Loading...
HomeMy WebLinkAboutChange Order No 2 with Ewing Company for WWTP ThickenerCHANGE ORDER No.-2 PROJECT City of Meridian WWTP. Dissolved Air Flotation Thickener Project DATE OF ISSUANCE September 3.2003 EFFECTIVE DATE September 3. 2003 OWNER Citv of Meridian CONTRACTOR Ewing Company ENGINEER Carollo Engineers You are directed to make the following changes in the Contract Documents. Description: 1. Revise underground piping in Field Order No 5, per the price quotation from Terra-West Inc. of 8/18/03. 2. Provide accessories for above ground storage tank not included in CO. 1, per the illI quotation of 8/5/03. 3. Provide additional options for surveying not included in C.O. I, per the GeoLine quotation of 8/18/03. 4. Substitute removable handrail posts in DAFT Pump Building per Outland quotation dated 8/6/03 5. Substitute stainless steel piping for PVC per the Lacy Mechanical quotation of 7/25/03. Reason for Change Order: Unforeseen underground utility conditions at the time of design and bidding. Attachments: Price quotation letter from Ewing Company dated August 25, 2003, with summary by Carollo, CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Cnntract Price Original Cnntract Times Substantial Completion: 270 Davs November 21 2003 $ 809500.00 Ready for final payment: 300 Davs - December 26 2003 d'y,",d"" Net Cbanges from previous Change Orders No. ...L to No. ....Q Net Changes from previous Change Orders No. .JL to No. ~ $ 21.820.61 0 D,y' Contract Price prior to this Change Order Contract Times prior to this Change order Substantial Completion: 270 Davs - November 21 2003 $ 831.320.61 Ready for final payment: 300 Davs - Decemver 26 2003 d'y,md"" Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order) $ 4.971.25 7 Calendar Davs d,y' Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: 277 Davs November 28. 2003 $ 836291.96 Ready for final payment: 307 Davs - January 3.2004 d,y,md"" RECOMMENDED BY ENGINEER: William . By: By: Date: APPROVED BY OWNER: -. CITY OF MERIDIAN DISSOLVED AIR FLOTATION THICKENER PROJECT CHANGE ORDER NO 2 ITEM AMOUNT DESCRIPTION BY 1 YARD PIPING 1.1 $2,423.41 Mise Yard Piping and Clean-Outs from FO 5 Terra West 1.2 $207.00 Patch asphalt at road crossing from FO 5 1.3 ($726,80) (Credit) Relocated 6" SL not required (Detail AlC-3) 1.4 $334.75 Added buried valve vault, not called out on 2M-1 $2,238.36 Item 1 2 $4,300.42 CO 1 approved for new diesel storage tank Ewing $3,750.00 IBI quote 8/5/03 Base tank cost $690.00 Fililimiter $83.00 Low contact switch $58.00 Mechanical leak detection $58.00 Mechanical fuel gage $90.00 Decal kit $46.00 Fusible fire valve (1 ") $189.00 Anti-siphon valve (1") $70.00 Delivery $5,034.00 Subtotal Tank & Options $306.24 6%tax $5,340.24 Total Tank Cost $1,039.82 Cost Difference from CO 1 3 $7,000.00 CO 1 approved for surveying GPS Trimble GeoXT Ewing $6,695.00 GeolLine quote 8/18/03 GeoExplorer CE Svstem $75.00 Serial Clip $6,770.00 Subtotal GPS & Options $406.20 6%tax $7,176.20 Total GPS Cost $176.20 Cost Difference from CO 1 4 $585.00 Removable handrail posts wI delivery Ewing 5 $639.43 Substitute stainless steel piping on DAFT Recycle Lacy $4,678.81 TOTAL ITEMS 1 THROUGH 5 (tax