Loading...
HomeMy WebLinkAboutCentral District Health CommentCENTRAL CENTRAL DISTRICT HEALTH DEPARTMENT .. DISTRICT Return to: C HEALTH Environmental Health DiviC~~~~~ ^ Boise DEPARTMENT ` ^ Eagle ~A~ '~ ~ ~~ `~t ^ Garden City Rezone # Conditional Use # ~~tv olerk off oe ~p4eridian ^ Kuna Preliminary /Final /Short Plat iP y y ,-/OOZ, / ^ ACZ ~f/e~~.zL~ ~'c.~.~diri sm~„ ~ z ^ Star ^ 1. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerhing soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ or bedrock from original grade ^ other ^ 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. /JfL,I S. After writte~,approval from appropriate entities are submitted, we can approve this proposal for: !/ ~ .~- ntral sewage ^ community sewage system ^ community water well ^ interim sewage ,~ssntral water ^ individual sewage ^ individual water The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare, Division of Environmental Quality: .i~FcertCral sewage ^ community sewage system ^ community water ^ sewage dry lines ~-eentral water Runoff is not to create a mosquito breeding problem. ^ 11. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 13. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ beverage establishment ^ grocery store Please see attached stormwater management recommendatations ^ 15. ^ child care center Date: ~Isz~ Reviewed By: , ~~~ Review Sheet coHO s~oa i~c CENTRAL ~ • DISTRICT ~THEALTH . DEPARTMENT MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE,10 83704-0825 • (208) 375-5211 • FAX 327-8500 Ta prevent and treat disease and disability'; la promale heahhy lifesgdes; and ro protect and promote the health and quali(r of our em~irmrm~ur. STORM WATER MANAGEMENT RECOMMENDATIONS It is recommended that storm water bepre-treated prior to discharge to the subsurface to prevent impact to ground water and surface water quality: The engineers and architects involved with the design of this project should obtain current best management practices for storm water disposal and design a storm water management system that is preventing groundwater and surface water degradation. Manuals that could be used for guidance are: State of Idaho Catalog of Stormwater Best Management Practices For Idaho Cities and Counties. Prepared by the Idaho Department of Environmental Quality, July 1997. Stormwater Best Management Practices Guidebook. Prepared by City of Boise Public Works' Department, May 2000. 'ra,e.lz m oaw Ada /Boise County Office 707 N. Armstrong P., - Boise, l0 83704 Enviro. Health: 327-745 Family Planning: 327-7400 Immunizations: 327-745C Senior Nutritioni 327-746C W;C: 327-748£ FAiI ~ ~-8500. faller. Elnrnre, Braise, and Ada Countiea~ EIITOrc LOL'f i~ Jill CE 520 E. 8th 5;. North Mountain Home, IC E3647 Enviro. Health: 587-9225 Family Health: '..87-?40i WIC: Sfi7-44G9 FAX: 587-3521 iCOn1Y U`ii.E 7Cs N~. L. ° - F.G. Bax 1<EE McCall, ID 5353E Ph. c34-i15? FAY: 634-27 ~ 4