Loading...
HomeMy WebLinkAboutKey Bank CUP 03-053November 17, 2003 CUP 03-053 MERIDIAN PLANNING & ZONING MEETING November 20, 2003 APPLICANT CSHQA ITEM NO. ~ S REQUEST Public Hearing -Request for a Conditional Use Permit for development of a 2,800 sf bank with drive-thru and future retail tenant with drive-thru in a C-C zone for Key Bank --south of East Overland Road and west of South Eagle Road AGENCY COMMENTS CITY CLERK: CITY ENGINEER: CITY PLANNING DIRECTOR: CITY ATTORNEY CITY POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: CITY SEWER DEPT: CITY PARKS DEPT: MERIDIAN SCHOOL DISTRICT: SANITARY SERVICES: ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: SETTLERS' IRRIGATION: IDAHO POWER: INTERMOUNTAIN GAS: See attached Staff Comments See attached Comments No Comment No Comment See attached Comments See attached Comments No Comment See attached Comments OTHER: See attached Affidavit of Posting CDYriYY~~~ ~-(~~ CC~/GU ~v C~~ Contacted: bchtCr LCLtI~Y'P7y~RK Date: 117 p ~ Phone: 3 43- 4~ ~S Emailed: C~fni~~~~6l~yGn0~yl ~(,S~GaQ-(~ Staff Initials: Mafadals presented at publle meehnys shall baeome property oP tha CIN of Meridian. HUB OF TREASURE ~~~[,~\YO A Good Place ro LE:G,{]. Ltobcrt ll. CITY OF (208) 366- ~ I ~:rs 46(- h~~r l<: ~,,t,,~O~~,~tL 33 EAST IDAHO . Bu1LVING Kcith (-O8) 887-_~] 1 ~ I?ax 887- 'rammy MERIDIAN, IDAHO 83642 Chceie (208) 888-4433 ~ EARX (208) 887- PT ANNING tLND McCandless C;iry Cl¢ek Offiee Pax (208) 888- llL'RA RI'MPN (208) 884-1533 ~ E',\X 888- MEMORANDUM: Transmittal Date: November 13, 2003 Hearing Date: November 20, 2003 To: Mayor, City Council and Planning & Zoning Commission ~~ry~ry~~ 7~7-ti jjv ~ ~/ ~~,/ F Planne~~~ Siddowa Associate Cit St rom: y eve y, N~~ ~ 4 2~3 Bruce Freckleton, Assistant to City Engineer City Of Meridian Re: Key Bank City Clerk Office Request for a Conditional Use Permit for a new 2,800 s.f. Bat il: with aDrive-Thal and a Future 1,500 s.f. Retail Tenant with Drive-Thru in a C-C Gone, by D.L. Evans Bank (File No. CUP-03-O.i3). We have reviewed this submittal and offer the following comments, as condit ions of7he applicant. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATION SUMMARY On behalf of Key Bank, the applicant, CSHQA, has requested approval of a conditional use permit (CUP) for a new 2,800 square-foot full service bank building with three (3)drive-through teller lanes and adrive-up ATM. The applicant is also requesting approval for a future attached retail use and drive-through west of the proposed bank It is the applicants' intent to enter into contract negotiations for the future retail/restaurant use, though one has not yet been secured. Thus, they have submitted two alternate site plans (and corresponding landscape plans)-one showing the site with just the bank and the other showing the site with both uses on it. Since the future use will be attached as a single multi-tenant structure, a planned development is not required. The Conditional Use Permit is required due to the proposed drive-throughs. The subjectproperty was final platted earlierthis year as part ofthe El Dorado (Bonito) Subdivision and was recently recorded. The proposed project sits on a portion of lots 7 acid 8, Block 5 of Bonito Subdivision. Staff recommends that a lot line adjustment be recorded to match the configuration shown on the proposed site plan prior to issuance of a Certificate of Zoning Compliance. With that caveat, and the conditions noted in this report, staff recommends approval of the Conditional Use Permit. LOCATION & SURROUNDING USES The subject property is located near the intersection of Overland Road and Eagle Road, in the El Dorado (a.k.a. Bonito) Subdivision. The following uses surround the subject property: CUP-03-053 K~ Bari k.CIlPKzy-BenA.E'13P~ee Planning & Zoning Commission/Ivlayor & City Council November 20, 2003 (Hearing Date) Page 2 North -Rural residences and vacant land, zoned R1 and RUT (Ada County). South -Vacant lots in Bonito Subdivision, zoned C-C. East -Vacant lots in Bonito Subdivision, zoned C-C. West -Vacant lots in Bonito Subdivision, zoned C-C and C-G. OWNER OF RECORD The owner of record is Kimball Properties Limited Partnership, and they have given their consent for the applicant to submit the requested conditional use permit. STANDARDS FOR CONDITIONAL USES The Commission and Council shall review the particular facts and circumstances of each proposed conditional use in terms of the following, and may approve a conditional use permit if they shall find evidence presented at the hearing(s) is adequate to establish (ll-17-3): A. That the site is large enough to accommodate the proposed use and all yards, open spaces, parking, landscaping and other features as may be required by this ordinance; Staff finds that the subject property, as depicted, is large enough to accommodate the required open spaces, parking, landscaping and other features required by the ordinance. Staff notes that the site does not match the platted lot lines of Bonito Subdivision and sits on portions of Lots 7 and 8, Block 5. A lot line adjustment will be required prior to issuance of a Certificate of Zoning Compliance. If only the bank is built, 23 parking spaces will be constructed per the submitted plans; a minimum of 14 spaces are required by ordinance. Ifboth the bank and future retail restaurant space is built, 31 parking spaces will be constructed per the submitted plans; a minimum of 22 spaces are required by ordinance. Under the either scenario, the project will have ample parking. B. That the proposed use and development plan will be harmonious with the Meridian Comprehensive Plan and in accordance with the requirements of this Ordinance; The Comprehensive Plan Land Use Map designates the property as "Mixed Use Regiaial" and it is currently zoned C-C. Mixed Use-Regional allows for ban]<s and drive-through facilities (see Comprehensive Plan, p. 98). Ordinance 11-8-1, Schedule of Use Conn-ol, allows for drive-in establishments through the conditional use process in the C-C zone. The Development Agreement for the subdivision also allows for drive-tluough proj ects through the conditional use process. Staff finds that the requested uses, are in compliance with the approved Future Land Use Map and that if approved as a CUP the proj ect w itl b e i n compliance with the MCC. CUP-03-053 Ky_F3unl:-.<_ll'K~a-t3;a3k:FkdR~n Planning & Zoning Commission/Mayor & City Council November 20, 2003 (Hearing Date) Page 3 C. That the design, construction, operation, and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area; The surroundingproperties onthree sides are all part ofEl Dorado Business Campus and are intended for development of a similar nature. The existing rural residences across Overland Road from the project will experience a change from existing conditions; however, the Comprehensive Plan shows that the future intended land use of the area is also Mixed Use-- Regional. Therefore, staff finds that the proposed development will not adversely change the existing or intended character of the general vicinity. The decision to change the character of the area was already made with the approval of El Dorado Business Campus and Bonito Subdivision. D. That the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity; The adj oining properties to the east, west, and south are owned by the same property owner thaT has consented to submittal of this application. Therefore, staff does not anticipate that the proposed use will adversely affect adjacent properties. The Commission and Council should rely upon public testimony to determine if the development will adversely affect the other property in the vicinity. E. That the proposed use will be served adequately by essential public facilities and services such as highways, street, police, and fire protection, drainage structures, refuse disposal, water, sewer or that the person responsible for the establishment of proposed conditional use shall be able to provide adequately any such services; The prof ect has vehicular access from Overland Road via a previously approved curb cut for Bonito Subdivision. The Commission and Council will need to reference any written or verbal testimony submitted by the Meridian Police and Fire Departments regarding their ability to adequately service this project. ACHD approved the proposed project with no new conditions, except to comply with the conditions already placed on the subdivision. Water and sanitary sewer service to the project is readily available to the site via mains installed as part of the subdivision improvements. F. That the proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community; If approved, the developer will finance the extension of sewer, water, utilities and CUP-0?-Oi3 Key l3_inl _l_Uf'Key-gai3k6l1Rnrt~c Planning & Zoning Commission/Mayor & City Council November 20, 2003 (Hearing Date) Page 4 pressurized irrigation to serve the project. The primary public costs to serve the fixture residents will be fire and police services. Staff finds there will not be excessive additional requirements at public cost and that the proposed use will not be detrimental to the community's economic welfare. G. That the proposed use will not involve activities or processes, materials, equipment, and conditions of operation that will be detrimental to any persons, property, or general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors; ACRD estimates that the traffic volume would be 742 average daily trips (ADT) for the proposed bank and 744 ADT for the retail/restaurant space if the uses were free standing and not part of a larger development. According to Kendall Kemmer at ACHD, "since they are part of a larger development the actual new daily trips will most likely be reduced as larger developments such as Bonito [Subdivision] will experience the phenomenon of trip capture. The people who work within larger developments are more likely to use things such as banks and restaurants within the development as opposed to going outside which reduces the number of new trips actually being made to the uses within the development." The approved subdivision plans anticipate up to 8,262 additional vehicle trips per day for the entire EI Dorado Business campus; the proposed prof ect is only a fraction of the pre-approved ultimate traffic volume. Staff finds that no excessive traffic, smoke, fumes, glare or odors will result from the proposed use. H. That the proposed use will have vehicular approaches to the property which shall be so designed as not to create an interference with traffic on surrounding public streets; All vehicular approaches were previously approved with Bonito Subdivision. Staff finds that the proposed use will not create significant interference with traffic on the surrounding public streets. Please refer to ACHD comments for additional detail on this issue. ACRD will not prepare a separate site-specific report for the proposed project and instead have simply required the project to comply with conditions of approval already placed on the subdivision as a whole. I. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. Staff finds that no natural or scenic feature will be lost, damaged or destroyed by issuance of this conditional use. Staff has not identified any natural or scenic features on the site. SPECIAL CONSIDERATIONS CUP-03-053 Kev BankCUPKey-~a.'~."~..a;~ Planning & Zoning Commission/Mayor & City Council November 20, 2003 (Hearing Date) Page 5 1. Lot Shape: The subject property was final platted earlier this year as part of the Bonito (EI Dorado) Subdivision and was recentlyrecorded. The proposed project is on a portion oflots 7 and 8, Block 5 of Bonito Subdivision. Staff recommends that the applicant modify the existing lot lines through the lot line adjustment process and record it, providing a legal lotto the applicant in the shape shown on the site plan, prior to issuance of a Certificate of Zoning Compliance (CZC). See Site Specific Condition #2. 2. Site Plan Options: It is the applicants' intent to enter into contract negotiations for the future retail/restaurant use, though one has not yet been secured. Thus, they have submitted hvo alternate site plans (and corresponding landscape plans)--one showing the site with just the bank and the other showing the site with both uses on it. The Commission and Council should consider whether both options are acceptable so that if they are not successful at attracting a second tenant, the bank may be built independently. Staffrecommends approval of both site plans as options for the project. See Site Specific Condition #3. 3. Landscaping: The following additions are needed on the landscape plan to comply with ordinance. See Site Specific Condition #4. • The planter island in the northernmost row of parking does not have a tree in it and one must be added. • The south property line shows the required 5-foot perimeter landscape buffer, but no trees are shown. One tree per 35 linear feet is required along the southern boundary. 4. Planned Sign Program: The applicant is requesting to do a planned sign program for the project. According to Ordinance 11-14-9-E, "the purpose of a Planned Sign Program is to establish consistent signage criteria tailored to specific, multi-building or multi-tenant developments. The intent is to provide for flexible sign criteria that promotes superior design through architectural integration of the site, buildings and signs: If approved, a Planned Sign Program may allow for increases to the background area, height, and other standards for wall signs" (italics added). Specifically, the applicant desires to have wall signs for each tenant above the tenant space and on the "tower" architectural feature. As part of a planned sign program, according to Ordinance 11-14-9-E.2.d "wall signs are permitted in any number, location, or orientation... provided that the total square footage does not exceed eighteen percenC (18%) of the wall face upon which the sign is placed." Detailed sign elevations were submitted with the application. Staff recommends that the applicant submit calculations demonstrating that the total square footage of all signs on al] sides of the building does not exceed 18% of the wall facing Overland Road. Since the project has frontage only along Overland, the wall facing Overland should be the only wall used to calculate allowable sign area. The sign background area on the other tluee sides must CUP-03-053 Kvy_B_ink_Clll'keyk3uek,F;klR:den: Planning & Zoning Commission/Mayor & City Council November 20, 2003 (Hearing Date) Page 6 be borrowed from the wall facing the street. If the total sign background area is less than 18% of the wall facing Overland Road, staff recommends approval of the signage as submitted with the application. The Commission and Council should determine whether the same provisions are appropriate if the "alternate" site plan is constructed with just the balk. See Site Specific Condition #5. CONDITIONS OF APPROVAL 1. This Conditional Use Permit shall be subject to all applicable conditions of approval from the El Dorado Business Campus (AZ-O1-018, CUP-O1-037, PP-O1-020) and Bonito Subdivision (FP-03-010). 2. The existing lot lines shall be modified through the lot line adjustment process and recorded, providing a legal lot to the applicant in the shape shown on the site plan, prior to issuance of a Certificate of Zoning Compliance (CZC). 3. Two optional site plans are approved with this application. Sheet 1.0 depicts the intended multi-tenant structure and associated site improvements. Sheet lb depicts the site plan if only the bank is constructed. 4. Add one tree in the planter island of the northernmost row of parking. Add one tree per 35 linear feet along the southern boundary of the project. 5. Applicant shall submit for a planned sign program. Signage shall conform to the size and number depicted on the submitted plans. 6. This conditional use permit shall be subj ect to the expiration provisions set forth in MCC 11- 17-4.B. 7. A1190-degree parking stalls shall be at least 9 feet wide and l9 feet deep per Ordinance 11- 13-4.F. All two-way drive aisles adjacent to parking shall be at least 25 feet wide. Drive- thru lanes shall be constructed as depicted on the submitted site plans. 8. All parking and drive aisles shall be paved for all uses, in compliance with the submitted plans, Handicap pazking spaces shall be signed and striped in compliance with Federal accessibility guidelines. 9. The project shall provide across-access stub to the east, as depicted on the site plan. 10. Sanitary sewer and water service shall be from main lines currently being installed to the property. CUP-03-053 Ke~_Banl_,CaII'Ka;rvYx~ile,6F11',~1~x: Planning & Zoning Commission/Mayor & City Council November 20, 2003 (Hearing Date) Page 7 1.1. All exterior lighting, whether attached to the building or located within the parking lot, shall be down-shielded or otherwise altered so that the light does not spill over onto adjacent properties orright-of--way. All parking lot lighting shall be in accordance with Ordinance 11- 13-4C. 12. All signage shall be in accordance with the standards set forth in this report and Section 11- 14 ofthe City Zoning and Development Ordinance. All signage is subject to review acid shall require separate permits. 