions & Demo Plan -Admin. Buildin 07/19/2013 Site C2.1 C2.1 Dimensioned Site Plan -- Lab Buildin 07/19/2013 Site G2.2 C2.2 Dimensioned Site Plan -Admin. Buildin 07/19!2013 Site C3.1 C3.1 Gradin Plan -Lab Buildin 07/19/2013 Site C3.2 C3.2 Gradin Plan -Lab Buildin 07/19/2013 Site C3.3 C3.3 Gradin Plan ~ Admin. Buildin 07/19/2013 Site C3.4 C3.4 Gradin Plan -Admin. Buildin 07/19/2013 Site C3.5 C3.5 Drains a Pond Details 07119(2013 Site C4.1 C4.1 Utilit Plan -Lab Buildin 07/19/2013 Site C4.2 C4.2 Utilit Plan -Admin. Buildin 07/19/2013 Site C5.1 C5.1 Civil Details 07/19/2013 Site C5.2 C5.2 Civil Details 07/19/2013 Site C5.3 C5.3 Civil Details 07/19/2013 Site ESC1 ESC1 SWPPP Site Ma 08!1912013 Site S1.01 S1.01 Lab Foundation Plan 08!1912013 Site 51.02 S1.02 Admin. Foundation Plan 08/19!2013 Site V1.1 V1.1 Existin To o ra h -Lab Buildin 08/19/2013 Site V1.2 V1.2 Existin To o ra h -Admin. Buildin 08/19/2013 Page7of7 __-- of IUleridian Exhibit "C" -Contract Schedule Beniton Construction MS0003 ~ Substantial Completion -Lab Buiid'ang (August 1, 2014) ( 0 ~ 0% ~ ~ 30-Jul-14 MS0004 i 5ubstant~al Completion -Admin Building (September 19, 2 0 ~ 0% 08-Sep-14* ... _._... _ .......ww ~~ M50005 ; . _... _..~ - - ---... _. _ _ - . _. _ ......_._.~ -----._ ._.. ~ Substantial Completion -Existing Admin Building (TBD) _... 1 0 ~ ......... ... ......._ _ 0% .~ .... --- - .... ~ 27-Oct-14* ®- . - ~ ~ ~ • ~: ~ r• ~- - ~. ~ ~ e SITE1dV0FiK ' ..,; 201 13-Aug-13 R s 30-May-14 G1000 ~ Tem ora Fencin and Gates - CMlOwner p ry g 2 ; . 0% 09-Dec-13 ., 11-Dec-13 G1010 I Construction Entrance / SW PPP BMP's 2 100% ~ 24-Oct-13 A ~ 25-Oct-13 A G1030 I Utility Locates and Pat-Holing I 5 50% 121-Oct-13 A 101 Nov-13 I G1040 __. I Grub Turf Areas, Strip & Stockpile Topsoil 5 0% I Oi-Nov-13 _.__ ~... 108-Nov-13 G1050 I Layout & Asphalt 5awcutting ~ 2 ~ 20% 121-Oct-13 A 05-Nov-13 G1055 ~ Demo & Salvage Fencing as RequEred ~ ~ 5 I 25°!° ~ 16-Oct-13 A ~ 07-Nov-13 _.... . _.. Gi060 ..._...___- _ __..... ------- ---._...._ _.. ...... w~_ ~ .. _...-- I Gate Detection Loops -Coord w! RV Dump Project ' --~---...---- 3 1 --- ... 100% i7-Oct-13 A - - - 18-Oct-13 A `. G1070 . ;Relocate Access Gates ,... ~ 5 I 0% ~ 23-May-14 30-May-14 . e i ~ R ' > WWTPQI ' RV DUMP STATION Project (Ewing Co.) M _ _. - -- - ---- _ ____. ~. __....._..__ ........ ~ 90 ~ -- ----- 100% ~ 13-Aug 13 A ~~..~.... --- ~ 25-Oct-13 A WWTP02 I FIi31*R LOOP Project (8y City - PreCam &AME) . _ _ ~ 60 ~ . ,....... 70% j 09-Oct-13 A .._ __..