HomeMy WebLinkAboutRefurbishment Purchase Orders for Engine 32 and 39E IDIAN~~---
IC~t~FiC)
CITY OF MERIDIAN
SOLE SOURCE FORM
Requisition Number: 11-01 ~ jl- d 2~
PURCHASING AGENT
33 East Broadway Avenue
Meridian, ID 83642
Phone:208-888-4433 Fax: 208-887-4813
Date: 10-5-2010
Item or Service: Refurbishment of Engines 32 and 39
Sole Source: Item is available from only one vendor. Item is one-of-a kind item
and is not sold through distributors. Manufacturer is a sole
distributor.
^ Sole Brand: Various vendors can supply the specified model & brand, and
Competitive bids will be solicited for the brand requested.
Refer to instructions on 2"d page for completion.
JUSTIFICATION: (Attach additional pages if needed}
Pierce Manufacturing was the original manufacturer of Engine 32 and 39. All components from
the chassis up were assembled and or fabricated on site. Major components such as the engine, pump,
transmission, and transaxles were provided by suppliers with which Pierce manufacturing has working
relationships and in-house specialists. As the original sole source manufacturer, Pierce, has access to
the original specifications, plans, and wiring diagrams. All of these place Pierce in a unique position to
provide a completed product that is as good as or better than the original. In fact Pierce Manufacturing
was the sole source refurbishment contractor for Engine 38 in 2007, which has proven reliable. The
department has received sufficient service from these existing units, that it has confidence in the
company's ability to deliver a quality product
CERTIFICATION:
I am aware of the requirements set forth in the City's Purchasing Policy & Procedures Manual for competitive bidding and the
established criteria for justification for sole source/sole brand purchasing. I have gathered technical information and have made
a concerted effort to review comparable/equal equipment. I hereby certify as to the validity of the information and feel confident
that this justification for sole sourcelsole brand meets the City's criteria and is accurate. ,~' „
Council Li
Approval:,
L
In addition the City of Meridian fleet has standardized on Pierce Engines to
provide uniform driver training, pump controls and operations to assist when
crews are assigned to various apparatus which in turn enhances public safety.
Meridian Fire and Rescue
Meridian, Idaho
2000 Pierce Dash Pumper 11670TR
Engine 32
Maintenance and Refurbishment
Pierce Midwest Refurbishment Center
816 Commercial Avenue
Weyauwega, WI 54983
920-867-2142
Date: September 21, 2010 modified 10-04-2010
Quote is good for 90 days
QUALIFICATIONS
Pierce Manufacturing, Inc., located in Appleton, Wisconsin, is truly a leader and
innovator in the fire apparatus industry. The Pierce Refurbishment Center has achieved
the very same reputation for fire apparatus repair and refurbishing. Located 30 miles
west of Appleton in Weyauwega, Wisconsin, the Pierce Refurbishment Center facility is
dedicated exclusively to the refurbishing and repair of all makes and models of fire
apparatus. Pierce Manufacturing has produced fire apparatus for over 50 years and has
been refurbishing apparatus for more than 30 years.
The 40,000 square foot Refurbishment Center has 16 well-equipped bays staffed by 52
certified, highly skilled mechanics. Fabrication and refinishing is done at the main
manufacturing facilities to assure our customers the same fine quality that new Pierce
apparatus is famous for.
WELDING REQUIREMENTS
Pierce Manufacturing follows American Welding Society D1.1-96 standards for
structural steel welding. All aluminum welding will be done to American Welding
Society and ANSI D1.2-96 requirements for structural welding of aluminum. Flux core
arc welding shall use alloy rods, type 7000, American Welding Society standards A5.20-
E70T1.
SINGLE SOURCE MANUFACTURER
Pierce Manufacturing is a single source apparatus manufacturer. The definition of single
source is a manufacturer that designs and manufactures their products using an integrated
approach, including the chassis, cab and body being fabricated and assembled on the
bidder's premises. The warranties relative to the chassis and body design (excluding
component warranties such as engine, transmission, axles, pump, etc.) will be from a
single source manufacturer and not split between manufacturer (i.e. body and chassis).
ISO COMPLIANCE
Pierce Manufacturing operates a Quality Management System under the requirements of
ISO 9001. These standards sponsored by the "International Organization for
Standardization (ISO)" specify the quality systems that are established by the
manufacturer for design, manufacture, installation and service. A copy of the certificate
of compliance Number 32454 is included with this proposal.
WARRANTY
Pierce Manufacturing, Inc. warrants all new components and repairs to existing
components to be free from defects in materials and workmanship per the enclosed
warranty policy.
TERMS
Payment is to be made, in full, upon completion and final acceptance at Pierce
Manufacturing, Inc.
Page 2 of 17
SHIPPING PRECAUTIONS
All of the following will need be completed before shipping your apparatus to
Pierce Manufacturing for Refurbishment or Repair. Failure to complete the listed
items below will result in additional cost to the fire department.
• All water tanks, foam tanks, pumps, all inlets and discharge plumbing, all
drains, and any other plumbing are to be completely drained prior to being
driven orflat-bedded.
• Strip down all loose equipment unless arranged with Pierce prior to
shipping in order to make the repair process easier and to eliminate the
potential for lost equipment while the unit is being refurbished or repaired.
• All loose or potentially loose items should be taped or strapped to ensure
they do not come loose during transit.
INSPECTION
Following inspections will be performed before the removal of any components and
before any disassembly. A detailed inspection report will be forward to the fire
department for disposition. Additional repair costs will be open: subject to inspection
and written approval by the fire department.
• Incoming Electrical inspection
• Incoming Chassis Inspection and Road test
• Incoming Pump Test
• Incoming Body Inspection and Weld Cracks
Inspections are required to verify working components before they are removed.
SHORELINE AUTO-EJECT
Relocate the existing shoreline auto-eject from the exterior of the cab driver's side over
the front wheel to the inside step well on the driver's side.
CAB LIFT SYSTEM
The cab lift cylinders and electric pump will be fully inspected and tested for proper
operation.
A detailed inspection report will be forward to the fire department for disposition.
Additional repair costs will be open: subject to inspection and written approval by
the fire department.
