Loading...
HomeMy WebLinkAboutCourtyards @ Ten Mile FP 03-064 LEGALDEPARTMENT MAYOR (208) 46G9272 • FAX 466-4405 Robert D. Cowie PARKS & RECREATION (208) 888-3579 • Fax 898-5501 CITY COUNCIL MEMBERS Tammy de Weerd Willi L ID?.HO ~~ /~ PUBLIC WORKS (208) 898-5500 • Fax 887-1297 am . M. Nary T a ~~ P BUILDING DEPARTMENT Cherie McCandless Ce / ~E x (208) 887-221 l • Fax 867-1297 Keith Bird aa a` Taenscae V'e' sixce YLANNING & ZONING 190 (208) 884-5533 • Fax SSSfi854 TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN To insure that your comments and recommendations will be considered by the Meridian City Council please submit your comments and recommendations to Meridian City Hall Attn: Will Berg, city clerk, by: November 18, 2003 Transmittal Date: November 6, 2003 Hearing Date: November 25, 2003 File No.: FP 03-064 Request: Final Plat approval of 28 muRi-family residential attached building lots, 3 office/ commercial lots, and 70 common lots on 17 acres for The Courtyards at Ten Mile By: Doug Car Location of Prooertv or northeast comer of west Pme Avenue antl North Ten Mile Roatl DavidZaremba,P/Z rrJOVa2vagr-aJ Jerry Centers, P/Z ~ vaR. vac, FrJ Leslie Mathes, P/Z (ruo vaR, vac, raJ Michael Rohm, P2 Mo VAR, VAC, FAJ Keith Borup, P/Z rRJO vaR, vac, raJ Robert Conte, Mayor Bill Nary, C/C Tammy deWeerd, C/C Keith Bird, C/C Cherie McCandless, CJC Water Department Sewer Department Sanitary Service rROVAR, vac, aPJ Building Department Fire Department Police Department City Attorney City Engineer City Planner Parks Department ,.. ~~,,QQ ,,~~'' QTY OF IA~~~~i ~~ and Bevan Meridian School District rrm,vJ Meridian Post Office rFrirr omyJ Ada County Highway District Ada County Development Services Central District Health Nampa Meridian Irrig. District Settlers Irrigation District Idaho Power Co. (FP/PP axYJ U.S. West (aPmv mM'J Intermountain Gas rFrmr e„yJ Bureau of Reclamation rFaiva onmJ Idaho Transportation Department rROF~J Ada County razoreyJ Ada County Assess. Land Records r,-rmr~AyJ Meridian Development Corporation Your Concise Remarks: Historical Preservation Commission 33 EAST IDAHO AVENUE • MERIDIAN, IDAHO 83642 • (208) 888-4433 City Clerk Office Pax (208) 886-4218 Human Resources Fax (208) 884-8723 Finance & Utility Billing Fax (208) 887-4813 CITY OF MERIDIAN Planning & Zoning Department 660 E. Watertower Ln., Ste. 202, Meridian, ID 83642 (208)884-5533 Phonel(208)888-6854 Fax REQUEST FOR SUBDIVISION APPROVAL FINAL PLAT APPLICATION (RE: Meridian Subdivision Ordinance - 12-3-7 thm 12-3-9) GENERAL INFORMATION 2. 3. Name of annexation and subdivision: The Courtyards at Ten Mile ,L 63~Q~~ Address, general location of the site: Ten Mile and Pine Avenue Owner(s) of record: Anthony W. Gamer and Tracey A. Gamer Address: 680 North Ten Mile, Meridian, ID Phone: 888-5309 Fax: NA 4. Applicant: Doug Campbell and Thomas Bevan Address: 1661 Shoreline Road, Suite 205, Boise, ID 83702 Phone: 713-1363 Fax: 342-2220 5. Engineer: J. Reese Leavitt, P.E. Firm: Leavitt & Associates Engineers, Inc. Address: 1324 l91 Street South, Nampa, ID 83651 Phone: 463-0333 Fax: 463-9040 6. Name and address to receive City billings -Name: DTE Development, LLC Address: 1661 Shoreline Road, Suite 205, Boise, ID 83702 Telephone: 713-1363 7. Subdivision phase number (if applicable):--)-eft FINAL PLAT FEATURES 1. Acres: 1 t 2. Number of building lots: 31 (28 residential. 3 commercial) 3. Number of other lots: 8' 10 4. Gross density per acre: 4.2 5. Net density per acre: 7.27 6. Zoning district(s): R-15 PD/CN 7. If the proposed subdivision is outside the Meridian city limits, but within the area of impact, what is the existing zoning classification? NA 8. Have recreational easements been provided for in accordance with the approved preliminary plat? Yes 9. Are recreational amenities to the City agreed to in the preliminary plat provided in this plat? Yes Explain: Walking Paths, Tot Lot and Parks 10. Are there any amenities to the City provided in this phase? No Explain: 11. Type of building (residential, commercial, industrial, office, or combination) 12. Type of dwelling(s) (single family, duplexes; multiplexes, other);.p~lplexes 1 Rev.l/!/02 13. Proposed develop features: • a) Minimum square footage of lot(s): 4,273 sg. R. b) Minimum squaze footage of structure(s): 900 sq. ft. per unit c) Are gazages provided for? Yes Square footage: 220 d) Has landscaping been provided for? Yes Describe: See attached elan. e) Who will own and maintain the pressurized irrigation system in this development? Nampa-Meridian Irrigation District f) Are any lots intended for multi-family dwellings: Yes g) Are there special set back requirements? Yes Explain: 10' backs, 5' sides, 10' front gazage, and 10' corner lots STATEMENTS OF COMLIANCE 1. Streets, curbs, gutters, and sidewalks aze to be constructed to standards as required by Ada County Highway District and Meridian Ordinance. Dimensions will be determined by the City Engineer All sidewalks will be five (5) feet in width. 2. Proposed plat is in conformance with the City of Meridian Zoning & Subdivision Ordinance and Comprehensive Plan. 3. Development will connect to City services. 4. Proposed plat is in conformance with the approved preliminary plat. 5. Proposed plat is in conformance with acceptable engineering, architectural, and surveying practices and local standards. 6. Stteet names do not conflict with City grid system. 7. All items noted on the final plat checklist have been completed. I have read the information contained herein and certify the information is true ~ o ect an at this plat is in compliance with the above statements. / Signature of Rev. 2(1/02 File No.: FP-03-064 Project Name: The Courtyards at Ten Mile Request: Final Plat approval for 28 multi-family residential attached building lots, 3 office/commercial lots, and 10 common lots on 11 acres. Location: NE comer of W. Pine Ave. and N. Ten Mile Road in the SW '/a of Section 11, T.3N., R 1 W. ~~ ~8 3~ ~ ~~ ~SS~ ~~~~ea~ n ~~~99 ~ 5 aS"~'~~ w n ~ ~ €x ~~ ~ 6`2 $ 3° ~a~~p d ~$~, 3 `~~ n ~ yas3s3~ ~? ~~ I ~g ~a ~m ~ a~ s ~-0~ ~~ ~ ~~~~~ i~~ $~s~ ~ ~~~ .e 3 a ~ ~ .o$g~n aW. ~~ a ~, ~~ ~g~ ~a P~~ a ~~ ~b-~' _ ~~~"~~~~ ~~e ~ s~ ~ ~~ @ 'aW$~ ~ s a ~'~ ~ Z ~ _ ~y~y '~' ~ ~ g ~ e C yd F ~ °ef~ ~ gi ~~~ ~~ fd /fC •P ~'e / ~ •~ CC 5tl tl ~~ ~ a~~ ~ 9 `6kJj1~~~ ~ ~SS~gg ~ ~.