TASK ORDER NO. 10192a
Between
CITY QF .MERIDIAN
AND
BRC)WN AND CALDWELL
This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises,
covenant and conditions contain}ed in the Master Agreement between the above mentioned parties
dated April 1'3, 2010.
Secondary Clarifier Retrofit 'Design and Services Quring Construction
Task Order t0192a
SCOPE OF SERVICES
Introduction
54/051364.003
This pro}ect is a follow-on contract to the Preliminary Engineering Report completed by Brawn and
Caldwell and submitted to IDEA in September of 2010. This scope is for design services to
enhance the secondary clarifiers at the wastewater treatmen# plant (WWTP) and includes:
• Clarifier 3 -new sludge collection mechanism, .new return activated sludge (RAS) pump
station,. new scum beach, new scum skimmer, new scum pump station, and new weir
cleaning
• Clarifier 4 -new scum beach, new scum pump station, new scum skimmer, new weir
cleaning
If at 50% design firmer cast estimates reveal the City can afford the. WAS flowmeters to the
existing OAFTs and a new chemical feed station,. then that design work will be added by change
order. At that time, the City may decide to bid parts of the work as optional alternate construction.
Phase 100 -Project Management
Provide management, direction, and. coordination of all work associated with this scope, including
schedules, budgets, technical quality, deliverables, and invoices. Communication and coordination
~ with the City as necessary. Lead weekly design team meetings via telephone and travel as needed
to coordinate design staff. Prepare monthly invoices, .including, backup materials, and
accompanying status reports. Update construction cost estimate at each design submittal. Provide
quality control of all work produced.
Deliverables
.~-~ Meeting notes as needed
• Updated cost estimate
Assumptions
• Background information provided. by the City as needed
Phase 200 - GeneraljCivil design
The following drawings will be produced;
Cover sheet with index, location, and vicinity maps
• General notes and abbreviations
• Symbols, legends, and Hates
• Temporary Erosion and Sediment Control
• Grading and Yard Piping Plan
• Civil details
BC will prepare a site plan that will include yard piping, paving, and grading. CSI. Divisions 0
through 2 specifications will be produced. BC wilt provide senior level review of work products.
Deliverables
• 50 and 90 percent camplete civil drawings for City comment
• 1 OQ percent camplete civil drawings for IDEA submittal
Assumptions
• None
Phase 300 -Process Mechanical pesign
n
The fallowing drawings will be produced:
• General -legend, symbols, index, abbreviations
• Clarifier 3 Sludge and Scum Collection Phan and Section
• Glorifier 3 Ras Pump Station Plan and Sections
• Clarifier 3 Details
• Clarifier 4 Scum Collection Plan and Section
• Clarifier 4 Scum Pump Station Plan and Sections
The process descriptions and process and instrumentation diagrams (P&iDs) wil( be updated.
Plans, sections and details will be prepared for each clarifier including scum pits and RAS pump
station. CSI Divisions 9 through 15 specifications will be produced. Clarifier 3 sludge collector
mechanism will be prepurchased. BG will produce prepurchase documents for separate clarifier
procurement. BC will provide senior level review of work products.
Deliverables
• 50 and 90 percent complete process mechanical drawings
• 100 percent complete drawings for IDEA submittal
Assumpfions
• None
Phase 4QQ - Structural Design
The following drawings will be produced:
• Structural General Notes and Specifications
• Clarifier 3 RAS Pump Station Plan and Sections
• Clarifier 4 Scum Pump Station Plan and Sections
• .General -Legend, Symbols, Index, Abbreviations
• Concrete Typical details
• Guardrail and handrail typica( details
• Ladder and stairs typical details
• Pipe supports and platforms
Structural calculations will be produced. 'Plans, sections, anddetails will be prepared for each
clarifier including scum pits and RAS pump station. CSl Divisions 3 through 7 specifications will be
produced. Review shed and tank specifications. BC will provide senior level review of work
products.
