Loading...
HomeMy WebLinkAboutSundance 4 FP RecsResponse150 East Aikens Street, Suite B Eagle, ID 83616 Phone: (208) 938-0980 Fax: (208) 938-0941 E-mail: es-beckym@qwest.net October 31, 2003 Mayor and City Council City of Meridian 33 East Idaho Meridian, ID 83642 Re: Sundance Subdivision No. 4 (Final Plat) - REVISED FP-03-058 Dear Mayor and Council: We have reviewed staff comments for the hearing date of November 5, and have the following responses. SITE SPECIFIC CONDITIONS OF APPROVAL 1. The applicant will meet all terms of the approved preliminary plat, planned development, and development agreement. 2. The applicant will comply. 3. The applicant will comply. 4. The applicant will comply. 5. The applicant will comply. 6. The applicant will comply. 7. The applicant will comply. 8. The applicant will comply. 9. The note will be deleted. 10. The applicant does not intend to provide fencing on both sides of Lot 50, as it will create a tunnel behind the lots. The fencing along the rear of the lots is to serve as the boundary fence, as well as on the frontage adjacent to the street. Please remove the requirement for double-fencing of Lot 50. 11. The preliminary plat approved for this subdivision contained the same lots and the same dimensions on the cul-de-sac lots. The dimensions given on the preliminary plat were arc lengths, not chord lengths. Sundance Subdivisions Nos. 1 and 2 also have been approved and recorded with chord lengths less than 40’. We respectfully request that the lots be approved as shown. 12. Due to the requirement to align our entrance road with the driveway to the south, three lots fell below the dimensional requirement for R-8 frontage (Lots 2 and 15, Block 11, and Lot Mayor and City Council October 31, 2003 Page 2 C:\Documents and Settings\smiths.MERIDIANCITY\Local Settings\Temporary Internet Files\OLKC\RecsResponse.doc 40, Block 7). No lots were added as a result of the re-alignment, but these lots required a reduced frontage to maintain the number of approved lots. There is area to make the lots in Block 11, have a 65’ width. Lot 40, Block 7, cannot be adjusted, and we respectfully request that this lot be approved as shown. 13. The applicant will comply. 14. No encroachment agreement with Nampa-Meridian Irrigation District is required for Lots 34-39, Block 9, as it is not within their jurisdiction. 15. The missing call will be added to the legal description. 16. Noted. GENERAL REQUIREMENTS 1. The applicant will comply. 2. The applicant will comply. 3. The applicant will comply. 4. The applicant will comply. 5. The applicant’s engineer will submit the required statement. 6. The applicant will comply. 7. The applicant will comply. 8. The applicant will comply. We believe this letter addresses all items of the staff comments. We look forward to discussing the items where we differ at your meeting of November 5, 2003. Please feel free to call if you have additional comments or questions. Sincerely, Engineering Solutions, LLP Becky McKay Partner BM:ss cc: Mr. Eric Guanell