AUTOMATIC TIRE CHAINS
One (1) pair of "On Spot" automatic tire chains will be provided at the rear. System will
be electric over air operated with switch on cab instrument panel. System maybe
engaged at speeds up to 25 mph and operated at speeds up to 35 mph.
Page 3 of 17
FRONT SUSPENSION
Replace the front suspension with the following.
Front springs will be a heavy-duty, taper leaf design, 54.00" long by 4.00" wide, with a
ground rating of 19,000 lb.
Kaiser spring pins will be provided with double figure-eight grease grooves and a layer of
electroless nickel plating, 1.0 mil thick around the entire pin. The bushing that holds the
spring pin in place will also have a grease groove.
SEAT BELTS (red)
All seating positions in cab and crew cab will have red seat belts.
CAB AND CREW CAB DOORS
The cab and crew cab doors windows and latches will be repaired and serviced to like
new condition.
• Adjust and lubricate all door latches, any defective components will be replaced
with new.
• Adjust and lubricate window regulators, any defective components will be
replaced with new.
• New window track lining and weather stripping will be supplied.
• All cab and crew cab doors will be properly adjusted for fit and operation to
include new door stay straps.
DOOR SEALS
Replace the cab and crew cab door weather seals with double automotive type rubber
seals around the perimeter of the door to ensure a weather tight fit.
FRONT BUMPER EXTENSION
Remove the existing front bumper and replace with the following front bumper extension
matching the same size and layout of 20589TR
The hose boxes will also be the same size and capacity as 20589TR. MFD E-35
BUMPER
A one (1)-piece, ten (1) gauge, 304-2B type polished stainless steel bumper, a minimum
of 10.00" high, will be attached to a bolted modular extension frame constructed of
50,000 psi tensile steel C channel mounted directly behind it to provide adequate support
strength.
The bumper will be extended 19.00" from front face of cab.
Page 4 of 17
HOSE TRAY (center)
A hose tray, constructed of aluminum, will be placed in the center of the bumper
extension.
The tray will have a capacity as the tray on unit 20589TR.
Black rubber grating will be provided at the bottom of the tray. Drain holes are also
provided.
HOSE TRAY (left side)
A hose tray will be placed in the left side of the extended bumper.
The tray will have a capacity as the tray on unit 20589TR.
Black rubber grating will be provided at the bottom of the tray. Drain holes are also
provided.
DISCHARGE OUTLET (Front)
There will be one (1), 1.50" gated discharge outlet, with a swivel, piped to the driver's
side on top of the front bumper extension.
Plumbing will consist of 2.00" piping and flexible hose according to the design
requirements of the chassis. A fabricated weldment made of black iron pipe will be used
in the plumbing where appropriate. A 2.00" full flow ball valve controlled at the pump
operator's panel will be used in the outlet plumbing. Automatic drains will be provided at
all low points of piping.
GRAVEL PAN
A gravel pan, constructed of bright aluminum treadplate, will be furnished between the
bumper and cab face.
The gravel pan will be properly supported from the underside to prevent flexing and
vibration of the aluminum treadplate.
TOW HOOKS
Reuse the two existing tow hooks.
SPEAKER
Reinstall the existing speaker recessed into the front bumper on the right side to match
20589TR
MECHANICAL SIREN, (Auxiliary)
Reinstall the existing Federal Q2B siren mounted on top of the new bumper deckplate
between the two (2) boxes on the driver's side to match 20589TR.
AIR HORNS
Reinstall the existing air horns recessed into the front bumper one (1) each side of the
Page5of17
center tray inside the frame.
STAINLESS STEEL CAB DOOR JAMBS
Install stainless steel edging on the cab and crew cab door jambs to protect the cab door
opening edges.
STAINLESS STEEL REAR BODY EDGING
Install stainless steel edging on the rear exterior corners of the body and lower inside
edge of the rear step area.
BRIGHT ALUMINUM TREADPLATE
All exterior, bright, aluminum treadplate will be replaced with NFPA 1901 compliant,
slip-resistant material. To include:
• Catwalks
• Running boards
• Front bulkhead
• Tailboard
• Beavertail lining
• Rear cab wall
• Aluminum treadplate panels above pump panels
• Walkway and front sheet area
REAR TAILBOARD
Modify the rear tailboard substructure and install a new aluminum treadplate rear step
matching 20589TR with the 8" full rear step area.
DOOR, ROLL UP REAR COMPARTMENT
Replace the rear body compartment roll up door with a new Gortite roll up door with an
anodized satin finish, double faced, aluminum construction and manufactured by A&A
Manufacturing (Gortite).
Lath sections will be an interlocking rib design and will be individually replaceable
without complete disassembly of door.
Between each slat at the pivoting joint will be a PVC inner seal to prevent metal to metal
contact and prevent dirt or moisture from entering the compartments. Seals will allow
door to operate in extreme temperatures ranging from plus 180 to minus 40 degrees
Fahrenheit. Side, top and bottom seals will be provided to resist ingress of dirt and
weather and be made of Santoprene.
All hinges, barrel clips and end pieces will be nylon 66. All nylon components will
withstand temperatures from plus 300 to minus 40 degrees Fahrenheit. Hardened plastic
will not be acceptable.
A polished stainless steel lift bar will be provided for opening door. Lift bar will be
located at the bottom of door and have latches on the outer extrusion of the door's frame.
Page 6 of 17
A ledge will be supplied over lift bar for additional area to aid in closing the door.
Door will be constructed from an aluminum box section. The exterior surface of each slat
will be flat. The interior surfaces will be concave to provide strength and prevent loose
equipment from jamming the door from inside.
To conserve space in the compartment(s), the spring roller assembly will not exceed 3.00"
in diameter. A roll-up door that retracts below the compartment ceiling (garage door
style) will not acceptable.
A heavy-duty magnetic switch will be used for control of "open compartment door"
warning lights.
All mechanical components of the door will be warranted to be free from defects in
materials and workmanship for the lifetime of the vehicle. All parts covered under this
warranty will be to the original owner.