Deliverables
• 50 and 90 percent complete drawings
• 100 percent complete drawings for IDEA submittal
Assumptions
• None
Phase 504 -~ Electrical Design
~`' The fallowing drawings will be produced:
• Legend and Symbols 1
• Legend and Symbols 2
• Construction Details 1
• Construction Details 2
• MCC -X Single Line Diagram and Elevation
• Control Schematic 1
• Control Schematic 2
• Site Plan 1 Power and Ground
• Lighting Fixture and Raceway Schedules
CSI Division 16 specifications will be produced. Clarifier 3 sludge collector mechanism will be
prepurchased. BC will produce prepurchase documents for separate clarifier procurement. BC will
provide senior level review of work products.
Deliverables
• 50 and 90 percent complete drawings
• 100 percent complete drawings far IDEA submittal
Assumptions
• None
Phase 6fl0 -Instrumentation and Control Design
The following drawings will be produced;
~''~ • Legend and Symbols 1
Instrument Installation Details 1
• Clarifier 3 P&ID
• Clarifier 4 P&iD
• Instrument .Location Plan
The process descriptions and P&IDs will be updated. Clarifier 3 sludge collector mechanism will be
prepurchased. BC will produce prepurchase documents for separate Clarifier procurement, CSI
Division 17 sped#ications will be produced. BC will provide senior level review of work products.
Deliverables
• 50 and 90 percent complete drawings
• 100 percent. complete drawings for IDEA. submittal
Assumptions
• None
Phase 700 - Services During Construction
• BC will provide bid period services including attendance at the pre-bid meeting., answer
questions during the bid, and issue addenda as needed.
• BC wilE provide review of up to 18 shop drawing submittals
• BC provide one person to attend the weekly construction meetings
• BC will provide periodic review of new construction
• BC wily be available for Startup and commissioning support
BG will provide as-builts based on contractor markups
Deliverables
• As-builts
Assumptions
• None
TCM€ OF PERFORMAPlCE
The attached MS Project chart shows the anticipated schedule of the project.
CUMPENSATI4N
The following table provides a summary fee estimate far the scope of services proposed in this
task order. The fee estimate is based on the assumptions developed from our' conversations with
City staff. These assumptions are presented in the fallowing section. Brown and Caldwell proposes
conduc#ing this work on a time-and-materials basis in accordance with the rate schedule attached
to the master Agreement dated Apri! 13, 2010.
~~
f ii ~~ ~.
~.....F k ~'.,rG t k,3.E' 1 f..: 1.
,ityy~.n7 ..} ~•k
100 -Project Management $15,:112
200 - Givil Design $10,432
300 - Process Mechanical Design $19,276
400 - Structural Design $21,320
500 - Electrical Design $20,788
600 -Instrumentation and Gantrol $20,528
700 - 5ervlces During Ganstructlon $25,948
Total $133,404
ASSUMPTIONS
The following assumptions were made in preparation of the scope of work and fee estimate:
• The cost presented in the fee table is on atime-and-materials not to exceed basis. Should
Brown and Caldwell approach the budget for the project, we will notify the City and decide
on requirements for additional funds, if needed.
• Brown and Caldwell will rely on information provided by the City to prepare the technical
documents.
• The owner will provide AutoCad files for all existing drawings needed to execute the project.
• The owner wilt provide a copy of the geotechnical report prepared for the site.
CITY OF MERIDIAN
TAMMY de 1N RD, MAYOR
Dated: (~ I ~ ~ ~ ~, ~ h ___ _
Approved by City Counc
JA
Approved as to Content
i~ J ~~s_~r. q.
k-q. (~~ ~~, ,. ~ ~ .~~ ~~ , ~ ,
"~ C- ~* svv O ~~ `~
\O ~ n B
~-~; ~ ~ G
f1 T ~~.
~«,. .` !~
~,~ x,19 r 4 ... iF~
KEITH WA TS, PU CH SII~IG AGENT
BROWN AND CALDWELL
Jeffrey S. son, .D., P.G., Vice President
Dated: /4,~S~Zo/~
Depart t Appr a
Title: _i~~.- ~~; ~iZ, ft~ = l~'IA~,~_
Dated: / a / ~ / a o t ~ Dated:
Pm~ece CNM4r Mro tlnpn I T~ ~ Proprws Swunery ~1 EbamciTWn Oa®Ina 6
DNK 7w 10r5H0 SAr ~.YMlarr • Pia~B01 fiummary EbMW Mtlesbn9 O
Pps1