included) $204.69 Ewina OHP (5%) on subs (Items 1, 2, 3, 5) $87.75 EwinQ OHP (15%) (Item 4) $4,971.25 TOTAL CHANGE ORDER No.2 W.J. Benko 8/29/2003 ~ '- August25,2003 Carollo Engineers 12952 W. Explorer Dr., Suite 200 Boise, 10 83713 Attn: William Benko Re: Meridian DAFT, Change Order Request #1 Yard Piping Add extra pipe and fittings per Bill Benko and Eric. Patch asphalt, good asphalt Debt reroute 48" ductile line Add 48" calvert and hid for value Lfl $2,423JW $ 207.00 <$ 726.80> $ 334.75 $2,238$ ~ #2 «(10 Z. If:..- 'I) Add for handrail squae tube and chains labor for this is (Outland) in base bid. The Ewing Co., Inc. Will furnish and install extra railings in DAFT building at no additional charge. #3 lCe? z. r~;.) Add 2 pieces 4" X 5" stainless steel pipe between DAFT pump and DAFT. lacy Mechanical $ 639.43 $3,472.99 ) The Ewing Co., Inc. OH & Profit $ 173.65 S-. G.O.?... $3,646.64 5.......-_/ ?JJß $ 5/5.00 Please W ~oodward Project Manager ~""-O------"-" I. \ \.'3> L . 'Í l.5 l-L.? 1.1 .ç"--ç~~",,u, ",u"""",-"", , p.l r~ / TERRA-WEST, INC. (208) 938-7956 Fax 938-7957 PO Box 904 Eagle, ill 83616-0904 REOUEST FOR CHANGE ORDER TO: ATTN: Ewing Co. Bob Woodward DATE: 8/18/03 PROJECT: Meridian WWTP CHANGE ORDER # I We herby request a change order on the above-mentioned project due to changes and/or extras outlined in the following: #1 Reroute 4" TWAS, 6" WAS, ami the 4" BD line, No additional laborer equipment is ~quired dig this line. There are some pipe fitting that will need to be changed, Attached isa copy of parts excluding tax. Onrprice for materials includes tax. Extra FiUin p tbat wiD be lell OD site 6 clean outs on the 6" D LiDe 3 clean Ollis on the 4" nv AS Line I clean out on the 6" WAS Line Materials: $1,413.41 \.2 Patch odditionalasphalt where the proposed rood ties into tho existing road. This price does not incJude patcbingtbo deterìomted soction oflOod. J15 SF @ 51.80 SF Material and Labor. $207.00 Deduct labor and , quip~nt for rerouting 8" Duçtile lronLino. Backhoe S39.00HR @8HR=S312.00J Operator S21.00HR @8HR=5168.00V Labor S19.00HR @ 8 HR= St52.00 V ) Overllead '" Profit 594 80 (¡ <? /- TOlD! 5726.8../ Labor and Equipment: ($ 726.80) . furnish additional 48" culvert with lid . ". M..erl'Is:~;2.3!' Jf,' Pump and clean tho lank before removal. DisCOÐl1oct Fuollinos ûom the tank and cop out 51 0 0 0 ~. ~ Labor aod materials: S36Ø.OO ......- Have a certified soil sample for meso! contamination. Labor and materials: SI,II36.00 Excavate and baUr ur.~~ ~ Backfill excavation with suìtnblo fill material. This price does not include excavating or handling oornaminatod soil DEQ requirements are not Included in this price. The tank will b. hauled to Pacific Recycling for disposal. 0 ~\"'- C-D ~.".";.....;.'....'.' 1>RUSf . : """" : '.: ", -_.-u~ """:i.-'. """"".""". .. -".~" ". . t""" OÐO""""PI.!1!> . . ="""'.... .- ....,.. ...... .' EU. = .I)fi.j . ::¡¡¡¡¡u CoW."........."... ....... DE A.ocE> PIlI TmdL...... pm- 2.c:oNO!EI<""""""""""""""P~-- ~~;n.;.,~~..:=io",,",,"'" ~""""""""""""D""""SIlE"\H:"'" ~""="""""""'R»IC!:"+"."""""""""""""'" ....... Dt '-. ,- 'OD ~ '" """ >ÆA,"'" ':I".......i Cø.c "'" ~ """". ~ CLEANOUTS y u -- -- ----.- ~~~ ~.!J ~.