HomeMy WebLinkAboutPurchase Approval with Western States Equipment, Co. for WWTP Wheel Loader Replacement Loader~~i~E IDIAN~--
IDAHO
Public
Works Department
TO: Mayor Tammy de Weerd
Members of the City Council
FROM: Rich Dees, Utility Operations Manager
DATE: January 25, 2011
Mayor Tammy de Weerd
City Ceandl Membe~s~
Keith Bird
Brad Hoaglun
Charles Rountree
David Zaremba
SUBJECT: PURCHASE APPROVAL FOR CAPITAL REPLACEMENT OF THE
WASTEWATER DIVISIONS WHEEL LOADER. REPLACEMENT
LOADER FROM WESTERN STATES EQUIPMENT CO. FOR ANOT-
TO-EXCEED AMOUNT OF $96,335.00
I. RECOMMENDED ACTION
A. Move to:
1. Accept proposal from Western States Equipment Co. submitted under RFP
PW-11-10217 for a used loader in an amount not to exceed $96,335.00; and
2. Authorize the Purchasing manger to sign the Purchase Order or Purchase
agreement.
II. DEPARTMENT CONTACT PERSONS
Tom Barry, Director of Public Works 489-0372
Rich Dees, Utility Operations Manager 489-0351
Tracy Crane, Plant Superintendent 888-2191
III. DESCRIPTION
A. Back~ound
The Public Works Wastewater Divisions current Hitachi Front Loader is not
capable of moving large quantities of biosolids or reaching the top of the
biosolids hauling vehicle. Last year it was discovered that the Hitachi loader was
Page 1 of 3
unsafe and the loader was taken out of service. Since that time the Wastewater
Division has been renting a front loader for $4,000.00 per month. Replacement
of the loader saves up to $48,000 per year in equipment rental costs. The current
unsafe Hitachi loader will remain out of service until sold.
B. ProRosed Purchase
The Wastewater Division needs a front end loader capable of moving large
quantities of biosolids with the ability of reaching the top of the biosolids hauling
vehicle. Operation of the current sized loader requires getting dangerously close
to the trailer containing the biosolids. This produces a high risk of damaging to
the mechanisms on the side of the trailer that are utilized for covering the
biosolids. Alternatives, like the installation of ramps were investigated, but were
found not to be feasible or cost effective. Not only does the bucket barely reach
the trailer edge, but the bucket is too small requiring many additional trips that
result in lost operator time and causes inefficiencies. The Hitachi loader is unsafe
and has been taken out of service. The bid amount for the used loader is
$96,335.00. A total of $100,000.00 was budgeted for capital replacement for the
used loader.
C. Bidder Selection
Western States Equipment Co. was the lowest bidder and is qualified to provide
the appropriate equipment.
IV. IMPACT
A. Strategic Impact:
This project supports the Public Works Mission and Vision for strategic growth.
The replacement of the current loader provides satisfactory biosolids removal
equipment to provide compliance with State and Federal regulations regarding
biosolids disposal.
B. Service/Deliver~Impact:
The replacement of the current loader increases the capabilities of moving large
quantities of biosolids with the ability of reaching the top of the biosolids hauling
vehicle which allows the City of Meridian to reduce manpower and equipment
rental costs.
Page 2 of 3
C. Fiscal Impact:
Project Costs
Net Selling Price $ 61,200.00
Options:
(Hydraulic oil cooler
Hydraulic 3 valve
Angle broom
Quick coupler) $ 35,135.00
Total $ 96.335.00.
Project Funding
WW (60-3500-94100) $100,000.00
V. ALTERNATIVES
A. The City could defer replacement of front loader. Doing so would be more
costly in the future as rental costs are likely to increase over time. This option
would also prevent the City from decreasing daily discharge rates, resulting in
higher treatment costs.
B. The City could discontinue loading biosolids hauling trucks with city staff and
use contract services. Doing so would be more costly as contract service
provider costs would increase overall biosoilds disposal costs. This option
would also prevent the City from decreasing daily discharge rates.
VL TIME CONSTRAINTS
Council's approval of the used loader purchase will allow Public Works to eliminate
equipment rental cost related to the loading of biosolids hauling vehicles.
