HomeMy WebLinkAboutInteragency Agmt with ACHD and MDC for Split Corridor Phase 2JOINT PROJECT IBETWEEN CY AGREEMENTCOPY
ADA COUNTY HIGHWAY DISTRICT, CITY OF MERIDIAN,
AND MERIDIAN DEVELOPMENT CORPORATION
- MERIDIAN SPLIT CORRIDOR PHASE TWO
ACHD PROJECT NO. 506047
THIS JOINT PROJECT INTERAGENCY AGREEMENT ("Agreement") is entered into
this ... day of J V ; , , 2012, by and between ADA COUNTY HIGHWAY DISTRICT,
by and through its Board of Commissioners (hereinafter referred to as "ACHD"), and the CITY
OF MERIDIAN, by and through its Mayor and City Council (hereinafter referred to as the
"CITY"), and the MERIDIAN DEVELOPMENT CORPORATION, by and through its Board of
Commissioners (hereinafter referred to as "MDC") all parties being bodies politic and corporate
of the State of Idaho.
RECITALS
WHEREAS, ACHD is a single county -wide highway district, a public entity, organized
and operating pursuant to Idaho Code Title 40, Chapter 14, as amended and supplemented.
WHEREAS, CITY is a public entity, organized and operating pursuant to Idaho Code
Title 50, as amended and supplemented.
WHEREAS, MDC is a public entity, organized and operating pursuant to Idaho Code
Title 50, Chapter 20, as amended and supplemented.
WHEREAS, ACHD is planning to construct a road improvement project focusing on
widening and realigning Main Street and Meridian Road from north of Franklin Road to Cherry
Lane -Fairview Avenue, Ada County, Idaho, known as Phase Two of the Meridian Split Corridor
Project, ACHD Project No. 506047 (hereinafter referred to as the "ACHD Phase Two Project").
The ACHD Phase Two Project includes the construction of a cross-over roadway, connecting
Main Street to Meridian Road, north of Franklin and south of the railroad crossing. It includes
the expansion of Meridian Road to 5 -lanes, from the crossover roadway, north to the Meridian
Road/Cherry Lane -Fairview Avenue 'intersection and elimination of the free -running right turn at
the intersection of Main Street and Fairview Avenue. The ACHD Phase Two Project is
generally depicted in the aerial/GIS map attached hereto as Exhibit A. The Meridian Split
Corridor project has been identified in the Downtown Meridian Transportation Management
Plan (2005).
WHEREAS, CITY is planning a public works sewer and water project for Meridian Road
(hereinafter referred to as "CITY Sewer and Water Project") and desires the CITY Water and
Sewer Project to be incorporated into a portion of the ACHD Phase Two Project and CITY
agrees to pay for the actual design and construction costs of the CITY Water and Sewer Project
if it is incorporated into the ACHD Phase Two Project.
Page 1 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
WHEREAS, ACHD is willing to accommodate CITY's request for the incorporation of
the CITY Water and Sewer Project into the ACHD Phase Two Project so long as CITY agrees to
be fully responsible for all costs of the CITY Water and Sewer Project.
WHEREAS, MDC desires the installation of decorative street lighting (hereinafter
referred to as the "MDC Lighting Project") to be incorporated into a portion of the ACRD Phase
Two Proj ect and MDC agrees that the MDC Lighting Project is a "non -transportation
component" and agrees to comply with all requirements set forth in ACHD's Cost Share
Ordinance Section 3109 et. seq. (hereafter "Cost Share Ordinance"), and MDC agrees to pay for
the design and construction costs of the MDC Lighting Project in accordance with the Cost Share
Ordinance, and as a co -permittee with CITY, MDC shall assume secondary responsibility for the
perpetual maintenance and operation of the MDC Lighting Project in accordance with the Cost
Share Ordinance. CITY agrees that the MDC Lighting Project is a "non -transportation
component" under the Cost Share Ordinance and CITY agrees to have primary responsibility to
pay for the perpetual maintenance and operation of the MDC Lighting Project in accordance with
the Cost Share Ordinance as a co -permittee on the MDC Lighting Project, and City agrees to
comply with all applicable requirements set forth in the Cost Share Ordinance.
WHEREAS, CITY desires the installation of landscape improvements (hereinafter
referred to as the "CITY Landscape Project") to be incorporated into a portion of the ACRD
Phase Two Project and CITY agrees that the CITY Landscape Project is a "non -transportation
component" and agrees to comply with all requirements set forth in ACHD's Cost Share
Ordinance Cost Share Ordinance, and CITY agrees to pay for the design, construction costs, and
perpetual maintenance and operation of the CITY Landscape Project in accordance with the Cost
Share Ordinance.
WHEREAS, ACRD, CITY and MDC desire by this Agreement to work cooperatively
and to set forth their respective duties and obligations which they are authorized by law to
perform, and to allocate certain costs and responsibilities, each with regard to the joint ACHD
Phase Two Project/CITY Water and Sewer Project/CITY Landscape Project/MDC Lighting
Project in accordance with law and as further set forth in this Agreement.
WHEREAS, Idaho Code § 67-2332 expressly authorizes public agencies to enter into
agreements with one another for cooperative action for purposes within the power, privilege or
authority of said agencies.
AGREEMENT
NOW, THEREFORE, for and in consideration of the foregoing Recitals, which are
made a part of the Agreement, and not mere Recitals, and for other good and valuable
consideration, the receipt and sufficiency of which are hereby acknowledged, the parties do
mutually undertake, promise and hereby agree as follows:
Page 2 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
SECTION I.
ACHD PHASE TWO PROJECT
1. DESIGN
1.1 ACHD, and/or its consultant, shall complete all design work for the ACHD Phase
Two Project. The ACHD Phase Two Project shall be designed in compliance with the standards
of the American Association of State Highway and Transportation Officials ("AASHTO"), the
standards and specifications set forth in the ACHD Policy Manual. ACHD shall provide the
CITY and MDC with plan sets at all design phases for review and comment.
1.2 ACHD shall provide for the design of the ACHD Phase Two Project. CITY shall
pay ACHD for the additional cost for design of the ACRD Phase Two Project resulting from
incorporation of the CITY Water and Sewer Project and/or the CITY Landscape Project. MDC
shall pay ACHD for any actual additional costs for design of the ACRD Phase Two Project
resulting from incorporation of the MDC Lighting Project The actual cost of the ACHD Phase
Two Project design is EIGHT HUNDRED THOUSAND SEVEN HUNDRED AND EIGHTY
FOUR DOLLARS AND SEVENTY-SIX CENTS ($800,784.76). ACHD shall invoice any
actual additional costs for the design of the ACHD Phase Two Project accordingly and within
thirty-five (35) days receipt of any such invoice, CITY and/or MDC shall pay the amount
invoiced by ACRD.
1.3 ACHD shall approve, in its sole discretion, the Engineer's Estimate and the
ACHD Phase Two Project plans. ACHD, CITY and MDC shall acknowledge in writing the
final, approved ACHD Phase Two Project bid plans and the Engineer's Estimate prior to
commencement of formal bid, and neither shall thereafter be modified in any material way
unless such modifications are approved in writing signed by ACHD
2.
CONSTRUCTION ACCESS MEASURES — SHARED RESPONSIBILITIES
2.1 In order to ensure access for properties during construction which would
otherwise be landlocked as a result of road closures during the joint ACHD Phase Two
Project/CITY Project, and in order to ensure parking access for CITY' s City Hall building during
the joint ACHD Phase Two Project/CITY Project, ACHD and CITY shall coordinate measures
for alternate access, which includes the acquisition of temporary easements, the placement of
temporary paving, and the removal of curbing and other features.