13. All construction and site improvements shall conform to the requirements ofthe Americans with Disabilities Act and the adopted building and fire codes. 14. A drainage plan designed by a State of Idaho licensed architect or engineer is required and shall be submitted to the City Engineer (Ord. 557, 10-1-91) for all off-street parking areas. Storm water treatment and disposal must be designed in accordance with Department of Environmental Quality 1997 publication Catalog of Storm Water Best Management Practices for Idaho Cities and Counties and City ofMeridian standards and policies. Off-site disposal into a surface water is prohibited unless the jurisdiction which has authority over the receiving stream provides written authorization prior to development plan approval. The applicant is responsible for filing all necessary applications with the Idaho Department of Water Resources regarding Shallow Injection Wells. 15. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy for the proposed development. A temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a letter of credit or cash in the amount of 110% of the cost of the required improvements (including paving, striping, landscaping, and irrigation). A bid must accompany any request for temporary occupancy. RECOMMENDATION Upon resolution of the remaining issues raised in this report, staff recommends approval of this application with the aforementioned conditions of approval. CUP-03-053 Kev Bank~.CUP!4aL~1R-dee MAYOR Robert D. C 'e CITY COUNCIL MEMBERS Tammy de Weerd William L. M. Nary Cherie McCandless Keith Bird m TA ~~~~^"`- ~~~ PLANNING & ZONING (208) 884-5533 • Fax 888-G854 TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN To insure that your comments and recommendations will be considered by the Meridian Planning and Zoning Commission, please submit your comments and recommendations to Meridian City Clerk's Office Attn: will Berg, City clerk, by: November 13, 2003 -r°x' : ,` fryer., ~. , ~~,, QQ ,,~~'' CITY OF j'~~_ • ~~VLBYIG~l~yl~ IL IDAHO LEGAL DEPARTMENT (208) 4669272 • FAX 466-4405 PARKS & RECREATION (208) 888-3579 • Fax 898-5501 PUBLIC WORKS (208) 898-5500 •Faz 887-1297 BUILDING DEPARTMENT (208) 887-2211 • Fax 887-1297 Transmittal Date: September 30, 2003 File No.: CUP 03-053 Request: Conditional Use Hearing Date: November 20, 2003 of a foot bank drive-thru and future retail tenant with drive-thru in a C-C zone for Key Bank By: Location of Property or Project: south of East Overland Road and west of South Eagle Road David Zaremba, P2 (nro vaR, vnc, FP) Jeny Centers, P2 (No vaR, vac, FP) Leslie Mathes, P!Z (No VAR, VAC, FP) Michael Rohm, P/Z (No VAR, VAC, FP) Keith BOfUp, P2 (No vAR, vac, FP) Robert Come, Mayor Bill Nary, C/C Tammy deWeerd, C/C Keith Bird, C/C Cherie McCandless, C/C City Attorney Your Concise Water Department Sewer Department Sanitary Service (No VAR, VAC, FP) Building Department Fire Department Police Department City Engineer Clty Planner Parks Department RECEIVED OCT - 2 2003 City of Mertdian City Clerk Office Meridian School District (No FP) Meridian Post Office (FPiPPoMy) Ada County Highway District Ada County Development Services Central District Health Nampa Meridian brig. District Settlers Irrigation District Idaho Power Co. (FP/PP Dory) U.S. West (FPiPP ~~ty) Intermountain Gas (FPiPP only) Bureau of Rectamation (FPrPP Doty) Idaho Transportation Department (No PP) Ade County (Annexation Doty) Ada County Land Rewrds (FPrPP only) Meridian Development Corporation Historical Preservation•Commission 33 EAST IDAHO AVENUE • MERIDIAN, IDAHO 83642 • (208) 888-4433 City Clerk Ot'tice Fax (208) 888-4218 Human Resources Fax (208) 8848723 Finance & Utility Billing Fax (208) 887-4813 MAYOR Rober[ D. Cowie CITY COUNCIL MEMBERS Tammy de Weerd William L. M..Nary Cherie McCandless Keith Bird !"m" _- i =° ~ .. '~ ~,Q ,/' CITY OF h~~- ~.~Vl eYlG~lCt 1?~ ti 1DAH0 TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN To insure that your comments and recommendations will be considered by the Meridian Planning and Zoning Commission, please submit your comments and recommendations to Meridian City Clerk's Office Attn: Will Berg, city clerk, by: November 73, 2003 Transmittal Date: September 30, 2003 Hearing Date: November 20, 2003 File No.: CUP 03-053 Request: Conditional Use Permit for development of a 2,800 square foot bank with drive-thru and future retail tenant with drive-thru in a C-C zone for Kev Bank By: CSHQA Location of Property or Project: south of East Overland Road and west of South Eagle Road David Zaremba, P/Z (No VAR, VAC, FP) Jerry Centers, P2 (No VAR, VAC, FP) Leslie Mathes, P2 (No VAR, VAC, FP) Michael Rohm, P/Z (No VAR, VAC, FP) KBlth BOfUp, P/Z (No VAR, VAC, FP) Robert Come, Mayor Bill Nary, C/C Tammy deWeerd, C/C Keith Bird, C/C Cherie McCandless, C/C ater Department Sewer Department Sanitary Service (No Building Departure Fire Department Police Department City Attorney City Engineer City Planner Parks Department VAR, VAC, FP) nt Meridian School District (Na FP) Meridian Post Office (FPiPP Dory) Ada County Highway District Ada County Development Services Central District Health BUILDING DEPARTMENT (208) 887-221] • Fax 887-]297 PLANNING & ZONING (208) 884-5533 • Fax 888-6854 Nampa Meridian brig. District Settlers Irrigation District Idaho Power CO. (FP/PPonty) U.S. West (FPiPP ~~ty) LEGAL DEPARTMENT (208) 466-9272 • FAX 46G-4405 PARKS & RECREATION (208) 888-3579 • Fax 898-5501 PUBLIC WORKS (208) 898-5500 • Fax 887-1297 Interrnountaln Gas (FP/PP only) Bureau of ReGamation (FP/PP oMy) Idaho Transportation Department (No FP) Ada County (Annexation Doty) Ada County Land Records (FP/PP Doty) Meridian Development Corporation Historical Presenr$tton Commission Your Concise Remarks: ECEIVED ocro3~3 City Of Meridian City Clerk Office 2 2003 Ci ~ :...iF MERIDIAN WASmEWATER DEI'~', 33 EAST IDAHO AVENUE • MERIDIAN, IDAHO 83642 • (208) 888-4433 City Clerk Office Pax (208) 888-4218 Human Resources Fax (208) 884-8723 Pinance & Utility Billing Pax (208) 887-4813 CENTRAL CENTRAL DISTRICT HEALTH DEPARTMENT •. DISTRICT RFiCEIVEI9eturn to: oi1rHEALTH Environmental Health Division ^ Boise DEPARTMENT OCT 10 2003 ^ Eagle Rezone # City of Meril3ian ^ Garden City Conditional Use # ' y er 1°e ~Neridian Preliminary /Final /Short Plat /~' P 03 -GS/ 3 Lo~ 7f'~ /~.~.>~ Swb ^ Kuna ^ ACZ ^ Star ~. We have No Objections to this Proposal. ^ 2. We recommend Denial of this Proposal. ^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ or bedrock from original grade ^ other ^ 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or surface waters. ^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: D central sewage ^ community sewage system ^ community water well ^ interim sewage ^ central water ^ individual sewage ^ individual water ^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare, Division of Environmental Quality: ^ central sewage ^ community sewage system ^ community water ^ sewage dry lines ^ central water ^ 10. Run-off is not to create a mosquito breeding problem. ^ 11. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^ 13. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ beverage establishment ^ grocery store ~14. Please see attached stormwater management recommendatations ^ 15. ^ child care center Date: /~ I ~ l~ Reviewed By: ~-~~~~L ~oHO9,~,~ Review Sheet CENTRAL ~ DISTRICT y~i'HEAL DEPARTM TH ENT MAIN OFFICE • 707 N. ARMSTflONG PL. • BOISE, ID 83704-0825 • (208 375-5271 • FAX 327-8500 To prenenr med treat disease and disabi(im; m promote Nea(thp fifes?Pfes; end ro protect axd prom ore the Ireolnr and quality of our envirnnmelrt. STORM WATER MANAGEMENT RECOMMENDATIONS It is recommended that storm water be pre-treated prior to discharge to the subsurface to prevent impact to ground water and surface water quality: The engineers and architects involved with the design of this project should obtain current best management practices for storm water disposal and design a storm water management system that is preventing groundwater and surface water degradation. Manuals that could be used for guidance are: State of Idaho Catalog of Stormwater Best Management Practices For Idaho Cities and Counties. Prepared by the Idaho Department of Environmental Quality, July 1997. Stormwater Best Management Practices Guidebook. Prepared by City-of 13oise Public Works Department, May 2000. uv,e.iz a. moo Sewing Pal(ep, Ebnnre, Boise, and.9da Counties Ada I Boise County Office 707 N. Armstrong PI. Boise, ID &3704 Enviro. Heallh: 327-7459 Family Planninc: 327-7400 Immuniza [ions: 327-7450 Senior Nutrition: 327-7460 WIC: 327-7488 FAX: ?27-8500 Elmore County Dffice sec E. am sl-Norm Moumair. Home, ID 8?64i Envira. Heallh: 587 ~[2S Family h'eaHn: 587-4407 VAC: 527-44v5 FAX: SE7-3 E21 Vzliey County Office 703 N. 1st A. P0. Boa 1442 McCall, ID S36?S Ph. 654-7195 FFY: 634-Z1 i~ L lr~ & 7~Z~r~,d~a~ %~1tGg~G4,Gt ~ut,~iict 1503 FIRST STREET SOUTH NAMPA, IDAHO 63651-4395 16.L?otober, 2003 Willlart°~ Berg City ofiMeridian 33 East Idaho Ave. Meridian, ID 83642 RE: 4"lJPD3-053 Key Bank FAX # 208-463-0092 ~')'`~ T~ 7~y K P1.