VII. LIST OF ATTACHMENTS
A. Western States Equipment Used Loader bid.
~~-- l_~s---_~~
Approved for Council Agenda:
"`~ Date
Page 3 of 3
~C
E IDIAN.---
tt~1~~C~
PURCHASING DEPARTMENT
33 East Broadway Avenue,
Meridian, ID 83642
Phone: (208) 489-0416
Fax: (208) 887-4813
REQUEST FOR PROPOSALS
PROJECT N O. PW-11-10217
CONTRACT SPECIFICATIONS FOR:
USED LOADER
PROPOSALS MUST BE RECEIVED PRIOR TO 4:00 P.M.
December 21, 2010
DELIVER TO: CITY OF MERIDIAN, PURCHASING DEPARTMENT
33 EAST BROADWAY AVENUE
MERIDIAN, ID 83642
Pre-Proposal Conference
MANDATORY [ ]YES
[X]NO
Prepared by: KEITH WATTS
OF VENDOR
PROPOSAL
NAME: Western States Equipment Co. ADDRESS: 500 East Overland Road
. Meridian, Idaho 83642
REQUEST FOR PROPOSALS ~ '' ®~ ~~
CITY OF MERIDIAN
Meridian, Idaho 83642
PROJECT ~ PW-11-10217
TABLE OF CONTENTS
PART PAGE
.Cover SheetlTable of Conterrts .................................................2
I. Nonce Cail'mg for Proposals .................... . ..............................3
ii. Instructions to Proposal's .........................................................7
ill. Proposal Documents .................................................................10
A. Proposal Form
B. Respondents Experience Statement .
IV. Exhibit A Minimum Specifications .............................................14
usEO ~o~oEa Pw-»-~oz» 2 ~. 14
PART I
NOTICE CALLING FOR PROPOSALS
PURPOSE
~~OP~'
The City of Meridian is soliciting proposals from respondents to provide a Used
Cat 928G Loader or equivalent.
SCOPE OF WORK
Contained within the Spedfications /Scope of Work "Attachment A" are specifics
objectives which will be required of the awarded responderrt. The .City of
Meridian shall retain the ability to revise this scope as necessary.
PRESENTATIONS
Those respondents, which are determined to be best quai'rf'ied to undertake the'
senrices required under this Request for Proposals may be invited to make a
presentatbn to the City. Further information may be provided to the prospecthre
respondents after the ~itiai selection.
SUBMITTAL REQUIREMENTS
One (1) original and two (2) copies of the respondents sealed proposal wiN be
received by the City on December 21, 2010 unto 4:00 p.m., MT at the office of
the Purchasing Agent, City of Meridian, 33 East Broadway Avenue, Meridian.
Idaho 83642.
The Proposal must contain, but is not limited to the foibwing information:
1. Completed proposal form submitted on PART III-A PROPOSAL FORM.
2. A summary of the respondents experience with projects similar to the
#ypes of work stated in this Request for Proposals, submitted on PART 111-
6, RESPONDENT'S EXPERIENCE STATEMENT.
3. Total proposed cost of respondent's services in response to and in
compliance of this Request for Proposal's. (COST SECTION SHALL BE
PROVIDED IN A SEPARATE SEALED ENVELOPE MARKED "COST
PROPOSAL" Proposal costs shall be detailed and are to inducts all
labor, material, travel, related expenses, equipment, etc.
4. Any additional information which the respondent deems appropriate.
useo ~o~ wv-~~-~o~~~ 3 of 14 .
NCO PY
GENERAL TERMS AND CONDITIONS
Mistakes must be corrected and the correction inserted; corrector must be initialed in
ink by the person signing the Proposal.
Alternate Proposals will be considered unless otherwise stipulated.
If required, before award or execution of the contract by the City, the Contractor shall
file with the City a surety bond satisfactory to the City in the amounts and for the
purpose noted. Borxls shall be duly executed by a responsible corporate surety,
authorized to issue such bonds in Idaho and secured thorough an authorized agent with
an office in Idaho. Contractor shall pay all bond premiums, costs and incidentals.
The City reserves the right to waive any informalities or minor irregularities in
connection with the Proposals received.
All provisions of the City code are applicable to any Proposal submitted or contract
awarded pursuant thereto.
tf equipment is proposed, it is to be new and latest model in currer~ production. Used,
remanufactured, shopworn, demonstrator, prototype or discontinued models are not
acceptable unless otherwise stipulated.
Within thirty (30) days after the Proposal opening, a contract may be awarded by the
City to the lowest responsive and responsible Proposer, subject to the right of the City
to reject aN Proposals, as it may deem proper in its absolute. discretion The time for
awarding a contract may be extended at the sole discretion of the City. If required to
evaluate Proposals or for such other purposes as the City may determine, unless the
Proposer objects to such extension in writing with his Proposal.