HARD SUCTION HOSE STORAGE
Remove the existing hard suction troughs and storage compartment on the driver's side
catwalk, plug all holes. The new LED rear upper warning light will be mounted on an
aluminum treadplate box match the passenger's side.
The suction hose will now be relocated to the existing hydraulic ladder rack. The two (2)
aluminum pike poles will be moved to the front of the rack with the folding ladder and
the two (2) hoses mounted to the upper section of the rack.
VALVE OVERHAUL
All discharge, tank fill, tank to pump and auxiliary inlet valves will be removed from the
adjacent piping to facilitate cleaning and allow bench rebuilding. The valve seals and ball
will be removed and carefully inspected for wear or abnormal operation. New seals and
O-rings will be installed per manufacturer's recommendation, including a new stainless
steel ball. The valves will be reinstalled and dynamically tested for internal and external
leakage.
OUTLET BLEEDERS, SWING STYLE HANDLE CONTROL
All drains will be updated to the new swing handle design.
A .75" bleeder valve will be provided for each outlet 1.50" or larger. Automatic drain
valves are acceptable with some outlets if deemed appropriate with the application.
The valves will be located behind the panel with a swing style handle control extended to
the outside of the side pump panel. The handles will be chrome plated and provide a
visual indication of valve position. The swing handle will provide an ergonomic position
for operating the valve without twisting the wrist and provides excellent leverage.
Bleeders will be located at the bottom of the pump panel. They will be properly labeled
Page7of17
identifying the discharge they are plumbed in to. The water discharged by the bleeders
will be routed below the chassis frame rails.
ANODE, INLET
A pair of replaceable sacrificia10.75" magnesium anodes will be provided in the water
pump to protect the pump from corrosion. One (1) will be placed in the inlet side of the
pump and the other in the discharge side of the pump.
FRONT and REAR SUCTION VALVES
The existing front and rear suction manual valves will be replaced with an electrically
operated valve with an electric control at the pump operator's panel. The control will be
momentary to allow the valve to be gated for ease of operation. Indicator lights will be
provided to show if the valve is open or closed.
HOSE REEL
Relocate the hose reel from the driver's side of the cargo area to the passenger side.
FOAMPRO SYSTEM
Replace the FoamPro 2001 control panel gauge on the pump operator's panel.
GREEN COMMAND LIGHT
Remove the green command light from the cab roof area, plug holes and metal finish for
complete repaint.
ALL EMERGENCY WARNING AND DOT LIGHTS WILL BE UPDATED TO
LED LIGHTS AS FOLLOWS:
DIRECTIONAL (Front)
Front turn signals to be Whelen 600 series LED full populated amber lamps housed in
chrome bezels. The turn signals will be housed in the same common bezel as the front
warning light and be located above the headlights.
In addition to the front facing directional, a Weldon, Model: 9186-8560-20, marker/turn
indicator will be provided on each side of the cab.
LIGHTS. FRONT ZONE LOWER
One (1) pair of Whelen mode160*02F*R, flashing "Super" LED lights will be installed
on the cab face above the headlights, in a common bezel with the directional lights.
The color of these lights will be red Super LED/red lens.
These lights will meet or exceed NFPA front lower zone requirements.
Per NFPA, these lights will be activated by a switch in the cab.
Page 8 of 17
STEP LIGHTS
All cab and body step lights will be changed to Ri-Tar, Model M27HW2 Super LED,
step lights.
The new LED step lights on the apparatus will be illuminated per the current edition of
NFPA 1901.
REAR FMVSS LIGHTING
The rear stop/tail and directional LED lighting will consist of the following:
Two (2) Whelen mode160R00XRR red LED stop/tail lights.
Two (2) Whelen mode160A00TAR amber LED arrow turn lights.
Two (2) Whelen, Model: 60J000CU backup lights will be provided.
Each light will be installed separately at the rear without a flange.
Four (4) red reflectors will be provided.
A Weldon, Mode123882-2600-00, license plate bracket will be mounted on the driver's
side above the warning lights. A Weldon, Model 9186-23882-30, step lamp will
illuminate the license plate.
LIGHTING BEZEL
Two (2) Whelen, model CAST4V, four (4) light aluminum housings will be provided for
the rear stop/tail, directional, scene lights and warning.
REAR ID/MARKER DOT LIGHTING
The three (3) identification lights located at the rear will be installed per the
following:
As close as practical to the vertical Centerline.
Centers spaced not less than six (6) inches or more than twelve (12) inches
apart.
Red in color.
All at the same height.
One (1) Truck Lite model 15050R LED ID bar
The outside clearance lights located at the rear will be installed per the following:
To indicate the overall width of the vehicle.
At least one (1) each side of the vertical Centerline.
All at the same height.
As near the top as practical.
To be visible from the rear and the side.
Four (4) Ri-Tar red Model M27 LED lights
LIGHT, INTERMEDIATE
There will be one (1) pair, of Truck-Cite, Model: 60115Y, amber, LED, turn signal,
marker lights furnished, one (1) each side, horizontally in the rear fender panel.
Page9of17
A stainless steel trim will be included with this installation.
PERIMETER SCENE LIGHTS, CAB
There will be a Truck-lite, model 4404X, 4.00", LED, grommet mount weatherproof
light provided for each cab door. Lighting will be designed to provide illumination on
areas under the driver, officer, and crew cab riding area exits, which will be activated
automatically when the exit doors are opened, by the door jam switch and by the same
means as the body perimeter lights.
The lighting will be capable of providing illumination at a minimum level of two (2)
foot-candles on ground areas within 30.00" of the edge of the apparatus in areas which
personnel climb in or out of the apparatus or descend from the apparatus to the ground
level.
PERIMETER SCENE LIGHTS, BODY
There will be a total of four (4) Truck-Cite, Mode144042C, LED lights provided on the
apparatus. Each light will consist of a 4.00" weatherproof LED light, rubber mount, and
pigtail kit.
The lights will be mounted in the following locations:
Two (2) lights will be provided under the rear step area.
One (1) light will be provided each side under the pump panel running boards.
The lighting will be capable of providing illumination at a minimum level of two (2)
foot-candles on ground areas within 30.00" of the edge of the apparatus in areas designed
for personnel to climb onto the apparatus or descend from the apparatus to the ground
level.