__ (16-Nov-13 + 's J G1400 (Site Demo Trees, Out-Buildings, etc Coord w/ Electrical 14 0% 130 Oct-13* 112 Nov-13 ~' G1410 ~ Grading & Storm Drainage Improvements ; 5 0% 06 Nov-13 ---- 13-Nov-13 G1430 i Jomt Trench Utilities IPGO !nt Gas & Faber TBA _ ~ 10 I 0% 13 Nov 13 27 Nov-13 G1435 ~ Bwld~ng Pad 3 ~ 0% 27-Nov-13 ~ 04-Dec-13 Gi440 _ ^ .. .._. _ ... ~ WaterService to Lab i 3 ( 0% ~ 13 Nov 13 ° 15 Nov 13 _ _.. .... ' Gi450 " _ -- --- .-- -. _ New Water Service to Existing Admin / Ops Building .. I 3 i _ _ 0%° j 18-Nov 13 ... ~ 20 Nav 13 . G1500 _... ... Prep and Place 5tte Concrete i 5 ( 0% 24-Apr 14 01-May i4 _ -- -- -. _ _ G1510 .._..__ ~_ -. -. _._. _.._ -- ------ - - - .... .. w.... _ , ~ Paving, S~gnage and Striping" ..,._ I 5 ~ .. ---- .... _....... _ 0%° 116-May-14 _ , . _._ .. _ .._. . ~ 23-May-14 G1200 . ... ~ Grading & Storm Drainage Improvements I 10 ~ 0% ~ 01 Nov 13 (15 Nov-13 Actual Work Critical Remaining Work ~~` Summary Page 1 of 4 O Remaining Work ~ ~ Milestone ' ~ Substantial 3 A, Design Phase 09-Dec-13, Pre-Constru tion ep-13 A, Material Procureme t 30 May X14, ~~'Temporary Fencing and ate - c ons~ructian Entrance / SW P P 8MP': Jtilit~r Locates and Pot-Holing Grub Turf Areas, Strip & Sto kpile To _aybut & Asphalt Sawcutting Demo & Salvage Fencing as Req~ire~ to L;Ietection Loops -Coord. / R1! Dr ' 16; Nov-13, Other WTP P ojeefs V DAMP STATION rojec# ( win Co.} FIE~ER LOOP Proj ct (By C - FreCo &AME 23- ay-14, L Bldg Si Sits Demo Trees, ut-Buildi gs, etc. - oord w/ Grading & Storm D ainage I pra~em s Joint Trench Utilit es - IPC , Int Gas Fiber - _ i~uilding Pad Water Service to L b N&:w Water Servic to Exis rig Admin Ops Bu Prep a d Pace a Conci Pa 'rig, Signa and Si 23- ay-rt4, A in Bldg ~~ Grading & Star rainage 1 provem is November 5, 2fl13 of Meridian I Exhibit "C" -Contract Schedule Beniton Construction G1210 ~ 24" Pressure Sewer- Boise River Outfall (BRO) Line $ 15 € 0% 101-Nov-13 122-Nov-13 ---- >~-° 24" Pressure er -Bois Riv&r Ou 1 II (BRO G1215 ~ Install New Electrical Service IPCO ~ 3 I 0% 22-Nov 13 27-Nov i3 l~stall New ~l ~a ical Serv ce - t;PCO G1220 ~ BRO Shutdown and Tie-in {Plant Final Flush Date} ~ 1 i 0% 22-Nov-13 ~ 25 Nov 13 B~iO Shutd rid Tie-In (Plarft Fin Flush ;. G1225 ~ Remove & Dispose BRO Under Building Pad 2 I 0% 48-Nov 13 ~ 12 Nov-13 Remove & Di p BRO U er Quildi Pad _ --- G1235 1 $" Water Service Relocation ( 3 60% ~ I 28 Oct 13 A ~ 31 Oet 13 " V~ater Servi location _ . -- - , - _ - _ - G1240 2Non-Potable Water ~ 2 0% 31-Oct-13 04-Nov-13 _~.... .. _. ...... - . _~__ ---_ i ~ ~ ~ 2" Ikon-Potabl 1 a er ~~ ....