~ ~3Q~ ~~ g~~ / + ~i gea^zs~~„ _ '~ ~$a Se ~~~ ~ 2~~~ ~..a~$ $~~~~_~~~ aN~ a ~~~~ .[ gs ~aa'sh i- : '4 z ~~ ~^ ~ ~ n$ 'i 4 / ear .us ~tl,~k ~m ~~q~ ~ _8 Z n i aa 3 -0 6 n i ~ n i ar i ~ g 8 8. ~ ms 6~ $ ~~^^n~^~on ~ :R~^.RIS ~ 3 3 --.[. o,~ ~ -Ln.4.L6 n " YS ~ ~°~3h 333 ~] ]~ ,I « e..'. ~ a ~ ~« ~ o ~ [l, iw 8 ~ y '~ ~.i KL.A1dB dd ~ Z 3 i i asa i e tl Qq;[ ee -0 1 'a (LC. W tl tl 6 E 4 ~ ~ 5 'J`S Sna FSry ~¢n .aenlw- ~ gg Fe n~ ~..Y~i O o ~ ~ ~ m ggg g§g h ~ ~ 3 d~' 6 van tew. 4 dn~n n ~ :~:~~ FSr.lrpX ^ O f ~ r R e 9 v ~e. lnv $ -n ~'p 9b vee lroro 3 In •w g z od=^• ^SSa8~~$8'n== u..l. ~N~.o-I Y~~~ ~ I y v.y ~y ~ie,n Y ~~7 39!.99'^`-n:==ji 'F/1 w .I an m~ I ; R nl to ~ vcn m r S yLqu I_..LO'w w ~ F'~'Y ~L. pL.YU _ TF T! W~W i~WY WFFYF 'e C an YB Lr.u~ a ~~a~tlaa~n.-~R-aE:aa i$~ ~ a~.ccntc G~;S um •wy g .'8R5$RSgRA$'oR E zl~ill mm$ .zZnnne.n Fz 22 Cp ^a ~ m 114 •~y t, tag m M1[r.lrW4 ~ 24FiF 0550 Rn ~ ~ .mul Bng ~ ~~ v¢l zmev $ "a$$8 $X'wq FnS..3 $e gg c~iw g~ _ «~~ ~ ts..lwox ~L ,¢~ul B ~°-0nn~^Sa:'~:R ~F'O-^ C.~ N z 8' z R ~mon •m 4 ~ 3 °~ 4xr.lrnm ly .... b• . w w S 2~ iu Mul ~ v'a env _ _ x• o• Ocn 9, m ~ pclnyY yl2° ~ Y hn o87I'~a~$' 3Y o Argil asr.ums Aln ~ v'L• zwr $ ~ a \\444 $•. •n i:i me asx A[[E aas m, lullwi B ~8 ~9~$~a,a $88~588$8g ~~//''~~ wi~ s i> .ow a.l. R ~..d ., x88 R~$P.~^.°.++ V1 ~~ 9 v~m env g n t F is 2 t ~g vn to ¢$ E^$a88~`n'88' ~~nnn pz~N 9s?~SasByda$'~'a.°~^.9~g~ek .::`l:`a[ ~g -"~&:A:~^nam~~ F~-I~~~ ~~~~_~~~ ~,~~~a3~: ~og~-~3 ll~t~.•. ~ rs333ai33333s33a?33 ~,1~ .I.gYI _ W D.' 91 FI'0. R' ,Ylp AI .iC 2 W I ! Y F ~Z ~ ax 4 le nn A.aee ~3 ^ :w,€ .,7R °.D. An _~ wH -0 ~ - eW ~ .ar,m wLUrms 3 Yz C= ;[ ...°N 3, ..,^oM1 -~ ~-~ a O ^ S .u'u •fYAt ~L AMp OfVpAFDN fp 9 d J °- .neG g ce MI m~ "S ~ 5P ^$F -'ce:,'a~%`~sx'"~ 1t•I.AN ~+ ~i_ ~F.dia _` k b_ 8A q~'l ~i O ! ARL azw, - ~ ~~aa$ag$$$ss$as.$a.g$ ~ 1L..lIJX Ar,,, ~ ~ dizooe~ „aanaad= .Lr.. ~ n asa T 1 <~ y ~• ~a ur.lraw e$ ~d: _`~~s ~an °x~gd om'd >i ~.$'<`~'~E 33 Y N Y ~ ,llR. ~ ~ ~ ~308?'3"a363a"3333 -a 9° b 3 R rte[' % [ 6$ ~ \_ ~ [ M~ ~ 4 4 ag ~(Si .WY. • g ~ 9p ~ROO~~a'Id6 ni°~.6 C ~3 " gg C ~y Q• ~ 3¢ ~ ~ ~d$~nn__.nSn~~~enn.. c7 ; ~ N { 9 ~ya R~ $•f S~ ~ y ~ _~ nn~ $~_ 9 ~ ~ ~ +~ 8 _~ ~1O1YazLr~ic C ~$ 88 $$888~8~8~88 a$ ~si~~ ~a h..i.°nnd9 ' za ul $ w o "ea ~~g ~{ N>t.l .IVL05 ~~ .q Pi I.L1•Irw[ ll •!. Lw'0 n n •• • d n ~ N •4 n a $- fL90L ~ ,Olq 3aJ~.n ,[plCL ll '19 tl $ ___ ACtlY u+znoo ~0aage~e 9°-~,;;,~~~n~~ 'OiCI Aveae - . ~ ~~S 3w.AYa _ ]] 01OLIU .4CINE M1MSIL® •'~C6 ®IIYMYI 9LVIA 1 m'9 ~~~ s a J S Q A r a ~ (A 87 V R ~ O TEN MILE ROAD n, u ~ O$ G ~~ y 4 ~ 4 4 ~ - y m oyi ;y i n n r ~~ d 4 e m ~ ~~ G m N~ 1-1 N. GREY CLOUD WA TT ~~ ~ ~ m Vl ea u. R LT 9 ~ p R ~ -~ ~ ez w 6 G F G A -mm ' a+ asm ~ ' 9x, u mT m. ~ W. 1]i 9i. L,4 0 IIL BP. LI, ; iR u ~ rL 1~J 3 @. LN W LZl X11 m, L~9 f ps O ~ . ~,~ 1 ~ R L~9 L z = ~] BE L11 91 LNI Bi. Lle q Y m. uo ~ I-~ 9L ue ~ ~/i- c .9 1"~ ~~ r t~ ~ E , THE CDURfTAfl08ATTEN MILE LEAVITT&ASSOCIATES ~ EERIpNV.ONp FWAL SAT ENOIN EERS, INC. _ ~LL~ 9TRUCTURAL'CIVIL p ~ O.T.E, OEVELOPERBLLC 18B18XORHlNE 08.BU0E R06 0.1L OE8101r„n RURVEIMNG ° NNeoranesrnwu EOIBP 10>HO B8iU1 ~ tlOg04 ~~ neecnlnneu PHONE I311E) i1}1889 ,~ ~~ „ r~ j ~ KM ~9 Storm water Calculations for THE COURTYARDS AT TEN MILE Meridian, Idaho ~~~~~ ~OF"p~`' \'\ti Ff 5 [ ~~~ ~:'%`' ~~;3 LEAVI k ~ ` IATES ENGGYEERING THE ~ » GlGEA! ' 4lfl 90 STATES ~~~, ~ ~~ 1324 1'' Street South, Nampa Idaho 83651 ~ (208) 463-7670 ~ www.leavittnengineers.com Revision # azed b Reviewed b Pro ect # 0 Nathan Cleaver, E.LT:. J. Reese Leavitt, PE/SE SD001.001 DESIGN CRITERIA: CODES: ACRD -SECTION 8000 -DRAINAGE & STORM W ATER MANAGEMENT DESIGN STORM DETENTION: 100-YEAR, 60 MINUTE STORM PRIMARY CONVEYANCE: 25-YEAR, 60 MINUTE STORM SECONDARY CONVEYANCE: 100-YEAR, 60 MINUTE STORM BEST MANAGEMENT PRACTICE: #38a - BIOFQ.TRATION S WALE #44 -INFILTRATION BASIN 1 1 1 1 1 1 1 r 1 TABLE OF CONTENTS Vicinity Map Plat Runoff Area Map Area Classification Map Intensity, Duration, Frequency Curve Pre-Development Flow Determination Post-Development Flow Determination Gutter Flow Biofiltration Swale, BMP #38a Appendix Geotechnical Report, Bob Amold, P.E. 1 2 3 4 5 6 7-8 9 10 SEPTEMBER 18, 2003 1 1 VICINITY MAP FOR THE COURTYARDS AT TEN MILE MERIDLAN, IDAHO 1 1 1 1 1 1 1 PAGE LEAVITT d ASSOCIATES ENDINEERE. INC. 1324 1s[ Slresl Sauth Nampa, Itlaho 83651 208/463-0333 , RAINFALL INTENSITY DESIGN kiYDEAUI.ICS APPENDIX D Figure D-7 C • N • D • 0 W C D N E V • D • STATE OF IDAHO AREA CLASSIFICATION MAP 7 7/OD Q-Disirtct Nu-tuber F --Zane Designation JOB: Tha COUrlyarGs JOB NUMBER: $0001.007 DATE: 8/20/2003 FILE: Sloimweler Celw.ds e z 3 0 s i D27 1 1 r r LEAVITT i AESOC111TEE ENOINEEREr INC. 1324 1s1 Street SouM Nampa, gaho 83651 2081483L333 HYDRAULICS RAINFALL INTENSITY DESIGN a S >w d m x ca x r a~ x m w z J J r z t PAGE JOB: The CouRyartls JOB NUMBER: SD001.001 DATE: RR02003 ERE: Stormwaler Celcs.ds APPENDU(D Figure D-8 Page 1 of 9 ^AQ 15.0 MO f[ FX[01I[NCY AMJfLY lli w u [T MOO O f 14.4 [Xri![M[ YRtY[S . [ PT[ R OW Yt[t 1A ~4 ZONE A +o ' IN T ENSITY-DURATION-FREQUENC Y CURVE zA p ~L 1.0 Os! O~i oat oz 4,1 As as ar 'O~s t o Is m s 4 ~ o S os o z s a s s s t a sn r 1 w u T € a M o u e s O U R A T I ' O N I1).R ,4lfl t 1 1 1 1 PAGE rr/ LEAVITT 8 ASSOCIATES ENGINEERSr ING. 1324 1st Street Soufh Nampa, Itlaho 83851 2081463-0333 JOB: The Courlyartls JoBNUMBE6: 80001.001 DATE: 0120/2003 FILE: Stormwater Calcs.vls STORM RUNOFF CALCULATIONS - RATIONAL METNOD PRE-DEVELOPMENT FLOW RATIONAL METHOD: Du=C'i'A Number of Acres 6.33 RUNOFF EVENT FREQUENCY: 2 YEAR STORM