2.2 The approximate location and configuration of the alternate access measures to be
coordinated by ACHD and CITY and made a part of the joint ACHD Phase Two Project/CITY
Project are depicted in the attached Exhibits B 1, B2 and B3.
2.3 The current cost estimate of the alternate access measures is TWO HUNDRED
FIFTY THOUSAND DOLLARS ($250,000); CITY shall reimburse ACRD for one-half of the
costs of such alternate access up to a maximum amount of ONE HUNDRED TWENTY-FIVE
THOUSAND DOLLARS ($125,000). ACHD and CITY agree that if the actual cost of the
alternate access measures exceeds TWO HUNDRED FIFTY THOUSAND DOLLARS
($250,000) CITY and ACRD shall each be responsible for one-half of such excess costs. ACHD
Page 3 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
shall provide CITY with a breakdown of the actual costs of the access measures along with an
invoice for the CITY's share of the same as set forth herein and as may be agreed by ACHD and
CITY with regard to any excess amounts and within thirty-five (35) days receipt of such invoice,
CITY shall pay the amount invoiced by ACRD.
3.
ACHD STORM WATER FACILITY — PARCEL 143
3.1 ACHD Phase Two Project will include a storm water facility on a parcel located
at the southeast corner of the intersection of Meridian Road and Carmel Drive; the work is
depicted in the attached Exhibit C, and is identified as Parcel 143 in the attached Exhibit C.
3.2 Parcel 143 and the storm water facility to be constructed thereon shall be
characterized by ACHD as "highway" and "public right-of-way" as such terms are defined in
Title 40, Chapter 1, Idaho Code.
SECTION II.
CITY WATER AND SEWER PROJECT
SUMMARY STATEMENT OF AGREEMENT
ACHD shall incorporate the CITY Water and Sewer Project into the ACHD Phase Two
Proj ect subject to the terms and conditions of this Agreement.
2. SCOPE OF WORK, ESTIMATED COST
2.1 ACHD and CITY agree that the scope of work for the CITY Water and Sewer
Project provided by this Agreement is set forth in the document entitled "Scope of City Water
and Sewer Project", a copy of which is attached hereto as Exhibit D.
2.2 CITY's consultant has prepared a cost estimate in 2011 Dollars for the
construction of the CITY Water and Sewer Project. Construction of the CITY Water and Sewer
Project is estimated to cost a total of ONE MILLION TWO HUNDRED THOUSAND
DOLLARS ($1,200,000). The parties acknowledge that these costs are only an approximation of
the cost in 2011 dollars for the construction of the CITY. The parties acknowledge and agree
that rapid rise in construction materials may affect the actual cost of construction of the CITY
Water and Sewer Project that are substantially higher than the estimated costs in 2011 dollars.
CITY shall be solely responsible to pay all actual construction costs for the CITY Water and
Sewer Project including all actual construction costs in excess of the CITY's estimate.
3.
DESIGN AND PERMITS
3.1 CITY, and/or its consultant, will complete all design work for the CITY Water
and Sewer Project. The CITY Water and Sewer Project shall be designed in conformance with
all applicable federal, state and local laws and regulations and standards and specifications for
such work including but not limited to the most current edition of the Idaho Standards for Public
Works Construction (ISPWC) and the CITY Supplemental Specifications to the ISPWC and all
applicable standards and specifications set forth in the ACHD Policy Manual.
Page 4 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
3.2 The design work for the CITY Water and Sewer Project shall include detailed and
comprehensive plans addressing ground water to be encountered during sewer excavation in the
project site and adequate countermeasures for handling ground water including, but not limited
to, dewatering. The dewatering plans must be approved by the CITY Engineer and all applicable
agencies.
3.3 Copies of complete and final designs for the CITY Water and Sewer Project
including detailed and comprehensive plans addressing ground water in the project site and
adequate countermeasures for ground water including, but not limited to, dewatering shall be
provided to ACRD no later than June 1, 2012.
3.4 CITY shall be solely responsible to apply for and obtain all necessary federal,
state and local permits for the CITY Water and Sewer Project as incorporated into the ACRD
Phase Two Project.
4. SPECIAL PROVISIONS AND BID QUANTITIES
4.1 CITY, and/or its consultant, will develop special provisions, and unit bid
quantities for the CITY Water and Sewer Project work to be included in the bid documents for
the ACRD Phase Two Project construction contract. The special provisions and unit bid
quantities shall support the CITY Water and Sewer Project as designed, including but not limited
to ground water countermeasures such as dewatering, and shall be in conformance with all
applicable federal, state and local laws and regulations and standards and specifications for such
work including but not limited to the most current edition of the Idaho Standards for Public
Works Construction (ISPWC) and the CITY Supplemental Specifications to the ISPWC and all
applicable standards and specifications set forth in the ACRD Policy Manual.
4.2 Complete and final special provisions, and unit bid quantities for the CITY Water
and Sewer Project work shall be provided to ACRD no later than June 20, 2012.
5.
BIDDING AND CONTRACTING
5.1 ACRD shall incorporate the designs, special provisions, and unit bid quantities
for the CITY Water and Sewer Project work as developed and submitted by CITY into the bid
documents for the ACRD Phase Two Project. ACRD shall provide CITY a complete set of
combined bid documents for the ACRD Phase Two Project, and the CITY Water and Sewer
Project work referenced herein.
5.2 ACRD shall solicit, receive, and open bids for the ACHD Phase Two Project
incorporating the CITY Water and Sewer Project work referenced herein utilizing a two-step,
prequalification methodology as allowed in Idaho Code Section 67-2805. In the initial phase,
ACRD shall prequalify prime and specialty contractors and in the second phase, bid prices will
be accepted by ACRD only from prequalified contractors. ACRD shall furnish CITY with an
abstract of all bids received.
Page 5 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
5.3 ACRD shall award a contract for construction of the for the ACRD Phase Two
Proj ect incorporating the CITY Water and Sewer Project work referenced herein, or in its
discretion, ACHD may reject all bids and re -bid the project. CITY agrees and acknowledges that
the contract for construction may include incentives for early completion.
5.4 Following award, ACRD shall execute and administer the construction contract
for the ACRD Phase Two Project incorporating the CITY Water and Sewer Project work
referenced herein.
CONSTRUCTION
6.1 The construction of the CITY Water and Sewer Project as incorporated into the
ACHD Phase Two Project shall be built in conformance with the designs, plans and
specifications provided to ACRD by CITY. Such construction shall comply with all applicable
laws, ACRD policies and standards, and engineering practices.
6.2 For all lawful purposes, CITY shall be considered a "Co-owner" of the ACRD
Phase Two Project to the extent that it incorporates the CITY Water and Sewer Project. Pursuant
to and in accordance with, applicable laws and regulations, the CITY shall file separately with
the appropriate agencies a Notice of Intent (hereinafter referred to as "NOI") for the construction
of the CITY Water and Sewer Project as incorporated into the ACHD Phase Two Project.
6.3 ACHD shall at all times be the party responsible to provide inspection for all
work for the ACRD Phase Two Project that is not within the scope of the CITY Water and
Sewer Project. CITY shall at all times be the party responsible to provide inspection for all work
for the CITY Water and Sewer Project and shall provide copies of appropriate inspections, tests
and diaries to the ACRD Phase Two Project representative. ACHD shall combine all applicable
inspections, tests and diaries into a joint report which shall be co-signed by CITY and ACRD.
The CITY shall at all times be the party responsible for maintenance, inspection, and tracking of
any and all dewatering work associated with the CITY Water and Sewer Project.
6.4 CITY shall reimburse ACHD for all costs associated with the portion of the
awarded bid relating to the CITY Water and Sewer Project. CITY shall have the discretion to
accept or reject any change orders to the portion of the awarded bid relating to the CITY Water
and Sewer Project within 5 business days. CITY shall not be obligated to reimburse ACHD for
any costs associated with unapproved change orders, but may, in its discretion, approve any
change order retroactively.