~~ 1 V F7.~ Phones: L I~Y~JJ 1LL~11111 ^-~ Area Code 208 . OFFICE: Nampa 466-7861 OCT 2 7 20(13 SHOP: Nampa 466-0663 City Of Meridian City Clerk Office Dear Will: All sfionn drainage is being retained onsite, therefore no further review is required by Nampa & Meridian Irrigation District. All laterals and waste ways must be protected. The Developer must comply with Idaho Code 31-3805. Thank you, ~,se/~~~ Bill Henson Asst. Water Superintendent Nampa & Meridian Irrigation District BH/dbg C: Water Superintendent File -Office/Shop APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJEQ RIGHTS - 40,000 -~E ~~~}~ Ada County Highway District Sherry R. Huber. President R1R Fact ~74h STlPPT Susan S. Eastlake, 1st Vice President Garden City ID 83714-6499 Dave Bivens, 2nd Vice President Phone (208) 387-6100 David E. Wynkoop, Commissioner FAX (208) 387-6391 John S. Franden, Commissioner E-mail: tellusQACHD.ada.id.us I~ErFIVEI~ October 20, 2003 TO: CSHOA 250 S. 5th Street Boise, Idaho 83702 SUBJECT: MCUP03-053 Key Bank with drive thru and future retail tenant south of East Overland Road and west of S. Eagle Road OCT 2 2 2003 City Of Meridian City Clerk Office On January 18, 2002, the Ada County Highway District Commissioners acted on MCUP01-037/MAZ01-018 Eldorado Business Campus. The conditions and requirements also apply to MCUP03-053. If you have any questions or concerns please feel free to contact this office at (208) 387-6170. Sincerely, ~~-t~-~ Joyce Newton Development Analyst Right-of-Way & Development Services CC: Project File Drainage/Utilities/Construction Services Lead Agency: 4ity of Meridian Kimball Properties LTD Partnership P.O. Box 8204 Boise, Idaho 83704 EAGLE RIB 0 m z v v n Z_ D II ADA COUNTY HIGHWAY DISTRICT Planning and Development Division Deve]opment Application Report Preliminary Plat -Eldorado Business Campus s/w/c Overland Road/Eagle Road 15-lots MCUPOl-037 / MAZOl-018 The application has been refen•ed to ACHD by the City of Meridian for review and comment. The Eldorado Business Campus is a 32-lot office/commercial subdivision on 85.36-acres. The applicant is requesting rezone approval from R-1 to C-C/C-G, annexation approval, as well as preliminary plat approval for the 85.36 acre subdivision. The site is located at the southwest corner of Overland Road and Eagle Road. This development is estimated to generate 8,262 additional vehicle trips per day based on the submitted traffic impact study. Roads impacted by this development: Overland Road Eagle Road Interstate 84 ACHD Commission Date -January 16, 2002 - 12:00 noon. Facts and Findings: A. General Information Owner -Winston Moore Applicant - W.H. Moore Company R-1 -Existing zoning (low-density residential) C-C/C-G -Proposed zoning (general commercial) 85.36 -Acres 32 -Proposed building lots 17 -Proposed common lots 4,950 -Total lineal feet of proposed public streets 285 -Traffic Analysis Zone (TAZ) West Ada -Impact Fee Service Area Meridian -Impact Fee Assessment District Eldorado.cmm Page 1 Eldorado.cmm Page 2 N 1000 0 1000 2000 Feet Overland Road Minor arterial with bike lane designation Traffic count of 13,551 on 11-30-99 (e/o Eagle Road) Traffic count of 11,422 on 11-30-99 (w/o Eagle Road) D -Existing Level of Service Greater than E -Existing plus project build-out Level of Service 1,300-feet of frontage 50-feet existing right-of--way (25-feet from centerline) 54 to 48-feet required right-of--way from centerline Overland Road is improved with 2-lanes with no curb, gutter or sidewalk abutting the site. There is a southbound turn lane on Overland Road at the Eagle Road intersection. The Overland/Bagle Road intersection currently operates at a level of service F. Eagle Road Minor arterial with bike lane designation Traffic count of 19,790 on 11-30-99 (n/o Overland Road) Traffic count of 7,498 on 2-2-00 (s/o Overland Road) Traffic count of 44,397 on 10-19-99 (n/o I-84) C -Existing Level of Service D -Existing plus project build-out Level of Service 2,700-feet of frontage 50-feet existing right-of--way (25-feet from centerline) 52 to 48-feet required right-of--way from centerline Abutting the site Eagle Road is improved with two travel lanes with no curb, gutter or sidewalk. North of Overland Road Eagle Road widens to 5-lanes. North of I-84 Eagle Road is under the jurisdiction of ITD. Interstate 84 Traffic count on I-84 was not available 0-feet of frontage Interstate 84 is three lanes eastbound and three lanes westbound. There is an "ON" and "OFF" ramp at Eagle Road. B. The Overland/Eagle Road and Meridian/Overland Road intersections operate at a Level of Service F (LOS F~, and are listed as one of the 100 most critical intersections in Ada County. Access control within the operating area of the intersection is vital to the safe operations of the intersection. The subject site's additional traffic will exacerbate the traffic problems at these intersections. Eldorado.cmm Page 3 C. The Overland Road /Eagle Road intersection is in the Five Year Work program. With the reconstruction of this intersection, the level of service for Eagle Road, Overland Road and the intersection are anticipated to improve. D. On Mazch 14, 2001, the Commission approved the original Silverstone Corporate Center located directly across from the proposed Eldorado Business Campus. The Silverstone Corporate Center was estimated to generate approximately 9,629 vehicle trips per day. The Eldorado Business Campus is estimated to generate approximately 8,262 vehicle trips per day. On November 7, 2001, the Commission considered and allowed the Silverstone Corporate Center to have a fourth access point on Eagle Road due to the fact that the Silverstone Corporate Center had an extraordinary circumstance before them. Staff supported a fourth access on Eagle Road because of three key major components: 1. The Silverstone Corporate Center did not anficipate ownership of the newly acquired parcel, 2. They placed the access point (a public street) in a safer location than if they had not been approved with this request and 3. The applicant did not request direct access to Eagle Road when a formal application was filed for the newly acquired pazcel (Silverstone II) with the City of Meridian or the District. On January 9, 2002, the Commission formally acted on Silverstone II, the newly acquired parcel. Silverstone II did not request a new access point to Eagle Road. Rather, they subdivided the 7.83 acre site into 31-lot commercial subdivision and took access from the fourth access point that was approved on November 7, 2001. E. The formal application that was submitted to the City of Meridian and the District showed three access points on Eagle Road. Since the District received the formal submittal, the applicant has requested a fourth access point located on Eagle Road approximately 1,150-feet south of Overland Road. On January 16, 2002, the Commission formally acted on the Eldorado Business Campus and granted the fourth access point to Eagle Road. This access point was proposed to be a driveway located on Eagle Road approximately 1,150-feet south of Overland Road. The following report reflects the Commissions formal action. F. The applicant hired Earth Tech Traffic Engineering to perform a traffic analysis of this site. The analysis has identified the following conclusions, and this information has been verified by District staff: ^ The proposed development is projected to generate an average daily traffic (ADT) of 8262 vehicles per day (vpd), of which the PM peak hour traffic (PHT) is 1085 vehicles per hour (vPh)• • At build-out, the project will add 5,420 vehicles per day to Eagle Road north of the site, of these trips 727 will take the westbound I-84 ramp, 2,148 will travel eastbound on I-84, and the remaining 2,545 will continue to the north. An additiona1942 vehicles per day will travel south of