The lights will be activated by a cab and crew cab door switch and a switch on the
instrument panel.
LIGHTBAR
One (1) 82.00" Whelen, Model: Freedom LED lightbar will be mounted on the cab roof.
This lightbar will include the following:
Two (2) red flashing forward facing LED modules.
Two (2) clear flashing forward facing LED modules.
Two (2) red flashing front corner LED modules.
One (1) red flashing driver side facing LED module.
One (1) red flashing officer side facing LED module.
One (1) switch located in the cab on the switch panel will control this lightbar.
Page 10 of 17
The lens color will be clear.
All clear lights will be deactivated when the parking brake is applied.
SIDE ZONE LOWER LIGHTING
Four (4) Whelen mode160*02F*R flashing "Super" LED lights will be located at the
following positions:
Two (2) lights, one (1) each side on the front cab corner -red Super LED/red lens
each side.
Two (2) lights, one (1) each side rear body fender panel -red Super LED/rd lens
each side.
The lights will be controlled by a lighted switch on the cab instrument panel.
These lights will be installed in chrome bezels.
REAR ZONE LOWER LIGHTING
Two (2) Whelen mode160*02F*R flashing "Super" LED warning lights will be located
at the rear of the apparatus, required to meet or exceed the lower level optical warning
and optical power requirements of NFPA.
The color of these lights will be red Super LED/red lens.
One (1) switch in the cab on the switch panel will control these lights.
These lights will be installed in the CAST 4 bezel.
REAR SCENE LIGHT
Replace the existing rear Whelen mode173 rear scene light with a Whelen, Model
7000ELZR Gradient LED scene light
WARNING LIGHTS (Rear of Hose Bed)
Two (2) Whelen L31 H*FN LED warning beacons will be provided at the rear of the
truck, located one (1) each side. These lights will be activated by a lighted switch on the
instrument panel.
The color of the lights and domes will be red LED on the driver's side and amber LED on
the passenger side.
CORROSION and SMALL DENTS
Metal finish and repair all minor body and cab corrosion and any small dents prior to
repainting the complete exterior of the apparatus body and cab. Additional major
corrosion and / or accident damage repair costs will be open: subject to inspection
and written approval by the Bre department.
Page 11 of 17
CAB TWO-TONE
The cab will be two-tone, with the upper section painted Upper cab black #101 along
with a shield design on the cab face and lower section of the cab red #80. Two tone to
match existing scheme.
BODY PAINT COLOR
Single color RED # 80
PAINT. COMPARTMENT INTERIOR
The compartment interior will be painted with a gray spatter finish for ease of cleaning
and to make it easier to touch up scratches and nicks.
BODY PAINT COLOR and SCHEME to MATCH ORIGINAL
The exterior custom body will be metal finished and repainted to include hosebed,
crosslays, cargo area and exterior of pump hose.
PAINT -BODY and CAB
The exterior custom cab and body painting procedure will consist of a seven (7) step
finishing process as follows:
1. Manual Surface Preparation -All exposed metal surfaces on the custom body will be
thoroughly cleaned and prepared for painting. Surfaces that will not be painted include
all chrome plated, polished stainless steel, anodized aluminum and bright aluminum
treadplate. Each imperfection on the exterior metal surface will be removed or filled and
then sanded smooth for a smooth appearance. All seams will be sealed before painting.
2. Chemical Cleaning and Treatment -The aluminum surfaces will be properly cleaned
using a 4-phase, high pressure and high temperature acid etching system. All steel
surfaces will be properly treated using a 3-phase, high temperature,
cleaning/phosphatizing system. Surfaces are chemically cleaned to remove all dirt, oil,
grease and metal oxides to ensure the subsequent coatings bond well. An ultra pure water
final rinse of 25 parts per million solids or less, will be applied to final rinse all metal
surfaces at the conclusion of the metal treatment process. This final rinse ensures all
chemical residues are removed and that no minerals, (salts), from the water dry onto the
metal surface and remain under the primers and topcoats. These salts can lead to
blistering and under film corrosion.
3. Primer/surfacer Coats - A minimum of two (2) mil dry, (.002), of two component
urethane primer/surfacer will be hand applied to the chemically treated metal surfaces to
provide a strong corrosion protective base coat and to smooth out the surface. The primer
is a high solids and low VOC paint.
4. Hand Sanding to Ultra Fine Finish The primer/surfacer coatis lightly sanded with
mild abrasive paper to an ultra smooth finish. This hand finish process is critical to
produce the smooth mirror like finish in the topcoat.
Page 12 of 17
5. Sealer Primer Coat A two- (2) component sealer primer coat is applied over the
sanded primer to again build toward the final smooth finish. This layer of primer sealer
also gives additional corrosion protection.
6. Topcoat Paint Two (2) coats of an automotive grade, two component acrylic urethane
paint are applied to provide the lasting beauty and durability. The acrylic urethane
topcoat contains a clear coat resin chemistry that creates the high gloss and depth of
image. This type of topcoat provides the best resistance against acid rain and other more
common chemicals.
7. Clearcoat -Two (2) coats of an automotive grade two (2) component urethane will be
applied. Lap style doors will be clear coated to match the body. Roll-up doors will not
be clear coated and the standard roll-up door warranty will apply.
A cyclic corrosion test, (General Motors test GM-9540), of 40 cycles will be required
before making changes to the exterior coating process. Exterior coating systems,
(excluding the undercarriage components), must achieve a 1/16 or less maximum creep
from the scribe for aluminum and an 1/8 or less maximum creep from the scribe for
galvanneal after 40 cycles in the General Motors GM-9540 test.
Each batch of color topcoat, together with the finish painted vehicle, is tested for precise
color match. Visual color match will be checked following ASTM D-1729, (American
Standard Testing Methods), procedures using CIE, (International Commission on
Illumination), D75 Northern Daylight light source. Instrumental color match will follow
ASMT D-2244 procedures with a maximum delta E of 1.0 for whites, 1.4 for yellows,
blues, greens and 1.5 for reds.