DURATION IME MINUTES i in.lhr Du cfs 5 Min. 5 1.20 0.987 10 Min. 10 1.00 0.823 15 MIn. 15 0.84 O.BB1 20 Min. 20 0.74 0.809 30 Min. 30 0.57 0.409 40 Min. 40 0.50 0.411 50 Min. 50 0.45 0.370 60 Min. 80 0.40 0.329 2 Hr. 120 0.27 0.222 3 Hr. 180 0.20 0.165 4 Hr. 240 0.17 0.140 5 Hr. 300 0.14 0.115 6 Hr. 380 0.12 0.099 8 Hr. 400 0.10 O.OBO 10 Hr. 600 0.08 0.069 12 Hr. 720 0.07 O.OBO 18 Hr. 7080 0.05 0.043 24 Hr. 1440 0.04 0.03fi Ou = 0.329 cf ~ 60 (MIN) 2 YEAR STORM Qu = 0.035 ci ~ 24 (HR) 2 YEAR STORM Qu=UNDEVELOPED RUNOFF, CFS C =RUNOFF COEFFICIENT (Rewmmentled "C" CoeHicienls for "Rational Method Equation" -Peak Rate of Discharge, ASCE 1972) i =RAINFALL NTENSRY, IncheslHOUr (Zone A lnlensity-Duration-Frequency Curve) A =DRAINAGE AREA, Acres C = 0.13 (UNIMPROVED AREA RUNOFF COEFFICIENT) A = 6.330 ACRES RUNOFF EVENT FREQUENCY: 25 YEAR STORM DURATION TIME MINUTES i in.lhr Qu ds 5 MIn. 5 3.20 2.633 10 Min. 10 2.25 1.852 15 Min. 15 1.60 1.481 20 Min. 20 1.fi0 1.377 30 Min. 30 1.25 1.029 40 Min. 40 1.00 0.823 50 Min. 50 0.89 0.732 80 MIn. 60 0.78 0.642 2 Hr. 120 0.48 0.395 3 Hr. 180 0.35 0.286 4 Hr. 240 0.28 0.230 5 Hr. 300 024 0.197 8 Hr. 360 0.22 0.181 8 Hr. 400 0.17 0.140 10 Hr. 000 0.14 0.115 12 Hr. 720 0.13 0.107 18 Hr. 1080 0.09 0.074 24 Hr. 1440 0.07 0.058 Qu = 0.642 cf ~ 60 (MIN) 25 YEAR STORM Qu = 0.058 c1 ~ 24 (HR) 25 YEAR STORM RUNOFF EVENT FREQUENCY: 80 YEAR STORM DURATION TIME MINUTES i in./hr Qu cfs 5 MIn. 5 3.60 2.882 10 Min. 10 2.55 2.098 15 Min. 15 2.15 1.769 z9 Min. zD 1.eo 1.ae1 30 Min. 30 1.40 1.152 40 Min. 40 1.15 0.946 50 Min. 50 1.00 0.823 60 MIn. 60 0.90 0.741 2 Hr. 120 0.54 0.444 3 Hr. 100 0.39 0.321 4 Hr. 240 0.32 0.263 5 Hr. 300 0.27 0.222 6 Hr. 360 0.24 0.197 8 Hr. 480 0.1 B 0.148 10 Hr. 600 0.16 0.732 12 Hr. 720 0.14 0.115 16 Hr. 1080 0.10 0.078 24 Hr. 1440 0.08 0.062 Qu = 0.741 cf ~ 60 (MIN) 60 YEAR STORM Qu = 0.062 cf ~ 24 (HR) 50 YEAR STORM RUNOFF EVENT FREQUENCY: 100 YEAR STORM DURATION TIME MINUTES i in.lnr Ou cls 5 MIn. 5 4.30 3.538 10 Min. 10 3.20 2.633 15 MIn. 15 2.80 2.140 20 Min. 20 2.20 1.610 30 Min. 30 1.75 1.440 40 Min. 40 1.40 1.152 50 Min. 50 1.20 0.987 80 MIn. 60 1.10 0.90fi 2 Hr. 120 0.60 0.494 3 Hr. 100 0.45 0.370 4 Hr. 240 0.36 0.296 5 Hr. 300 0.30 0.247 8 Hr. 380 0.28 0.214 8 Hr. 480 0.21 0.173 10 Hr. 600 0.18 0.146 12 Hr. 720 0.15 0.123 18 Hr. 1080 0.11 0.091 24 Hr. 1440 O.OB 0.066 Qu = 0.906 cf ~ 60 (MIN)100 YEAR STORM Du = 0.066 cf ~ 24 (HR) 100 YEAR STORM ' ~ ~ PAGE 1 1 1 L 1 1 1 LEAVITT S ASSOQIATES ENGINEERSr INC. 1324 tsl Slreel South Nampa, Idaho 83651 208/463-0333 Storm Runoff for Infiltration Basin ,106; The Courtyards JOB NUMBER: SDD01.OD7 DATE: 8202003 FILE: Stormwafer Celcsxls POST-DEVELOPMENT FLOW RATIONAL METHOD: O = C' i Roof Surface Acres e 1.54 Walks Drives and Roe Surface Acr e 1.% Candace dAcres 2.83 Total Area. A 6.33 Netive Soil Infikmlion Area 115 x 100' = 11500 Bs Sand La er I~kraficn Aree 0 Total Pond Bolcom Area 11500 sf = 0.264 acres Qnet Q =RUNOFF FLOW, CFS A =RUNOFF AREA, ACRES i =RAINFALL INTENSITY C =RUNOFF COEFFICIENT (k1= DEVELOPEO RUNOFF, CFS Du =UNDEVELOPED RUNOFF, CFS (FROM PRE-DEVELOPMENT FLOW SHEET) = 0505 CFS Qi = INFILTRATATION, CFS NATIVE SOIL TYPE = B-1 AREA OF NAIVE SOIL = 11500 SF NAIVE SOIL INFILTRATION RATE = 1 INIHR AREA OF SAND LP.YER = 0 SF SAND LAYER INFILTRATION RATE= SIWHR Oi =AREA (SF) `INFILTRATION RATE (INMR)' (1 HRl3600 SEC) ` (1 FT7121N) = 0266 CFS Qnat =NET DISCHARGE FLOW WHICH FILLS THE POND OR SUMP, CFS =Qd-Ou-Qi Cu =UNIMPROVED AREA RUNOFF COEFFICIENT = 0.13 Cd =DEVELOPED RUNOFF COEFFICIENT = 0.75 (or use calculated (vveighled) value k higher) C„wyfie ° ROOF ACRES ro 95) PAVED ACRES (0 90) LANDSCAPED ACRES (0.20) TOTAL ACRES Cm,as,a= tb4 acres'0.96+1.98 acres'0.90+2.83 ecres'0.20 =0.60 6.33 acres USE Cd = 0.75 Vnet =NET VOLUME REQUIRED FOR POND AND10R SUMP STORAGE, CF Vnet = 2 67' (Met' (80 serJmin)' Duration (min) 2 REQUIRED SECONDARY CONVEYANCE FLOW RATE, Od = 522 cfs ~ 60 (MIN)100 YEAR STORM REQUIRED STORAGE VOLUME = 22390 cf 23.36 hrs <24 hrs O.K. TIME OF INFILTRATION FOR 7-HOUR STORM = 84107 sec = Modified Triangular Hydrograph RUNOFF EVENT FREQUENCY: 100 YEAR STORM-POST DEVELOPMENT 1 1 1 ~~ 1 1 1 1 i LEAVITT 8 ASSOCIATES ENGINEERSr INC. 1324 tel Sln~t SoNh Nampa, Idaho 83651 208/463-0333 • PAGE V JOB: The Coudyards Joa NUMBER: SD001.001 DATE: 8202003 FILE: Slomrvsler Calcs.xis POST-DEVELOPMENT FLOW Storm Runoff for Infiltration Basin MINIMUM REQUIRED STORAGE VOLUME FOR PONDS THAT DRAIN OF SITE 1!8 OF THE 2-YEAR 2A HOUR STORM REQUIRED PRIMARY CONVEYANCE FLOW RATE, Qd = 115% 113'Vnet'115% 0.0 0.0 3.70 tfs ~ 60 (MIN) 25 YEAR STORM ' ESTIMATED POND VOLUME LEN3TN 1 DRAINGGE POND JI SLOPE r 1 ~~ i Estimated Pond Dimensions Vpond = (hB)" ((a • A • SQRT(a"A)) TOP LENGTH = 115.OD FT a =AREA OF POND AT BASE, SF TOP WIDTH = 10D.00 FT = 7954 SF SLOPE= 3.00 T01 POND HEIGHT= 4.00 FT A =AREA OF POND AT SURFACE, SF FREEBOARD = 1 ~ ~ = 11500 SF WATER DEPTH= 3.00 FT Vpond= 29018 SF TOTAL POND VOLUME 29,018 cf REQUIRED STORAGE VOLUME = 22,390 tl VOLUME> REQUIRED, OK 0 d < 22,380cf USE REQUIRED STORAGE VOLUME = 22,39D tT RUNOFF EVENT FREQUENCY: 26 YEAR STORM-POST DEVELOPMENT 1 1 1 1 1 i • PAGE LEiV1TT i ASlOCU7K ENOINEERa, INC. t324 ist STleet 601411 Nampa, Maho 89&57 20B/463A333 FLOW IN GUTTER L= ^D^ REF: luard, C.F. 'TaMaliva Results on CMpaelty o! Curb Opaeing InMtsr' Rosureh npor! no. 77-B on surha dnl~gs, Nighlsay Research Board, Washington D.C. 7850 Unit Conversion O.b60 Menningn Number,n= 0.016 Cross Slope, lh= 0.020 0.56z DAs Suz MODIFIED MANNING EQUATION O = n O =GUTTER FLOW, CFS z =RECIPROCAL OF CRO55-SLOPE, FT/FT (USE 2% = 0.02 F7lFT) n = ROUGHNESS COEFFICIEM (USE O.OI 6) D =DEPTH, FEET 5 =SLOPE OF CHANNEL, FT/FT (USE 0.3% MIN. = 0.003 FT/FT) FLOW CAPACITY, O (CFS) 0.50 0.76 1.00 1.25 1.60 1.76 200 2.26 2.60 276 3.00 3.25 3.b0 3.76 4.00 4.25 4.50 4.76 6.00 6.25 6.60 6.75 8.00 Slope=.9% Slope=.4% Slope=.b% Slope=.6% Slope=.7b% Slope=.85% Slope=1.D°h 0.003 0.004 0.005 0.008 0.0075 0.0085 0.010 0.003 0.004 0.004 0.004 0.005 0.005 0.006 020 0 0.028 0.028 0.028 0.092 0.094 0.037 . 