6.5 CITY shall at all times be the party solely responsible for and shall reimburse
ACRD for backfill of excavation, safety measures, landscape restoration solely attributable to the
CITY Water and Sewer Project as incorporated into the ACHD Phase Two Project and all other
activities incidental to the CITY Water and Sewer Project.
6.6 CITY shall also be responsible for and shall reimburse ACHD for changed
conditions, plan errors and omissions, and any delays attributable to the CITY Water and Sewer
Project as incorporated into the ACRD Phase Two Project.
Page 6 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
6.7 ACHD shall make any monthly progress payments to and the final construction
contract payment to the Construction Contractor in conformance with the Construction Contract.
Provided, however that before ACHD makes any monthly progress payment to the Construction
Contractor for any work relating to any portion of the CITY Water and Sewer Project, CITY
shall first approve and authorize such payment in writing within S business days of receipt.
CITY shall hold ACHD harmless for any disputes relative to any monthly progress payment or
portion thereof that the CITY does not approve and authorize.
6.8 ACHD will submit to CITY a copy of each Contractor progress payment estimate,
as such estimates are approved by ACHD, together with an invoice for CITY's share of the
Construction Contract costs earned by and to be paid to the Contractor. ACHD shall retain all
invoices and other documents supporting such payment estimates. ACHD shall submit a
monthly bill to CITY for reimbursement of the actual construction costs of the CITY Water and
Sewer Project, as well as other costs for which CITY is responsible as set forth in this
Agreement, and a final bill within THIRTY (30) days after completion of the work which shall
include the CITY's share of any early completion incentive paid to the Construction Contractor
as provide in Section II.8.1 of this Agreement.
6.9 CITY shall reimburse ACHD for the actual construction costs of the CITY Water
and Sewer Project as incorporated into the ACHD Phase Two Project as well as other costs for
which CITY is responsible as set forth in this Agreement. CITY shall pay ACHD within
THIRTY (30) days after receipt of ACHD's monthly and final bills referenced in Section II.6.8
of this Agreement in cash or other immediately available funds.
6.10 CITY shall be solely responsible for determining that the work for the
construction of the CITY Water and Sewer Project is Substantially Complete and will provide
ACHD evidence of said acceptance and determination in writing. CITY shall be solely
responsible to notify ACHD in writing when Construction Completion may be issued for the
CITY Water and Sewer Project.
6.11 CITY shall be solely responsible for operation and maintenance of the work for
the construction of the CITY Water and Sewer Project once said CITY Water and Sewer Project
becomes operational.
6.12 ACHD shall transfer to CITY for the benefit of CITY, all warranties in the
Construction Contract relating to the CITY Water and Sewer Project.
6.13 ACHD shall transfer to CITY for the benefit of CITY, all title in the work for the
construction of the CITY Water and Sewer Project.
7.
CITY SEWER AND WATER WORK OUTSIDE OF ACHD PHASE TWO
PROJECT BOUNDARIES
CITY shall be fully responsible for any sewer and water work outside of the ACHD
Phase Two Project boundaries as depicted in Exhibit A, including, but not limited to, property
Page 7 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
owner notification, excavation, material costs, construction costs, traffic control, grading, and
associated paving work which will be subject to ACHD permitting, inspection, and approval.
Provided that any ACHD permit fees shall be waived in accordance with the ACHD-CITY
Interagency Governmental Agreement for Waiver of Costs and Fees dated June 9, 2010 and
incorporated herein by reference. City shall also be responsible for inspection of storm water
protection and erosion control measures outside of the aforementioned ACHD Phase Two
Proj ect boundaries.
8.
EARLY COMPLETION INCENTIVE PAYMENT
8.1 The early completion incentive that may be paid to the Construction Contractor
shall not exceed THREE HUNDRED FIFTY THOUSAND DOLLARS ($350,000.00). CITY
shall be responsible for and shall reimburse ACHD for one-half (1/2) of any early completion
incentive paid to the Construction Contractor, up to a maximum amount of ONE HUNDRED
SEVENTY-FIVE THOUSAND DOLLARS ($175,000.00).
8.2 One-half (1/2) of any liquidated damages received by ACRD from the
Construction Contractor shall be reimbursed back to the CITY.
SECTION III.
CITY LANDSCAPE PROJECT
SUMMARY STATEMENT OF AGREEMENT
ACHD shall incorporate the CITY Landscape Project into the ACHD Phase Two Project
subject to the terms and conditions of this Agreement.
2.
ISLAND MEDIAN AND FREE -RUNNING RIGHT -TURN — MAIN STREET
AND FAIRVIEW AVENUE INTERSECTION — PARCEL 162; CROSS-OVER
ROADWAY MEDIANS — PARCELS 163 AND 164.
2.1 As part of the ACHD Phase Two Project, ACRD shall modify the landscaped
island median on the southeast corner of the intersection of Main Street and Fairview Avenue
that is currently right-of-way owned by ACHD and maintained by CITY and ACHD shall
eliminate the free -running right turn at said intersection. The work is depicted in the attached
Exhibit E and these areas are identified collectively as Parcel 162 in the attached Exhibit E.
2.2 As part of the ACHD Phase Two Project, ACHD shall construct an island median
southwest of the intersection of Main Street and Ada Street and an island median west of the
intersection of Bower Street and the cross-over roadway. The work is depicted in Exhibit F and
Exhibit G and these areas are identified respectively as Parcel 163 and Parcel 164 in the attached
Exhibit F and Exhibit G.
3. CONSTRUCTION
Page 8 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
3.1 As to Parcels 162, 163 and 164, ACRD shall be responsible for all traffic related
improvements and removal of all roadway base material as part of the ACRD Phase Two
Project, construction of curb, gutter and sidewalks, and the placement of conduit and 12" of top
soil to a finish grade of 2" below top back of curb for the interior of and within each parcel as
indicated on the plans for the ACRD Phase Two Project.
3.2 As to Parcels 162, 163 and 164, CITY shall be solely responsible for the design,
construction and inspection of the installation of the sod, landscape, sprinkler irrigation facilities,
renovation materials, and warranties and such work shall be completed prior to substantial
completion of the ACRD Phase Two Project. CITY understands and agrees that if the work is
not completed prior to substantial completion of the ACRD Phase Two Project, ACRD may in
its full and complete discretion, pave Parcels 162, 163 and 164 with asphalt and any obligations
of ACRD and the CITY under this Section III shall terminate.
0
COST SHARE PERMIT
4.1 CITY agrees that the CITY Landscape Project is a "non -transportation
component" as defined in the Cost Share Ordinance and that CITY shall apply to ACRD for a
Cost Share Permit for the CITY Landscape Project. CITY shall comply with any and all terms
and conditions of the permit that may be issued to CITY by ACRD as to landscape
improvements placed on Parcels 162, 163 and 164 by the CITY.
4.2 The terms and conditions of this Agreement relating to the CITY Landscape
Project shall be null and void in the event CITY fails to apply to ACRD for a Cost Share Permit
for the CITY Landscape Project or if ACRD does not issue a Cost Share Permit for the CITY
Landscape Project.
5. MAINTENANCE AND OPERATION
5.1 CITY shall be solely responsible to pay for the perpetual maintenance and
operation of the sod, landscape, and sprinkler irrigation facilities on Parcels 1625 163 and 164 in
accordance with the Cost Share Ordinance and any permit that may be issued to CITY
thereunder. CITY shall be solely responsible to provide adequate water volume and pressure for
landscape irrigation.