the site on Eagle Road. The project will also add 1,182 vehicles per day to Overland Road east of the site and 727 vehicles per day on Overland Road west of the site. Eldorado.cmm Page 4 ^ The intersection of Eagle Road and Overland Road is currently operating at Level Of Service (LOS) F. It will operate at a LOS F under background conditions with or without the site traffic. This Development should be required to participate in improvements to this intersection to bring it up to an acceptable level of service. ^ The intersection of Eagle Road and the Eastbound and Westbound off ramps of I-84 will function at an acceptable LOS with the addition of the site traffic. This assumes that the proposed signal in the Eastbound off-ramp is constructed by ITD. ^ The intersection of Eagle Road and Franklin Road will operate at LOS F with or without the project. Irnprovements to this intersection will require additional right-of--way and coordination with the other projects. Since the majority of the traffic will be coming from other growth in the area, widening of this intersection should be considered by ACHD and ITD. ^ The intersection of Overland Road and Meridian Road will operate at LOS F with or without the project. Additional lanes are required to make this intersection operate at an acceptable LOS D. This intersection is within the limits of a proposed project by ACHD. The site traffic should be included in the planning of the ACHD improvement project. ^ The intersection of Overland Road and Cloverdale Road will operate at LOS E under background traffic. This site traffic will reduce the operation to LOS F. Additional lanes are required to make this intersection operate at an acceptable LOS E. This area will probably see development in the coming years. ^ The intersection of Eagle Road and Victory Road will operate at LOS D under background traffic. The intersection operation will reduce to LOS F with the addition of site traffic. Adding a southbound left turn lane to this intersection would increase the operation to an acceptable LOS C. ^ Eagle Road south of the project will operate at an acceptable level of service after build out of the project. The site should contribute right-or-way for future roadway expansion. Since Eagle Road is on a section line, it is assumed that the future roadway will be a five-lane road. ^ Eagle Road north of the site will operate at an acceptable level of service after build out of the project. ^ Overland Road west of Eagle Road will operate at an acceptable level of service for athree-lane road. A three-lane road is proposed to be built by ACRD on this section of roadway. ^ Overland Road east of Eagle Toad will operate at a poor level of service after build out of the project. The Silverstone Corporate Center Traffic Irnpact Study suggests that right-of--way should be dedicated for afive-lane future roadway. ^ The prof ect should be required to construct a signal at the south main entrance to the site on Eagle Road. • The on-site roadways will operate above LOS C. ^ The signalized entrance to El Dorado, along Eagle Road, will operate at a LOS C. ^ The north unsignalized entrance, along Eagle Road, will operate at a LOS E. ^ The south-unsignalized entrance, along Eagle Road, will operate at a LOS C. • The west unsignalized entrance along Overland Road will operate at a LOS C. ^ The middle unsignalized entrance, along Overland Road, will operate at a LOS C. ^ The east unsignalized entrance, along Overland Road, will operate at a LOS B. ^ The signalized entrance to El Dorado along Eagle Road will operate at a LOS C. Eldorado.cmm Page 5 Pending projects assumed to be built by build-out and included in the analysis. ^ Locust Grove Overpass, and associated projects (RD157, RD157B, F201-O1, F201-O1B). These projects are all either unfunded or pending and are not scheduled to begin acquiring R/W until at least 2004 for the overpass. Overland Rd, Eagle Rd/Cloverdale Rd (RD072) -Reconstruct and widen to 5-lane urban section. (unfunded) Overland Rd, Locust Grove Rd/Eagle Rd (RD266) - 4/5-lane rural section. (2005) Project not included in the traffic analysis that will affect the impact area. ^ Project RD201-02, on Cloverdale Road between Overland Road and the I-84 overpass. This project includes widening the overpass to three lanes and will also include intersection work at Cloverdale and Overland that will widen all four approaches to a 5-lane rural section. This intersection. This project is scheduled to begin in Oct. 2002 and be completed by Summer 2003. G. The applicant should be required to construct a 5-foot wide detached concrete sidewalk on Eagle Road located 2-feet within the new right-of--way. Coordinate the location and elevation of the sidewallc with District staff. If the sidewalk meanders outside of the right-of--way, provide an easement for the sidewalk H. The applicant should be required to construct a 5-foot wide detached concrete sidewalk on Overland Road located 2-feet within the new right-of--way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of--way, provide an easement for the sidewalk I. District policy 7204.7.3 states that access points on arterials are based on the following: •3 One access point for less than 150-feet of frontage • Two access points for 150-600-feet of frontage • Three access points for greater than 600-feet of frontage. Access points are considered to be both public streets and driveways. Due to the fact that this parcel has approximately 1,300 feet of frontage, they are allowed a maximum of three access points to Overland Road. The applicant is proposing three access points on Overland Road. The access points are proposed to be located in the following locations: • The applicant is proposing to construct a drivewav on Overland Road approximately 240-feet west of Eagle Road • The applicant is proposing to construct a drivewyy on Overland Road approximately 550-feet west of Eagle Road • The applicant is proposing to construct a public road on Overland Road approximately 950-feet west of Eagle Road Eldorado.cmm Page 6 District policy requires driveways on arterial roadways to align or offset a 150-feet from any existing or proposed street. These Spacing requirements are illustrated in Figure 72-F5. If the driveway is proposed to be located at or near a signalized intersection, the driveway should align or offset a minimum of 440-feet for a full access driveway or 220-feet for aright- in/right-out driveway. These spacing requirements are illustrated in Figure 72-F3. The driveway that is proposed to be located on Overland Road approximately 240-feet west of Eagle Road meets District policy as a right-in/right-out driveway only. Because it meets District policy, it should be approved with this application. The drivewav that is proposed to be located on Overland Road approximately 550-feet west of Eagle Road meets District policy as afull-access driveway. Because it meets District policy, it should be approved with this application. District policy 7204.11.6 restricts access to collector and arterial roadways. Due to the fact that access is restricted on collector and arterial roadways the applicant should construct the new public streets entering onto the arterial public roadway system to align or offset a minimum number of feet from any existing or proposed street. These spacing requirements are listed on in policy number 7204.11.6 and states, "the optimum spacing for collector intersections along arterials is 1,700-feet to allow adequate signal spacing. The minimum spacing for collector intersections along arterials is 1,300-feet." The public roadwa access point that is proposed to be located on Overland Road approximately 950-feet west of Eagle Road is a collector roadway. This specific location does not meet District policy. Earth Tech, the applicants Traffic Engineer, states, and "the internal roadways will adequately handle projected traffic volumes at a LOS C or greater according to the Ada County Roadway Capacity Guidelines. These roads should be constructed to an ACRD standard for a collector road in a business district." Due to the fact that the District approved a similar design on the east side of Eagle Road and the applicants Traffic Engineer feels that a collector roadway is warranted with this development, District staff believes that a modification of policy 7204.11.6 is, both, warranted and justifiable. District policy 7204.7.3 states that access points on arterials are based on the following: • One access point for less than 150-feet of frontage • Two access points for 