All removable items such as brackets, compartment doors, door hinges, trim, etc. will be
removed and painted separately to insure paint behind all mounted items. Body
assemblies that can not be finish painted after assembly will be finish painted before
assembly.
PAINT -ENVIRONMENTAL IMPACT
Contractor will meet or exceed all current State (his) regulations concerning paint
operations. Pollution control will include measures to protect the atmosphere, water and
soil. Controls will include the following conditions:
- Topcoats and primers will be chrome and lead free.
- Metal treatment chemicals will be chrome free. The wastewater generated in the metal
treatment process will be treated on-site to remove any other heavy metals.
- Particulate emission collection from sanding operations must have a 99.99% efficiency
factor.
- Particulate emissions from painting operations will be collected by a dry filter or water
wash process. If the dry filter means is used, it must have an efficiency rating of
98.00%. Water wash systems will be 99.97% efficient.
- Water from water wash booths will be reused. Solids will be removed mechanically on
a continual basis to keep the water clean.
Page 13 of 17
-Paint wastes are disposed of in an environmentally safe manner. They are used as fuel
in kilns used in the cement manufacturing process -thereby extracting energy from a
waste material.
- Empty metal paint containers will be cleaned, crushed and recycled to recover the
metal.
- Solvents used in clean-up operations will be collected, recycled on-site, or sent off-site
for distillation and returned for reuse. Residue from the distillation operation will be
used as fuel in off-site cement kilns.
WARRANTY -PAINT AND CORROSION
Limited Warranty
Except as provided below, and provided the vehicle has been placed in service within 60
days after delivery to the original purchaser as established by our original invoice, for a
period of one (1) year after. Pierce Manufacturing Inc. ("Pierce") warrants to the user
that its cab and body are free of blistering, peeling, bubbling, or any other adhesion defect
caused by defective manufacturing methods or paint material selection for exterior
surfaces of the cab and body of the vehicle. This limited warranty will apply only if the
vehicle is properly maintained and used in service which is normal to the particular
vehicle. Normal service means service which does not subject the vehicle to stresses or
impacts greater than normally result from the careful use of the vehicle or chassis. If the
buyer discovers a defect or nonconformity it must notify Pierce in writing within 30 days
after the date of discovery. This limited warranty is not transferable by the first user, and
is applicable to the vehicle in the following percentage costs of warranty repair, if any:
Months Adhesion Blistering Bubbling Corrosion Cracking Gloss Color Retention
0 to 12 100% 100% 100% 100% 100% 100% 100%
This limited warranty applies only to cab and body exterior paint
REFLECTIVE BAND, LETTERING and GRAPHICS
All graphics, lettering and reflective bands are to match the newest current apparatus
20589TR
FINALIZATION and DETAILING
Prior to delivery the entire vehicle will be washed to include the interior and exterior.
All fluid levels will be checked on topped off if needed.
The vehicle will be fully fueled.
COST: $ 137,462.00
Page 14 of 17
OPTIONS:
COMPARTMENT LIGHTING
Replace all body compartment lights with AMDOR, LED strip lights.
The strips will be centered vertically along each side of the door framing.
Opening the compartment door will automatically turn the compartment lighting on.
Cost: $ 4,912.00
CHEVRON/INVERTED "V" STRIPING ON REAR WALL DIAMOND GRADE
All vertical surfaces of the rear aluminum treadplate will be replaced with smooth
aluminum sheet and covered will chevron stripping.
There will be alternating inverted "V" chevron striping located on the rear wall of the
apparatus to include the rear bulkheads.
The striping will consist of the following colors:
The first color will be Diamond grade RED
The second color will be Diamond grade YELLOW
The size of the striping will be 6".
Cost: $ 1,321.00
Retrofit TAK-4 on Dash 2000
SUSPENSION, FRONT NON DRIVE AXLE 19,500 POUNDS
The existing front axle will be removed and a front Oshkosh TAK-4TM independent
suspension will be provided in its place with a minimum ground rating of 19,500 pounds.
The independent suspension system has been designed to provide maximum ride comfort.
The design will allow the vehicle to travel at highway speeds over improved road
surfaces, and at moderate speeds over rough terrain with minimal transfer of road shock
and vibration to the vehicle's crew compartment.
Each wheel will have torsion bar type spring. In addition, each front wheel end will also
have energy absorbing jounce bumpers to prevent bottoming of the suspension.
The suspension design will be such that there is at least 10.00" of total wheel travel and a
minimum of 3.75" before suspension bottoms.
The torsion bar anchor lock system allows for simple lean adjustments, without the use of
shims. One can adjust for a lean within 15 minutes per side. Anchor adjustment design is
such that it allows for ride height adjustment on each side.
The independent suspension was put through a durability test that simulated 140,000
miles of inner city driving.
Page 15 of 17
Upper and lower control arms will be used on each side of the axle. Upper control arm
castings will be made of 100,000-psi yield strength 8630 steel and the lower control arm
casting will be made of 55,000-psi yield ductile iron.
The center cross members and side plates will be constructed out of 80,000-psi yield
strength steel.
Each control arm will be mounted to the center section using elastomer bushings. These
rubber bushings will rotate on low friction plain bearings and be lubricated for life. Each
bushing will also have a flange end to absorb longitudinal impact loads, reducing noise
and vibrations.
There will be nine (9) grease fittings supplied, one (1) on each control arm pivot and one
(1) on the steering gear extension.
The upper control arm will be shorter than the lower arm so that wheel end geometry
provides positive camber when deflected below rated load and negative camber above
rated load.
Camber at load will be zero degrees for optimum tire life.
The kingpin bearing will be of low friction design and be sealed for life.
Toe links that are adjustable for alignment of the wheel to the center of the chassis will be
provided.
The wheel ends must have little to no bump steer when the chassis encounters a hole or
obstacle.
The steering linkage will provide proper steering angles for the inside and outside wheel,
based on the vehicle wheelbase.
The axle will have a third party certified turning angle of 45 degrees. Front discharge,
front suction, or aluminum wheels will not infringe on this cramp angle.
FRONT NON DRIVE AXLE WARRANTY
The Oshkosh TAK-4TM system will have a three (3) year parts and labor warranty.
Cost: $ 34,996.00
WHEELS
The existing front tires will be mounted on Alcoa 22.50" x 9.00" polished aluminum
disc wheels with a ten (10) stud, 11.25" bolt circle.
The existing rear tires will be mounted on new Alcoa 22.50" x 8.25" polished aluminum
disc wheels with a ten (10)-stud 11.25" bolt circle.
Page 16 of 17
LUG NUT COVERS
Chrome plated lug nut covers will be installed on all lug nuts.
Cost: $ 6,101.00
DOORS, SIDE COMPARTMENTS "D-2" and "P-2"
Change the lift up body compartment doors on "D-2" and "P-2" to double door, vertically
hinged lap style with double panel construction.
Doors will be a minimum of 1.50" thick with a full interior panel. To provide additional
door strength, a "C" section reinforcement will be installed between the outer and interior
panels.
Doors will be provided with a closed cell rubber gasket around the surface that laps onto
the body. A second heavy-duty automotive rubber molding with a hollow core will be
installed on the door framing that seals onto the interior pan, to ensure aweather-resisting
compartment.
All compartment doors will have polished stainless steel continuous hinge with a pin
diameter of .25", that is bolted or screwed on with E-Zinc plated fasteners.
All door lock mechanisms will be fully enclosed within the door panels to prevent fouling
of the lock in the event equipment inside shifts into the lock area.
Doors will be latched with recessed, polished stainless steel "D" ring handles and
Eberhard 1061ocks.
To prevent corrosion caused by dissimilar metals, compartment door handles will not be
attached to outer door panel with screws. A rubber gasket will be provided between the
"D" ring handle and the door.
Cost: $ 2,210.00
12 VOLT TELESCOPING LIGHTING
Two (2), Whelen PFA2 Pioneer LED, 12 volt floodlights will be provided on a Fire
Research model LTP-540-DCO-TW, side mount, top raise pole with top wire. The LED
flood light will use a Havis Shield KR-PLA adapter bracket with a switch to mount each
light.
Remove the two (2) existing Nightfighter and replace these lights in the same locations.
The lights will be wired to the "Do Not Move Truck" light in the cab.
Switching will be controlled on each light.
Cost: $ 3,431.00
Page 17 of 17
~~
~~ ~
~~
Meridian Fire and Rescue
Meridian, Idaho
1993 Pierce Dash Pumper E-7867
Engine 39
Maintenance and Refurbishment
Pierce Midwest Refurbishment Center
816 Commercial Avenue
Weyauwega, WI 54983
920-867-2142
Date: September 20, 2010 modified 10-04-2010
Quote is good for 90 days
QUALIFICATIONS
Pierce Manufacturing, Inc., located in Appleton, Wisconsin, is truly a leader and
innovator in the fire apparatus industry. The Pierce Refurbishment Center has achieved
the very same reputation for fire apparatus repair and refurbishing. Located 30 miles
west of Appleton in Weyauwega, Wisconsin, the Pierce Refurbishment Center facility is
dedicated exclusively to the refurbishing and repair of all makes and models of fire
apparatus. Pierce Manufacturing has produced fire apparatus for over 50 years and has
been refurbishing apparatus for more than 30 years.
The 40,000 square foot Refurbishment Center has 16 well-equipped bays staffed by 52
certified, highly skilled mechanics. Fabrication and refinishing is done at the main
manufacturing facilities to assure our customers the same fine quality that new Pierce
apparatus is famous for.
WELDING REQUIREMENTS
Pierce Manufacturing follows American Welding Society D1.1-96 standards for
structural steel welding. All aluminum welding will be done to American Welding
Society and ANSI D1.2-96 requirements for structural welding of aluminum. Flux core
arc welding shall use alloy rods, type 7000, American Welding Society standards A5.20-
E70T 1.
SINGLE SOURCE MANUFACTURER
Pierce Manufacturing is a single source apparatus manufacturer. The definition of single
source is a manufacturer that designs and manufactures their products using an integrated
approach, including the chassis, cab and body being fabricated and assembled on the
bidder's premises. The warranties relative to the chassis and body design (excluding
component warranties such as engine, transmission, axles, pump, etc.) will be from a
single source manufacturer and not split between manufacturer (i.e. body and chassis).
ISO COMPLIANCE
Pierce Manufacturing operates a Quality Management System under the requirements of
ISO 9001. These standards sponsored by the "International Organization for
Standardization (ISO)" specify the quality systems that are established by the
manufacturer for design, manufacture, installation and service. A copy of the certificate
of compliance Number 32454 is included with this proposal.
WARRANTY
Pierce Manufacturing, Inc. warrants all new components and repairs to existing
components to be free from defects in materials and workmanship per the enclosed
warranty policy.
TERMS
Payment is to be made, in full, upon completion and final acceptance at Pierce
Manufacturing, Inc.
Page 2 of 24
SHIPPING PRECAUTIONS
All of the following will need be completed before shipping your apparatus to
Pierce Manufacturing for Refurbishment or Repair. Failure to complete the listed
items below will result in additional cost to the fire department.
• All water tanks, foam tanks, pumps, all inlets and discharge plumbing, all
drains, and any other plumbing are to be completely drained prior to being
driven orflat-bedded.
• Strip down all loose equipment unless arranged with Pierce prior to
shipping in order to make the repair process easier and to eliminate the
potential for lost equipment while the unit is being refurbished or repaired.
All loose or potentially loose items should be taped or strapped to ensure
they do not come loose during transit.
INSPECTION
Following inspections will be performed before the removal of any components and
before any disassembly. A detailed inspection report will be forward to the fire
department for disposition. Additional repair costs will be open: subject to inspection
and written approval by the fire department.
• Incoming Electrical inspection
• Incoming Chassis Inspection and Road test
• Incoming Pump Test
• Incoming Body Inspection and Weld Cracks
Inspections are required to verify working components before they are removed.
AIR CONDITIONING
A high performance air conditioning system will be furnished inside the cab and crew
cab.
