TASK ORDER NO. 10160
Between
CITY OF MERIDIAN
AND
CH2M HILL
This Task Order is issued by City and accepted by the Engineer pursuant to the
mutual promises, covenant and conditions contained in the Master Agreement
between the above mentioned parties dated April 13, 2010.
Wastewater Treatment Plant Tertiary Filters Building
Design and Services During Construction
Project Understanding
The City of Meridian is pursuing construction of a new building(s) to enclose the four
existing tertiary filters located at the wastewater treatment plant to provide protection from
the elements for the equipment and freeze protection. The design team is to determine an
appropriate building layout and foundation design suitable for enclosing the existing filters
and minimizing impact to the existing plant infrastructure and underground utilities.
Furthermore, the team is to design the necessary mechanical and electrical systems to support
the buildings}. The City has indicated that the four existing filters can be enclosed in one
large building or multiple smaller buildings depending on site constraints and cost benefits.
A fifth filter may be added at some point in the future south of Filter #4 and is to be
considered during this design phase to allow for building expansion or a separate, stand-alone
building.
PAGE 1 OF 15
The design, permitting, and construction of the new building{s) is targeted to be complete and
turned over for occupancy by the end of September 2011 coincident with the end of the 2010-
2011 City fiscal year. City Council has approved total budgetary funding of $1,250,000 for
the design and construction of the new building(s).
The City has indicated that the new buildings} do not require a robust HVAC system to heat
and cool the enclosures}, but must maintain temperatures above 35-degrees in the winter and
allow for cross-ventilation in the summer. Furthermore, the City has indicated that odor
control is not required for the new building(s). Proper ventilation needs to be provided for
the building(s) to allow for adequate air changes to avoid moisture build-up and minimize the
potential for corrosion of steel frame members. The mechanical ventilation system is to be
the minimum required to achieve the stated objectives.
The City is open to material (e.g. masonry, metal) to be used for the building construction
and desires the most economical solution that can be constructed within the allotted time
frame. Based on the existing underground obstructions that must be avoided with respect to
the building foundation, it appears that a metal building(s) is best suited for this installation
and will satisfy the stated conditions. Therefore, the scope of work and associated
compensation are based on designing a metal buildings}. An additional requirement is that
the building colors selected match the existing building colors located thzoughout the plant.
Consideration and accommodations are to be provided in the building design to allow access
for equipment maintenance of the pumps, motors, and filters. It was discussed that roll-up
doors on either end of the building(s) would suffice with a possible need for removable
skylights located above the vertical turbine pump motors at Filters #1 and #2 to allow for
crane access to remove the motors. Horizontal clearance around the existing equipment
needs to be provided to allow for personnel movement on the order of 3-feet at a minimum.
Vertical clearance above the equipment needs to be provided to allow for maintenance
activities on the order of 6- to 8-feet.
The pump and filter equipment is currently wired into the plant SCADA system and is to be
maintained. Controls for air handlers and other building operation equipment can be stand-
alone for the individual buildings} and does not need to be wired into the plant-wide control
system. The electrical design will address providing power for the new HVAC, lights, and
receptacles for the building{s) and does not account for any modifications to the electrical
service feeds for the existing process equipment.
The Ciry indicated that the building(s) do not need to have personal safety provisions such as
eye wash stations and showers. Potable water does not need to be plumbed to the building(s).
PAGE20F f5
Scope of Work
CH2M HILL will perform the following tasks in support of the Wastewater Treatment Plant
Tertiary Filters Building Design and Services During Construction project.
Task 1-Project initiation and Management
Task Description:
~ Initial design team project site tour with the City.
• Scoping, contract review/execution, and project accounting setup.
• Prepare Health & Safety Plan for onsite work activities and obtain staff endorsement.
Prepare Quality Management Plan for work tasks and ensure adherence by CH2M
HILL project staff.
• Supervise and manage CH2M HILL prof ect staff for execution of work tasks.
• Project documentation and coordination.
• Monitor project progress, including work completed, work remaining, budget
expended, schedule, estimated cost of work remaining, and estimated cost at
completion. Coordinate with and provide periodic updates to City Project Manager.
• Monitor project activities for potential changes, anticipate changes when possible, and
with City approval, modify project tasks, budgets, and approach.
• Prepare and submit monthly billing with brief explanation of work completed during
billing cycle.
• Manage the quality control review of all work activities and project deliverables.
Identify senior technical staff for the various technical disciplines and oversee the
adherence to the plan during the execution of the work tasks.
Deliverables•
• Periodic written project design schedule updates to keep City Project Manager
informed as to changes to initial schedule outlined below.
• Monthly project invoice statements with brief description of work performed.
Assumotions•
• One (1) initial project site tour will be conducted with the City Project Manager(s)
and WWTP staff to orient the CH2M HILL design team members (e.g. Project
Manager, Architect, Structural Engineer, Mechanical Engineer, Electrical Engineer,
and Geotechnicai Engineer).
• Twelve (12) month duration for completion of tasks described herein. Budget status
monitoring, schedule status monitoring, and project invoicing is a monthly activity for
the duration of the project.
PAGE 30F 15
Expenses: (Included in Compensation Table)
• Travel mileage reimbursement for initial project site tour.
Task 2 -Mapping Survey of Existing Conditions
A mapping survey will be performed to horizontally and vertically field-locate existing
site improvements within the imumediate vicinity of the four existing tertiary filters. The
survey services described below shall be performed by a subcontractor, Critigen.
Expenses related to the surveying effort are reflected in the Compensation table.
The survey will be controlled horizontally by either Idaho State Plane, West Zone, which
can be modified to the Ada County projection, or by a local datum and local control in
use by the site. Vertical control will be matched to conform to the elevation datum that
appears on the plans sheets provided with this scope. Topographic mapping will be
performed at a minimum to National Map Accuracy Standards for 1 foot contour
intervals.
Task Description:
• 2.1 Survey. Prepaze a field survey to locate existing site features within the project
area. The project area is approximately 120-ft by 160-ft extending to the far-side edge
of asphalt to the east, south, and west and to the approximate mid-point of the
existing mechanical building to the north of the filters. The field survey will locate
existing edges of asphalt, concrete slab corners, equipment corner locations, railings,
utility vaults, handholes, approximate underground utility horizontal locations as
marked by others, and other observable site infrastructure.
Deliverables•
• One (1) full-size bond copy of survey.
Assumptions•
• Survey crews will have plant access to conduct the survey.
• Survey benchmarks are available within the plant to establish vertical control.
• WWTP staffwill locate with surface paint markings and identify known underground
utilities prior to the survey crew being on site.
• WWTP staff will be available to answer help clarify infrastructure use as needed.
Expenses: (Included in Compensation Table)
• Vehicle mileage, RTK equipment costs, and miscellaneous survey supplies (stakes,
spray paint, rebaz with control caps}.
PAGE 4 OF 1 S
Task 3 -Concept Design
The purpose of this work task is to allow CH2M HILL design team to prepare a concept
builduag design to form the basis of design decisions by the City, help define the
intermediate and final design, and to confirm the City project budget estimate.
Task Descriution:
• 3.1 Site Visit. Site visit to validate the mapping survey (Task 2), document existing
equipment, observe existing utility routes, obtain additional field measurements of
equipment /site element locations and heights as needed, and other pertinent
background information. Site visit to include architect, structural engineer,
mechanical engineer, electrical engineer, geotechnical engineer, and project manager
for a total duration of 4 hours each including travel time.
3.2 Geotechnical Review and Recommendations. Review historical geotecbnical
investigation reports that have been prepared for previous WWTP projects in close
proximity to the tertiary filters. Evaluate subsurface conditions and prepare concept
geotechnical engineering design recommendations in support of building foundation
design. A brief Technical Memorandum (TM, up to 3 pages) will be prepared
describing conceptual geotechnical design criteria as part of this task and provided as
part of the Basis of Design document.
• 3.3 Concept Design. Prepare up to two (2) concept designs to identify building
location, layout, elevation, foundation, electrical service, and mechanical systems.
Drawings will be prepared in CAD and plotted electronically to depict the concept
designs} for each of the disciplines. Brief Technical Memorandums (TM, up to 2
pages) will be prepared by discipline to describe basis of design with supporting
calculations and/or provide additional clarification of design intent as needed.
Drawings and TMs will be provided to the City for review, discussions, and design
decisions.
• 3.4 Cost Estimate. Prepare up to two (2} Class 4 budget-level construction cost
estimates based on the concept designs.
• 3.5 Basis of Design. Prepare Basis of Design (BOD) document describing the project
background, goals, and design overview. Discipline-specific TMs and construction
cost estimate(s) will be included as appendices to the BOD document.
• 3.6 Review Meeting. Following review of the work task deliverables noted below by
the City project team, CH2M HILL discipline design leads and the project manager
will attend one (1) Concept Design Review meeting with City staffto discuss the
project, review comments, and decide on project elements to advance to Intermediate
Design.
Deliverables
• Concept Drawings in digital format {PDF, 11"xl7"} will be emailed to the City
Project Manager for distribution to City project staff.
PAGE 5 OF 15
• Basis of Design document, in digital format (PDF), will be emailed to the City Project
Manager for distribution to City project staff.
Assumntions•
• Site will be accessible for project field visit.
• The City will provide hardcopies and/or digital copies (Word or PDF format) of
historical geotechnical investigations performed for previous WWTP projects for use
by CH2M HILL geotechnical engineering staff to prepare design criteria for this
project. It is assumed that the conditions are known to an adequate depth to make
estimates of settlement and bearing resistance for foundations. CH2M HILL will not
be responsible for performing a subsurface geotechnical investigation as part of this
task order.
• Geotechnical scope assumes that the foundations will bear on undisturbed "native"
soil conditions that have not been disturbed by previous fill or other site activities and
that the foundation system will consist of conventional spread footing foundations.
Additional detailed analysis necessary (lateral loading) for deep foundations, such as
drilled shafts, would require additional time not included in this task order.
• WWTP staff will be available to provide input on design questions and will provide
timely responses to questions posed. Design questions will be routed to the City
Project Manager for distribution to the appropriate City staff.
• Building foundation design calculations will be based on estimated building loads and
reaction farces.
• City will review work task deliverables and have comments prepared in written form
within 5 working days of receipt of the digital submittal.
• The Concept Design Review meeting will take place at Meridian Public Works
Department conference room. The City Project Manager will coordinate with City
staff and CH2M HILL to schedule the meeting date and time (and conference room)
that is mutually agreeable to the participants.
Expenses, (Included in Compensation Table)
• Travel mileage reimbursement for project site visit associated with this work task.
Task 4 -Intermediate Design (90% Design)
Following the Concept Design Review meeting and design decisions, CH2M HILL will
prepare an intermediate building design commensurate with a 90% design level for
submittal to the City for review.
PAGE 6 OF 15
Task Description:
• 4.1 Intermediate Design. Prepare intermediate design and calculations. Prepare
Technical Memorandums, by technical discipline, with supporting calculations for
inclusion in the updated Basis of Design document.
• 4.2 Intermediate Drawings. Prepare intermediate drawings. Estimated sheet list
provided below.
• 4.3 Draft Technical Specifications. Prepare draft technical specifications based on
CH2M HILL Master Specifications.
• 4.4 Cost Estimate. Prepare a Class 2 construction cost estimate based on the
intermediate project drawings and technical specifications.
• 4.5 Basis of Design. Prepare updated Basis of Design document with discipline-
specific TMs and construction cast estimate included as appendices.
• 4.6 Review Meeting. Following review of the work task deliverables noted below by
the City, CH2M HILL discipline design leads and the project manager will attend one
(1}Intermediate Design Review meeting with City project team and review staff to
discuss the review comments for clarification for the Final Design.
Deliverables-
• Intermediate Drawings in digital format (PDF, 11"x17") will be emailed to the City
Project Manager far distribution to City project staff.