__ _ . ..._ ~ -G1244 I Build Road Section & Early Paving if Possible i 5 0% 25-Nov 13 04 Dec-13 _, ~ I I ~ uEld Road ~ c ion & Ea Pa`,vin i y g ossibl _ ......._. . __._.. ... _.. _ _.. ------ .........._ .-._.. -._ --------- _. -------- G1245 ~ Approaches Curb Gutter & Pave at S Access Road i 10 ~ 0°!° 110-Apr-14 124-Apr-14 --------- - ~ Approa , hes~ Cur ,Gutter G1250 Buildm Pad g , 3 0% i 12-Nov-13 15-Nov-13 _._..-------- ... _. ~ ~ Bu'Idin Pad ? 9 ; ___ .------- --- ._. ...... --- -- _._... _ _......-._ --- -------...._ ._.... G1300 I Prep and Place Remaining Site Concrete 10 0°!° ~ 01 Ma 14 I i6-Ma 14 y- Y- _. _ .. _..._.._._ ~ .._,_.- --- _ .... ..._ 1 _, ~ ~._~ Pre P and F'lac emaini . _._ . W . __ _ G1310 I-Paving, 5ignage and Striping 5 ~ 0°1° 16-May-14 23-May-14 Pa 'rig, Signa and St Lli$ $l1lLf]ING 6 - 1 5 09 Dec-i 3 04-Aug-14 ... ,. _... , ;04-A -14, LA • • ~ ' . • - ~ ~ ~ - ,1""9~ 16-Ja - t4 i ab Buil in ~ Fou atian & <• , _ g G2015 I Excavate, Form & Place Foundations I 10 1 4°l° ! 09-Dec-13 i 23-Dec-13 _. _ `! Excavat - - orm & Plac Fo~ndat ns G2070 Backfill Foundations 2 0°!° 23-Dec-i3 27 Dec-13 L I I Backfill undations , ----- ... _. -.._....~...__._ ---------- - --- .. - - - ---- -- ..-._._.., --- - G2080 ~ M, P & E Underground Rough-Ins ....... ._ ... _._....-... .~- __10 i 0%° 27-Dec-13 13-Jan-14 ------ ~ M, P Undergrou d Rough- s ;< ~ G2090 ~ Prep & Place Slabs-on-Grade I 5 ~ 0°I° ~ 09-Jan-14 ~ 16-Jan-14 _..... rep face Slabs on-grade ~ • ~ - 27-Mar-14, Lab Buildi - Stru ww G3035 ,Structural CMU Demo /Tie-into Existing ( 5 0% 16-Jan-14 23-Jan-14 _ ._ ~ ._ ! ~ L ; Stru t ra[ GMU De - o / ~'ie-i Existin . ..._ ...._ ._ --~----- -- - ---- ..~ .._... _... _ .............. ..__.~ -_ .....__ _...--- ----- ----........_ G3040 1 Structural Steel -Framing j 10 ( 0% 123-Jan-14 106-Feb-14 ~ Str tural Steel - Framing G3042 I Structural Steel -Complete Upper Decks j 6 0% 20-Feb-14 27-Feb-14 .--.... .. ~ -- ------ --- __..._..~.. __._._...._.....__ . ~ ~~ ~~ t uctural Ste I - Com I P U PPer _......._. . ------------.----- .. -..._._ _ --- -------...-.... ----~ - _G3144 - I M, P & E Rough-ins and Penetrations on Upper Decks 5 ~ 0% 127-Feb-14 ~ 06-Mar-i4 ~ , P & E Rou h-ink and enetrati G3156 ~ Prep & Place Upper Deck Slab 3 0% ~ 06-Mar-14 111-Mar-14 rep & Plac Uppbr De Slab >' ( G3166 Light Guage Structural Framing & Sheathing i 15 ; 0% 06-Mar-14 127-Mar-14 I ~ - Light Guag Str~ctur -.. Framin ' ..... ..: - + . + - a i_~ ; ,, 22-Apr- , 4, Lab B i ding - E G5040 I Aluminum Punched Windows i 5 0% 03 Apr,14 ~ 10-Apr-14 ~ ~ Aluminu Punched indow G5450 ~ Standing Seam Roofing ( 15 I 0% 27 Mar 14 i7-Apr-14 ~ ~ Standin 5eafn R ing I G5060 Brick Veneer 15 ~ 0% 27 Mar 14 l 17 Apr 14 . I ......