The air conditioning system will perform as follows:
In 100 degree Fahrenheit ambient temperature with 50 percent relative humidity and at
maximum compressor speed, the cab and crew cab will cool down to 75 degrees
Fahrenheit within 30 minutes. Actual test results of the air conditioning system, verifying
this performance requirement, will be submitted at delivery.
A 19.1 cubic inch compressor will be installed on the engine.
A combination condenser/evaporator with a BTU rating sufficient to meet the
performance specification will be installed on each side of the cab roof.
Page 3 of 24
There will be air flow outlets located in the following locations:
- Two (2) in the ceiling, just above the driver and the officer
- Six (6) in the crew cab, mounted in ceiling, positioned to maximize cooling
The evaporator units will have an adequate BTU rating to meet the performance
specifications.
The air conditioning system will have adjustable air outlets incorporated into the cab
ceiling at both the driver, officer, and crew cab positions.
The air conditioner refrigerant will be R-134A, installed by a certified technician.
INTERIOR CAB INSULATION
The cab and crew cab walls will be insulated with 2.00" insulation where possible and the
roof with 1.00" insulation to aid in cooling.
The insulation will be covered with a vinyl liner or a metal panel painted to match the
interior.
An additional red warning light will be installed to the side of the exterior air
conditioning housing. The light will match the upper zone lighting package to meet
NFPA requirements.
FRONT AXLE
Replace the existing front axle and suspension with the following:
The front axle will be a reverse "I" beam type with inclined king pins. It will be a
MeritorTM axle, Model FL-943, with a rated capacity of 18,000 lb.
The turning angle will be 45 degrees or greater.
A viewing window will be provided on each side of the axle for checking the oil level.
FRONT SUSPENSION
Front springs will be a heavy-duty, taper leaf design, 54.00" long by 4.00" wide, with a
ground rating of 19,000 lb.
Kaiser spring pins will be provided with double figure-eight grease grooves and a layer of
electroless nickel plating, 1.0 mil thick around the entire pin. The bushing that holds the
spring pin in place will also have a grease groove.
BRAKES
The service brake system will be full air type by MeritorTM
Page 4 of 24
Front brakes will be EX225 Disc Plus, disc type with automatic pad wear adjustment and
17.00" ventilated rotors for improved stopping distance.
TIRES
Front tires will be Michelin 315/80822.50 radials, 20 ply "all position" XZA-1 tread.
WHEELS
The new front tires will be mounted on steel disc wheels, 22.50" x 9.00" with a ten (10)
stud, 11.25" bolt circle.
MUD FLAPS FRONT and REAR
New mud flaps with a Pierce logo will be installed behind the front and rear wheels.
CAB REUPHOLSTER
Reupholster the following items with 46 ounce, leather grain vinyl resistant to oil, grease
and mildew with color to match existing.
• Headliners
• Cab door Panels
• Instrument panel (Dashboard)
CAB and CREW CAB INTERIOR UPHOLSTERY
The cab and crew cab interior upholstery will be light gray in color matching the color
and pattern of 20589TR.
INTERIOR CAB PAINT
The cab interior will be brush painted light gray to match 20589TR
SEAT BELTS (red)
All seating positions in cab and crew cab will have red seat belts.
DRIVER SEAT
Reupholster the existing driver's seat with Imperial 1200 material, color to match the
seats in job 20589TR MFD-35.
OFFICER SEAT
Reupholster the existing officer's seat with Imperial 1200 material, color to match the
seats in job 20589TR MFD-35.
REAR BENCH SEAT
Remove the existing rear bench seat and ship back with completed unit.
REAR FACING P.S. OUTBOARD SEAT
Reupholster the existing rear forward facing outboard seat with Imperial 1200 material,
color to match the seats in job 20589TR MFD-35. Reinstall this seat in the rear facing
passenger side outboard position.
Page 5 of 24
REAR FACING D.S. OUTBOARD SEAT
Reupholster the existing rear forward facing outboard seat with Imperial 1200 material,
color to match the seats in job 20589TR MFD-35. Reinstall this seat in the rear facing
driver side outboard position.
SCBA BRACKETS
New "Smart Dock" "Hands Free" SCBA bottle brackets will be installed in the existing
seat backs. One (1) on the officer seat, two (2) on the rear facing crew seats. Total of
three (3) new Smart Dock SCBA brackets.
CAB DOORS and WINDOWS
The cab door windows and latches will be repaired and serviced to like new condition.
• Adjust and lubricate all door latches, any defective components will be replaced
with new.
• Adjust and lubricate window regulators, any defective components will be
replaced with new.
• New window track lining and weather stripping will be supplied.
• All cab doors will be properly adjusted for fit and operation to include new door
stay straps.
DOOR SEALS
Replace the cab door weather seals with double automotive type rubber seals around the
perimeter of the door to ensure a weather tight fit.
ENGINE BRAKE
The existing exhaust brake will n be removed and a new engine Jacobs Brake installed as
follows:
A Jacobs Engine Brake is to be installed with the controls located on the instrument panel
within easy reach of the driver.
The driver will be able to turn the engine brake system on/off and have a high, medium
and low setting
The engine brake will be installed in such a manner that when the engine brake is slowing
the vehicle the brake lights are activated.
The ABS system will automatically disengage the auxiliary braking device, when
required.
Page 6 of 24
FRONT BUMPER EXTENSION
Remove the existing front bumper, center hose tray and modify to match as close as
possible 20589TR MFD E-35. The steel structure will be reused as is.
The hose boxes will also be the same size and capacity as 20589TR.
BUMPER
A one (1)-piece, ten (1) gauge, 304-2B type polished stainless steel bumper, a minimum
of 10.00" high, will be attached to the existing steel structure.
HOSE TRAY (center)
A hose tray, constructed of aluminum, will be placed in the center of the bumper
extension.
The tray will have a capacity as the tray on unit 20589TR.
Black rubber grating will be provided at the bottom of the tray. Drain holes are also
provided.
HOSE TRAY (left side)
A hose tray will be placed in the left side of the extended bumper.
The tray will have a capacity as the tray on unit 20589TR.
Black rubber grating will be provided at the bottom of the tray. Drain holes are also
provided.
