HomeMy WebLinkAbout2-3-04 Letter from Mike AdkinsRECEIVEn
FHB - 32004
p Michael S. Adkins
~~ C ~A[eri 6000 North Meridian Road
Meridian, ID 83642
February 3, 2004
The Honorable Tammy DeWeerd, Mayor of Meridian
The Honorable Council, City of Meridian
33 East Idaho Avenue
Meridian, ID 83642
RE: Saguaro Canyon Estates Subdivision
Dear Mayor DeWeerd and Council Members:
I am respectfully submitting written testimony in addition to oral testimony to be presented at
the February I0"', 2004 public hearing regarding the proposed Saguaro Canyon Estates
Subdivision. My estate style home and twenty acre pazcel lies directly to the west of the
proposed subdivision and I have several concerns that have not been addressed by the
developer or by the City Council to date.
On December 2, 2003 I submitted written testimony to Ms. Borchers of Meridian Planning and
Zoning regarding my concerns (copy attached). To date, I have had no response from her
office or from the developer regarding my concerns. The developer has not made any attempt
to contact me to discuss finding a mutually beneficial resolution, indicating that his regard for
adjacent properties is non-existent.
I will first summarize my concerns noted in my letter of December 2, 2003 to Ms. Borchers
followed by detail on these concerns. As well, I have added comments from the City Planners
Staff Report dated January 5"', 2004 to the Mayor and City Council.
• Lot size and density of the proposed Saguaro Canyon Estates Subdivision exceeds those
recommended in typical R-4 Zoning (request is for 70% of minimums).
• Consideration for adjoining properties is not adequately addressed, specifically those
properties to the West.
• Active farming/ranching is taking place on these properties and the needs of existing,
along with the new homeowners of the subdivision, should be addressed. (Fencing ou
the east side has only been discussed and not required to date)
• City infrastructure in North Meridian is inadequate to support the proposed subdivision.
• The North Meridian Development Plan of 2002 does not appear to be of consideration.
recommended in t ical R-4 Zo
Lot Size- City Requirement
R-4: 8,000 sq, ft. per lot
House Size- City Requirement
1,400 sg. Pt. minimum
Frontage- City Requirement
80' minimum
40' minimum (cul-de-sac)
Cul-de-sac City Requirement
Length 450' maximum
Proposed Lot Sizes
5,735 sq, ft. minimum per lot
Proposed Minimum Area
1,201 sq, ft. minimum
Proposed Minimum Frontage
60' minimum (perpendicular
streets)
30' minimum (cul de sacs/curves)
Proposed Lengths
Approx. 550' maximum
Staff report recommendations: Due to the lack of existing gravity sewer for 392 of the 442
buildable lots and the lack of a secondary permanent vehicular access road, we bel_ ie
annexation and reliminar lat boundaries should be limited to the 50 lots at the south end of
thethe dev~nrnent. This will require the applicant to submit a new
and a revised preliminary plat. Alternatively, staff is recommendi g ae ond'tion be placed on
the preliminary plat and CUP/PD applications that allow a maximum of SO lots to be developed
and until such time as these services become available. Finally, the applicant told staff on
12/31/03 that they understand the inherent risk involved with these two issues (extension of the
North Slough Trunk and a secondary access road). The Public Works Department's
preliminarily estimates the North Slough extension to be complete by ,Tune 2005.
Staff finds that the requested zoning and annexation could be deemed premature for this section
(T.4N., R.IE, Section 30) based on the Comprehensive Plan
of Havasu Creek Subdivision and the school district's intent tooconshuct a new~Middle School
in the next two to three years demonstrates a certain degree of intent for the City to expand in
this area. The P&Z Commission and City Council should consider whether the timing is correct
for expansion of the city limits into Section 30.
My concerns: Meridian has a finite resource in North Meridian and a
pproving densities of this
magnitude will further exasperate over-crowding of our infrastructure. As well, Saguaro
Canyon Estates doesn't protect the heritage of Meridian or the "rural-feel" that currently- exists.
Meridian's mantra on its letterhead states "Hub of the Treasure Valley, A good place to live".