_. ,___.... 1 ~ ~ I ~ ~ Bri++k Ve eer; . _ -------------_ . _ ......_ _...__ ___ . .. _. _ . -.. . .. __..._.. - -- _ ----------- - G5070 ;Storefront Entrance I 3 I 0% 117-Apr-14 ~ 22-Apr-14 Stprefr nt Er~tran ..: - . - _.. --- G4060 f Light Guage Interior Framing I 15 I 0°t° ~ 11 Mar-14 101-Apr-14 j ; , ; 2~- Light~u2 ay-i4, L a Int~riar Buildin aming G4065 ~ M, P & E Rough fns 15 ~ 0°I° 118-Mar-14 108-Apr-14 j M, f~ & ~ ough-Iris ___ - .. _ .-.. o I G4i00 I Set HM Door Frames m GWB 5 0!° 101 Apr-14 , 08-Apr 14 ~ Set HM. oor F3ram in GW _ G4110 (Batt Insulation and Hang GWB i 10 0% ~ 24-Apr-14 ~ 09-May-14 ---a -h ~3atl;~ .. i.. sula~ion d Hang Actual Work Critical Remaining Work O°°~°IP Summary Page 2 of 4 November 5, 20~ 3 Remaining Work +f~ ~ Milestone of Meridian ~ Exhibit "C" -Contract Schedule ~ Beniton Construction G41 z_D G4130 . . G6012 G6015 G6020 G6100 ~s11 ti G6118 G6120 G613D G&140 G6150 G6160 G6168 Tape & Finish Gypsum Wal[ Board Set HVAG Equipment 10 ~ 0% ~ 09-May-14 ... ~ 23~May-14 ---......... ...._ 5 I D°I° ~ 17-Apr-14 ~ 24-Apr-14 - ; ~ ; ~T~~e & S+tit Hl~ C E -, ,1, finish uipn ypsum nt • 1 • 1 F I , 04-A -14, La _ 5 I 0% 113-Feb-14 120-Feb-14 I itial T rrizo;l rind lab Grade -- 10 ; 4% 130-May-14 113-Jun-14 ~ ~~ 11 rime & Pa t GW B, 5 j 0°I° 113-Jun-14 ~ 20-Jun-14 ;; nstal CeiE g Grid 30 ~ 0% (13-Jun-14 i 28-Jul-14 ......... .. .............. .. .. . ... ......... ... .. ... .. 11 -%~ ase rk ! La . ......._ -.. . ..... ..,.................._-.. 15 0% 114 Jul 14 104 Aug-14 ..... 1 FI ~. ,. 1 °= lu in Set g - 8 1 0% I16-Jul-i4 I28-Jul-14 1 loor overing 5 0% 21-Jul-14 28 Jul-14 - athr m Parti 7 D% 20-Jun-14 Di-Jul-14 ._.. . ? ..--- --- 1 ~ „ Ele trical ro Li P 9 _.. ._.._.. -..----------___.._..._.._._ _.~.~._...-..._---.....----- 8 ~ 0% 01-Jul-14 ~ 14-Jul-14 EI ctric Trim D i D I 0% (20-Jun-14 07-Jul-14 ....._ .m... _ ----!------_....._...._~._..__..~ ~ HV ..--- C E ipment _ .. . ........._......_....._.__..--- 5 I 0% i 21-Jul 14 s 28-Jul-14 __.. .. ................,..... ...... .. ..- .......... .._._ . .