-IIUNOF\Nic[(IYP) fW<C( """"" (IYP) r70~~) ....... .' """" : ".: IŒE...J p"""",,~,,, ",<os.."""", ........... TERMIN.'oT10N IN PAVEMENT &L..:I:ŒE:i ClEJHCUJ ~ """""'".CPl"" ~ ~~~~, ..,_. ,~.uo,""o-,,"" p." Mt!,.,~..c..", U~ ~f- " I -.t- W"'>-C.... Dte..:~ l.'~~ [)¿ I<,~ 1...( ŒFë"'"ou.+5 CD ~" D L"",~ @ L¡" 'WAS L:"" G) IÞ' ¡,,)AS L,',,~ CUN«M-:;:;:;:--- """""'"" PI"" ~'X:eoi¡¡; ",....' .": (1\10) DLOCK . . IŒE-2 :,,~ I I I r r-.L """,,",TIC Þl"" ,- ./ / / ~ '- r á-.. 2- August25,2003 Carollo Engineers 12952 W. Explorer Dr., Suite 200 Boise, 10 83713 Attn: William Benko Re: Meridian DAFT, Fuel Tank Dear Bill, Please find attached a quote from IBt that Len Grady went over with IBI. The tank has increased from $4,300.42 including tax to $5,336.04, a net increase of $1 ,035.62. The Ewing Co., Inc. OH & Profit $1,035.62 $ 51.79 $1,087.41 /°:::":,"7. S-<-. , 0?/13/ ~003 12: 18 FAX 2084599320 1111 IiìI 001 I '. :,.1)\'... '("7..~ ID)'" ; '~~I . } ,~-lC,~ . U \ { Tanks. Industrial Fabrication PO Sox 1243 -20394 Pinto Lane 'Caldwell 'Idaho 63606 SUS. (208) 459-8077 .FAX (208) 459-9320 PROPOSAL-ACCEPTANCE Page 1 of 1 Pages DATE August 5. 2003 JOB NAME to. CITY. STATE AND ZIPCODE Boise, ID 837114 JOB LOCATION PHONE 1208) 377-1$00 FAX 1208) 316-1481 PROJECT DIRECTOR Bob Woodward 8í S GìSS1 CATE OF PLANS L~n" J), BOb: Thanks for the opportunity to quote a 1JL2O85, please look oller these numbal"8 to ensure all needed Items have been quoted. 4' ,83 Dia x 5' Length Tank to include: Emergency Vents, Nðnnal Vent, & 7 Gallon Spill Bucket Optional Equipment; Fill Umltsr- Clay & Bailey F-30: fC:::;~~~taG~ :w~:::' " I Lealc Detection: '~-""'~<.....:>o( .S~I."'" MeGhanic;a1 Fuel Gauge: ~ IC-ÌT C?-~:.""O~ ~',\.<....,.Jk \)òt'W3) , - l;¡. o.M.J ) }" ~~...'- Ù~ ,'f~~ (...) . In ¡:,¡,,~( ":.<-.,~ v...R--.(t..) $ 680.00 .., ........- ....0 $ 83.00 œ $ -8HO 5'6 0 $ 58.00 <-\O.~ <./G,.~ \8,e. Ex I des' T 'ts erv'ce 10 nloacl all site. wor1< $ 3,750,00 1° ~ ~ C¡~ ri t ff)í-, ¿(q67 Iv .g> 11) & "Ð ú if 2,ðr 1. é) I £Jjf.,o q-OOÖ cu axe$, perml ,crane s I U ~~ r, MY AL"""""" CA œv"~ON ,"OM AiOV. SPE.ULAl1ONS IMIOLVING ex'IRACO5T1> WL~ && &XIiCU1iO A\!1HORIZED SIGNA TlJRE OM. y,",OH WRlrTEN ORD"AS ....0 Will sr¡ç()Ul¡ ... EX11OA .IWIGE """A ""D """". "'" AMDUNTOET FOInH OS","-. IN< SHALL NOr.. A.SP<JNSÐLE FOR DELAYS tAU"D ..._s""""'""'" OR """'" """""""'DIES ÐE'I"OND OUR CONTIWI., OWHEAlO CARRY <"', TO""^"" ANO <mIEA NeœSs,o,R1 INSUAAFIC¡ QUA WOR""" ARI! PULl Y COVEReD 8YW"""",,H'. _.E_11O' NSUI>A>Iœ - ........ "'tMlS IXICUMENT CONTAINS NOTe:"tH1S F'OOPOS'L MAY ",Wm<QRAWN .YUS "PORTANT PROVISIONS WI".. ALSO .0HSl1T1TÆ PARTOP THE MlREEMM.'" S""" ..LOW, - "NOT"CO."""'W",,'HS.D"" ACKHOWI.E- READ"""" AG..I!MEM"IN FU~~ ~- ACCEPTANCE OF PROPOSAL "'NAru.. _ABOVE PA"'S S"C'<:AroNS. TERMS....DCONOmONS- SA",,<ACTQRY""'" ""N." ACŒP1ED. YO\) AR,AUT\IOAIZI!OTODOtME WORK" SP.CIFED.. PA"""'WILL.."""'" OLFTI.t<EDA8OV&, DA1B OJ' ACCEPTANC.: --ruNE :;: .. ! £'J,.k<þQ(1. I J 48~' I ~ h ~ 60 --'-t ~ f~ jf tl.