The City of Meridian does not discriminate on the basis of race, religion, .sex, national,
origin, marital status, age, physical handicap, ownership by women or minorii~ies or
sexual orientation.
ADDITIONAL TERMS AND CONDITIONS
EXAMINATION OF CONTRACT DOCUMENTS
The Proposal's shall carefully examine the specifications, and satisfy themselves
as to their sufficiency, and shall not at any time after submission of the Proposal,
dispute such specifications and the directions explaining or interpreting them..
AWARD
The City of Meridian reserves the right to make an award on any item, group of
items in the aggregate to that/those highest ranked responsive and responsible
contractors (s) whose Proposal (s) is/are most responsive to the needs of the City.
used ~oa,~eR ~+v-i~-~oz» 4 of 14
%` _~ ~ ~T
EVALUATION tinsuectionl
Equipment and goods will be inspected before aoceptarK:e by an authorized
represerrtative of the City of Meridian for workmanship, appearance, proper
functioning of all equipment and systems, and conforrnanoe to aN other
requirements of the ,specifications. if defiaendes are found.' it sha>f ~ be the
responsibility of the contractor to pick up the equipment/goods and replace for
reinspection and acceptance. Payment will not be made until corrective action has
been made.
RANTY/GUARANTEE
Contractor delivering equipment !goods against this specification shall guarantee
that the equipment /goods meet the minimum requirements set forth herein. ff it is
found that the equipmen# /goods delivered do not meet the minimum requirements
of this spec cation, the Contractor will be required to oonect the same at the
Contractor's expense.
BRAND NAME
Brand names and numbers, when used, are for reference do ind'~cate the character
and quai'dy desired. Contractors may offer comparable 'EQUAL" .products unless
expressly prohibited herein. >f necessary, the burden of proof and cost on analysis
to determine equality shall be that of the Contractor; If proposing an "EQUAL';
please state .name of manufacturer, model, and part number, if applicable, and
endow descriptive .literature.
PURCHASE AGREEMENT DOCUMENTS
A Dopy of the Notice Inviting Proposals, General Conditions and instnactions to
Proposal's, Speaal Conditions, Additional Terms and. Conditions. Specifications,
Plans and / or. Drawings, Proposal's Submittal, and. any other related documents
will remain on file in the office of the City Purchasing Manager, fi is understood
that these documents will form the basis of the purchase agreement upon award ~
the contrail. Ali materials or services supplied by the Contractor shah be in
conformance with all the spedfications contained herein and shall be in compliance
with any applicable Local, State, and Federal Laws and regulations.
usEO ~o~w~ wv-„-,oz» 5 of 14
OCOPY
CITY'S REPRESENTATIVES
Purchasing Representative
Keith Watts, Purchasing Agent
33 East Broadway
Meridian, ID 83642
{208)$88-4433
Fax (208) 887-4813
kwatts cr'i.meridiancity.orq
Technical Representative
John McCormick
Business Operations Manager
Public Works Division
City of Meridian
33 E. Broadway
Meridian, ID 836442
jmccormick =meridiancity.org
Any and all explanations desired by a respondent regarding the meaning or
interpretation of this Request for Proposals or any part thereof must be requested
in writing and directed to the person named as the Purchasing Representative
and in accordance with section 1 "EXPLANATIONS TO RESPONDENTS".
Violation(s) may be caused for rejection. of the proposal.
K WA TS, PURCHASING MANAGER
CITY OF MERIDIAN
~-~/~~
DATE
USED LOADER PW-11-10217 6 Of 1~I
PART II ~t , .. '
INSTRUCTIONS TO RESPONDENTS
1.... EXPLANATIONS TO RESPONDENTS
There .are fourteen {14) total pages in this Request for Proposals. It is the
respondent's responsibility to ensure that all pages are inducted. ff any pages
are missing, immediately request a copy of the missing.page (s) by e-maiang
your request to Keith Watts, Purd~asing Agent at kwattsCcbmeridiancity.ors~ ,
RFP Project # PW-11-10217.