0.068 0.086 0.078 0.063 0.083 0.099 0.108 127 0 0.147 0.164 0.180 0.201 0.214 0.232 . 0 290 0.286 0.297 0.926 0.384 0.388 0.420 . 374 0 0.452 0.489 0.530 0.692 0.630 0.684 . 0.686 0.652 0.728 0.798 0.893 0.951 1.031 0.806 0.931 1.041 1.140 1.275 1.967 1.472 104 1 1.276 1.425 1.581 1.75. 1.88 2.02 . 1 462 1,888 1.89 2.07 2.31 2.48 2.67 . 1 886 2.177 2.43 267 2.98 9.17 3.44 . 2.377 2.746 3.07 9.38 3.76 4.00 4.34 2.843 3.398 3.80 4.18 4.66 4.95 5.37 586 9 4.141 4.65 5.07 6.67 8.04 8.55 . 4.911 4.977 6.56 6.10 8.82 7.26 7.87 120 5 6.912 6.01 7.24 6.10 8.62 9.35 . 6.016 8.950 7.77 8.51 9.62 10.13 10.99 7.009 8.094 9.05 9.91 11.08 11.80 1280 087 8 9.349 10.45 11.46 1280 13.63 14.78 . 9 289 10.719 11.98 13.13 14.69 15.83 18.85 . 10.573 12.209 13.85 14.95 18.72 17.60 19.30 11 970 13.821 16.45 18.95 16.83 20.15 21.86 . 13.476 16.681 17.40 18.06 21.31 22.68 24.80 ' 15.096 17.451 19.49 21.35 23.87 25.41 27.58 PRIMARY SYSTEM MA%. OEPTH=2.581n MIN. SLOPE OF CHANNEL= 0.4% CROSS SLOPE = 2.0% L=DEPTH/CROSS SLOPE= 10.78N ROAD W ID1H (iBC) = 4o ft NUMBER OF LANES CLEAR REOVIREO = 0 WIDTH OF LANE = 10 N SECONDARY SYSTEM PRIMARY CONVEYANCE REQUIRED = 522 cls TOTAL # OF INLETS PER BASIN = 2 REQ. OUTTER FLOW, CONVEYANCE REQUIRED f # OF INLETS = 2.et eh STREET TYPE: LOCAL STREET PRIMARY CONVEYANCE REQUIRED = 3.70 ce TOTAL # OF INLETS PER BASIN = 2 REQ. GUTTER FLOW, CONVEYANCE REQUIRED I # OF INLETS = 7.36 4fa LANE WIDTH. IF WATER AT CURB IS AT DEPTR "tl" = 7TA4 R PRIMARY BYSTEM O.K. JOB; The COUnyartls JOB NUMBER: SD001.001 GATE: 08/18103 FILE' Stmmvias:r Wlcs.>9s MIN. SLOPE OF CHANNEL = 0.4% L= OEPTHICROSS SLOPE = 2228ft MA%. DEPTH AT GUTTER = 6.96 in 6.96" ~ 12" SECON DARV SYSTEM O.K, 1 • • ° 1 f~ 1 1 1 1 1 1 aoB T~4E Cov I=`~/A R T/ S ' Leavitt & Associates SHEET NO. OF ~'. Engineers, Inc. NRTi~ANCi,EfIV~~ DATE 9-IG-o3 1324 1st Street South CALCULATED BV ,_ NAMPA, IDAH083651 CHECKED BY DATE (208) 463.0333 SCALE pj10FIL'fICHT6cn1 SVaALE f"~~S~GN ref : Ca-f~ilog o-F Si-ormwaF~e r B~sf" Manw~ennenf' prat--~"fceS }~AKIMvni ~~oW (.5 ~~s ~3B MAXIMVM 17E~'IN = Yo INCHES MA2ClMVM StpE-SLDf~'E = 3 ~ l - pnlNln~ul^^ =Re-c-T.:~ r ~ZD = C~ ~NcH~.S MIN iMUM S~,or~6 = 2% I2Ef.~vl(t;T~ GoNV£yANCE = 5,22 c~'S NvMB~2 yr SV~ALtS = 2 1"\F~xMUM iZ~Qu l~D conlu~~/t7rlCE BIZ Sw~`I LF 5,2Z cFi rc ~~ ToTjIL 2uN = 3.Y-S a-Fs 'P-;;QUIRE4 e~e~S SKTICNfIL RIZ~~ = 3. $ e'~s = 2,3Z ~t2 1,5 ~'ps ~Ro55 S~"TIONF!L l~f2~R D~A6~Ah~ (p'' Fi-E$SoFF ~p I 3 (a^ Df~r+l t112ti1'1 ~ fl TI2fl?izaiD c 'pyP7~ ~Tn~ w+DTi~ + $oT.u~I~7t{, z -rop wIDT+i . 'CSoT,wIPTH + 3(6"xi~ Bc'1. w~nr{r s '3' '~ $owE iro2 3oT, wIPTt( '~dr.wl~ti REQ. AREf+ 3' O,S~ 2 IX~E 3 z~ MINIMUM [30TfoM V"1pTH (p% `J`IPT'~f. f~EJE= '7D t'' ~,n11D7H `~I~i 'FR=6BoF1/2-D WJDTH o Paooucr xa i 1 1 1 1 1 1 1 1 1 1 • • -A6B LEIIVITT i iiEOCIiTEi ENFINEFRi, INC. 1331 fel SbeM SaM Nempe, ItleM 63691 30X369-0?13 REfiTBICTOR PLATE •iRE/. tO RON08 _ __ ALLOWABLE FLOW BASED UPON PREDEVELOPM ENT FLOW = 0.33 cfi FLOW THROUGH ORIFICES AND NOZZLES Approximate discharge through orifice or nozzle. 1 q = 19.636 Cd,' ~ f _ l ~~ ~3 where dz is greater than 0.3 Q = 19.636 Cd; where d' is leas than 0.3 d2 Q =flow, in gpm d1 =dia of orifice or nozzle opening, inches h = di@'erentisl head at orifice, in feet of liquid. d2 =dia of pipe in which orifice is placed, inches C =discharge c~cient (typical values below for water) .t1-FNIRNNT SNMI" SOU.IRE NE-ENITINT SOLA.e! WELL T4I! !OSLO 1G6E0 TUAE EO66L OUNLFO ~~_ ~_ -~ '~ -~ __ ~ _y ____ 1 ~ w '7 y I ly- -1 ~--- J~N =~, ~ ~ ,s C=.Y8 C-.b C=.fiJ C=.T3 C=.82 C=.99 ' ppm b of6 N 0.002Y1i Aeauma orNlee le In a 12" Wme e~ n~MM CMS HEAD 2.00 2.60 3.00 3.60 4.00 4.60 5.00 6.50 8.00 6.60 0.25 0.063 0.089 0.120 0.183 0.215 0.279 O.S39 0.413 0.496 0.590 0.60 0.076 0.118 0.170 0.291 0.304 0.888 0.479 0.684 0.702 0.894 0.76 0.082 0.144 0.208 0.283 0.372 OA7S 0.587 0.715 0.859 1.021 1.00 0.107 0.167 0.240 0.927 0.430 0.648 0.677 0.826 0.992 1.179 1.25 0.119 0.188 0.269 0.988 0.480 0.810 0.757 0.923 1.109 1.319 1.60 0.931 0.204 0.294 OA00 0.528 0.869 0.830 1.011 1.215 1.444 1.76 0.141 0.221 0.316 0.432 0.588 0.722 0.896 1.092 1.513 1.580 2.00 0.151 0.296 0.940 0.482 0.808 0.772 0.968 1.188 1.409 1.888 2.26 0.180 0.250 0.960 0.490 0.644 O.B19 1.016 1.259 1.488 1.769 2.60 0.169 0.284 0.980 0.517 0.879 y,B$~ 1.071 1.908 1.569 1.885 2.76 0.177 0.277 0.998 0.642 0.712 0.905 1.123 1.969 1.645 1.956 3.00 0.165 0.289 0.418 0.566 0.744 0.945 1.173 1.430 1.719 2.049 5.25 0.192 0.301 0.439 0.589 0.775 0.984 1.221 1.489 1.789 2.128 3.50 0.200 0.912 0.449 0.812 0.004 1.021 1.267 1.545 1.858 2.207 3.76 0.207 O.S23 0.465 0.633 0.692 1.057 1.312 1.599 1.921 2.284 e,..F., n.JF.e 39we HEAD 7.00 7.60 8.00 8.50 9.00 9.60 10.00 10.60 11.00 11.60 026 0.696 0.815 0.855 1.114 1.307 1.646 1.654 2.287 2.978 4.480 0.50 0.983 1.153 1.348 1.678 1.849 2.188 2.829 5.234 4.212 8.308 0.76 1.204 1.412 1.651 1.950 2264 2.877 8212 3.961 5.158 7.725 1.00 1.391 1.631 1.907 2.229 2.614 3.091 3.709 4.574 5.958 8.920 1.26 1.565 1.823 2.132 2.492 2.923 5.458 4.147 5.114 6.658 9.973 1.60 1.703 1.997 2.336 2.730 3.202 3.788 4.542 5.602 7.295 10.925 1.78 1.840 2.167 2.522 2.949 9A69 4.089 4.806 8.050 7.879 11.801 2.00 1.867 2.308 2.696 3.152 3.807 4.871 5.246 6.468 8.429 12.615 2.25 2.086 2A48 2.880 3.343 3.922 4.696 5.665 6.881 8.934 13.381 2.50 2.199 2.578 3.015 3.524 4.184 4.887 5.884 7.232 9.417 14.104 2.7b 2.308 2.704 3.182 3.696 4.336 5.128 6.160 7.585 9.877 14.799 3.00 2.409 2.824 3.302 3.881 4.528 5.354 6.424 7.922 10.316 16.451 3.26 2.607 2.940 3.437 4.018 4.713 5.572 6.686 8.245 10.737 16.082 3.50 2.602 3.051 5.567 4.170 4.891 5.782 6.939 8.557 11.143 16.689 3.76 2.693 3.158 3.692 4.916 5.063 6.866 7.182 8.857 11.534 17.274 USA ~~/y (L.