150-600-feet of frontage • Three access points for greater than 600-feet of frontage. Access points are considered to be both public streets and driveways. Due to the fact that this parcel has approximately 1,300 feet of frontage, they are allowed a maximum of three access points to Overland Road. The applicant is proposing four access points on Eagle Road. The access points are proposed to be located in the following locations: Eldorado.cmm Page 7 • The applicant is proposing to construct a public roadway on Eagle Road approximately 700-feet south of Overland Road • The applicant is proposing to construct a driveway located on Eagle Road approximately 1,150-feet south of Overland Road. • The applicant is proposing to constmct a public roadway on Eagle Road approximately 1,700-feet south of Overland Road • The applicant is proposing to construct a public roadway on Eagle Road approximately 2,400-feet south of Overland Road District policy 7204.11.6 restricts access to collector and arterial roadways. Due to the fact that access is restricted on collector and arterial roadways the applicant should construct the new public streets entering onto the arterial public roadway system to align or offset a minimum number of feet from any existing or proposed street. These spacing requirements are listed on in policy number 7204.11.6. The public roadwa access point that is proposed to be located on Eagle Road approximately 700-feet south of Overland Road is a collector roadway. This specific location does not meet District policy. Earth Tech, the applicants Traffic Engineer, states, "the internal roadways will adequately handle projected traffic volumes at a LOS C or greater according to the Ada County Roadway Capacity Guidelines. These roads should be constructed to an ACfID standard for a collector road in a business district " Due to the fact that the District approved a similar design on the east side of Eagle Road and the applicants Traffic Engineer feels that a collector roadway is warranted with this development, District staff believes that a modification of policy 7204.11.6 is, both, warranted and justifiable. The driveway that is proposed to be located on Eagle Road approximately 1,150-feet south of Overland Road was approved as a modification of policy by the District Commission on January 16, 2002. The public roadway that is proposed to be located on Eagle Road approximately 1,700-feet south of Overland Road meets District policy. Because it meets District policy, it should be approved with this application. The public roadway access point that is proposed to be located on Eagle Road approximately 2,400-feet south of Overland Road is a collector roadway. This specific location meets District policy and should be approved with this application. K. The applicant is proposing to construct a spine road through the site with connections at Overland Road and Eagle Road. This roadway (Copper Point Way) is proposed to align with the roadway that was approved with the Silverstone Corporate Center. Due to the volumes of traffic this development is expected to generate, the recommendation of the applicants Traffic Engineer, and the applicant's proposed site plan, the applicant should construct this roadway as a 46-foot street section with curbs, gutters and sidewalks. The street should be constmcted within 70-feet Eldorado.cmm Page 8 ofright-of--way. Parking should be restricted on the proposed street, and the applicant should submit a signage plan prior to final plat approval. L. The proposed roadway on Eagle Road located approximately 1,700-feet south of Overland Road is proposed to align with the roadway that was approved with the Silverstone Corporate Center. Due to the volumes of traffic this development is expected to generate, the recommendation of the applicants Traffic Engineer, and the applicants proposed site plan, the applicant should construct this roadway as a 46-foot street section with curbs, gutters and sidewalks. The street should be constructed within 70-feet ofright-of--way. Parking should be restricted on the proposed street, and the applicant should submit a signage plan prior to final plat approval. M. The proposed roadway on Eagle Road located approximately 700-feet south of Overland Road is proposed to offset a driveway that was approved with the Silverstone Corporate Center. Due to the volumes of traffic this development is expected to generate, the recommendation of the applicants Traffic Engineer, and the applicants proposed site plan, the applicant should construct this roadway as a 46-foot street section with curbs, gutters and sidewalks. The street should be constructed within 70-feet ofright-of--way. Parking should be restricted on the proposed street, and the applicant should submit a signage plan prior to fmal plat approval. N. The Silverstone Corporate Center has a comparable impact on the public roadway system. The Silverstone Corporate Center was required to construct center turn lanes on Eagle Road and Overland Road. To promote consistency and mitigate traffic in the area, the applicant should be required to construct center turn lanes on Overland Road and Eagle Road for the proposed public street intersections and for full access driveways. O. The applicant's site plan indicates a traffic signal on Eagle Road located approximately 1/3-mile south of Overland Road. According to the submitted traffic study that was submitted by the Eldorado Business Campus' and the Silverstone Corporate Center's traffic impact studies, at full build-out, the projects should be required to construct the signal, and the necessary site improvements associated with the signal. The Eldorado Business Campus' traffic impact study specifically addresses the proposed signalized intersection and states that the Eldorado Business Campus should construct a left tum bay at the main entrance on Eagle Road. Based on ACHD Commission action, traffic signals cannot be installed at these intersections until there is a warrant. The applicant's traffic engineer should work with ACHD Traffic Services staff to determine when the warrant is met, or is close to being met. The developer should be financially responsible for the cost of one-half of the signal due to the fact that the Silverstone Corporate Center was required to contribute the half of the signal. This applicant should enter into a three way written agreement with the District for the cost and specific location of the traffic signal. P. The applicant is proposing to construct several landscape islands throughout the site. Any proposed landscape islands/medians within the public right-of--way dedicated by this plat should Eldorado.cmm Page 9 be owned and maintained by a homeowners association. Notes of this should be required on the fmal plat. Q. The applicant is proposing to construct a stub street to the west property line. District staff recommends that a stub street be constructed to the west property line to provide connectivity throughout the area. District policy requires temporary turnazounds at the end of stub streets that serve more than one ]ot, or are greater than 150-feet in length. The applicant should be required to provide a paved temporary turnaround at the west end of the stub street with a temporary easement provided to the District. The applicant should be required to install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub street, and the design of the turnaround (if necessary) with District staff. R. The turnarounds should be constructed to provide a minimum turning radius of 55-feet. S. Any existing irrigation facilities should be relocated outside of the right-of--way. T. Utility street cuts in pavement less than five yeazs old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. U. If utility relocation is necessary to construct improvements required with this development, then all utility relocation costs associated with improving street frontages abutting the site should be borne by the developer. V. ACHD's Park & Ride Division Staffhave indicated the need for a pazk and ride location at the applicant's site. The District requests that applicant grant the District an easement fora 10 to 12- space Park & Ride area at this site. Commuteride staff will contact the applicant to coordinate the location of the Park & Ride area. W. In order to reduce trips to and from this development it is recommended that Tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACHD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Pat Nelson at 387-6160. X. In order to reduce trips to and from this development, it is recommended that the tenants occupying the proposed building(s) be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. A Transportation Management Association (TMA) or Transportation Management Organization (TMO) is formed with a coordinator that works as a liaison between businesses and private and public transportation providers to increase the use of alternative transportation and other trip reduction measures (shuttle buses, bus pass programs, vanpools, carpools, bicycle and walking Eldomdo.cmm Page 10 enhancements). An annual survey will be required of the TMA/TMO to monitor participation in alternative transportation programs and forwarded to the ACHD Commuteride Office. Y. Based on development patterns in this area and the resulting traffic generation, staff anticipates that the transportation system will not be adequate to accommodate additional traffic generated by this proposed development at accepted levels of service without modifications to Eagle Road and Overland Road, and the intersection. Special Recommendation to City of Meridian: In order to reduce trips to and from this development it is recommended that tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACHD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Ms. Pat Nelson at 387-6160. 2. In order to reduce trips to and from this development, the tenants occupying the proposed building(s) should be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. The Overland/Eagle Road and Meridian/Overland Road intersections operate at a Level of Service F (LOS F), and are listed as one of the 100 most critical intersections in Ada County. Access control within the operating area of the intersection is vital to the safe operations of the intersection. The subject site's additional traffic will exacerbate the traffic problems at these intersections. 4. Based on development patterns in this area and the resulting traffic generation, staff anticipates that the transportation system will not be adequate to accommodate additional traffic generated by this proposed development at accepted levels of service without modifications to Eagle Road and Overland Road, and the intersection. The following Site Specific Requirements and Standard Requirements must be met or provided for prior to ACHD approval of the final plat: Site Specific Requirements: 1. Dedicate 54 to 48-feet ofright-of--way from the centerline of Overland Road abutting the parcel by means of recordation of a fmal subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of--way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of--way dedicated which is an addition to existing ACHD right-of--way. The applicant shall coordinate the dedication ofright-of--way on Overland Road with District staff. Eldorado.cmm Page 11 Dedicate 52 to 48-feet ofright-of--way from the centerline of Eagle Road abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of--way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of--way dedicated which is an addition to existing ACHD right-of--way. The applicant shall coordinate the dedication ofright-of--way on Eagle Road with District staff. 3. Construct a 5-foot wide detached concrete sidewalk on Eagle Road located 2-feet within the new right-of--way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of--way, provide an easement for the sidewalk 4. Construct a 5-foot wide detached concrete sidewalk on Overland Road located 2-feet within the new right-of--way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of--way, provide an easement for the sidewalk 5. Construct the proposed drivewav on Overland Road approximately 240-feet west of Eagle Road. This driveway meets District policy as a right-in/right-out driveway only and is approved with this application. The applicant shall coordinate with the Districts Traffic Services Division to determine a mean to restrict this driveway to aright-in/right-out driveway only (ie raised median, internal island, etc.). 6. Construct the proposed drivewav on Overland Road approximately 550-feet west of Eagle Road as afull-access driveway. This driveway meets District policy and is approved with this application. 7. Construct the proposed public roadwav access point located on Overland Road approximately 950-feet west of Eagle Road is a collector roadway. This location is granted a modification of policy and is approved with this application. 8. Construct the proposed public roadwav on Eagle Road approximately 700-feet south of Overland Road as afull-access roadway. This roadway meets District policy and is approved with this application. 9. Construct the proposed drivewav on Eagle Road located approximately 1,150-feet south of Overland Road. This driveway was granted as a modification of policy by the District's Commission on January 16, 2002. 10. Construct the proposed public roadwav on Eagle Road approximately 1,700-feet south of Overland Road. This roadway meets District policy and is approved with this application. 11. Construct the proposed public roadwav on Eagle Road approximately 2,400-feet south of Overland Road as a full access roadway. This roadway meets District policy and is approved with this application. Eldorado.cmm Page 12 12. Construct the proposed spine road with connections at Overland Road and Eagle Road, as proposed. This roadway shall be constructed as a 46-foot street section with curbs, gutters and sidewalks within 70-feet ofright-of--way, as proposed. Parking shall be restricted on the proposed street, and the applicant shall submit a signage plan prior to final plat approval. 13. Construct the proposed roadway on Eagle Road located approximately 1,700-feet south of Overland Road to align with the roadway that was approved with the Silverstone Corporate Center. This roadway shall be constructed as a 46-foot street section with curbs, gutters and sidewalks within 70-feet ofright-of--way. Parking shall be restricted on the proposed street, and the applicant shall submit a signage plan prior to final plat approval. 14. Construct the proposed roadway on Eagle Road located approximately 700-feet south of Overland Road is proposed to offset a driveway that was approved with the Silverstone Corporate Center. This roadway shall be constructed as a 46-foot street section with curbs, gutters and sidewalks within 70-feet ofright-of--way. Parking shall be restricted on the proposed street, and the applicant shall submit a signage plan prior to fmal plat approval. 15. Construct center turn lanes on Overland Road and Eagle Road for the proposed public street intersections and for all of the full access driveways. 16. Construct a left tam bay at the main entrance on Eagle Road. 17. Enter into a three way written agreement with the District for the cost and specific location of the traffic signal on Eagle Road. 18. Any proposed landscape islands/medians within the public right-of--way dedicated by this plat shall be owned and maintained by a homeowners association. Notes of this shall be required on the final plat. 19. Construct a stub street to the west property line. The applicant has proposed that the stub street be located approximately 450 feet north of the south property line. Staff is supportive of this location or any location that is located south of the proposed Lot 11. The applicant shall construct the stub street and provide a paved temporary turnazound at the west end of the stub street with a temporary easement provided to the District. The applicant shall be required to install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub street, and the design of the turnaround (if necessary) with District staff. 20. The turnarounds shall be constructed to provide a minimum taming radius of 55-feet. 21. Any existing irrigation facilities shall be relocated outside of the right-of--way. Eldorado.cmm Page 13 22. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. 