Meridian needs to strive for something better than "a good place to live" it should be a
"GREAT" place to live. If we succumb to the pressures of developers and development,
Meridian will become nothing more than anover-crowded bedroom community ofentry-level
homes. As I have stated previously, I support growth and develo
of existing homeowners, and certainly not without some conside anon for the pent spa epense
Approving lot sizes 70% of the city requirement would be extremely questionable considering
the number of homes planned for this North Meridian location.
properties to the West
Staff recommendation: Staff does not anticipate that the ro
hazardous. However, staff finds that the new residences may be disruptive to existing
agricultural practices to the west and north. p posed residential uses will be
The Commission and Council should rely on public testimony (oral and
neighborin written) to determine
whether or not the proposed uses will be disturbing or hazardous to the existing or future
g uses.
MY Recommendation: The conditional use request to allow for greater density should not be
granted. And. the developer needs to provide an adequate barrier between the existine
landowners to the west that should include a berm and solid fence protecting the future
neighbors from the existing agricultural practices. Furthermore, a solid fence and hi
would be a step in the right direction towards protecting the value of existin
properties. gh berm
g and adjacent
Citv infrastructure
Staff recommendation: Existing elementary school ca aci
undetermined factor for thie• subdivision. In his Novemb~ I ~ remains an important but
Wendel Bi ham states that "additional students will urther com~houlnd the cu~rent Mr
overcrowded situation. Residents cannot be assured o
Both Havasu Creek and Paramount Subdivision, a
attendin the nei hhorhood school "
this time. A ke ~' miles to the west, have been
approved, for new elementary schools, although ne~her ofthese sites has p constrzrclion date at
involved with a rovin
uestion or the Commission and Council to consider is the de ree o risk
munici al services and school ca atcon o which onl a small onion is serviceable iv'
toda . rtla
Joint School District No. 2 does not intend to 0
Fall 2007, assuming it is approved on the Fa112005 bond w Mi This would e this section until
the North Slough trunk to the east side of Meridian
that new residential develo Road by Spring 2007, It c 9 ld be argl esg
precede the availability of the public school s stem to t~ty m this square mile should not
coincide. Y provide service, and that the two should
Sewer - It is debatable whether the applicant's hasin
P g of Saguaro Canyon Estates is in
accordance with their connection to the North Slough Trunk. The Master Facility plan's
designated gravity drainage area for the majority of this subdivision is not available for service
at this time. While it is possible the North Slough Trunk may be available to the subject
property by the time Phase 2 of Saguaro Canyon Estates is ready for submission, it cannot be
determined for certain because fhe majority of the sewer trunk extension is through Paramount
Subdivision -property outside the control of the developer of Saguaro Canyon Estates.
3
Police/Fire -The Meridian Police Department has not replied in writing to this application.
However, they have historically opposed new developments of this sire in North Meridian until
the patrol force is expanded and response tinges improved Fire service is available via
Substation No. 3, which opened December 2003. However the applicant has riot demonstrated
how or when the majority of the subdivision will be serviced with a per mancnt secondar y
vehicular access As proposed, only ~0 Zots can be served with emergency, fire service at this
time.
My concerns: A development of this magnitude and this aggressive considering all of the
concerns raised in the staff report is premature and certainly shouldn°t be approved. with the
current conditional use requests for increased density, and without satisfying neighboring
concerns. The proposed development will lead to further over-crowding of the schools,
substantial congestion on McMillian between Meridian and Locust Grove roads, lacks the
necessary police and fire protection and has inadequate sewer facilities. Finally, the staff report
questions the timing of this development and whether or not it is in the best of interests of the
ci considering all of the factors called out in the report.
As a resident and business leader, I recognize that growth is critical, provided it protects the
interests of established property owners and adequate city infrastructure exists. The Saguaro
Canyon Estates Subdivision certainly doesn't satisfy neighboring concerns and as the staff
report calls out numerous times, city infrastructure is inadequate. Approving this subdivision
in its current form would establish a precedent in North Meridian that predisposes the future of
Meridian into one of an over-crowded city with inadequate infrastructure.
I am appealing to the City Council to reconsider the Saguaro Canyon Estates Subdivision and
to reject it as currently proposed for all of the reasons mentioned above. I am asking the City
Council to require the developer to resubmit a plan that meets the zoning requirements of the
;city, and more importantly, deliver a plan that is supported by adjacent home/landowners.
Respectfully,
~L'' ~N
Michael S. Adkins
attachment: Letter to Ms. Borchers dated December 2, 2003
4