~Ci'12(G'Pj12 ~LPT'k ~ 2..?5~ $F.Lav~ PEA-~.PR~KfF1lL~ W V('C~1G ~ V ~ I, JOB: TOe CaeM/ertls JOS NJMIfl[ 88001001 B0.TE: N90Yt003 FlLE: blameeta Leke.tle 1 1 1 1 1 1 1 1 1 1 Bob J. Arnol• PE Civil Engineering Geotechnical Engineering Materials Testing 8lnspection Services 208-440-6276 Fax 208-323-7866 bjarnoldpe@msn.com Mr. Doug Campbell DTE Developers, LLC 1661 Shoreline Drive Boise, Idaho 83702 Dear Mr. Campbell: Septepmer 8, 2003 Page 1 of 8 3032D0'I.doc Re: Residential Development at The Courtyard at Ten Mile Ten Mile Road Meridian, Idaho As per your request, on March 22, 2003 this engineer observed the excavation of a test pit and installed a piezometer in the proposed drainage pond location within the referenced subdivision. A second test pit and piezometer were installed on the north end of the adjacent commercial property. A third test pit was excavated on the south end. On March 26, 2003 and September 8, 2003, the groundwater elevation was measured with results reported below. Location Well #1 Draina a Pond Well #2 Commercial Property Casing Elevation 2567.94 2569.24 ~ Ground Elevation 2565.11 2567.73 03/26/03 2556.11 2556.68 09/08/03 2558.90 2558.24 September 8, 2003 readings are seasonal high water elevations. In the pond location, the soil profile included approximately 2.5 feet of brown, moist, nonelastic, silty sand. The upper foot of this soil contained organic materials. Below this soil was a layer of cemented silts that extend to approximately 4.0 feet below the existing ground surface. Next was a silty sand that extends to 6.0 feet. Sands with varying amounts of silt and cementation were present below this stratum to the bottom of the test pit, 11.5 feet below the existing ground surface. Groundwater was originally encountered at 11.0 feet below the surface and was later measured at the depths indicated above. ' Bob J. Arnold, PE 5516 North Fivemile Boise, Idaho 83713 1 1 1 1 ~J 1 1 LJ Bob J. Arnoli PE ~~ Civil Engineering Geotechnical Engineering Materials Testing & Inspection Services 208-440-6276 Fax 208-323-7866 bjarnoldpe@msn.com Septepmer8,2003 Page 2 of 6 3032001.doc It is noted that a sand pocket was encountered in the third test pit that started at three feet below the ground surtace and extended to depths greater than the 7.5 feet excavated. This soil was not encountered elsewhere on the property. As per the clients request and R-value sample was gathered from the near surface soils. The subcontracted soil laboratory obtained a result of R=30 on the submitted sample. This value and an ACHD mandated Traffic Index of TI=6 have been used to calculate the recommended pavement sections for the streets within the subject subdivision. See the attached calculation sheet for recommended pavement section. I appreciate this opportunity to be of service. Please contact my office should you require additional information or services. Re . , ~ fitted: +° ,~ e .fi~ .,r,~.t _s r,°L v 1/ /D~ o~~rArno~,d;;3~ ~,~" ' Attachments: Test pit Logs Pavement Section Calculations ' cc: Leavitt & Associates CJ 1 ' Bob J. Arnold, PE 5516 North Fivemile Boise, Idaho 83713 1 1 1 1 1 1 1 1 1 1 i Bob J Arnold, PE Civil Engineering Geotechnical Engineering Materials Testing 8 Inspection Services 208-440-6276 Fax 208-323-7866 bjarnoldpe@msn.com Septepmer8,2003 Page 3 of s 3032001.doc Test Pit #: Test Pit #1 Client: DTE Developers, LLC Project: The Courtyard Location: Storm Water Pond Test Pit Log File: 3032001 Date Excavated: 5122103 Excavated By: Wheel mounted backhoe Logged By: Bob Arnold Sample # # # # DEPTH SOILS DESCRIPTION Type 4 10. 40 200 M PI LL Q.~ Brown, MOISt, Dense, Sllty, SAND Bag 100 99 63 37 26.1 NP NP - Organics and root zone to 12" +.s 2.5 2.5 Slightly cemented silts Bag 1so 75 as 2a +s.s v v - 3.0 NP NP 4.0 sam le contained cemented feces 4.0 Brown, moist, dense, silty SAND with Beg +ss ss 7s a7 zo.s NP NP - minor cementing a.s 6.0 6.0 Brown to tan, moist, dense, SAND Bas ss 99 61 27 22.6 V V - 6.5 NP NP 8.0 8.0 Brown, moist to saturated, dense silty Bas ss ss sa z7 ,o.a v v - SAND 13.5 NP NP 1 1.5 Bag 11 0 tao ss 7z ao 23 v v . NP NP 11.5 Bottom of Excavation Sloughing prevents further excavation Groundwater Contacted at 11.0' Piezometer Installed NP= Nonp~asoc by A57M lest metnoo vNP = visuany aeremnnea to oe nonp~asnc Bob J. Arnold, PE 5516 North Fivemile Boise, Idaho 83713 1 l 1 1 1 Bob J. Arnol• PE ~ Civil Engineering ~ Geoteehnical Engineering Materials Testing 8lnspection Services 208-440-6276 Fax 208-323-7866 bjarnoldpe u~msn.com Septepmer 8, 2003 Page 5 of 6 5032001.doc Test Pit Log Test Pit #: Test Pit #3 Client: DTE Developers, LLC Project: The Courtyard Location: South End of Commercial File: 3032001 Date Excavated: 5/22103 Excavated By: Wheel mounted backhoe Logged By: Bob Arnold sample # # # # DEPTH SOILS DESCRIPTION TYPe 4 10 40 200 M PI LL 0.0 Brown, Moist, Dense, Silty, SAND - Organics and root zone to 12" 3.0 3.0 White, Dry SAND Bag 10o az ao 13 1zs v v , 3.0 NP NP 7.5 Bottom of Excavation 7.5 Sloughing prevents further excavation NP= Nonplasfic by ASTM Test methotl VNP = visualry tleterminetl to be nonelastic Bob J. Arnold, PE 5516 North Fivemile Boise, Idaho 63713 Bob J Arnol~ PE • Civil Engineering Geotechnical Engineering Materials Testing 8lnspection Services 208-440-627fi '" Fax 208-323-7866 bjarnoldpe@msn.com Septepmer 8, 2003 Page 4 of 6 3032001.doc Test Pit Log Test Pit #: Test Pit #2 Client: DTE Developers, LLC Project: The Courtyard Location: North End of Commercial File: 3032001 Date Excavated: 5/22/03 Excavated By: Wheel mounted backhoe Logged By: Bob Arnold Sample # # # # DEPTH SOILS DESCRIPTION ryPe 4 10 40 200 M PI LL 0.0 Brown, MOISt, Dense, Sllty, SAND Bucket 100 99 64 47 23.8 NP NP - Organics and root zone to 12" 1.s 4.0 R-Value sam le athered here 3.0 Slightly cemented silts, Hardpan say ss sa sz s7 ao.5 v v 3.0 NP NP 5 0 (sam le contained cemented feces) 5.0 moist, dense, silty SAND Brown Bao 10o s, 53 21 6.5 V V , NP NP 7.0 7.0 Brown to tan, moist, dense, SAND 9.0 9.0 Brown, moist to saturated, dense silty - SAND 12.0 