6. VACATION AND ABANDOMENT OF PARCEL 162
6.1 Upon completion of the ACRD Phase Two Project, the ACRD Board of
Commissioners shall consider the vacation and abandonment of Parcel 162 as public right-of-
way in accordance with the procedures set forth in Idaho Code. Upon vacation and abandonment
of Parcel 162, ACRD shall convey Parcel 162 to CITY as surplus property in accordance with
the procedures set forth in Idaho Code with the execution of a Quitclaim Deed, "as -is" and
without warranty of any kind. Any compensation normally due to ACRD in the event of such a
conveyance will be waived by ACRD in accordance with the ACRD -CITY Interagency
Governmental Agreement for Waiver of Costs and Fees dated June 9, 2010 and incorporated
herein by reference.
Page 9 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
6.2 If Parcel 162 is vacated and abandoned by ACRD and conveyed to CITY as
surplus property as provided in Section III.6.1 of this Agreement, any Cost Share Permit granted
to CITY by ACHD for the CITY Landscape Project shall terminate as to Parcel 162.
SECTION IV
CITY A CO -PERMITTEE ON MDC LIGHTING PROJECT
1.1 CITY agrees that the MDC Lighting Project provided for in Section V of this
Agreement is a "non -transportation component" as defined in the Cost Share Ordinance and that
CITY shall apply to ACRD for a Cost Share Permit for the MDC Lighting Project as a co -
permittee with MDC, for the purpose of assuming primary and sole responsibility for perpetual
maintenance and operation of the MDC Lighting Project. CITY shall comply with all applicable
terms and conditions of the permit that may be issued to MDC and the CITY by ACRD for the
MDC Lighting Project.
1.2 The terms and conditions of this Agreement relating to the MDC Lighting Project
shall be null and void in the event CITY fails to apply to ACHD for a Cost Share Permit for the
MDC Lighting Project as a co -permittee with MDC or if ACRD does not issue a Cost Share
Permit for the MDC Lighting Project.
2. MAINTENANCE AND OPERATION
CITY shall be primarily and solely responsible to pay for the perpetual maintenance and
operation of the MDC Lighting Project in accordance with the Cost Share Ordinance and any
permit that may be issued to MDC and the CITY thereunder. CITY shall be primarily and solely
responsible to pay the energy costs necessary for the perpetual operation of the MDC Lighting
Project.
SECTION V
MDC LIGHTING PROJECT
SUMMARY STATEMENT OF AGREEMENT
ACHD shall incorporate the MDC Lighting Project into the ACRD Phase Two Project
subject to the terms and conditions of this Agreement.
2.
COST SHARE PERMIT
2.1 MDC agrees that the MDC Lighting Project is a "non -transportation component"
as defined in the Cost Share Ordinance and that MDC shall apply to ACRD, as a co -applicant
with the City, for a Cost Share Permit for the MDC Lighting Project as required by the Cost
Share Ordinance.
2.2 MDC shall pay for the design and cost to construct the MDC Lighting Project in
accordance with the Cost Share Ordinance and any permit(s) that may be issued to MDC
Page 10 of 21
ACRD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
thereunder. MDC shall comply with any and all terms and conditions of the permit(s) that may
be issued to MDC by ACHD. As a co -permittee with CITY, MDC shall assume secondary
responsibility for the perpetual maintenance and operation of the MDC Lighting Project in
accordance with the Cost Share Ordinance and shall take on such responsibilities in the event the
CITY fails in any way to carry out its obligations as set forth in Section IV of this Agreement.
2.3 The terms and conditions of this Agreement relating to the MDC Lighting Project
shall be null and void in the event MDC fails to apply to ACHD for a Cost Share Permit for the
MDC Lighting Project or if ACHD does not issue a Cost Share Permit for the project.
3. SCOPE OF WORK, ESTIMATED COST
3.1 ACHD and MDC agree that the scope of work for the MDC Lighting Project
provided by this Agreement is set forth in the document entitled MDC Lighting Project, a copy
of which is attached hereto as Exhibit H.
3.2 MDC's consultant has prepared a cost estimate in 2011 Dollars for the
construction of the MDC Lighting Project provided by this Agreement. Construction of the
Lighting Project as provided by this Agreement is estimated to cost a total of FIVE HUNDRED
THOUSAND DOLLARS ($500,000). The parties acknowledge that these costs are only an
approximation of the cost in 2011 dollars for the construction of the MDC Lighting Project. The
parties acknowledge and agree that rapid rise in construction materials may affect the actual cost
of construction of the MDC Lighting Project that are substantially higher than the estimated costs
in 2011 dollars. MDC agrees that if any additional construction costs for the MDC Lighting
Project are incurred, MDC shall be solely responsible to pay these additional costs.
0
DESIGN AND PERMITS
4.1 MDC, and/or its consultant, will complete all design work for the MDC Lighting
Proj ect. The MDC Lighting Project shall be designed in conformance with all applicable federal,
state and local laws and regulations and standards and specifications for such work including but
not limited to the most current edition of the Idaho Standards for Public Works Construction
(ISPWC) and the CITY Supplemental Specifications to the ISPWC and all applicable standards
and specifications set forth in the ACHD Policy Manual.
4.2 Copies of complete and final designs for the MDC Lighting Project shall be
provided to ACHD no later than June 1, 2012.
4.3 MDC shall be solely responsible to apply for and obtain all necessary federal,
state and local permits for the MDC Lighting Project as incorporated into the ACHD Phase Two
Project.
5. SPECIAL PROVISIONS AND BID QUANTITIES
5.1 MDC, and/or its consultant, will develop special provisions, and unit bid
quantities for the MDC Lighting Project work to be included in the bid documents for the ACHD
Page 11 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
Phase Two Project construction contract. The special provisions and unit bid quantities for each
project shall be in conformance with all applicable federal, state and local laws and regulations
and standards and specifications for such work including but not limited to the most current
edition of the Idaho Standards for Public Works Construction (ISPWC) and the CITY
Supplemental Specifications to the ISPWC and all applicable standards and specifications set
forth in the ACHD Policy Manual.
5.2 Complete and final special provisions, and unit bid quantities for the MDC
Lighting Project work shall be provided to ACHD no later than June 1, 2012.
BIDDING AND CONTRACTING
6.1 ACHD shall incorporate the designs, special provisions, and unit bid quantities
for the MDC Lighting Project work, as developed and submitted by MDC, into the bid
documents for the ACHD Phase Two Project. ACHD shall provide MDC a complete set of
combined bid documents for the ACHD Phase Two Project, and the MDC Lighting Project work
referenced herein.
6.2 ACHD shall solicit, receive, and open bids for the ACHD Phase Two Project
incorporating the MDC Lighting Project work referenced herein utilizing a two-step,
prequalification methodology as allowed in Idaho Code Section 67-2805. ACHD shall furnish
MDC with an abstract of all bids received.
6.3 ACHD shall award a contract for construction of the ACHD Phase Two Project
incorporating the approved MDC Lighting Project work referenced herein, or in its discretion,
ACHD may reject all bids and re -bid the project.
6.4 Following award, ACHD shall execute and administer the construction contract
for the ACHD Phase Two Project incorporating the MDC Lighting Project work referenced
herein.
7.
CONSTRUCTION
7.1 The construction of the MDC Lighting Project as incorporated into the ACHD
Phase Two Project shall be built in conformance with the designs, plans and specifications
provided to ACHD by MDC. Such construction shall comply with all applicable laws, ACHD
policies and standards, and engineering practices.
7.2 CITY shall inspect work under the Lighting Project at no- cost to ACHD or MDC
and shall provide copies of appropriate tests and diaries to the ACHD Phase Two Project
representative.
7.3 MDC shall reimburse ACHD for all costs associated with the portion of the
awarded bid relating to the MDC Lighting Project. MDC shall have the discretion to accept or
reject any change orders to the portion of the awarded bid relating to the MDC Lighting Project
within 5 business days. MDC shall not be obligated to reimburse ACHD for any costs associated
Page 12 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
with unapproved change orders, but may, in its discretion, approve any change order
retroactively.
