Loading...
HomeMy WebLinkAboutTask Order 10002C with Brown and Caldwell for WWTP Headworks Odor Control Design~~i~E IDIAN~-- PURCHASING AGENT 33 E. Broadway Ave, Meridian, ID 83642 Phone: X208} 489-0411 Fax: (208} 881-4813 TASK ORDER NO. 10002c Between CITY OF MERIDIAN AND BROWN AND CALDWELL This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated April 13, 2010. Roadworks odor Control Design SCQPE of SERVICES Introduction 541051364.003 This project is afollow-on contract to the .Preliminary Engineering Report completed by Brown and Caldwell and submitted to IDEA in December of 2010. This scope is for design services to provide odor control for the primary clarifiers, primary clarifier splitter box, the screening channels, and the grit removal facility collectively called the headwarks. Foul air ductwork, foul airtreatment, building construction and associated electrical upgrades required due to the hazardous atmosphere will be deferred until a later date. Phase Zoo -Project Management Provide management, direction, and coordination of all work associated with this scope, including schedules, budgets, technical quality, deliverables, and invoices. Communicate and coordinate with the City as necessary. Lead weekly design team meetings via telephone and travel as needed to coordinate design staff. Prepare monthly invoices, including, backup materials, and accompanying status reports. Update construction cost estimate at each design submittal. Provide quality control of all work produced. Deliverables • Meeting notes as needed • Updated cost estimate Assumptions • Background information provided by the City as needed Phase 200 -General Design The following drawings will be produced: • Cover sheet with index, location, and vicinity maps • General notes and abbreviations • Symbols, legends, and notes CSI Divisions 0 through 1 specifications will be produced. BC will provide senior level review of work products. Deliverables • 50 and 90 percent complete general drawings and specifications for City comment • 100 percent complete general drawings and specifications for IDEQ submittal Assumptions • None Phase 300 -Process Mechanical Design The following drawings will be produced: • General legend, symbols, index, abbreviations • Primary Clarifier Plan and sections • Primary Clarifier sections and details Primary Clarifier cover specifications produced. BC will provide senior level review of work products. Deliverables • 50 and 90 percent complete process mechanical drawings and specifications • 100 percent complete drawings anal. specifications for IDEQ submittal Assumptions • None Phase 400 -Structural Design The following drawings will be produced: • Structural general notes, special inspections, and specifications • Steel connections and aluminum covers typical details • Splitter Box Plan- and details • Headworks Channel Covers Plan • Headworks Channel Covers sections and details • Grit Removal Channel Covers Plan • Grit Removal Channel Covers sections and details Structural calculations will be produced. Plans, sections, and details will be prepared for each area. CSI Divisions 3 through 7 specifications will be produced. BC will provide senior level review of work products. Deliverables • 50 and 90 percent complete drawings and specifications • 100 percent complete drawings and specifications far IDEQ submittal Assumptions • None TIME OF PERFORMANCE The attached MS Project chart shows the anticipated schedule of the project. COMPENSATION The following table provides a summary fee for the scope of services proposed in this task order. The fee estimate is based on the assumptions developed from our conversations with City staff. These assumptions are presented in the following section. Brown and Caldwell proposes conducting this work in accordance with the rate schedule attached to the master agreement dated April 13, 2010. 100 -Project Management $5,110 200 -General Design $1,665 300 -Process Mechanical Design $12,340 400 -Structural Design $38,318 Total $57,433 ASSUMPTIONS The following assumptions were made in preparation of the scope of work and fee estimate: • The cast of this task order is $57,433, is on atime-and-materials, not-to-exceed basis, and the amount and will not be exceeded unless the scope of work changes and only upon prior written authorization by the City • Brown and Caldwell will rely on information provided by the City to prepare the technical documents • Bid period services and services during construction are not included CITYaF MERIDIAN By. ~~I TAMMY de W D, MAYOR Dated: ~ r• g ~ ~1 BRAWN AND CALDWELL Jeffrey S. o , Ph. ., P.G., Vice President Dated: ~ ~- Approved by City Council: _ ~ a~ ~~ ~ ~' ~:a~~ ~ ~,~~~~ ~r~,a ~ ~ ~ `~ ~ Attest: ~ ~ ~. ~ L ; _ ~ ~ , t, ~rn.'i'J 7~ ,; ~ T ...s '1 Q { { JAYC C ~ ~, ~ ~'~" ~~ AN ~ , .~~.. ,~ ~_ ; , i. .', ~., 1J, ~ , ~ ~ A roved as pp ~ ~-~ ~~ to Content ~ ~ ~~'+' ~~~ ' ~~~ ~ ~~ ~ 1 ~ s KEITH WATTS, PURCHASING AGENT Depart t Appro a! By~ Title: ~-Nc.~-~~ ~. ~.~tzN ~.... ~i1~~uit~.~,.~z- `~ ~~ - ~ ~ Dated: Dated: