HomeMy WebLinkAboutACHD Comments•
Ada County Highway District
John S. Franden, President
Dave E. Wynkoop 1st Vice President 3775 N. Adams Street
Susan S. Eastlake, 2nd Vice President Garden City ID 83714-6499
Sherry R. Huber, Commissioner Phone (208) 387-6100
Dave Qivens, Commissioner FAX (208) 387-6391
E-mail: tellus@ACHD.ada.id.us
May 7, 2004
TO: Pinnacle Engineers Inc ~~~~~~~~
Dave McKinnon ~~~' ~ ~ ~~~~
12552 W. Executive Drive, Suite B
Boise, Idaho 83713 City of Meridian
City Clerk Office
SUBJECT: MCZC04-027
LDS Paramount Stakecenter
Lot 3, Block 4 of Paramount Subdivision # 1
The Ada County Highway District (ACHD) staff has received the above referenced application
requesting a Certificate of Zoning Compliance approval to construct LDS Paramount Stakecenter.
On March 19, 2003, the Ada County Highway District Commissioners acted on MCUP03-008/MAZ03-
006 for Paramount Subdivision. The conditions and requirements also apply to MCZC04-027.
- The applicant shall submit two (2) sets of engineered plans directly to ACHD for review by the
Development Review Division for plan review and assessment of impact fees. (Note: if there
are no site improvements required by ACHD, then architectural plans may be submitted for
purposes of impact fee calculation.)
- The applicant is required to get a permit from Construction Services (ACHD) for ANY work in
the right-of--way, including, but not limited to, driveway approaches, street improvements and
utility cuts.
If you have any questions or concerns please feel free to contact this office at (208) 387-6171.
Sincerely,
~~ ~..~~
Jo ce ewton
Development Analyst
Right-of--Way & Development Services
CC: Project File/ Drainage/L7tilities/Construction Services
Lead Agency: City of Meridian
N
VICINITY MAP
•
1 inch equals 400 feet
', 04/13/2004 06:14 8865 2
Rpr 09 0~ 04:OOp~ Pinnacle
SANITARY
Engineers, Inc.
SERVI ES
20 ?78I
PAGE 02
p.2
•
Ada County Highway District
Development Process Checklist
®Submit a development application to a City or to the County
®The City or the County will transmit the development application to ACRD
®The ACHD Planning Review Division will receive the development application to review
®The Planning Review Division will do one of the following:
^Send a "No Review" letter to the applicant stating that there are no site specific
requirements at this time.
®Send a "Comply With" letter to the applicant stating that if the development is within a
platted subdivision or part of a previous development application and that the site
specific requirements from the previous development also apply to this
development application.
^Write a Staff Level report analyzing the impacts of the development on the
transportation system and evaluating the proposal for its conformance to District
Policy.
^Write a Commission Level report analyzing the impacts of the development on the
transportation system and evaluating the proposal for its conformance to District
Policy.
^The Planning Review Division will hold a Technical Review meeting for all Staff and Commission
Level reports.
®For ALL development applications, including those receiving a "No Review" or "Comply With"
letter:
The applicant should submit two (2) sets of engineered plans directly to ACHD for review
by the Development Review Division for plan review and assessment of impact fees.
(Note: if there are no site improvements required by ACHD, then architectural plans may
be submitted for purposes of impact fee calculation.)
The applicant is required to get a permit from Construction Services (ACHD) for ANY
work in the right-of-way, including, but not limited to, driveway approaches, street
improvements and utility cuts.
®Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review
approval.
DID YOUREMEMBER:
Construction (Zone)
^ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACRD) Construction
(for approval by Development Services & Traffic Services). There is a one week turnaround for this
approval.
I
^ Working in the ACRD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway
Use Permit Application" to ACRD Construction -Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench
is >50' or you are placing >600 sf of concrete or asphalt.
Construction (Subdl'vlslons)
^ Sediment 8 Erosion Submittal
• At least one week prior to setting up a Pre-Con an Erosion 8 Sediment Control Narrative & Plat, done
by a Certified Plan Designer, must be turned into ACRD Construction -Subdivision to be reviewed
and approved by the ACRD Drainage Division.
^ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-
Con being scheduled.
^ Final Approval from Development Services
• ACRD Construction -Subdivision must have received approval from Development Services prior to
scheduling aPre-Con.
.~
~O
s