-1- I A ~ ~~~~__f~- ~:_~ðJ~ '. Æ6íO 9~1 @ ~~ED .. g IS' RIVS 300 lJL 2095 LABELED A-36 MATERIAL MATERIAL AND VENTS PER UL REQUIREMENTS NOTEI TIGHT NDlZEL SPA~[JN[} 4-1/4 CENTER TO CENTER NOZZLES PLEASE VERifY IBITANKS IE INDUSTRIAL F ABRICA nON 211394 PINTO LANE, ~ALDVlELL IJJ. 83605 P.D. B[]X 1243, 83606 PH. 208-459-6017 FAX, 20B-459-9320 1-800-497-8251 [-MAIL ibincron@Mlndsprlng.coM I UL 142 "Aug 18 03 12:0Bp Scot-t- Wendling 208-442-1363 p.2 / tL.-..-.- .:3 @) GeoLine. POSIT 0.'"" SYSTEMS GeoLlne Boise 9546 Cherry Lane Nampa, 10 83687 scotl..wendljng@geoline.com 208.442,1356 Fax 208.442.1363 Toll Free 888.658.1162 8ellevue 800.523.6408 August 18, 2003 Ewing Company Atln: Bob Woodward 1500 Eldorado Suite 4 Boise, ID 83704 Dear Bob: The following is a Trimble GPS proposal for your consideration. This proposal re1lects a Complete GeoExplorer CE System with TerraSync software. This system should deliver in 6 - 10 Days Qty. UlM Description GeoExplorer CE System, (TFT Display wf 64MB) INCLUDES: 1 ea GeoXT 512MB wi TerraSync Professional, Part# 49100-30 1 ea Pathfinder Office Software 1 ea Soft Case 1 ea Charging Cradie and Download Cables Pñce $6,695.00 Other 1 ea GeoExplofer CE PowerlSeriaJ CliP. Part# 4650B-CO 1 ea 2 hours Technical Support on-site Sub-Total $75.00 Included $6,770.00 When making out your purchase order for the above items, please make it out to: GeoLine Positioning Systems, Inc. 1331118'" Avenue BE, Suite 400 Bellevue, WA 98005 Write the purchase order on YOUf organiza"on's letterhead. Provide bolh shipping and biHing addfesses, Lisl the equipmenl or attach a copy 01 this proposal. Your desired delivery dale. Piease fax the purchase order 10 GeoLine aI1(2O8) 442-1363. Thank you for the opportunity 10 help provide you with a GPS solution to suit your needs. If you have any questions, please do not hesitate to call. Sincerely, ~ _~I ~~ Scott Wendling - GPS & Survey Systems Sales The Leaders In GPS a Optical Surveying, GIS, Mapping and Construction Technologies Sale. . 5ernce . Le"", . Rentals. Repairs' Trafning , .AUG 06 2003 2:23PM OUTLAND STEEL,INC. 208 466 4095 p.l ~'-I OUTLAND STEEL) INC. 19M? FRANKLIN RD., NAMPA, IO 83687.8047 208.466.841O{ZO8.466.4095 FAX QUOTE Date: ~ To: Ewing Company Project: DAFT Attn.: Bob Location: Meridian. 1D Fax: 376,14811377.1500 Items: Removable posts, chain E:¡ hooks for pump building rail. Add for delivery ------..--------------------------------------$40 Galvanized. FOB our shop. Sales taK included. Five Hundred Forl;,y Five & No/IOO dolla~ Terms Finance charge of I %% interest per month on any unpaid balance. This bid proposal becomes a part of any purchase order issued. $545 .. Your signature faKed on this quote may senoe as your purchase order.M ~~ DATE AuTlIORIZED SIGNATI.1RE /k?/ , TmE: PRINT NAME Er TmE PURCHASE ORDER # :z:-~ s- :1 )/lechanical y9.C ~. 111c. CRAIG A. LACY PRESIDENT 1500 Eidorado Stree~ Suite 5 Boise, Idaho 83704 Phone (208) 377-3237 FAX (208) 327'()553 July 25, 2003 The Ewing Company, Inc. 1500 Eldorado St. Suite 4 Boise, Idaho 83704 Attn: Bob Woodward Re: Meridian WWTP Dear Bob, The added cost to insta1l stainless steel piping in place of the C900 pipe on the recycle lines between the DAFT Pwnp Building and DAFT Tank is as follows: Material Labor 6Hrs @ $44/ Hr 10%OH&P Total $2p.30 $264.00 $58.13 $639.43 Material break down: 10' -4" SCH 40 SS 316 Pipe $21.73/ FT Please notifY