12.0 Bottom of Excavation Sloughing prevents further excavation Groundwater Contacted at 11.5' Piezometer Installed wP= rvonpiasnc by asi in i esr memos vnr = wsuany aeremunea co oe nonpiasnc Bob J. Arnold, 5516 North Fivemile Boise, Idaho 63713 ' Bob J. Arnol~ PE ~ Civil Engineering ' ~ Geotechnical Engineering ' Materials Testing & Inspection Services 208-440-6276 Fax 208-323-7866 * bjarnoldpe@msn.com ' Septepmer 8, 2003 Page 6 of 6 1 1 1 1 1 1 DESIGN SECTION CALCULATIONS (ACRD R-Value Method) Project: The Courtyard File No.: 3032 Tenmile Road talc By: B. Amold Client DTE Developers Date: 09/02!03 Design Thickness Equation: T = 0.0032 (TI) (100-R)(12) = GE (inches) T= Design Thickness TI =Traffic Index = 6 (By ACRD) GE =Gravel Equivalent R = R-Value = 30 (ey Soils Test) GE= 16.6lnches ACRD ACP. 314" Road Base and Aastreaate Subbase Actual Thickness Equivalent Thickness ACRD Asphalt Concrete Thickness = 2.5 Inches ACE= 5.0 Inches 314" Road Base Thickness Desired = 4.0 Inches RBE= 4.4 Inches Calculated Aaareaate Subbase Thickness Eauation: Subbase Thickness=SB=GE-ACE-RBE SB= 7.2 Inches CALCULATED DESIGN SECTION ACRD Asphaltic Concrete= 2.5 inches 314" Road Base = 4.0 inches Aggregate Subbase = 8.0 inches RECOMMENDED DESIGN SECTION Asphaltic Concrete = 2.5 inches 2.5 inches 314" Road Base = 4.0 inches OR 12.0 inches Aggregate Subbase = 8.0 inches Reviewed By: ' Bob J. Arnold, PE 5518 North PivemBe Boise, Idaho 83713 x64.esc+~7.e Y10NHER 11TL8 COA4PAPIY OF AbA ~Id'fT 5151 P!. 6i6aum Ava 1 HofR. fEaM 63704 ! QLB) 777-2741 lI'I7JIl ~'~~/,/14 ~ [O[nlYtaeUti~ ~ 7ar 7oYOSt. o~eol~a ~ wn aErsYS a. A~Yif. aR1~ ~ ~ ~t IBR rB BDi±i~, 1996 ~ a .; ,1~p~bep4, s6adeatP3eab1 iFIDf~ li. QIBMEB• 86ti 'IlUi89 L "' 860 aaFs im~+e s w6~eaeltaiNes 6t: 6b0 6. fFY llIl.? 6~A8a, aaa3mair, 7H 63i1'i2 deel9.ta Sefdb~b6d~eSt~1.e4~~k 8W Om~q,lsaf6ia6e~.~e9ugYdsY l~ ~ , I47TA~ 363iESO ~ 69AE t taws 'AI~BCF, DY a >!em 4aaat Es ~s~ or t~6 Eia Rd~ - _.p~(~i 1°!~BlTRLE ~ DE4li'f i!liNOio e9s~3s 98E082 ~ ~. e ~~ n~ rs ..ieOklMm' a a~em sa>~r~+em.uaea. i~~ q Im1N10ei, s 61eei 6o.®i'mt ab, 119Y ,,~~jj,~ / e~}- eo6ro~ a- xi aunts s. ~rsrm, 7776®T: ;tc7avowixo~s+3' - ~d.9iaemt 4[A1'E QF ~~ e- County of (4LCQ~ - a ~e m is 17auu~'~ ume ie > toe 6e 'AYIiR ivbweek ~ ackeoekdaed m s t4ua eatid the anw. /a md+ l= I477~,a ~7' Pu46t _J~~1I~i f' ~ J'rl~.! G L~ a..on.s,. aw. W +IE: ~.... r. ~ :....,.. 6+mCo~R~e~ „e, c a rora~nni mi~~.~•~~ onn~ ~ ~~ ~a~r r ' A11~afagaR PIONEER'LTA.E CDir~ANY OtdDA~ tlil W, 8i0maa A~~ / Ha4e, F7nLio 87704 ! [JOtl 9Tf 3700 ~~ ~ IH~Ob7 I~.YAL[)P: 1~ 8. A$m Nb GIAC90 P.ABSllI[. m-'. Og, YY®. i !A 1'1Dat, OF ~ 801'8. MOl C.EH9PB P. 808'LQ 2@~. 9/F/,6/ D8'ted ffi 87N 1f67~1994 Q~br a , ds 1a~ ~. La®i, ae8 adtsota*toes HCtBiP W. 811188: iild ~ a_ C11BP1. 8esbomi Aw! B3Pa, iloC4atmte a .s4~lmt~t[dtatlG 410 #. SE8 A'E7,61'011, ~fY, IN 19412 dts~wiaEmel.pt4api iC8 Catlq. dopleda SB@ 4~Q$1T 'A• ~ 67'SC~ SdTtiD .!~ NA68 t 86kC '~F..bY 1ffi~H1CE il@ I~AI is 4 TS ®B (3y ~ O'RFOUE5FOF ~°"' R0RiG14,'Fy' 4 d 0 ~IQ elt4:3s 98rn$ ?a t08AYE.AIiD,i1110l34tbttMleadaa.,dititFt,~tmwAeadi4it.ae ~~ rmo ~tai8asmner./id/etiOOlatt ~ [ledseagatbai+db0~o7i0sio a,OeB~tlur a ns18e aasr s43eiplta[ai[pmiab irsi171e~etaoe'[erMq+Batele6t~et ~ro• gwFfd~/da ~k'IDtlt ~~e¢11t11la~®IG' 7d[ee[ta'm1t~~0 ~a ^aW AlaCtb ltRa~ re.wa_. del~aa®e ~dwadae~.0[sHdned.aOlWU~togai'ameob. ~ llo.aabcn 03, 7.l91 / ~~ ~ ~- i~,~•f~ lei .~:r la H~I - s r~l~~' ACCPIOWINT - HMadaq/0[ada[ SCATEOF.-~,S~.~~V Cauatyo[ ~~}.,! .SS. t a0oe a Lv ibc ttlltle, ~ ac 4o ale ~ ele®ed 1hC torte a mcb --- flu" ~ '' . ~~ 1[PCels~eBmirs _ h ',1 -CQCO'Ogl ul,lh7.7i cnn~ •nc~.iac ripe NO.s Pn<sie • Eki~1T A A PARCEL OP LANG LYING IN THE BOIITIIfEBT WRRIER OF 6EGTION ii, TO1N6lIIP 8 NORTH, R.WBfi i t~6T, EOIBE Y68IDL5N, A9A COUNTY, IGYq, YDRE PAATICYLARIY oEdc928d0 AB FDLLONS: CNDENCIN9 AT THE dOR'TIOYEff7 CONKER OF THE SOUTNNEaT OIIAiITEN OP 9EOTI4N 11. TOe118i1LP 3 NORM, RANGE 7 NE$T, 9018E YERIDTAN~ THE PEAL P07NT DF aE6INNINB aF Txss oFaGaxvrsoN• THENCE 900TH 8s DE19EEe5 10'15• EAST 1ed.T9 PEST ALONG 1NE NORTH LINE OF THE sounmE6r 0LY91rER Ta A POINT; THENGE 80UTH 00 DEGREE 52'i6' WEBT 71.89 PEEi' TO A POINT ON THE GENTEALINE OF THE TEN YIIE STDB ORPSN; TNCNQE SO1RN 59 D£OREEd Ea'16' EABT 915.63 FEET' ALdlB YIIE SAID CElIT9NLLNE 70 A POINTS THENCE SOUTH <1 DE9NEE8 16'5' EASE 5!6.84 FEET ALONG SRID CENTERLINE TO A POIN7g THENCE SOUTH 20 OE9REE6 0.5''48• EASE 98.82 PEEP ALONG SAID CENTERLINE TO A POINTp TIaSIGE 8@RB ~02 9FHEES 56'ifi• t$CT <T.6p FEET' TQ A EOrIIT DN THE: NONTNEILY NYBPtr iq+ iKY OF 'FdE DRE80R. aN0971.rdE NAILNOAD; 7lfk11SE N0RTI1 d6 OE~16Ea 2E'28' NE6T T1a6.~ FEET JBAIB BAIR NORTHENLY NIBfiT OF NYIY TB R PDINr ON TIIE MIFST LUE aF rNE dElilNECf OUARILy SNP 7YBC$ lDITFIF BD OEdREE 92.39• EAST 889.18 FEET ALON9 ~ 1i~T L2NE OP 7FIE SD<I11diEryT DWYTIER r0 7NE gH1L PODir OF 9EDINIIINB pF 71RE ~IPTIDIIi A PA918 DF LJD19 LYLNp III 779E 9IXIIHEST Ol119EEi1 aF SECITON 71, 70i~ J IdIdIA, MII6E 7 Nl~T, BQIBE NENID6AM, AIIA C9111YY, I1Y190, ROUE ~RKfIIt71LMRY OESiNlIDEO A5 POII,BN$: ' !!IB ./(T 111E NOB[Nlk'tigT ClN91H! of 1'NE SOV11f1fSf OpWT~1 DF at5"FIQEI Ti, flY~Fid 8 NORI}I, RAR9E 1 9EST, 60IfE YHU~DW TNEdC1 91(JIf! Og aElid$ 62'98' 1651' 79$.90 FEt7' ~OEd 7NE sE1iT LIRE OP' 7HE SOIIII/6+T dd51iTB! W TIE dE'JJd. PDliTr QF' !~6 9F 7NI9 989GpYPF'If911 - TYDICE aOUiN 98 OEBAE~ Td•19' EA6'T 85T.E< l~f T:D A 1pfNr; 7aEW~E dDllTti S9 QE~a 25`+16' EIISr >~.IfE FEET rO A pODR; TNBICE 60UlTf 06 SY'99' 6E8T 9St.tl PEET l0 A PODiT; TID:JJlCE N9ifN 48 9E~ 78.1a` 'BEET .656.>si flET 1o x PdBNT DN rNE AE3r LINE OF THE SdfgIl6ESf OIIRiREA; TfIH1EE wlNiti D6 DE61llf 59".