Any explanation desired by a respondent regarding the meaning or interpretation
of the. Request for Proposals, or any part thereof, must be requested in writing(
via fax or a-mail) and with sufficient time allowed for a repy to reach respondent
before the submission of their proposal. Any Request of a technical nature
should be sent to BOTH the Purchasing. Representative and Tedtnical
Representa#ive. Any interpretafion made will be in the form of an addendum to
the Request for Proposals, issued by the Purchasing Agent, and will be furnished
to all prospective respondents of record. Oral explanations or instructions given
before proposal opening wiH not be binding.
2. CONDITIONS AFFECTING THE YVOfitMC
Before submitting a proposal, each respondent must (1) examkte the
Request for Proposals documents thoroughly, (2) visit the site to familiarize
himself/herself with local conditions that may, in any manner, affect cost,
progress or performance of the work, (3) familiarize himselflherself with
Federal, State and local laws, ordinances, Hiles and regulations that may, in any
manner, affect cost, progress or performance of the work; and (4) study and
carefully correlate respondent's observations wdh the Request for Proposaps.
Failure to do so will not relieve respondent from responsibility for estimating
properly the difficulty or cost of successfully performing the work. The City wiN
assume no responsibility for any understanding or representations conoeming
conditions made by any of it's officers or agents prior to the execution of the
contract, unless included in the Request for Proposal's, or any addendum..
3. SUBMISSION OF PROPOSALS
Interested firms shall submit one (1) original and two (2) copies of their response
in Accordance with this Request for Proposals and must be sealed and
addressed as directed below. Failure to do so may result in a premature opening
of, or a failure to open, such proposals. Such premature or late opening, or
failure to open, may result in disqualification of the proposal. The outside of the
envelope must bear the notation:
usEO ~oao~ Pw-»-~o¢~~ 7 of 44
~a..- ~ ..
PROJECT i PW-11-10217
USED LOADER
Decemt»r 21.2010 4:00 P.M.
The envelope must be addressed and delivered to: City of Meridian, Purchasirp Department, 33
East Broadway Avenue, Meridian, Idaho 83642.
4. LATE PROPOSALS AND MODIFICATIONS
Proposals and modifications thereof received 'after the exact time of closing of
proposals which is 4:00 p.m. MT, December 21, 2010 will not be considered.
S. WITHDRAWL OF PROPOSALS
Unless othennrise specified, proposals- may be withdrawn by written request,
received from respondent prior to the time set for closing of proposals.
6. PROPOSAL REQUIREMENTS
To receive consideration, the proposal must compy with the foAowing additional.
requirements:
a. The proposal and aN other documents or material'sutxnitted wilt be
deemed to constitute part of the proposal
,b. Proposals must be valid for a period of sixty (60) calendar days from the
date of opening.
7. INTENT OF THE CITY
The objective of this Request for Proposals is to provide sufficierrt ir>formatan to
. enable qual~ed responderrts to submit written proposals. This Request for
Proposals is not a contractual offer or commitment th purchase services.
Contents of this Request for Proposals and respondent's' proposal will be rased
for establishment of final contractual obligatbn. It is to be understood that this
Request for Proposals and the respondent's proposal may be attached or
included by reference in an agreement between the City and successful
respondent.
USED LOADER PW-11-10217 $ Of ~ 4 .
~~®.
8. BASIS FOR SELECTION
This Request for Proposals will be evaluated utilizing the criteria listed below.
History from the current and previous projects and customers of the respondent
may be used to evaluate some of the criteria.
a. (20 Points) Number of hours on loader.
b. (10 Pointe) % of wear available on tires.
c. (10 Points) Options on bailer.
d. (20 Points) Warranty.
e. (10 Points) Convenience of service nearest service center.
f. (10 Points) Condition of interior.
g. (20 Points) Cost.
The City reserves the right to reject any or al proposals, to make an award on the
basis of suitability to purpose or superior quality, to acxept other than bwest
proposal or any other criteria the City believes to be in the best. intereil of the :
City.
After the City has identfied the. proposal with .the best value for the City, the City
shall have the right to negotiate with the respondent over the final terms and
conditans of the contract. These negotiations may include bargaining. The
primary objective of. the negotiations is to maximize the City's ability to obtain
best value, based on the requirement and the evaluation factors set forth in the
Request for Proposals. ff an agreement cannot be reached, the negotiatwn wNl
be terminated and similar negotiations will occur with the second ranked fum.
9.