__ .. ................. f ang oors an 2 ( 0% ~ 28-Jul-14 ~ 30-Jul-14 ~ roo eiEina Ti Initial Terrazo Grind Slab on Grade Prime & Paint GWB, HM Frames Install Ceilrng Gnd Casework /Lab Equipment Deliver & Install Plumbing Set Fixtures and Equipment Floor Coverings & Final Polish Concrete Bathroom Partitions & Accessories Electrical Drop Light Fixtures Electrical Trim Devices HVAC Equipment Startup, Drop Registers and Tnm Hang Doors and Install Hardware Drop Gelling Tile G2000 Excavate, Form & Place Foundations G202D I Backfill Foundations _. __.. -------- _ . _- -- G2D30 I -- -- -- M, P & E Underground Rough-Ins G2060 ( Prep & Place Slabs an-Grade ~. - G3025 --- Structure! Steel __ G3030 i _ - - ----- - --- --- _.. .. w...... ... . WaII and Upper Decks Structure I G314B , Light Guage Structural Framing & Sheathing - ..- GSppp j Brick Veneer, Stucco, Metal Panels _......_ .. _ ._.. _ __ _ . _...w~ ____ -- ... G501fl Aluminum Windows G5020 f Curtainwall /Storefront Entrances E G5D3D ~ Membrane Roofing - -...._. G5032 I Standing Seam Roofing ~+ ~. . ` ~ G40DD I Light Guage Interior Framrng .... - - .. -~- -- _ ._.G4008 ----~-M, P & E_Rough-fns ........... ...~., ... ~. _ - -- ---- Actual Work Critical Remaining Work P®® Summary D Remaining Work ® ®Milestone 10 1 0°J° ( 23 Dec-13 ~ 09-Jan-14 mm,. - __ 3 ~ 0% ~ 09 Jan 14 ~ i4 Jan-14 „„ ^, - 5 ~ 0% D2 Jan 14 ~ 09 Jan-14 - -- . _ 5 i 0% ~ 14-Jan-14 I21-Jan-14 ! 1. ^• 1 '• 10 --- I 0% -------- £ 06-Feb 14 ~ ~ ' 20-Feb-14 15 ~ 0% ....-..._.. _.._.. f 20-Feb-14 ...._..._ . ---- - ~ 13-Mar-14 15 _ ( 0% ~ 13-Mar-14 03-Apr-14 ~1 _ ___ 1 •• __ 1 _.... 40 I 0% I03-Apr-i4 (30-May-14 10 I 0°!° (1 D-Apr-14 124-Apr-14 _....._ 10 -..... ~ 0% _. _..._._..._._ ~ 01-May-14 ~------. y...._... 16-Ma -14 5 ~ 0% ; 03-Apr 14 i 10-Apr-14 15 ~ 0% 10-Apr-14 I01-May-14 .1 1 , '. -- - 20 0% 03-Apr 14 41 May-14 20 I 0% ~ 10-Apr-14 ~ 09-May-14 Page 3 of 4 21-J n-14, Admin Buildi g - undatio xcav te, Form & Place and ions ackfi I Foundations P & E Undergraund R gh-1 'rep & Place Slabs-on- rad 03-Apr-14, Ad in B ding - S S ructural Stee! Wall and Upper cks tructure Light Guage St uctu I Frami ~~ 30-May 14, in Bui! Brick V Weer tucco, Aluminum --- indo --- Curtainw ~ II /$t efront M, ~';& ~ F~ough~~ns November 5, 2013 of Meridian ~ Exhibit "C" -Contract Schedule G4430 I Set HVAC Equipment ~ 2 ~ 0% 10-Apr-14 14-Apr-14 G4044 . _. _. _. ... ._.~~ .. .....- I Set HM Door Frames m GWB --- - - -----. 5 _.~.~ 0% ~ m._. _ ......_.. 41-May-14 -----------..._. 09-May-14 G4454 -. I Batt Insulation and Hang GWB . ~ 15 I 0% .. ~ 49 May 14 30 May 14 . - . _ - G4074 .- _..._ -..... - --__ . __..