7.4 MDC shall also be responsible for and shall reimburse ACHD for changed
conditions, plan errors and omissions, and delays attributable to the MDC Lighting Project as
incorporated into the ACHD Phase Two Project.
7.5 ACHD shall make monthly progress payments and the final construction contract
payment to the Construction Contractor in conformance with the Construction Contract.
Provided, however that before ACHD makes any monthly progress payment to the Construction
Contractor for any work relating to any portion of the MDC Lighting Project, MDC shall first
approve and authorize such payment in writing. MDC shall hold ACHD harmless for any
disputes relative to any monthly progress payment or portion thereof that MDC does not approve
and authorize.
7.6 ACHD will submit to MDC a copy of each Contractor progress payment estimate
relating to the MDC Lighting Project, as such estimates are approved by ACHD. ACHD shall
retain all invoices and other documents supporting such payment estimates. ACHD shall submit
a bill to MDC for full and complete reimbursement of the actual construction costs of the MDC
Lighting Project as incorporated into the ACHD Phase Two Project and as earned by and paid to
the Contractor by ACHD, as well as other costs for which MDC is responsible as set forth in this
Agreement, within THIRTY (30) days after final completion of all the work on the MDC
Lighting Project.
7.7 MDC shall reimburse ACRD for the actual construct costs of the MDC Lighting
Project as incorporated into the ACRD Phase Two Project as well as other costs for which MDC
is responsible as set forth in this Agreement. MDC shall pay ACHD within THIRTY (30) days
after receipt of ACHD's bill referenced in Section V.7.6 of this Agreement in cash or other
immediately available funds.
7.8 MDC shall be solely responsible for determining that the work for the
construction of the MDC Lighting Project is Substantially Complete and will provide ACHD
evidence of said acceptance and determination in writing. MDC shall be solely responsible to
notify ACHD in writing when Construction Completion may be issued for the MDC Lighting
Project.
7.9 In accordance with and subject to, the Cost Share Ordinance and the terms and
conditions of the Cost Share Permit as may be issued to MDC by ACHD, MDC, as a co -
permittee with the CITY, shall be secondarily responsible for operation and maintenance of the
work for the construction of the MDC Lighting Project once said MDC Lighting Project work
becomes operational and shall take on such responsibilities in the event the CITY fails in any
way to carry out its obligations as set forth in Section IV of this Agreement.
7.10 ACHD shall transfer to MDC for the benefit of MDC, all warranties in the
Construction Contract relating to the MDC Lighting Project.
Page 13 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
7.11 ACRD shall transfer to MDC for the benefit of MDC, all title in the work for the
construction of the MDC Lighting Project.
SECTION VI.
INDEMNIFICATIONS
1. ACHD
1.1 ACRD shall, subject to the limitations hereinafter set forth, indemnify, save
harmless and defend regardless of outcome, CITY and/or MDC from expenses and against
suites, actions, claims or losses of every kind, nature and description, including costs, expenses
and attorney fees caused by or arising out of any negligent acts by ACHD or ACHD's officers,
agents and employees while acting within the course and scope of their employment, which arise
from or which are in any way connected to the ACRD Phase Two Project. Any such
indemnification hereunder by ACRD is subject to the limitations of the Idaho Tort Claims Act
(currently codified at chapter 9, title 6, Idaho Code). Such indemnification hereunder by ACRD
shall in no event cause the liability of ACRD for any negligent act to exceed the amount of loss,
damages, or expenses of attorney fees attributable to such negligent act, and shall not apply to
loss, damages, expenses or attorney fees attributable to the negligence of CITY and/or MDC.
1.2 For any claims or actions arising out of the ACRD Phase Two Project, ACHD's
obligations pursuant to this Section VI.1 shall survive the termination of this Agreement.
2. CITY
2.1 AS TO THE CITY WATER AND SEWER PROJECT, CITY SHALL
INDEMNIFY, DEFEND AND HOLD HARMLESS ACRD FROM ANY CLAIM OR ACTION
BY ANY THIRD PARTY FOR REIMBURSEMENT OR ANY INDIRECT, SPECIAL,
PUNITIVE, OR CONSEQUENTIAL DAMAGES (INCLUDING BUT NOT LIMITED TO,
ANY DAMAGES ARISING OUT OF ANY CLAIM FROM ANY CUSTOMER FOR LOSS
OF SERVICES) ARISING UNDER THIS AGREEMENT OR FROM ANY BREACH OF THIS
AGREEMENT, OR ARISING OUT OF ANY ACT OR OMISSION OF EITHER PARTY
HERETO, ITS EMPLOYEES, SERVANTS, CONTRACTORS AND/OR AGENTS.
2.2 As to the CITY Water and Sewer Project, CITY shall, subject to the limitations
hereinafter set forth, indemnify, save harmless and defend regardless of outcome, ACRD from
expenses and against suites, actions, claims or losses of every kind, nature and description,
including costs, expenses and attorney fees caused by or arising out of any negligent acts by
CITY or CITY's officers, agents and employees while acting within the course and scope of their
employment, which arise from or which are in any way connected to the CITY Water and Sewer
Project. Any such indemnification hereunder by CITY is subject to the limitations of the Idaho
Tort Claims Act (currently codified at chapter 9, title 6, Idaho Code). Such indemnification
hereunder by CITY shall in no event cause the liability of CITY for any negligent act to exceed
the amount of loss, damages, or expenses of attorney fees attributable to such negligent act, and
shall not apply to loss, damages, expenses or attorney fees attributable to the negligence of
ACRD.
Page 14 of 21
ACHD/City of Meridian/1\4eridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
2.3 As to the CITY Landscape Project, pursuant to the Cost Share Ordinance and any
Cost Share Permit issued to CITY there under for the CITY Landscape Project, CITY shall
indemnify, defend, and hold harmless ACRD and its elected and appointed officials, employees,
agents, and contractors from and against any and all claims or actions for loss, liability, cost,
injury, death, damages, mechanics and other liens, arising out the construction, installation,
design, use, operation, repair, maintenance, and removal, of the CITY Landscape Project, or that
otherwise results from the use, operation, maintenance, design, construction, installation, repair,
and occupation of the Right -of -Way by CITY for the CITY Landscape Project, and including
any attorney fees and costs that may be incurred by ACRD in defense of such claims or actions
indemnified against by CITY (it being specifically agreed that ACRD as the indemnitee may
retain its own counsel in connection with any such action, and MDC shall be solely responsible
for any attorney fees and costs incurred by ACHD).
2.4 As a co -permittee on the MDC Lighting Project, pursuant to the Cost Share
Ordinance and any Cost Share Permit issued to CITY there under for the perpetual maintenance
and operation MDC Lighting Project, CITY shall indemnify, defend, and hold harmless ACRD
and its elected and appointed officials, employees, agents, and contractors from and against any
and all claims or actions for loss, liability, cost, injury, death, damages, mechanics and other
liens, arising out its use, operation, repair, maintenance, and removal, of the MDC Lighting
Project, or that otherwise results from the use, operation, maintenance, repair, and occupation of
the Right -of -Way by CITY for the MDC Lighting Project, and including any attorney fees and
costs that may be incurred by ACRD in defense of such claims or actions indemnified against by
CITY (it being specifically agreed that ACRD as the indemnitee may retain its own counsel in
connection with any such action, and CITY shall be solely responsible for any attorney fees and
costs incurred by ACHD).
2.5 For any claims or actions arising out of this Agreement, CITY's obligations
pursuant to this Section VI.2 shall survive the termination of this Agreement.