PUBLIC RECORDS
The City of Meridian is a public agency. All documerrts in its possession are
public records. Proposals are public records •and, except as noted bebw, will be
available for inspection and copying by any person.. ff any Proposer, claims any
material to be exempt from disclosure under. the Idaho Public Records- Law,. the
Proposer wiq expressly agree to defend, indemnify and hold fiarmless the City
from any claim or suit arising from the City's refusal to discbse any such
material. No such claim of exemption wiN be val'~d or effective without such
express agreemenrt. The City will take reasonable efforts do protect any
information marked "confidential" by the Proposer, to the extent permitted by the
Idaho Public Records Law. Confidential information must be submitted in a
separate envebpe, sealed and marked "Confidential Information" and w~l be
returned to the Proposer upon request after the award of the contrail. 8 is
understood, however, that the City wig have no IiabiGty for disclosure of such
information. Any proprietary or othennnse sensitive information contained in or
with any Proposal is subject to potential discbsure.
uses ~o~a Pw-~~•~oa» 9 of 14
PART III
PROPOSAL DOCUMENTS
A -PROPOSAL FORM
~;
In response to the Request for Proposals, the undersigned respondent hereby proposes
to furnish labor, material, travel, professional services, permits, supervision, equipment
and equipment rental and all related expenses, and to perform all work necessary and
required to complete the following project in strict acxordance.with the terms of this
Request for Proposals and the final contract for the prices specified by the respondent
for:
PROJECT S PW-11-10217
USED LOADER
Responden# certifies that heJshe has examined and is fully fam~iar with all of the-
provision of the Request for proposals and any addendum thereto; that he/she is
submitting a proposal in strict accordance with the Instructions to Respondents; and that
he/she has carefully reviewed the accuracy of all attachments to this proposal..
Respondent certifies that he/she has examined the proposal documents thoroughly,
studied and carefully correlated respondent's observations with the proposal
documents, and all other matters which can in any way affect the work or the cost `
thereof..
Respondent agrees that this proposal constitutes a fmm offer to the City which cannot
be withdrawn by the respondent for sixty (60) calendar days from the date of actual
opening of proposals. if awarded the contract, respondent agrees to execute and
deliver to the City within seven (7) calendar days after recent of City's Conditional
Notice of Award, the applicable Contrail form, insurance certificates and bonds (if
required).
Attached :~s the Respondent's Experience Statement (Part ill, B) which has been
completed by respondent and made a part of~this proposal.
Respondent also acknowledges receipt of the following addendum to the Request for
Proposals which addendum have been considered by respondent in submitting this
proposal (if none, state "NONE"r
Addendum No. 1 ~ Addendum No. 2 xa -
Respondent certifies that he is currently registered as a Contrailor-and licensed as a
Public Works Contractor in the State of Idaho. State NJA if not applicat~le.
usEO ~onDER aw-»-+o2n 10 of 14 .
^r ~ ~~: vp
`~__! 7N~
NA
Idaho Contractor Registration No. wA r noe apv~csbls
Idaho Public Works Contractor License No. NA
wA M not applictabk
Submitted by,
RESPONDENT'S BUSINESS NAME (type or print)
Name:
Title' Sales Re resentative
RESPONDENT'S BUSINESS ADDRESSIPHONE/FAX/E-MAIL
500 Eat Overland Road
Meridan, Idaho 83642
(208) 888-2287 ~ fPH)_
(208) 884-2314 (FAXI.
dougmoore@wseco.com (e-mail)
Note: ff respondent is a corporation, give State of incorporation;. if a partnership or joint
venture, give full names of aA partners or joint venturers.
Cororation -State of Idaho
USED LOADER wv-~~-~oz~T 11 of 14 .
Date' December 21, 2010
DECLARATION UNDER PENALTY OF PERJURY
The undersigned declares: that he/she holds the position indicating below as a
corporate
Officer or the owner or a partner in the business entity submitting this Propos~l~ttnat t~
unders~ned is informed of all relevant facts surround'ng the preps
submission of this Proposal, that the undersigned knows and represents and 'warrants
to the City of Meridian that this Proposal is prepared and submitted without collusion
with any other person, business entity, or corporatwn with any interest inais Proposal
I declare under penalty of perjury that the foregoing is true and coned.
CONTRACTOR/FIRM: Western States E ui ment Co an ~
BY: Douglas J. Moore
TITLE: Sales Re resentative
ADDRESS: 500 East Overland Road
Meridian, Idaho 83642
DATE:
. _ - _
usED ~ono~ wv-~~-~02» 12 of 14 ~.