~' E'AST ~1Tt_Td FEET AI.BNB TAE aE6T LIYF: OF TdE aDmineaT aruTrEN ro THE NEIIL Pa>kr o~ a65mlmiD of Teas oE6DdLVrI~11. ~ of t69AL 9l9CdI!'T38N ~~ ~ G N G949~oN !N~b%..71 E007 ~f'da~ File Naeher: PS7~79D SCNEBULE C Tne lead referrer! to in t&s.e Commitment Ss tleseribed ao tollwec A PARCEL OF LAND LYII16 IN TNf SOU'I77NE8T UUARTEFl OF SEC'fIDN 17, TDNN4lIIP ~ NDRTH, RANGE / PIE4T, BBI6E N811IBIAN• ADR CDUNTY, IDARD, IitlRE PARTICULARLY. DESCRIBED AG FGLLI184: GDNgENG1NB AT THE NDRTRNEBT CGRNER OF 171E SGIJ1181EBT QUARTER OF SBCTIQN 7T, TBIetlW1IP B N4RTN, 'Ae1BE T ME3T, !GIBE 4HR4L41 TiEM'E 80GIN AO iBBRC£ 38'94. 8647 785.00 FFtT JIL048 THE ~T LDIB¢ ~ 71E Sbllr181fST 44NA'4ER 70 SNE IBFAL POI14T OF T~IAR84 OF TNI4 0E4t8SP[IDN; Tf491CE 801fIG 8B TG+48` OASd' 95I.SR FEET 'I!F A I'OIBTi 'tIffJICE fl0llTB S® B>dp~ 2B•~6' FJi9T 498.BB FEET TG A PODiI; TifPILE 901IIM BO OEFiRE 52.99' ~I EB9_~L4 FEtT'14 A P45RT: TIlEIICE NOAT11 S4 10•Jb' ~P 558.BS }EfF T4 A P~II 0W TBE BB.Rf LINE QF THE 506fi1~ES'f 0L441i£A; TlN:ICE NOAIli 0D OEBREE 98.99' EASF itT .IB FEET AL08B likE 4ES1' LIME DF TIIE SmR8~8T OtYtRTHI TO T1E 9FAL P0I11! dF B~I147I11G OF Ti119:0£ff!{IF7i08. EAD eF LBBAL BBBCRIPTION R ~ ~~~ 9 'd G9Q9'oN ~+11~IQ7'71 9M7 ~no~dac AFFIDAVIT OF LEGAL INTEREST STATE OF IDAIIO ) COUNTY OF ADA ) 1, ANTHONY W GARNER & TRACEYA GA.RL680 N TENNIILE (name) (address) ROAD. MERIDIAN. IDAHO being fast duly sworn upon oath, depose and say: (city) (state) 1. That I am the record owner of the property described on the attached, and I grant my permission m: Douglas Campbell DTE Devehtipment LLC,1661 Shoreline Ddv_e, Spite 205. Boise. Idaho 83702 - To submit the accompanying application pertaining to that properly. 2. I agree to indemnify, defend and hold the City of Meridian and iYs employees harmless from any claim or liability resulting from any dispute as to the statements contained herein or as to the ownership of the properly, which is the subject of the application. Dated this ~~ f~ day of ~a~rr ,~~ 20~. AND SvVDRN to before me the day and year .fiat above vadtteo. taut~s>1EU ta. TENarti~ NOTARY PUBLIC STATE OF 1DN~K) ~~ r Naasy ~ .fib Illy Gvamiasion 4~ • mil' • m?o~ 7, ',I CQCQ•ON IA,ICI'.71 0001 ~P9 d3C a ~ ~~ has 4 ~ ~ se ~~3 ~~~:~~` ~~ ~ ~ ~ ,s ~~~~ ~~~~~~~~ ~~ 9i 4§ !S~ ~~ii KOS~35Y¢ ~5J ~ ~ eg~~ e~ ~~~ '~ @ 1~{ ~ ~ €~€~~~ a ~~~~ 5~ 4 € ~ 3 3Q~: ~s 3~ ~~~~~ e ~el ~~~~ ~.~ IIsP 3~3~1 ~ e12.~.;~7 S ~s ®s ! ~i~~ ~ ~I~~I.il~i a a III I II I I I ili I4I:!'~. tl i:_ wau avu Naa %~~~ i ~- ® 3f~tl O~tltlN'N 13I`~"I I I I$I I I I' 6 311/11 ~I ,~~ ~~ ;%i i N J W W ',~ ~ c 3 ,, ~, ~. 2 i ~ .+ / s ry ICI J W ~ W B ' N ~~ ~i~ II~ I~~ ~~ I E~ ~ ~i.II(~Ili!ilill~,I~a aron n[N r9i ~_ III 4 ~ a 1 ~ ! ll p~ JJ ~fl~ I .mlaa;?ga~' a aospus-I ! ~' ~ rJl~II'~I2i~a.L S ~~~°~".~-°,ao>~°„.a"a3= i~~ o ntouv~i~aav ssn ~vxo€uaxoo ~ ~ ~ J ~a x~, i~ sax~a.ixnoo ~, ~,e / --__. ~. ;~. . . .:. i ---- / ;;,. / , ~ - / -- ~; ----- i - , ~ , / ~ ~ ! / ~ I'i ~ I~ ;~ " € € g q p~~R ~~. € ~ ~$ ~ a ~ ~ ~ e a e ~ryc€g g~ ~~ ~ ~g 9 ¢ ~a§g ~aY ~~~~~ ~€ ~y R €€ ~ 8 $ ~ big ~ ggg°p / - - 9 ° j ~ ~~ ~ea~ a ~~gg8g gg - ~ gg_ e$a i agg vg g (a y~y 6y pgpgpp qq y33y ~s°a@@ eF `~c ~ ~ - ~ g ~~ e6~ e~~€ aB 3 R ~~@~~ ~~$ ea t f . ~ i ~ ~~ gge $ae~ ~- e a'c~e Y~@€@a~ ~ a is g. g 8 a9 ~ 1 ~ ~~§aC ~s,~ S@~~p@g ~ 888 & 55 3 @ €~ eI- $g~$ ° F 91: ~ g gA ~]E @ ~ g ~ .9i g ~ 3 R€6~ ~ d~~! EE g r_ 8gooooooouu - - - - - - - .. ...- ~' - ~ ~~~~ ~g~ ~~~~ C a ~ €R ~ ~ g i` .. i °,ty ®~® ~ e ~@Sp5 ® 2 ~ ~ @F@~2 2 g ~g ~~ ' ~ ~ ~ YB g i g6ig .F. . g ~ Y e °~ p gg gg a g p 2iE 4 34kE s ' a iE 9~ i§ gg e e ~ _ . a g ° @ ~~ee~ ~9g ~~A~~~ ~~ 'a$s ~ ~ gg$ egg el®I i g$ sei i li i i ~ ~ k~~~~4 n~~~p~pg ~ ~~ ~~e ~ i ?~$ $gg ~ i . i g gg ~ i eee ~'g B~ q gg gg®® gg g~ tll~gi~a ~ gA Mpg ~ ggg rf ~ ~~ ~ ~ ~ '. ae¢ e s-,ea 9 ~ " g5:~~~ a eke `~ 5 ®q 0 ~. ~~~§@ Y~ ~ ~¢ I . __ ~ - s S 3 ~8d~9~~~s 3433~$`a ~ an~ .€i ~ g . I ~ B$$8. ~ "gg$ i ~ gage$ ~ ~ ~. re . !$ i ach . . . . . . .. ___ ~\ gP 1 ° 4 as ~j $ ' ~~ 2 2 ! 2 2 2 33 3 ! 2 3 33 aa ; ,~ ~ ~ ~ I o IA g ~ ~ tl ! I ~®e®~I II I ~' ~ , $< a ~ I ~ ~_' a. ~ ev ~ eag a g ' ~' E i I gg a ~ p g a e l sa a' .$ a ~~ ~ ~~ 5 ! " 9 ~ 9~ 4 " o ~ I ~€ '. eS~~ gg ~ A g -. ~ - a a~1 1 ~ ~I ~ ~ ge t i lga ' ~ _ _ _~ ~ `. ~ -~-- - ~~I i ' g I ! ~ ~ ~ 3 \ - I ~ ~' '~ ~ c ~34 ~ 3 a ~ A g ~S ~ $ ------- ------------ ---- - --- -- -- - ~ ~ g g ~ a ~ e $i g ~4 e~ .S '~~~ AC s ~ ~ ~ •~ z . .~ as a tls v r.ae e c. ,~ i ~ a ~ ~ ~ ~~~I ~~ eaiuoa~iq~a~ ads~s uE P "I I '" e, °~~-e,m~, Houvonaav asn rvxotttaxoo i .. d ~ ' II Jl~II I2i~1.S ~-~ u~ id sax~a.rxno~ ~.r. ~ ,~ f __.._.._.._ .~~. .._.._.._.._.. ;~~ - --- ----- - - - -- ---- A: ,~ b ?I ~ __ ___ ___.___~~ a ~~ ___,.___ ____ -- v a I ---------- - --- j ___ _ r___ I " --- -- I I i v ____ ~' ~~, A f __ i ` '> i I' ~- Y =~ ~', _r 6 ., __ __ ~, _a~ ; ~ ~ /. _ i i J ../. @ ~ ~ ~p e e~3 ~~~~3a93 m3 v [ °° N 3 ~ cc P ~~2~~ g ~ 6~ q _ ° _.._ l g 77 g ~~ ggp~ g€4 ~@e 3n ~~~~ ~ 5 ~ ~ v • 3 - ~ @~ 3A I y 3 yy +, sease g2g ~®v®€gg .3~88 B • ~ ~ g@g@ 77gg 5 m ~@ ~~~5 ~ B~ggge 3€Qea 23" eng~g5e 5a p 4d~pg~ 3g ~~~ v$ ~ 9t~ ' ` ~ i @~ 4 • 3 z~~f eA~a s 5 S !4® , i fe kS 5 pa95 ®AS es~~ ~Wak § ~ y gFe 3 ~ a ~~ .I $~ @~~~ $~ F&9tl ~E 6 r ~ s ~ 6@a ~§ ~~~ 99 ~ oouuoooougssi ~. 3 ~ 1 e ~ ~ 3 g ~ ~ .., g e ~ 3 i!;a~ a 3@~? A ..J3€F 3 ~j$fi a Ge ~~ ~ : ~ ~~~~ ~ ~ ° A° • A° • ~, e 5§. ~ ec d € g ~~ ~ ~ d ? }a3 3e3 3~ @ A ~3i@~ ~io4 ~ A a :~a s. c tl tl S v 3k~ v I 3~e ee~ ~~ 3 ~~ ~E~ ~ 3 ~~~ _ s'~ ~'• a • ' \i ~ ~~ 9 g~ ~ s ~~~gY~~ ~~~~~; ~ ~~ ~~~ Gp i ~ 939 833 € r • 3 5 ®5 3 F- ®6 yg~y$g~r g@~g~~pp s~~Y€tl4de ~ ~p ~: ![ E!g 8 Y62 " ~° ES4~ a ®9 ~~ ~~9~~ ~ 3 e e a1 9:~9$Ya a96e B0& € 3~~` k pp 202 i ~~~~.~~d ~~~~~~~ ~ z3 @pQ -~ A ~m a e e~ ~~~ ~~9 3°-3 4 EE $ ~~~~~ E~~g$~~~e ~ ~3 € g 9 @ g e$ 3 ~~~~i~~9i ~~~~~&9 7 io3 ~~~p 3 s ~ " " A ~ - a a 3.3 asiie66p b Aaa ei, a .ry Aa0A6a s 0:a a:aea a }^IITII 3385A AaAtlA `tla ~ „ i I vfa el b _ _l.l_ f 1 3S3A~4 ° 3.33" a, 33 33 e ~ ` i ~ i ~ ®e®; Icy e ~~ I. I I I I I3ae ~s ~ j 3 i 3!3 38 3e 3 xa Y, °` ~aa 6,a AA "e G e~ ~3~'I $ f ;~~ ~ ~ 33" $1 I laid I°3 ~ 3 atl' 5 ~' 8 ~ ~ I 43 ~ 3 , 1 ae~. a i 3 ~Q~ i3' 3~ ~ --- =1 ~-~- - ~` ---- ` i i I -- .. i i i eeyp1 3 gg a ____-__ Q ~ i~ v _________-__-__________ 1 _ ___ 3¢3¢ 9 u AA a§a 5 8 ~t yF. ~ 2a 1 iA Z p ~ E 9 i ~ ~.