us if you would like us to proceed with this work. ~~ Meridian City Council Meeting September 16, 2003 Page 2 of 25 Approve minutes of September 2, 2003 Pre-Council Meeting: Approve minutes of September 2, 2003 City Council Regular Meeting: Bird: Madam President? De Weerd: Mr. Bird. Bird: I would move that we approve the amended agenda, which item six is the only amendment. Nary: Second. De Weerd: Okay. It's been moved to adopt the agenda, with the exception of item six. Nary: We are going to move that at the - okay. Bird: We have to move that when - Nary: Okay. De Weere!: Okay. Right. Thafs correct, So, moving to approve the agenda. All those in favor say aye. Okay. All ayes. Motion carried. MOTION CARRIED: TWO AYES. ONE ABSENT. Item 3: Consent Agenda: A. B. C. Findings of Fact and Conclusions of Law for Approval: VAC 03-003 Request for a Vacation of a sewer easement on lot 2 Block 1 of Pack It UP Subdivision by Pinnacle Engineers - north of East Overland Road approximately one-half mile west of South Eagle Rqad: D. Findings of Fact and Conclusions of Law for Approval: AZ 03- 009 Request for annexation and zoning of 11 acres from RUT to R-15 (PD) and CoN zones for proposed The Courtyards at Ten Mile by Doug Campbell I Tom Bevan I DTE Developers - southeast corner of North Ten Mile Road and West Pine Avenue: E. Findings of Fact and Conclusions of Law for Approval: PP 03- 010 Request for Preliminary Plat approval of 31 building lots and 5 other lots on 11 acres in proposed R-15 (PD) and CoN zones for proposed The Courtyards at Ten Mile by Doug Campbell I Tom Meridian City CouncU Meeting September 16, 2003 Page 3 of 25 G. J. Bevan I DTE Developers - southeast comer of North Ten Mile Road and West Pine Avenue: F. Findings of Fact and Conclusions of Law for Approval: CUP 03-020 Request for a Conditional Use Permit for attached single- family residential with commercial in proposed R-15 (PD) and C-N zones for proposed The CourtYards at Ten Mile by Doug Campbell I Tom Bevan I DTE Developers - southeast comer of North Ten Mile Road and West Pine Avenue: Findings of Fact and Conclusions of Law for Approval: TCU 03-002 Request to transfer a Conditional Use Permit from Wendell and Kathleen Lawrence to Debi Sheridan for a child care facility in an L-O zone for Sunshine Academv - 737 North Linder Road: H. Findings of Fact and Conclusions of Law for Approval: CUP 03-033 Request for a Conditional Use Permit for a professional dental office in an L-O zone for Millenium Dental by Millenium Dental - south of East Overland Road on South Millenium Way: I. Change Order No.2 for Dissolved Air Flotation Thickener Project - Ewing Company: Approve Release of Bitterroot Construction from 2003 Locust Grove Water and Sewer contract: De Weerd: Item number three, Consent Agenda Bird: Madam President? De Weerd: Mr. Bird. Bird: I would move that we approve the Consent Agenda and for the President of the Council and the Clerk to sign and attest all proper papers. Nary: Second. De Weerd: Okay. It's been moved and seconded to approve the Consent Agenda. Mr. Clerk, roll call. Roll Call: McCandless, absent; Nary, yea; Bird, yea. De Weerd: Thank you. MOTION CARRIED: 1WO AYES. ONE ABSENT,