Loading...
HomeMy WebLinkAboutNorthwest Machine & Manufacturing CZC 00-0461 ~ • HUB OF TREASURE VALLEY MAYOR Robert D. Cowie A Good Place to Live CITY OF MERIDIAN CITY COUNCIL MEMBERS Ron Anderson 33 EAST IDAHO Keith Bird MERIDIAN, IDAHO 83642 Tammy deWeerd (208) 888-4433 • Fax (208) 887-4813 Cherie McCandless City Clerk Office Fax (208) 888-4218 LEGAL DEPARTMENT (208) 288-2499 • Fax 288-2501 PUBLIC WORKS BUlLD1NG DEPARTMENT (208)887-2211 • Fax 887-1297 PLANNING AND ZONING DEPARTMENT (208) 884-5533 • Fax 888-6854 CERTIFICATE OF ZONING COMPLIANCE* Date: January 31 2000 Owner: Northwest Machine & Manufacturing (Contractor Valley Steel Builders Inc ~_ Address: 1957 East Lanark Street (Lots 3 & 4 Locust Grove Industrial Park Sub ) Proposed Use: 15,000 s.f. Building Expansion of Existing Manufacturin Facility Zoning: I-L ~,~~~ ~Q ,. ~~ Comments: Must comply with redline comments on Site Plan (dated 1 19 99) re arding scale and parking dimensions. All signs a is subject to design review and requires separate permits All landsca in must be served b an under rounds rinklin s stem. Landsca a lan not to be altered without prior written approval of the Planning & Zoning Department A minimum of 14 new 3" caliper trees must be planted on west end of site as shown East end main building entrance accommodatml? handicap-accessible parking stalls must meet accessibility standards and be striped with a mimmum 8-foot access aisle, ramp and handicap sign No field changes to site plan permitted• rior written approval of all chances required All draina>;e to be retained on site Shari Stiles Planning & Zoning Administrator *Receipt of a Certificate of Zoning Compliance does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, etc. This certificate shall expire one (1) year from the date of issuance if work has not begun. ~, .,, ~~ c2e,).j~.~7 h-.5.= ~-~-=V+- v~ .ems ~.~--~-u~- ,~ i R ~du ~ou~ct J~ti hcva oC.Ji~trict Sherry R. Huber, President 318 East 37th Street Judy Peavey-Derr, Vice President Garden City, Idaho 83714-6499 Marlyss Meyer, Secretary Phone (208) 387-6100 Dave Bivens, Commissioner Fax (208) 387-6391 Susan S. Eastlake. Commissioner _ __ a-mail tellusCo~achd.ada.id.us December 13, 1999 Valley Steel Builders, Inc. Attn: Phil Ourada 10621 Executive Drive Boise, Idaho 33713 RE: vISPR-33-99//197 E. Lanark St. /northwest ivlanut'acturin; addition PLAiyS ACCEPTANCE The District has reviewed the plans for the above referenced project, and they are accepted for public street construction. By stamping and signing the improvement plans, the Registered Engineer ensures the District that the plans conform to all District policies and standards. Variances or waivers must be specifically and previously approved by the District in writing. Acceptance of the improvement plans by the District does not relieve the Registered Engineer of these responsibilities. The District will assess the following impact fee for this project. The impact fee must be paid prior to issuance of a building permit. Total Impact Fee due: $16,63.00 Standard Requirements: I. Utility street cuts in new pavement less than five years old are not allowed unless approved in writing by the District. II. All irrigation facilities must be located outside the public right-of--way unless otherwise approved by the District. III. Replace damaged curb, gutter, and sidewalk with new curb, gutter, and sidewalk to match existing improvements. IV. All facilities to be constructed with a proposed development, and to be owned and maintained by the District, must be constructed according to the latest edition of I.S.P.W.C. and the District's Supplemental Standard Specifications. V. Any work in the pubiic right-of--way requires a permit from ACHD Construction Services. VI. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. [ f you have any questions or concerns, please feel free to contact me at 387-6176. Sincerely, Jeff Lowe Planning and Development r ~ •--^ ~da ~ount ~1~i hcvu oC.Ji3tNict Sherry R. Huber, President 318 East 37th Street Judy Peavey-Derr, Vice President Garden City, Idaho 83714-6499 Marlyss Meyer, Secretary Phone (208) 387-6100 Dave Bivens, Commissioner Fax (208) 387-6391 Susan S. Eastlake, Commissioner _ e-mail: tellus@achd.ada.id.us December 13, 1999 N[SPR-33-99 197 E. Lanark St. Northwest Manufacturing Addition IMPACT FEE CALCULATION Building Type Cost per L'nit Area (SF) Total Cost light industrial $1,109.00 1 x,000 S 16,63.00 Total Impact Fee Due S 16,635.00 g~~-~~~~ ~-~ Memo To: Brad Hawkins-Clark From Brad Watson, P.E CC: File Date: 04/06/00 ills: Northwest Machining ~ Manufacturing This is the revised plan I spoke to you about. The drainage plan shows them changing the bottom of the swale from grass to sand/rock throughout the length. Drainage wise, they are approvable. I want to make sure it does not cor-flict with your approved landscape plan. Thanks. ~,~ aesk oE.. Brad Watson, P.E. Assislaffi City Engines Meridian Public Works Department 200 E Carlbn St, Suite 100 Merman, Idaho 83642-2600 • Page 1 (208) 887-221 l Fax (208) 887-1297 watsanb n~a.tneridianidus • CITY OF MERIDIAN PLANNING & ZONING DEPARTMENT LETTER OF TRANSMITTAL July 20, 2001 To: Will Berg City Clerk's Office From: Brad Hawkins-Clark Planning & Zoning Dept. Subject: Bond Release -Northwest Machine & Mfg. Remarks: I conducted a final site inspection on 07/19/01 of the Northwest Machine warehouse/manufacturing building at 1957 E. Lanark to determine compliance with landscaping, pazking and irrigation requirements. I believe Guy Gauge with NW Machine & Manufacturing submitted a Letter of Credit last December for the landscaping and curbing. All improvements aze complete as per the approved site plan and the Letter of Credit can be released for these elements. Please contact Guy at 888-5334 on this matter. Copy to: File Signed: ',8~ ~ - ~ 660 E. Watertower Ln., Ste. 202 Meridian, Idaho 83642 (208) 884-5533 Fax (208) 887-1297