® a - real a e va : ae a v DII,L ZV SQ~IHI~.L~If10~ ,' ,' ,' ,' j ' ,' j' ' , pp j' ', SS eC ~ _ / / 3 .k ~ ~~ 3°~4y~ p929~id~i~~ ep // / , / /` ~~ FF ~~ ~ ~ ~C tl4i eaYH6tl~ eg~ 6~Q€ / ~ /: g0 ~]7 q3qa pyp { !ypg qEy pS~ @! ee ~~ ` e 8 ~ ~@~~ ~~'~ ~~ a %~ 1 Y ~ 9 9~j ~9 e~ ~~~Q ~ ~ i !, / z I ®®Y k Jk~ ~d@d ~F AyaC ~ ~ / I A @g 8 , y. ' 34~bnd~ e~Ob~a ~ 4 ~6@e i _ ___ i 'p5C 9 ~ 9d l~§!~§9999 p~p Qg pp8pp bg / / 1 •' i @@Q 3tl3tl g5§~dE3~ qq eg~i~p / ~ ~y I F~e~e°~C ~¢~~9~~ k i~ ~~~ / / / k I pp g ~_____~ ~a p a y a e~A 4° / -I_ - e 9®@¢~~5gg5g@eS~~gqE ~9q~~pp~778~¢ ~ ~~ ~gp9g~~f i ~ ~ - - -I - - - - - - - ~ ~ / ~/, + ~ j I . ree ie - I ~ __- ___ _ I a. s / ' /: I W 1 1 n ~¢ ~ b ~~~p~p9~ Egy~ja~~ ~~~~~® ~~ a ~~~6e p~p~ ~~~ ~s~~9 ~n~s ~~~Q~~~~ ~~a~ ~~~~ ~ @@°kfag! ~ °g ~~° a .e @ ~~a@ ° ~e a~ 9 ~ ~8~ g~g~ ~~~~~ ' ey ~ g8 I'' s i ~. B i gf~~ ~: ~~~ m~ ~ ~, ~eg~ g~~~ ~~ 4~ g~ep ~ q~~ ,~~,gg~i~ ~ 8~8,$$; Se gg8 ~9i58~ S~ P- ~ y@ ~4®gka ~g~ga y9$9$~~~7~g g~ ~?~ i9B9 tl'~k~ di 6696 :a r§~ i§~~ ,, RR ti-~£ ~ff~~ 9~d9~ `ss`s` E~~Yi :@@pp YY f = 9 8&agA ;~ S °r~ o;tla ai E '_.. a ~ ~° 6aaa~ ~~II ~~ a~s "@ e$3 ~C ~~~ ~4 ~~,i ~~ aRfiag 9 ~~~~ ~~ ~~y' ~~ s 6 Lg 1 ~ ' I~ i $ ' e~ ~~ i s e _ if ~e 3a g": ~~E gg°q ~ ~ 4 J8%~r '~~~~133 SA ~3g9'~5£g~ ~.~¢ °gk~k ~E ~93 j'~a, i4~a~F$~~i9 1 4 # ~ ~ ~ k ~~'sai~a;~§aa3~ a a a i a e~ .ao a s o, ~I ®® o a ?e 8Y a ~E ~ E' E$ ss 8sR€: tl ~ u e ; pg5 ~e & 8 ~ 3's Y R.~ E j~ a39r~~ s Y qB 3 3aii gg~~ g~ b id E Y 1 e a ~~ 8=~~ . R~~ee~ ~~~~~$ a~~~~~ ~~~~ ~~ 8a~~@ x~@a~~ ~°s ~a~~~~ :~~~~~ ~; ;-.~ .~ 3~ oa; u/ 3~ ~~ f tl~ ~ n i u ~ ? 3~ ~ L~ g ~ a 3, ~ 8 8 93 4g f ~,~8e~ r ,, s ~ ' f ~g •~d ~~~ ° @~ g~ ~g°g ~~9~ ~E4 ~~geg ~~° °8~ €8 ` Saq € 3 €3 ~ ~ ° `~~~~~~~i~ ~~~ ~~~ ~~~ ~anannx °~~ ~~ ~R a a f ~ 3 6 ~ ~~. ~~ ~ a ~ ~ ~ 9 u~ ~~ i ~ a ~~ ~ ~., '-f i IRRIGATION PERFORMANCE SPECIFICATIONS PER ORDINANCE 12x13-S .NOTE: Submit 3 copies of this completed form with nrry applecatlon for CerBfecate of Zoning Compliance (CZC). Project Name: The Courtyards at Ten Mile Specifications: Available Gallons per Minute: 6 0. 9 gom AvailableWaterPressure: 45 psi Point of Connection (describe and/or submit a site plan): • Primazv Connection: Nampa-Meridian Irrigation District • Secondarv Connection: Cit2 of Meridian Landscape Area: If the irrigation system is hooked to City water as a primary or secondary water source, submit the square footage of landscape areas to be irrigated.- 2 8 , 8 0 0 s.f. Backflow Prevention A backflow prevention device must be installed as required by City Ordinance 9-3. Coveraee The irrigation system must be designed to provide 100% coverage with head to head spacing or triangulaz spacing as appropriate. Matched Precipitation Rates Sprinkler heads must have matched precipitation rates within each control valve circuit. Irrieation Zones Sprinkler heads irrigating lawn or other high-water-demand areas must be circuited so that they are on a sepazate zone or zones from those irrigating trees, shrubs, or other reduced- water-demand areas. Oversprav Sprinkler heads must be adjusted to reduce overspray onto impervious surfaces such as sidewalks, driveways, and pazking azeas. Rcv. !. 2a. ~l~ ~` i ~ Additions! Irrigation Notes: Irrieation Required All landscape azeas regulated by the City Landscape Ordinance (12-13) shall be served with an automatic underground irrigation system. Additional requirements afi'ecting pressurized irrigation systems can be found in City Ordinance 9-1-28. Irrieation Water Source Use of non-potable irrigation water is required when determined to be available by the City Public Works Department as regulated by City Ordinance 9-1-28. L` city potable water is used, a separate water meter is recommended so the owner can avoid paying sewer fees for irrigation water. Potable water shall not be used as a primary irrigation water source on non-residential lots with more than % acre of landscaping. Yeaz round water availability is also required by connecting to city potable water or an on-site well as a secondary source. Certification: I, n~++q ramnha 7 1 do hereby affirm that anY irrigation system installed for the proje entt ed abbe will be designed and installed in compliance with the specifications and no ated ; th' r.,, J e~ Date Itev. 1: 7~.'J3 KEYNOTES Ol INSTALL 4' WROUGHT IRON FENCE O2 1NSTALL 6' CHAIN LINK FENCE O3 INSTALL 6' CECAR GRAPHIC SCALE >a m ( u+ escr I i min - w et FENCING PLAN n ENOINEERB, IN dINUClUrtAL•GYIL YLL VO IOM MV/JI 91fgyEyl/q :^:..`. ._ "/.tixi_ ~-~/.'2 ~/aW.]YJi~vi~rt. aVib.J/.:Oeli~ ','iF.pJ'•iFp;~y~uy~y, / /_/.. Woo/'1/./i.Wlq:nr~il~ ~v.~Y,'y/~ "/'lip: i.:.-_ .: /JissA.:..~t.., vJi'. i_. PRELIMINARY ADA COUNTY STREET NAME EVALUATION SUBDIVISION NAME: Court and at the Ten Mile Sub, The SECTION/TOWNSHIP/RANGE: 3N1 W11 AGENCY and AGENCY FILE NO: Meridian PP 03-010 SURVEYOR/DEVELOPER: Leavitt & Associates DATE OF EVALUATION: 5/8/03 The street name comments listed below are made by the members of the ADA COUNTY STREET NAME COMMITTEE (Under the direction of the Ada County Engineer) regarding this development in accordance with the Ada County Street Name Ordinance. 1F THERE ARE CORRECTIONS RECOMMENDED. PLEASE MAKE THESE CHANGES ON THE SUBDIVISION PLAT AND RESUBMIT. THE FOLLOWING EXISTING STREET NAMES SHALL APPEAR ON THE PLAT: N. TEN MILE ROAD W. PINE °'ar^~c~-~~Tr ~P 2, mS . N. GRAY CLOUD WAY ALIGNS AND WILL REPLACE MARCO.• THE FOLLOWING PROPOSED STREET NAMES ARE APPROVED: W. MARBETH COURT N. TREVA DRIVE WILL REPLACE TREVA WAY- ; NOTE: A FINAL YELLOW street name evaluation must be presen d to the Ada County En ineer at the time of recording to verif street na s. :;Ada County Engineer ''Meridian ''Fire Department Ada County Highway District Ada County Emergency Response John Priester ~. Date: 5 803 Representa a ti- Date: ~ ~a~~3` Representative Date: S' ~.3 Representative ~ ° Date: Sa'a3 Representative ate: ~~3 NUMBERING OF LOTS AND BLOCKS ~~~_TS/D~3 ~