3. MDC
3.1 Pursuant to the Cost Share Ordinance and any Cost Share Permit issued to MDC
there under for the MDC Lighting Project, MDC shall, to the extent permitted by Idaho Law,
indemnify, defend, and hold harmless ACHD and its elected and appointed officials, employees,
agents, and contractors from and against any and all claims or actions for loss, liability, cost,
injury, death, damages, mechanics and other liens, arising out the design of the MDC Lighting
Project, or, following completion of the MDC Lighting Project, MDC's use, operation, repair,
maintenance, and removal, of the MDC Lighting Project, or that otherwise results from the use,
operation, maintenance, design, repair, and occupation of the Right -of -Way by MDC for the
MDC Lighting Project, and including any attorney fees and costs that may be incurred by ACHD
in defense of such claims or actions indemnified against by MDC (it being specifically agreed
that ACRD as the indemnitee may retain its own counsel in connection with any such action, and
MDC shall be solely responsible for any attorney fees and costs incurred by ACHD).
3.2 ACRD shall, to the extent permitted by Idaho Law, indemnify, defend, and hold
harmless MDC and its elected and appointed officials, employees, agents, and contractors from
and against any and all claims or actions for loss, liability, cost, injury, death, damages,
Page 15 of 21
ACRD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
mechanics and other liens, arising out the construction and installation of the MDC Lighting
Proj ect including any attorney fees and costs that may be incurred by MDC in defense of such
claims or actions indemnified against by ACRD (it being specifically agreed that MDC as the
indemnitee may retain its own counsel in connection with any such action, and ACRD shall be
solely responsible for any attorney fees and costs incurred by MDC).
3.3 For any claims or actions arising out of this Agreement, MDC and ACHD's
obligations pursuant to this Section VI.3 shall survive the termination of this Agreement.
SECTION VII.
TERM OF AGREEMENT
1. ACRD
1.1 As to the work described in Section I of this Agreement and the mutual
obligations relating thereto, it is anticipated that this Agreement shall terminate upon the
satisfactory completion of the work and satisfaction of the obligations of ACRD and CITY and
otherwise, the term of this Agreement shall be in conformity with the provisions of Article VIII,
Section 3 of the Idaho Constitution.
2. CITY
2.1 As to the work described in Section II of this Agreement and the mutual
obligations relating thereto, it is anticipated that this Agreement shall terminate upon the
satisfactory completion of the work and satisfaction of the obligations of ACRD and CITY and
otherwise, the term of this Agreement shall be in conformity with the provisions of Article VIII,
Section 3 of the Idaho Constitution.
2.2 As to the work described in Section III of this Agreement and the mutual
obligations relating thereto, if a Cost Share Permit is issued to CITY as provided in this
Agreement, the term of this Agreement shall be perpetual as to the CITY's maintenance of the
sod, landscaping and irrigation facilities subject to such Cost Share Permit, subject to annual
appropriation of such maintenance cost by the CITY as provided in the Cost Share Ordinance
and any Cost Share Permit issued to CITY under the Cost Share Ordinance and in conformity
with the provisions of Article VIII, Section 3 of the Idaho Constitution. Any party shall not
terminate this Agreement without the prior written consent of the other party, other than as set
forth in this Agreement.
2.3 As to the the work described in Section V of this Agreement and CITY's status as
co -permittee, primarily responsible for the perpetual maintenance and operation of the work as
set forth in Section IV of this Agreement and the mutual obligations relating thereto, if a Cost
Share Permit is issued to CITY and MDC as provided in this Agreement, the term of this
Agreement shall be perpetual as to CITY's maintenance of the work, subject to annual
appropriation of such maintenance cost by the CITY as provided in the Cost Share Ordinance
and any Cost Share Permit issued to CITY under the Cost Share Ordinance and in conformity
with the provisions of Article VIII, Section 3 of the Idaho Constitution. Any party shall not
Page 16 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
terminate this Agreement without the prior written consent of the other party, other than as set
forth in this Agreement.
3. MDC
3.1 As to the work described in Section V of this Agreement and the mutual
obligations relating thereto if a Cost Share Permit is issued to MDC and CITY as provided in this
Agreement, the term of this Agreement shall be perpetual as to MDC's status as a co -permittee,
secondarily responsible for the perpetual maintenance and operation of the work in the event the
CITY fails in any way to carry out its obligations as set forth in Section IV of this Agreement
and MDC takes on such responsibilities, subject to annual appropriation of such maintenance
cost by the MDC as provided in the Cost Share Ordinance and any Cost Share Permit issued to
MDC under the Cost Share Ordinance and in conformity with the provisions of Article VIII,
Section 3 of the Idaho Constitution. Any party shall not terminate this Agreement without the
prior written consent of the other party, other than as set forth in this Agreement.
SECTION VIII.
JURISDICTION
CITY and MDC each acknowledge and agree that ACRD has exclusive jurisdiction of the
public Right -of -Way on the ACRD Phase Two Project. ACRD may grant a license and/or a
Cost Share Permit to the CITY and/or MDC for the limited purpose of entering upon the Right -
of -Way which is the subject of this Agreement, to install, maintain, repair and replace the
lighting and related infrastructure and to plant, install, maintain, repair and replace the
landscaping and related sprinkler irrigation infrastructure within the Right -of -Way subject to the
approval of a license and/or a Cost Share Permit. CITY and MDC each agree that this grant of a
license and/or permit by ACRD does not grant or confer upon CITY and/or MDC any rights over
such public Right -of -Way other than specifically granted by ACRD to CITY and/or MDC under
the terms of this Agreement.
SECTION IX.
GENERAL PROVISIONS
1. In accordance with Idaho Code § 67-2332, the purposes, powers, rights, and
objectives of each of the parties are as set forth in the Recitals above. Each of the Recitals above
is incorporated into the body of this Agreement.
2. Contact Information. The contact for ACRD shall be the Project Manager for the
Meridian Split Corridor Phase Two Project at (208) 387-6249. The contact for CITY shall be the
�o�� Manac�r, Tim COM $ at (208) 4901 — Z The contact for MDC shall
be tie �-t'�-� � at (208) 19) �; 0.
3. Debt Limitation. Nothing in this Agreement shall be construed to be an
indebtedness or liability in violation of Article VIII, Section 3 of the Idaho Constitution.
4. Attorney Fees. In the event of any controversy, claim or action being filed or
instituted between the parties to enforce the terms and conditions of this Agreement, or arising
Page 17 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
from the breach of any provision hereof, the prevailing party will be entitled to receive from the
other Party all costs, damages, and expenses, including reasonable attorneys' fees including fees
on appeal, incurred by the prevailing party. The prevailing party will be that party who was
awarded judgment as a result of trial or arbitration.
5. Choice of Law. This Agreement shall be governed by, and construed in
accordance with, the laws of the State of Idaho.
6. Exhibits. All exhibits to this Agreement are incorporated by reference and made a
part of this Agreement as if the exhibits were set forth in their entirety in this Agreement.
7. Entire Agreement. This Agreement and the exhibits hereto constitute the full and
entire understanding and agreement between the parties with regard to the transaction
contemplated herein, and no party shall be liable or bound to the other in any manner by any
representations, warranties, covenants and agreements except as specifically set forth herein.
This Agreement may not be enlarged, modified, amended or altered except in writing signed by
all parties hereto.
8. Acknowledgments and Modifications. No acknowledgments required hereunder,
and no modification or waiver of any provision of this Agreement or consent to departure
therefrom, shall be effective unless in writing and signed by ACHD and CITY and MDC.
9. Headings. The headings used in this Agreement are used for convenience only
and are not to be considered in construing or interpreting this Agreement.
10. Counterparts. This Agreement may be executed in three or more counterparts,
each of which shall be deemed an original, but both of which together shall constitute one and
the same.
