TO: CMD, Inc.
850 E. Franklin Rd. Ste. C/06
Meridian, Idaho 83642
June 19, 2004
REC~1~'~~
SUBJECT: MCZC-04-048
Pool Cabana in Cobblefield Crossing Subdivision
Ann Taylor Street & Kilee Avenue
City of Meridian
City Clerk Officr.
In response to your request for comment, the Ada County Highway District (ACRD) staff has reviewed
the submitted application and site plan for the item referenced above. It has been determined that the
Right-of-Way and Development Services Department does not have any site specific requirements for
you at this time due to the fact that the roadway improvements were constructed with Cobblefield
Crossing Subdivision.
If the site plan or use should change in the future, ACRD will review the site plan and may require
improvements to the transportation system at that time.
A traffic impact fee may be assessed by ACRD and will be due prior to the issuance of a building
permit. Contact ACRD Planning 8< Development Services at 387-6170 for information regarding
impact fees.
Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement
widening, driveways, culverts, etc), a permit or license agreement must be obtained from ACRD.
If you have any questions, please feel free to contact me at (208) 387-6174.
Sincer
~~
on Den artog
Senior Developme t Analyst
Right-of-Way and Development Services, Planning Division
Cc: Project File, Construction Services, Drainage, Utilities
Lead agency: City of Meridian
Pacific Development Inc. 3101 W. Champagne Place Meridian, Idaho 83642
Media One
9601 W. State Street Ste. 112
Boise, Idaho 83703
II Development Process Checklist II
®Submit a development application to a City or to the County
®The City or the County will transmit the development application to ACRD
®The ACRD Planning Review Division will receive the development application to review
®The Planning Review Divlslon will do one of the following:
Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time.
^Send a "Comply With" letter to the applicant stating that 'rf the development is within a platted subdivision or part of
a previous development application and that the site speafic requirements from the previous development also appl:
to this development application.
^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the
proposal for its conformance to District Policy.
^Write a Commission Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
]The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
For ALL development applications, including those receiving a "No Review" or "Comply With" letter:
• The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Reviev-
Divlslon for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD,
then architectural plans may be submitted for purposes of impact fee calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, includinc
but not limited to, driveway approaches, street improvements and utility cuts.
^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DlD YOU REMEMBER:
Construction (Zone)
^ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by
Development Services 8 Traffic Services). There is a one week turnaround for this approval.
^ Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to
ACHD Construction -Permits along with:
a) Traffic Control Ptan
b) An Erosion 8 Sediment Control Narrative & Plat, done by a Cert~ed Plan Designer, if trench is >50' or you are
placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
^ Sediment 8 Erosion Submittal
• At least one week prior to setting up a Pre-Con an Erosion 8 Sediment Control Narrative 8 Plat, done by a Certified Plan
Designer, must be turned into ACRD Construction -Subdivision to be reviewed and approved by the ACRD Drainage
Division.
^ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled:
^ Final Approval from Development Services
• ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con.
Page 1 of 1
Brad Hawkins-Clark
From: Brad Hawkins-Clark [hawkinsb@meridiancity.org]
Sent: Friday, October 22, 2004 3:14 PM
To: 'Karie Glenn'
Subject: Cobblefield Crossing Cabana/Pool
Karie,
The cabana, pool and landscaping in Cobblefield Crossing are complete per CZC-04-048.
Brad Hawkins-Clark
10/22/2004