-_ ~ Tape & Finish Gypsum Wall Board .. I 20W~ .I m m^ 0°l° . ^ _ _ 30-May-14 _...... ~ 27-Jun-i4 - --- G6004 Initial Terrazo Grind on Slab V µ --- 15 0 / 20 Feb-14 I ---...-- I 27 Feb-14 G6008 .. _ -------- --- - _- . ~ Prime & Paint GW B, HM Frames ~ 2t) ( 4% - 120-Jun-14 V W 121-Jul-14 ..... G6010 ~~ ---- ---~--- install Ceiling Grid ---- I 10 ~ -- a 4/° (07 Jul 14 121 Jul 14 G6030 -- -- - _. ~ Casework Deliver & install ~ 20 i 0% 114-Jul-14 I 1 i-Aug-14 G6440 Plumbing -Set Fixtures and Equipment ' 10 1 0% 27-Jun-14 114-Jul-14 G6450 ----- ~ Bathroom Partitions & Accessories ' ~ 5 jj 0°!° L 14 JuI-14 I ~ 21 Jul-i4 ~ G6060 ------. .-__..... -... --- ~ Electrical Drop tight Fixtures ,... _ - ..... . i 8 ....M_ Qp~° ----- ---- --- ~~-'~u1-14 I ..._ .-....... --- 31-Jul-14 G6070 ~ Electrical Trim Devices _„__ .~~__ ~ 10 i _._._ ..... 0% .- _ 31-Jul-14 ...._.._.- ....w. ~ 14-Au -14 g G6080 HVAC Equipment Startup, Drop Registers and Trim ~ i 10 _ 4°!° 2i-Jul-14 ~ 44-Aug-14 ~ _..-...---- - . G6090 .._.. ...___...~.__._-...._. ------ -- - ----- - - ......_.._..... w. (Hang Doors and Install Hardware .. ..----- j 10 j ----._.._.- 0°I° _ ._ _.__.-. .. ~ 25-Aug-14 ._ _._.V_....~...~.....-. ~ 08-Sep-14 G6498 I Floor Coverings & Final Polish on Slab 10 i 0% ~ 11-Aug-14 ~ 25-Aug-i4 __.._.. ...... G6148 . i...._. -----------. ----- .._.- ..___.... ..__~..........__- Drop Ceiling Tile _ -- ---- -- - ~ 5 - - o--- 0 /° -'---- g-........ ~ 25-Au 14 ~-..-..._...p_.._._ 01 Se 14 XESTIhtG A~MIN Building Re#rafii: 44 01-Sep 14 27 Oct-14 , ...... 175000 ;Selective Demolitian~ 10 0% ~ D1-Sep-14 115-Sep-14 ~_ . NC140D I Rough Ins, Framing, Drywall & Finishes ~ 30 I 0% _ --- 15-Sep-14 -~ (27-Oct-14 Pl_2000 ~ Complete & Distribute Final Punchlist 5 0% L08FSep 14 I 15 Sep-14 Pt2010 .... I Address Punchl~st Items ..._ l 10 . 0% _ _ 15-Sep 14 - ~ 29 Sep 14 Pt2020 - -- --- ---- - -- ---- I Final Walkthroughs w_.. I 0 4% - 29-Sep-14 . ' ~- _. _ - ~ n . ~ e TR2000 ... .._ ~ Training & Demonstrations ... I 5 I 0% ~ 15-Sep-14 ~ 22-Sep-14 - . • ! ~. ... -M R r.........-w ..._-_ ~ ..---- - - - - ----------- --- - ---. . . . __-w . 02000 Owner Equipment Installation & IT Setup . .. ._ ---- ( 5 -- 0°I° 22-Se 14 29-Se 14 02010 ~ Owner Furnishings 5 l I % 0 p i 22-Se 14 ~ ...Y._...p- 29 Se 14 Actual Work Critical Remaining Work ~0 Summary I Page 4 of 4 D Remaining Work ® ®Miles#ane Beniton Construction Setf S ~. . Initial Ter rrFr esinC at~o and Hai & ~ ish Gyp: '~ -Sep-1~ ~n,S b m~ Paint G ~tatl eiling G C~ ork DE rl~i -Set Fi: ., Addres Final UI ~ 22-Sep• Traininc W 29-Sep Owner Owner November 5, 2013