~~'~sA'
PART 111
PROPOSAL DOCUMENTS
B-RESPONDENT'S EXPERIENCE STATEMENT
The respondent submits as a part of its proposal. the folbwing information- as to it's .
',
experience and qualifications:
a• The respondent has been engaged in this business under its present business
name for ~ Y~m•
b. Experience in work of a nature similar in type and magnftude to that set fortl~ in .
the request for proposal extends over a period of 54 yeaB.
c. The respondent has satisfactorily completed all oor>tracts awarded to it, except.
as folbws: (name any and all exceptions and reasons therefore.
None, No execeptions
d. List all work completed within the last ten (10) years of similar type and
magnitude as set forth in this Request for Proposals. Please include a sheet with
all contact ir>formatwn and details of the project on a separate sheet.
OWNER YEAR TYPE OF CONTRACT
COMPLETED WORK AMOUNT
NA _ NA NA NA
I certify that the above information is true and correct to the best of my knowledge.
Signed this 21st' day of December ~ 2010 at Meridian, Idaho
.... ~~~) (,,,ordh) (Yeerl (d1Y~ 1
NAME OF RESPONDENT: Douglas J. Moore
Sales Representative
(1~)
usEU~onoa~ wv-~a-~at» 13 of 14 .
~~-[ ..~
~ , ~ ~'
EXHIBIT A
MINIMUM SPECIFICATIONS
. Cat 928G or Equivalent
Air Suspension Seat
Alr Conditioner with Heater
Caterpillar 305fiE DITAAC Diesel
Engine
Limited Slip Front Differential
Limited Slip Rear Differential
Precleaner
Sun Visor
Cab, Sliding Windows
130 Amp Alternator
Flood Liights
20.5-25 Tires
Warring Beacon Light
Outside Mounted Mirrors ~ .
AM FM Radio
.General Purpose 3.0 CYD .'
bucket w/edge
Internal Rearview. Mirror
In addition the City would like pricing on the folbwing new attachments
• .Hydraulic Heavy Duty Oii Cooler for use in high ambient temperatures and
is required for continuous hydraulic flow applications for angle broom.
Hydraulics, 3 Valve, 2 Lever FNR Provides third valve and a second
lever for the third function. Joystick lever operates both lift and tilt
functions and includes a remote FWD-NEU-REV control switch
Hydraul'~c Heavy Duty Oil Cooler
New Caterpillar BA30 Hydraulic Angle Broom ~ ~ ~ -
• . 118" Sweeping width straight
• ...1.02" sweeping width angled (c~ 30 degrees .
^ Brush material - 50% polyl50% Steel Wire
• 36" Brush Diameter
Quick Coupler, Includes electrohydraul'~c coupler actuation System activated from
the cab. Includes Coupler lines and lock valve cylinder
Includes ordering New Coupler, Ordering Hook Assembly and ap modifications
and installation.
use ~onoEa Pv+r-~~-~oQn 14 of 14 .
" ~ ~ (q ~ : "'~ `0. PURCHASING IrAANAGER
`-~--; ~'''• 33 East Broadway Ave.
E IDIA.N~:---- Me~~n, ~D
Phone:208-888-4433 Fex:208-887-4813
IDAHO
ADDENDUM N0.1
RFP ~ PW-11-10217
TO: ALL PROSPECTIVE PROPOSERS December 17, 2010
Reference: USED LOADER
Subject: Project PW-11-10217 - Addendum No.1
Prospective Proposers for the above mentioned Request for Proposal is hereby corrected. and
amended as folbws:
i . Q: How old and how many hours can this loader have?
A: This is a proposal and not a bid. The equipment proposed will be evaluated.
Age and hours are part of the evaluation. There is no minimum for the age or
hours.
2. Q: Can you clarify the types of levers and functions you would like to have on the
loader. I understand the third valve with a~ standard detent lever for third vaMe
operation. Also a joystick that functions Lift and Tilt. So we will have a joystick w/
fwd-neu-rev switch, and a lever to control third valve function?
A: Provide only the types of levers and functions that would come standard.on~~
the loader. All other additions should be proposed as options..
3. THIS ADDENDUM MUST BE SIGNED AND SUBMITTED WITH YOUR PROPOSAL.
4. ALL OTHER TERMS AND CONDITIONS OF THE PROPOSAL REMAIN THE SAME.
Please note the corrections by signing below and call me if you have any questions.