23. If utility relocation is necessary to construct improvements required with this development, then all utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer 24. Other than the access points specifically approved with this application, direct lot or pazcel access to Eagle Road and Overland Road is prohibited. Lot access restrictions, as required with this application, shall be stated on the final plat. Standard Requirements: A request for modification, variance or waiver of any requirement or policy outlined herein shall be made in writing to the ACHD Planning and Development Supervisor. The reauest shall specifically identify each reauirement to be reconsidered and include a written explanation of why such a reauirement would result in a substantial hardship or inequity The written reauest shall be submitted to the District no later than 9.00 a m on the day scheduled for ACRD Commission action. Those items shall be rescheduled for discussion with the Commission on the next available meeting agenda. Requests submitted to the District after 9:00 a.m. on the day scheduled for Commission action do not provide sufficient time for District staff to remove the item from the consent agenda and report to the Commission regarding the requested modification, variance or waiver. Those items will be acted on by the Commission unless removed from the agenda by the Commission. 2. After ACRD Commission action, any request for reconsideration of the Commission's action shall be made in writing to the Planning and Development Supervisor within six days of the action and shall include a minimum fee of $110.00. The reauest for reconsideration shall specifically identify each reauirement to be reconsidered and include written documentation of data that was not available to the Commission at the time of its orieinal decision The request for reconsideration will be heard by the District Commission at the next regulaz meeting of the Commission. If the Commission agrees to reconsider the action, the applicant will be notified of the date and time of the Commission meeting at which the reconsideration will be heazd. 3. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #193, also known as Ada County Highway District Road Impact Fee Ordinance. 4. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. Eldorado.cmm Page 14 5. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 6. .Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of--way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be required to call DIGLIIVE (1-800-342-1585) at least two full business days prior to breaking ground within ACRD right-of--way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 9. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless awaiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. Conclusion of Law: ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Should you have any questions or comments, please contact the Planning and Development Division at 387-6170. Submitted bv: Commission Action: Plannine and Development Staff Eldorado.cmm Page 15 MAYOR ROl31R'f t). CORRIE (.OU~CIL MFM UERS ' WILLIAM L M NARY . . _„„ I<EI TIIBlRD n TAMMY DE WEERD ~.xrv oe~ _ CHERIE MCCANDLESS y/ -~ ~ ~ ~ ~~ RURAL FIRE COMMISSIONERS ~~~ ~~~L ir RICHARDGREeue ~i~. II)r~F1U z~ FGRRY LEIO HTON EFY ~ STEVE eLLlarr e '^- Ya, r voy>aS„_, Ytt i (; r z~,pl ~~ L'T ,' ~[ %=.-. t _2E L' ~,R"=~ F ti'-t, CHIGP KEN W. BOWERS DEPHTY CHIEF- FIRE hREV ENTICIN JOSEPH SILVA DEPUTY CHIEF -TRAINING BILL JOHNSON 540 F;esC Franklin Road Meri~Lan ID 44642 (°_04) 8b8 1 X34 Pax (20R) Rh-D390 RECEIVED NOV 12 2003 November 10, 2003 City Of Meridian City Clerk Office TO: Mayor, City Council and Meridian Planning & Zoning Commission FROM: Joseph Silva, Deputy Chief, Fire Prevention SUBJECT: Key Bank CUP 03-053 The following will be the requirements and/or concerns to provide minimum levels of fire protection for the proposed project: 1. That afire-flow consistent with Appendix D of the International Fire Code be provided to service the entire project. Fire hydrants shall be placed an average of 350' apart. 2. Operational fire hydrants and temporazy or permanent street signs are required before combustible construction begins. 3. Acceptance of the water supply for fire protection will be by the Meridian Water Department. 4. Final approval of the fire hydrant locations shall be by the Meridian Fire Department thru the Public Works Department. 5. All radii shall be 28' inside and 48' outside radius for all entrances and internal roads. 6. All fire lanes shall have an unobstructed width of 20'. 7. The proposed project lies outside the five-minute response zone goal. Achievement of this goal is subject to budgetary constraints and is intended to enhance the probability of a favorable outcome on a request for Basic Life Support. The budget constraints are typically defined as capital outlay for facilities that are located within 1.5 miles from a given location and sufficient operational fiords to staff the facilities. 8. No Parking will be allowed on the access road to the West. / 11x11/2003 102:135~~,~8885052 MAYOR Rabcrt D. Ca CITY COUNCtL tvlEMl Tammy de Weerd William G M. Nary Cherie McCandless Keith Bird SANITARY SERVICES ... ,~~~ / ,. ( , ;~~ crly oP ~ ~•+'' ~ . -'y ,~i eri~r~n a~ ,~ ~~ _ IDAHO .1 PAGE 05 LEGAL DEPARTMENT (208) 666AZ72 • FAX dGG-0a05 PARKS 8c RECREATION (208) 888.3579 • Fax 396.5501 PUBLIC WORKS (208) 698-5500 • Pax 697.1297 BUILDING DEPARTMENT (206) BB7-2211 • Fax 887.129? `~~ ; I iifo PLANNING & ZONING (2D8) 884.553; -Fax 888-G65a ~~~~ TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN To insure that your comments and recommendations will be considered by the Meridian Planning and Zoning Commission, please submit your comments and recommendations to Meridian City CleRc's Office Arin: Will Berg, City Clerk, by: Transmittal Date: September 30, 2003 Fie No.: CUP 03-053 Request: Conditional Use Permit for d~ drrive-thru and future retail to By: CSHQA Location of Property or Project: south of E David 2aremDa, P2 (No VAR, VAC, FPJ Deny Centers, PfZ (NO vAR, vac, FP) Leslie Mathes, P2 Mo vAR, vac, FP) Michael Rohm, P/Z (Ivo vAR vac, FP) Keith Borup, P2 (No VAR, VAC, FP) Robert Come, Mayor Biil Nrary, C/C TammydeWeerd, CIC Keith Bird, C!C Cherie McCandless, C/C Water Department er Department Sanitary Service (No vAR, VAC. FP) Building Department Fire DepaRmeM Police Department City Ariomey Your Conci City Engineer City Planner Perils Department 2003 Hearing Date: of a 2,800 square foot bank IVQ-thti In a C-C zone for Ks Meridian School District (,vo FPJ _,_MeridiartPostOffSce (FPrPPOnry) Ada County Highway District Ada County Development Services CenVal District Health Nampa Meridian Inig. District Settlers Irtlgation District Idaho Power Co. (FP/PP oNy) U.S. West (FPrPPonry) ,~_Intennountain Gas (FPiPPonry) Bureau of Reclamation (FPxpPprtryJ Idaho Transportation Department (rvo Fpj Ada County (Annoxa8on onryJ Ada County Land Records (FPAaP Dory! Meridian Development Corporation J Historical Preservation CommLSSion ,~j ~/TtH-~~ CQMMENTS:~~ Y wtlerlMeJ,rt,Q~' ,"r RECE~ ~ 1:1~ T.S'~- ro C«a.aca= is 'a-+ -Peovrsta .~t~rw~aay -r„r~ G,,,,~.Poa~ NOV 111003 City OFMeridian City Clerk Office 33 EAST IDAHO AVF_N())r • METt1DIAN, IDAHO 83642 • (208) 888.4433 City Clerk Office Fax (208) 888-4218 • Human Resources Fox (208) 88.1-8723 Finance & lit{lily Billing Fax (208) 887-a8I3 NOU 11 '03 14:48 CSHA4 November 6, 2003 City of Meridian Planning Department 660 East Watertower Lane, Suite 202 Meridian, ID 83642 Re: KeyBank Branch Office El Dorado Business Campus Meridian, Idaho Project No. 03225 Dear Ladies and Gentleman: S.S. We are including this statement as part of the CUP submittal package for the proposed KeyBank Branch Office located within the El Dorado Business Campus. The property has been posted for a public hearing scheduled on November 20, 2003. The posting contains the name of the applicant, the description of the request to be heard and the time and date of the public heazing. The hearing notice was posted at the subject property along Overland Road. If you have any questions or comments, please call. Sincerely, CSHQA (~ ~ ~~~ V~ ~" . Denise C. Laue DL as Enclosure c: Deborah Frudden -KeyBank Larry Grohn -KeyBank Stacie Kozak -KeyBank Kip McMahon -KeyBank Stephanie Speranza-Jonesday MattHeisey-Vocon Craig A. Slocum - CSHQA, a professional association File 03225/Reg Agency STATE OF IDAHO COUNTY OF ADA "- day of,.[~~ in the year of 20 O ~ ,before me r P"u ~ n•. a notary public, personally appeared O • L~Id~+R' ,personally known to me to be the person whose name to the within ins~Ra' ~~} ~ dged to my,.that he executed the same. C.W. Moore Plaza 250 S, 5th Street Boise, ID 83702 208.343.4635 Fax: 208,343, 7 858 RECEIVED. NOV 1 3 2003 City OCle k Office ~,: 1yOTA/Q} *: ~~~ ~t~ ~°UBt.IG '• T9~'•a...•'' ~'~~~ OP 1D~ An EEO/AA Employer esD: ~/~~~drj y people who listen - design that speak s Boise Sacramento Portland los angeles www.cshga.com ,~ RECEIVET) CITY OF MERIDIAN PUBLIC HEARING SIGN-UP SHEET Gov z ~ a~o3 City Of Meridian City Clerk Of&ce DATE November 20, 2003 ITEM # 15 PROJECT NUMBER CUP 03-05'3 PROJECT NAME Key Bank NAME (PLEASE PRIN FOR IAGAINSTINEUTRAL