11. No Third Party Beneficiaries. This Agreement is not intended to create, nor shall
it in any way be interpreted or constructed to create, any third party beneficiary of this
Agreement.
12. Drafting. All parties have been represented by counsel and no party shall be
deemed to be the drafter of this document for purposes of interpreting an ambiguity against the
drafter.
13. Severability. If any part of this Agreement is held to be illegal or unenforceable
by a court of competent jurisdiction, the remainder of this Agreement shall be given effect to the
fullest extent reasonably possible.
14. Warranty of Authority. All signatories to this Agreement represent and warrant
that they have the have the power to execute this Agreement and to bind the agency they
represent to the terms of this Agreement.
15. Non -Waiver of Breach. Failure of a party to insist on the strict performance of
any provision of this Agreement or to exercise any right or remedy upon a breach hereof shall
not constitute a waiver of any provision of this Agreement or limit such party's right to enforce
Page 18 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
any provision or exercise any right. No acknowledgments required hereunder, and no
modification or waiver of any provision of this Agreement or consent to departure therefrom,
shall be effective unless in writing and signed by ACHD, CITY and MDC.
16. No Joint Venture. The parties hereto agree that nothing herein contained shall be
construed to create a joint venture, partnership, or other similar relationship which might subject
any party to liability for the debts and/or obligations of the others, except as otherwise expressly
agreed in this Agreement.
17.
Time of the Essence. Time shall be of the essence for all events and obligations to
be performed under this Agreement.
18. MDC Existence Not Perpetual. So far as they pertain to MDC, the duties and
obligations under this Agreement shall only exist so long this Agreement remains in effect and
so long as MDC is in existence; provided however, that the duties and obligations under this
Agreement shall be binding upon, and shall inure to the benefit of MDC's lawful and approved
successors and assigns if any.
End of Agreement
[Signature page follows.]
Page 19 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
IN WITNESS HEREOF, the parties hereto have executed this Agreement on the
day and year herein first written.
City of Meridian:
By: Tamm Weerd
Its: May
Meridian Development Corporation:
By: bAie Pipal
Its: Chair
Ada County Highway District:
L
(4ye becca W. Arnold
Its: President
ATTEST:
ector, Bruce S. Wo
Page 20 of 21
ACRD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
EXHIBITS
Attached
Page 21 of 21
ACHD/City of Meridian/Meridian Development Corporation
Joint Project Interagency Agreement Meridian Split Corridor Phase Two
F MN KLI N ROAD
4
WILL'tAMS STREET
F KING STREET �
t , TAYLOR AVENUE
1 ,
ADA STREET
s
BOWER STREET
1
UNION PACIFIC
RAILROAD
i
f
t
F
t
BROADWAY AVENUE
t
4
Z
b
6
Y
t�
t
PINE
AVENUE
t
t b
t
s STATE AVEI`J J F
E
E
k
c r
f m CARLTON
AVENUE
WASHINGTON
STREET
m
m 0
i
►VE UEmom,
a
MAPLE AVENUE
4
LM AVENUE
y
ry
FAIRVriEW CHERRY
AVENUE IE
i
i
C
t
{ CARMEL DRIVE
EXHIBIT....
, 1 --
I
EXHlBiT Q I
i
fi
is
p q r
a4 yG k A �.r
sq� %
Area
f
e ;,,,pts'-... ..._ .._.....�..gpWl.�.............�....». ......
V a
M.
EXHlBiT Q I
j
$$tj�tj
ey
F
`•V
j
'ttL ` t + y q
« r • « „ �r e+w ,.i " t s. -��«� r '+�l� f'" i •: +a" ° ay :: ra x
St -
41
y
S*
♦ QAYNAc
• '� : ;i � •" � ..s � � � ,� � " ++♦. � Y � � � 'yew • ir. ! , +R:V.16.
.,.'"'°"aw x r w +t'>r F !!♦7r s
It
y���e�, t
+♦• i'� �-. ! � r„ iaw; ` .++�Ir` <#r.. �. "<'.".�`. t` �,. f . q ,ns *�fy■�.rw'
I -T
r.■ Drax • • ,' �.
..q vy 4 "' ,4 H ' • "3 i + � a,. f1�I L �
7.� � � ,# �. .>'�, "� ' , � 3 `g • s' +� -.
r
w ' r
x
�Ga +tee �!
"�F r.
g
- .,... - ` .w. � ✓ ..w y ...... �, ,.. 4. «ac - t '.A,,, .,..w.+� q 3.% � gn:` ',`x� � � � +*ir f
i ~
- ,
w
,t
r a.
fir,* Ile
�"• ' i`.`1rN 1 ♦ � " .. +' a ,°+vyW. x4 " F !'tea, ...''t"k1'► s•'ry... '' 1♦'b yr:..
n µ,
I
Cil,Ai i
ii
J*V
t�qj,�' r
l °` , :, �y
,. ,er`.e • . Mr�e 1AR htgF,;1,Y'1♦i,
A
+M► ra�I' Wr a. «... '- :�.:°at * `Yr � <af J P q .m��.-m ,,...�,,«w.
"
�-�
>
RAILRO
AD ST117
ot
Ll -cm _41
_ i 'AY v
t
Ito
Abl
4, wo ,
m' t
'
+ r ,. - , #X w .. e , r+ ! :+ s 'e � „�'! �y �l A.. +� max✓. �� 'a^+�,. f♦O" iw
ax.
s'
' , +r'' _ ae. �'"' ,,' m . q•'t ,,:. t .«,. �+e ` ; +s. .Y ...+ t ... - �` . ,,, - �+ '. ��a> •w - ,A , - ax
�r
gip• .+,.� � �.aq ,
R
a ,
.'a , q { �t ,.p $F' La. s ± y♦. ,yr AwY *x, b � n � ,� .� +� '. ! °f $ R# � • I ,� p
iiZii "''""
Fes. � we
a.,
, IYII�
a y�
,,,� ...,: a '. ,..., s t• °' �' t t ^ ! � 1 # `- T � + » x,+$�: .,,,:. -" �.^� + �_ , a.
e �
ypp
""
• B
, ,. �` +«
p.," '1�. -• €'� '� 1: � { �w iws r � �' s q .� g I � !daE'. � "� i ! T+ � a t � ` � �, � ? ,�li a.r! � � � � ^# A
+^ a
a
f
etc + s , e •""". a w> 9-a n« % Ig4a 1+.
�_• i;.,. �<:. '1,,�. r ��-.t;•.. "+'`�,,... ,. .. s� In fid.-,. �" �i��,rr *; a W �'•�, �,Q�� s,+n. �� j + ,. .. s"*.,. x�� • � � ��` ,y,..<>
,
w. • _,e €, U -7
j} s AVE
1$i�%� 9'
' 164 • b �E `r"":.' " ry 1�"'{ 1� e` ' w f a - e x♦. �E
a r ^ r�T'y F�
R y
g f.
ASO
.{ ) { •. .. � - as 6 �.. 1
3, � 1. y.;", 'i `�. •:: f '�.. * ,p_e -. �t } .. �� � y.:�. +r * • 'jF+
�,' .�`.>_� "�`� f � �, .. tom" .'F,��o �+.». � �_�3 '"w , ' •CPQ ,. ��>y; �'t e r • � �� x-+, •^' "f q
�war „
wre;a
WIWI
r�„r >� �'.•'a f ! � a [" � - " F ' �' "- . + a, •.. e M e �;. # � ". ' "'�. f . p" .eye • j- � r .. aa.i
': , ;+ +R ie«...,<a^ ' " .;, ' # r., ♦ t 'a'"" • 3."w i . °t q," . 1r. �
a ♦ +~ • <. i(- y. q ! "-a+ !tt. ! ` * fr'�..,.Y.:. `': ' i' (Ay," '• r« yr,
4. ! • x
a +
«
i. P f«.j 4.,
»
lNGT
ON, AVE
•"F"
F
• t+ ! ...v... +'• i' j t'- ##. - r ra ` - ,y .3.. !..•x'"::y `a ^A ° w+ p 9:..