Si cerely,
Keith Watts ~ ~~
Purchasing Manager
Addendum No 1
Western States Equipment Company
Film Name
Douglas J. Moore - Bales Representative
~T.voed or Panted Name and Title:
Signatu
December 21, 2010
Date
Page 1 of t
COPY
City of Meridian
Purchasing Department
33 E. Broadway Ave. Suite 200
Meridian, Idaho
One (1) 2005 Used Caterpillar 928G Wheel Loader
Serial Number ODJD002050 (Currently on Rent to City)
Current Hours 12/20/210 is 1227 Hours
928 Wheel Loader
Air Suspension Seat
Air Conditioner with Heater
Caterpillar 3056E DITAAC Diesel
Engine
Limited Slip Front Differential
Limited Slip Rear Differential
Pre-cleaner
Sun Visor, Front
Cab, Sliding Windows
Discounted Selling Price
Less Rent Paid - (6 months @ 70% to
be applied)
80 Amp Alternator
Flood Lights
20.5-25 Tires
Warning Beacon Light
Outside Mounted Mirrors
Radio
Engine Coolant Heater
General Purpose 3.0 CYD Bucket
w/edge
Internal Rearview Mirror
$ 78,000.00
(16, 800.00 )
Western States to bring machine into shop and service and repair as
needed prior to delivery.
** Priced based on City of Meridian paying all 6 months of rental
invoiced. Invoice Numbers MR7001006113, MR70011006491
M 87001006809, M 87001007205, M 87001007539, &
MR7001007827
~7COPY
WARRANTY
Have to have Western States Used Machine Power-Train & Hydraulic
Warranty for 90 days after delivery of machine.
OPTIONS -Should the City of Meridian want any of the following
options installed on the bid machine. Please add the
following prices to the above bid price.
• Hydraulic Heavy Duty Oil Cooler for use in high ambient
temperatures and is required for continuous hydraulic flow
applications for angle broom.
• Hydraulics, 3 Valve, 2 Lever FNR Provides third valve and a
second lever for the third function. Joystick lever operates both
lift and tilt functions and includes a remote FWD-NEU-REV
control switch for hydraulic heavy duty oil cooler
• New Caterpillar BA30 Hydraulic Angle Broom
^ 118" Sweeping width straight
^ 102" sweeping width angled @ 30 degrees
^ Brush material - 50% poly/50% Steel Wire
^ 36" Brush Diameter
!~JC O Ply
• Quick Coupler, Includes electro-hydraulic coupler actuation
System activated from the cab. Includes Coupler lines and lock
valve cylinder. Includes ordering New Coupler, Ordering Hook
Assembly and all modifications and installation.
TRADE-IN VALUE - Weste ~~ ~u~~~~~:~ ~+~ipment Company is pleased
to offers the City of Meridian $ 8,000Q00 nor the Hitachi LX80-2 Wheel
Loader Serial Number 41 R-C~v ~r'. ~ ~;~i~ offer is subject to the Wheel
Loader to be in working condition and being in similar condition as
per inspection 10/21 /2010.
AVAILABILTY -The machine is available one (1) week after receipt
of order. Installation of attachments and purchase of attachments
vary between 4 weeks and 8 weeks after receipt of order.
ENHANCEMENT TO THE BID -Machine to have these additional
attachments not specified in Bid. -Ride Control, Outside Exterior
Mirrors, Thermal Starting Aid, Halogen Working Lights (front & Rear)
Directional Signals, Pressurized Cab and Sound Suppressed, Speed-
ometer, Hydraulic Controlled Lever Lockout, Auto Shift-Transmission,
Front Fenders, Automatic Bucket Positioner, Automatic Lift Kick-out,
Hydraulic Diagnostic Connectors and Schedule Oil Sampling Ports.
E IDIAN~,--
~ o~ H ~ PROPOSAL RANKING SHEET
RFP NAME: Used loader
RFP NUMBER: PW-1i-10217
DUE DATE & TIME: December 21, 2010 4:00 p.m.
a:
c
a~
Q N
c ,~
f0 ~ ap
C ~' ~'
• N
O ~
wit m ~...
~ ~? . w N
Z
Q
Q ~
rm
GG W
z
W ~ ~ m
Q
~ O ~
~V
O G W W
~ ~
~ ~ U
~ w
U
~~ a
~
z~ WAN
~~
~ ~~
~
~~
Q~ _
`~o'
~'' .~' u.i `v
~~~
W ~°~
a
~~
~Q
C7 z
~w
cq >