• Draft Technical Specifications in digital format (PDF) will be emailed to the City
Project Manager for distribution to City project staff.
• Basis of Design document, in digital format (PDF), will be emailed to the City Project
Manager for distribution to City project staff.
ASSU111ptIOnS'
• WWTP staff will be available to provide input on design questions and will provide
timely responses to questions posed. Design questions will be routed to the City
Project Manager for distribution to the appropriate City staff.
• Building foundation design calculations will be based on estimated building Ioads and
reaction forces.
• City project team will review work task deliverables and have comments prepared in
written form within 5 working days of receipt of the digital submittal.
• The Intermediate Design Review meeting will take place at Meridian Public Works
Department conference room. The City Project Manager will coordinate with City
project team and review staff and CH2M HILL to schedule the meeting date and time
(and conference room) that is mutually agreeable to the participants.
PAGE 70F 15
• Permit application fee(s) will be paid by the City and provided to CH2M HILL. Fee
amount(s) to be determined at the time of application.
Expenses•
• N/A
Estimated Drawing Sheet List:
The list below provides an estimate of the drawing sheets to be included in the plan
set.
- Cover, Location Map and Index to Drawings
- General Civil Notes and Legend
- Civil Site, Grading, and Resurfacing Plan
- General Architectural Notes and Legend
- Architectural Plan, Elevations, and Sections
- Architectural Details
- General Structural Notes and Legend
- Structural Foundation Plan and Sections
- Structural Details
- General Mechanical Notes and Legend
- Mechanical -Floor Plan
- Mechanical Details
- Mechanical Schedules
- General Electrical Notes and Legend
- Electrical Site Plan and 1-line Diagrams
- Electrical Building Plan
- Electrical Details and Diagrams
Task 5 -Final Design and Bid Documents (1QiI% Design)
Following the Intermediate Design review meeting, CH2M HILL will prepare the final
building design commensurate with a 100% design level for submittal to the City records
and use in contractor bid solicitation.
PAGE 8 OF 15
Task Descriution:
• 5.1 Final Design. Update design and calculations based on Intermediate Design
(Task 4) review comments. Update Technical Memorandums, by technical discipline,
with supporting calculations for inclusion in the Final Basis of Design document.
• 5.2 Final Drawings. Prepare final project drawings. Estimated sheet list consistent
with list identified for Intermediate Design {Task 4). Final drawings will be stamped
by Professional Engineer /Licensed Architect.
~ S.3 Final Technical Specifications. Update technical specifications based on
Intermediate Design (Task 4) review comments. Final Technical Specifications will
be provided to City for inclusion with the City-generated Bidding Requirements.
• 5.4 Cost Estimate. Update the Class 2 construction cost estimate prepared as part of
Task 5 to represent the final construction cost estimate based on the final project
drawings and technical specifications.
• 5.5 Basis of Design. Prepare updated Basis of Design document with discipline-
specific TMs and construction cost estimate included as appendices.
• 5.6 Permit Submittal. Submit final drawings, technical specifications, and BCD
document to City of Meridian Building Services Department for approval.
Deliverables:
• Final Drawings in digital format (PDF, 11"x17") will be emailed to the City Project
. Manager for distribution to City project staff for Intermediate Design review
comment concurrence.
• Final Technical Specifications in digital format (PDF) will be emailed to the City
Project Manager for distribution to City project staff for Intermediate Design review
comment concurrence.
• Basis of Design document, in digital format (PDF}, will be emailed to the City Project
Manager for distribution to City project stafF.
• Following Intermediate Design review concurrence, one {1) stamped hard copy of the
Final Drawings (24" x 36"}, one (1) stamped hard copy of the Final Technical
Specifications, and one (1) hard copy of the Basis of Design document will be
delivered to the City Project Manager for reproduction and inclusion with the bid
document solicitation.
Assum»tions•
• Building foundation design calculations will be based on estimated building loads and
reaction forces.
• The City will be responsible for preparing the Bidding Requirements and contract
document reproduction for bid solicitation.
PAGE 90F 16
Expenses•
• N/A
Task b -Construction Bid Support
CH2M HILL will provide engineering support during the City construction bid
solicitation period as described below.
Task Description:
• 6.1 Pre-Bid Meeting. Attend apre-bid meeting with prospective bidders and City.
Budget assumes four (4) hours for CH2M HILL PM to attend one (I) meeting.
• 6.2 Bid Period RFIs. Respond to questions from bidders and provide City with
responses to distribute to bidding contractors. Budget assumes ten (10) RFI's at two
(2) hours each.
• 6.3 Bid Addendums. Assist the City by providing information to prepare bid
addendums, as necessary, for City to issue to bidding contractors. Budget assumes
four (4) addendums at two (2} hours each.
Deliverables-
• Pre-bid meeting will take place at Meridian Public Works Department conference
room. The City Project Manager will coordinate with City project team, bidding
contractors, and CH2M HILL to schedule the meeting date and time (and conference
room).
• Email responses to bidder RFIs to be transmitted to the City Purchasing Department
and City Project Manager.
• Content for technical bid document addendums transmitted digitally (Microsoft Word
document} to City.
Assumptions~
~ City Purchasing Department will be responsible for receiving and forwarding bidding
contractor RFIs. City Purchasing Department will be responsible for distributing
CH2M HILL RFI responses to bidding contractors.
• City Purchasing Department will be responsible for compiling and distributing bid
document addendums to bidding contractors.
Expenses: {Included in Compensation Table)
• Travel mileage reimbursement for Pre-Bid Meeting attendance.
PAGE 10 OF 15
Task 7 --Services During Construction
CH2M HILL will support the City during field construction by providing engineering
services as described below.
Task Description:
• 7.1 Pre-Construction Mee#ing. Attend apre-construction meeting with the
Contractor and City. Budget assumes four (4) hours for CH2M HILL PM to attend
one (1) meeting.
• 7.2 Submittal Review. Review and respond to thirty {30) technical submittals from
the Contractor and provide review responses to the City Project Manager. Budget
assumes two (2} hours per submittal.
• 7.3 RFI and WCD. Review and respond to requests for information (RFI) from the
Contractor. Develop content for Work Change Directives (WCD). Budget assumes
ten (10) RFIs at three (3) hours each and ten (10) WCDs at three (3) hours each
• 7.4 Construction Progress Meeting. Attend weekly construction progress meetings
at the Meridian WWTP. .Budget assumes five-month construction period for a total
of twenty (20) meetings at two (2) hours per meeting (includes travel time and
minutes preparation).
• 7.5 Additional Site Visits. Conduct additional site visits for periodic field
observations by one (1) technical design staff, as applicable. Budget assumes six (6)
trips for one {1} staffmember at four (4) hours each including travel time.
• 7.6 Contractor Change Order Request Support. Assist City in the review of
Contractor Change Order requests. Budget assumes five (5) change order reviews at
' tW0 (2} hours each.
• 7.7 Substantial Completion Site Visit. Attendance of design team (up to 4 technical
staff and project manager) at project site visit with City and contractor to observe
completed construction and punch list item identification. CH2M HILL will review
and provide comments to punch list prepared by the City. Budget assumes one (1}
site visit at six (6) hours for each attendee, including travel time and punch list
preparation.
• 7.8 Project As-Built Drawings. Prepare project record drawings based primarily on
as-built notes and drawing redlines provided by Contractor following completion of
construction activities and supplemented with CH2M HILL field notes from
intermittent site visits. Record drawing sheet list will be same as identified under
Task 4.
Deliverables•
• Technical submittal review comments transmitted digitally to the City Project
Manager for distribution.
PAGE 11 OF 75
• Contractor RFI responses and WCD content transmitted digitally to the City Project
Manager for distribution.
• City is responsible for documenting construction progress meeting minutes and
distributing.
• Scanned copies of field notes from periodic site visits (Task 7.5) transmitted digitally
to the City Project Manager.
• City is responsible for reviewing and approving Contractor Payment Applications.