K . 9 ,. i ' # �, tt ,r i ♦ ' a,�3 _t _„ a^ r�
Olr
i�b
• -"`a � #jam � -... -.. � � ) [/ Yr 1�fr 'E #
/ A=• Va {f,'i, I t !, c. >« .& 4h, 'f,^'g' lr ..N_ "Yi4 • <xf�w4
' rwK �. ��' `e' ." 'fIL i . + � b.a.�...w.<aar�°. . a ,. s • �r�,�, 'i�„ «ww+<n.. ,r Ra+,>.,r
-'�.,e"
� e
,q e
a area o � '�- ! s '- ��` y - ,• f , � r t i a z. �` j
` '�1f•F�> :' R s. r T� � � �# �.-R � . �.'� �' eM �s p. �tY - �'.+#°!K - :: ��'. e. � t. C � AVE
.f � ,r,+ � • 1 � .ru��:. �s.>.,,., >. 'isi x { «,-e fi�,:�,.., *� +iKf �' �`� ,_'�' Y � . t "R + �,+ a e ,�ia•.,w,,,,, x « re � � t3 � j.,� `� r f
+.,a a...r•w,++_. . E "" s c f � "'. ` a�a `.. ' � _�� � * }� + �=qi, , - ::.��- .. f � a �xr •
,
r .+ '�: ` r„x, -. , .,.,r_. 1 a..,• i i.ar + +.. '"°' > "> •�•i $ ±+7 _ q a 'g r+iis^. ......wK7,l,..us," an .� :.,j
f it °11
r
r �� •� i � , " "� I' .:L ' + ':7 � • � t�f ; t � „ § .a �'•"�+ � f ` < ♦ a �� ��.,,,�.a,,.,.. .�,,, a. � r m �r++c� +� �.' � _
iVw
LE
a
041,
• i a, 'wf:� .✓ s - !" «
w d
tt .....�...-�»t
r* wP x d
+ t • N '6
' dam'"_ � 4��..: $., •- • -, r*'» �°�'' � y.�.. s'Y- `$. F f � rF+�°e � � +rte»�
T
.' �} t fe 3. +F't +�«..,+• •'`''` , r 8 '4 _ q *&
+
a
>
¢ r
r
40
...
7,71
*?";8 g `' ' .:,.. °`. t �"' � s. �' y � �,i;: `.�r�..�s § r i _ ,. �h, :'. s t 3. .. >,. r � a, w;;�.wrerwl^• � � � �,. + �/"fr::a�yw s, �r,.> «� � .,.,..>.
�y R+ ♦ jar
- �. a • • - « �. %�g� n♦•ir�* ms`s c77 -
IMP=
'°°"
Y e e �. #,�• , #w f�T �.,., f • .f , yt. ,raX,♦ -+' a ,� &� ,
« _ � - ♦ + � - o ` - a � � '"'+s � a1 - ♦-��vw-.�I%r+ �•... ak � x >_ +i m x► s i
sr 4 P ` ie.s i
1 ��„+es« • +. _ <-.� ` 9"' •'a: .`'•x y
F
a
a
+' '4 p, w ,r ►�
b 1t
r
< +��
,, 4 �" if >, "�.:,',..:': `.♦. � o ? a ,�� Rw� s w.. g ✓ �" "w>..ru. `-�� '� `'s r � �+rti.l Mi
E AVE
SOP
Ol
=ar"'
ti -.s # �" • >y $ x< � �• *,ve r • � F� ! W w r" ^ w� a ` � 0m,
p y y
a£ _
y^M`�.''� { '»... 3�°a"ar!< ' ! �,,,.y #>..ro,.<< t 4tr.' •,. « e t w .. f
r yit
Ian
a > r
MIt
w. gyp. y•e x -^ € �y�dp
'+os
+.. "• ; ya '4, �• x fY > a er :�. b� T F A , *+►'d, a+
u
7 LIP
_ = �F � ;,.�, � ... �..rex�k tea' e _ ��a'"41 .�,.... +s•t. , �� '.. = ,, ;� s �r � � '�Xr�•+�„#!� .. � *�'
+' •" 4"t � ip, .rm E ° -a.--. ` x i '-S« +aw 4 � L
7t
g
ZAR
�n ! t
{' � �' J � a•+ V � , +a,. 7 ��"�' �," a° _ � �. _ �-
, fes, � ytff +4.1 ' k •i -�.. a>.�]yf '.3, `�
+�asm
x
EXH" ♦'
I
x
J*
�.��..+,+r < it ' +iP `e :. s „, 1/•,
s t. E '�i ° ,qa ` s., sa Rn"€a +r.`'° " ;",' .+�'"*„"°j1�"t. swan' .:w.�- <w,H+, < 'Se+ a wy♦�.ws'"'.`
Ilk.
P/L P/L P/L P/L P/L P/L P/L
LA
m
m
P/L- -P/L- -P/L- -P/L- P/L- -P/L I If
DAI d
co
0
0
NOW
rimAMM
mwww]
0
�Alo
.01
-Jew"
Ala
,7 t
............
FAIRVIEW
AVENUE
mwww]
0
�Alo
rTl
777 ?
4
vc
_ tom.....
77
rp VC+
CMP
ip.
x
i
>
r
,:..",ze✓�ss..z�.�,,.aws®,-csza-� �u.;� .ate. xaarr'- 'n. ��°
✓`� K ; F
f
s
lot
hL
ton,
3 R STREET
0WE
DROP
ASPHAIA
>
t3" ,
9
` � �� ,� �� •,; t �� `r"''�...,. ,,,..�.--..,'�''` orf i
r x
I'a
Ln
It" 4��
r
BROADWAY AVE
IDAHO AVE
PINE AVE
X
*0
STATE AVE
CARLTON AVE
WASHINGTON ST.,
CHERRY AVE
MAPLE AVE
rr
rr
rr
woxo
ELM AVE
FAIRVIEW AVE CHERRY LN
MERIDIAN RD AND MAIN ST
SPLIT CORRIDOR - PHASE 2
MDC LIGHTING PROJECT
EXHIBIT H
-0
r
CAI
m
r%3
cn
m
w
m
m
0
'o
:cn
i --i
m
Q)
0
c)
0 c—
m
0-7
CA
> -0
i X
o
c-
0 m
> 0
im
to > m
ton x
p>
< co
M
M
1>
10)
Im
iw
T
r
m
Hcn m (1) 7
x I
Z
CD
cn m
KING ST 04
ADA AVE
BOWER AVE
NOT APPROVED
FOR
Stanley Consultant
...
BROADWAY AVE
IDAHO AVE
PINE AVE
X
*0
STATE AVE
CARLTON AVE
WASHINGTON ST.,
CHERRY AVE
MAPLE AVE
rr
rr
rr
woxo
ELM AVE
FAIRVIEW AVE CHERRY LN
MERIDIAN RD AND MAIN ST
SPLIT CORRIDOR - PHASE 2
MDC LIGHTING PROJECT
EXHIBIT H
-0
r
CAI
m
r%3
cn
m
w
m
m
0
'o
:cn
i --i
m
Q)
0
c)
0 c—
m
0-7
CA
> -0
i X
o
c-
0 m
> 0
im
to > m
ton x
p>
< co
M
M
1>
10)
Im
iw
T
Hcn m (1) 7
x I
V 0 i z
m 0
-0 cn
cn m
M, 4
m
R
NOT APPROVED
FOR
Stanley Consultant
...
A Stw*y ;rem C&P;cny
---ICONSTRUCTIONI cu cou'u"