CH2M HILL is not responsible for reviewing and/or providing input.
• Review comments for Contractor change order requests emailed to City Project
Manager.
• Punch list review comments (Task 7.7} and Substantial Completion form transmitted
digitally to the City Project Manager for distribution.
• ~ Record Drawings -three {3) full-size bond copies. One (1} CD with PDF and CAD
files of the drawings.
Assumt~tions•
• Pre-construction meeting will take place either at Meridian Public Works Department
conference room or Meridian Wastewater Treatment Plant. The City Project Manager
will coordinate with City project team, contractor, and CH2M HILL to schedule the
meeting date and time {and conference room}. The City will be responsible for
recording, preparing, and distributing meeting minutes.
• Submittals and RFIs from the contractor will be received by the City Project Manager
who will Iog and forward to CH2M HILL for review. Submittal and RFI responses
and WCD content by CH2M HILL will be delivered digitally to the City Project
Manager for distribution to the contractor.
• City inspector will be responsible for performing daily inspections during
construction and will notify CH2M HILL of any material variation from design. City
will provide CH2M HILL with written documentation of daily construction
inspections/observations and performance test results upon request.
• Contractor will be-responsible for keeping accurate, detailed notes and drawing
redlines documenting changes from design drawings. These notes and drawing
redlines will be available for review by CH2M HILL throughout the project and the
City inspector will provide periodic reviews to ensure that the Contractor is
appropriately documenting the as-built conditions.
• Contractor will be responsible for providing written verification that construction is
complete and scheduling Substantial Completion Site Visit with the City and CH2M
HILL that will be mutually agreeable to the parties involved.
PAGE 12 OF 15
• As-built notes and design drawing redlines maintained by the Contractor will
accurately convey as-built conditions and provide sufficient detail for CH2M HILL to
easily use as primary basis far producing record drawings. CH2M HILL is not
responsible for performing field survey work to produce record drawings.
Exuenses: (Included in Compensation Table)
~ Travel mileage reimbursement for on-site meetings and site visits.
PAGE 13 OF 15
Compensation
Level of Effort
The task level of effort estimates are summarized in the following table. CH2M HILL has
developed this level of effort estimate based on the work plan presented herein and
assumptions stated previously. The fees will be billed as tame and material, and will not
exceed the total amount below without prior approval by the City. A rate escalation
factor of 4% has been applied to the tasks (or portion thereof) that are anticipated to occur
on or after April 1, 2011.
Level of Effort
Task Description Total Task
1 Project Initiation and Management $22,600
2 Mapping Survey of Existing Conditions $4,750
3 Concept Design $23,500
4 Intermediate Design $49,850
5 Final Design and Bid Documents $36,100
6 Construction Bid Support $4,250
7 Services During Construction $34,100
Summary -All Tasks $175,150
Schedule
Task 1 -Project Initiation and Management
Task 2 -Mapping Survey of Existing Conditions
Task 3 -Concept Design
Task 4 -Intermediate Design
Task 5 -Final Design and Bid Documents
Task 6 -Construction Bid Support
Task 7 -Services During Construction
October 2010 -September 2011
November 2010
November 2010 -December 2010
January 2011- Febraary 2011
. March 2011
Apri12011
May 2011-September 2011
PAGE 14 OF 15
CITY OF MERIDIAN CH2M HIL
TAMMY de W RD, MAYOR BY: Mark Bo
;;~,~ ~„
Dated: ^~ l ~ ~ ~ Dated: e ~ L lG'
3r ...,~ ,
~ ~,~,
Attest: ~ ~ ~~ ~-~ ~ ~~ ~'
~ / ~ ~ ,~- ,,
JAYCEE Lk H~WVI l~L`~
~~~~ ~ ~ ~~
Approved as to Content h.~ .. Department Approval
KEITH WATT ,PORCH SING AGENT
TITLE: ~~~7~I ~~t~ ~/~ G- ~A~Ip-G-I~ (Z
/~/'~/o~oio
Dated: Dated: / 1 ~Z