DISCHARGE OUTLET (Front)
There will be one (1), 1.50" gated discharge outlet, with a swivel, piped to the driver's
side on top of the front bumper extension.
Plumbing will consist of 2.00" piping and flexible hose according to the design
requirements of the chassis. A fabricated weldment made of black iron pipe will be used
in the plumbing where appropriate. A 2.00" full flow ball valve controlled at the pump
operator's panel will be used in the outlet plumbing. Automatic drains will be provided at
all low points of piping.
GRAVEL PAN
A gravel pan, constructed of bright aluminum treadplate, will be furnished between the
bumper and cab face.
The gravel pan will be properly supported from the underside to prevent flexing and
vibration of the aluminum treadplate.
TOW HOOKS
The existing front chrome tow hooks will be reused as is.
Page 7 of 24
SPEAKER
Reinstall the existing speaker recessed into the front bumper on the right side to match
20589TR
AIR HORN
Reinstall the existing air horn recessed in the front bumper on the left side of the center
tray.
AIR HORN ADDITIONAL
Provide one (1) additional air horn recessed into the front bumper on the right side of the
center tray, one (1) each side of the center tray inside the frame.
AIR HORN CONTROL
The air horns will be actuated by two (2) foot switches only, one (1) located on the
officer's side and one (1) on the driver's side.
MIRRORS
Remove the existing mirrors, plug weld all holes and install the following mirrors.
One (1) Ramco, Mode16000-PCHR, polished aluminum mirror will be mounted on each
of the cab doors. The mirrors will be 9.25" x 13.50", with a convex section. The mirror
head will have a highly polished aluminum finish.
Ensure visibility to be at least as good as current.
The flat glass in each mirror will be heated and adjustable, with remote controls that are
convenient to the driver.
The convex section in each mirror will be heated and adjustable, with remote controls
that are convenient to the driver.
PASSENGER SIDE BODY MODIFICATIONS
The passenger side body compartments will be modified to match the compartment
height of the driver's side with three (3) new compartments total.
Two (2) full height compartments with full height lap style doors will be provided, one
(1) in front of the rear wheels and one (1) behind the rear wheels.
One (1) center compartment with two (2) vertically hinged lap style doors will be
provided.
A hydraulic ladder rack will be installed.
DOORS, SIDE COMPARTMENTS
Three new hinged compartment doors located on the passenger's side body will be lap
style with double panel construction. Doors will be a minimum of 1.50" thick with a full
Page 8 of 24
interior panel. To provide additional door strength, a "C" section reinforcement will be
installed between the outer and interior panels.
Doors will be provided with a closed cell rubber gasket around the surface that laps onto
the body. A second heavy-duty automotive rubber molding with a hollow core will be
installed on the door framing that seals onto the interior pan, to ensure aweather-resisting
compartment.
All compartment doors will have polished stainless steel continuous hinge with a pin
diameter of .25", that is bolted or screwed on with E-Zinc plated fasteners.
All door lock mechanisms will be fully enclosed within the door panels to prevent fouling
of the lock in the event equipment inside shifts into the lock area.
Doors will be latched with recessed, polished stainless steel "D" ring handles and
Eberhard 1061ocks.
To prevent corrosion caused by dissimilar metals, compartment door handles will not be
attached to outer door panel with screws. A rubber gasket will be provided between the
"D" ring handle and the door.
HYDRAULIC LADDER/SUCTION HOSE RACK
The existing ground ladders and two (2) 6" hard suction hoses will be mounted above the
right side of the hose body in a specially designed swing-down cradle. This cradle will
be electric/hydraulic operated. The system design will have been life cycle tested for at
least 14 years of dependable service.
The existing ground ladders, one (1) 35' three section, one (1) 14' and one (1) 10'
folding ladder along with one (1) pike pole will be reused on the new ladder rack.
One (1) additional aluminum tube, painted job color for a pike pole will be
provided. There will be a total of two (2) paint aluminum tubes for the pike poles
on the ladder rack.
The two (2) 6" hard suction hoses from the driver side catwalk will be mounted on
the new hydraulic rack.
An independent hydraulic pump powered by a 12-volt electric motor will operate the
hydraulics. Operation of the hydraulic system for the ladder rack by anengine-powered
pump will be totally unacceptable. The hydraulic pump and reservoir will be accessible
from the ground through a stainless steel inspection door.
The ladder rack will incorporate two hydraulic rotary actuators, one each located inside
the front compartment and the rear compartment. The actuators will be completely
enclosed within each compartment to eliminate any pinch points while operating the
ladder rack. Lifting arms will be attached outside the compartment body to the front and
Page 9 of 24
rear actuator. Acenter-lifting arm built into the compartment space is unnecessary and is
unacceptable.
The rack can be designed in certain situations to provide lifting capabilities up to SOOIbs.
The maximum height of the rack from the ground in the lowered position will be no more
than 47.00".
The electric control panel will have a master switch on/off switch, an actuation switch, an
operation indicator light and operation instructions. The electric controls will be located
in such a manner to allow the operator full view of the area into which the ladders will be
lowered.
Two (2) air operated safety locks will be furnished to securely maintain the ladder
bracket assembly in the travel position. These air operated safety locks will be controlled
from the ladder rack control panel.
Ladders will be secured to the brackets with two (2) locks retaining the roof ladder and
the extension ladder. The locks will be such that when the roof ladder is removed, the
clamps can be moved a half turn to hold the extension ladder in place.
LADDER RACK INTERLOCK AND NOT STOWED INDICATOR LIGHT
An interlock will be provided to prevent operation of the ladder rack unless the apparatus
parking brake has been activated.
A steady red indicator light will be located on the cab instrument panel and illuminated
when the hydraulic ladder rack is not in the stowed position. The light will be labeled
"Ladder Rack". In addition, the "Do Not Move Apparatus" light located in the cab will
be activated when the hydraulic ladder rack is not in the stowed position.
LIGHTS, FLASHING, HYDRAULIC LADDER RACK
Flashing amber lights facing the front and rear will be provided on the ladder rack and
activated whenever the rack is in the down position.
DRIVER'S SIDE BODY MODIFICATIONS
The driver side body compartments will be modified to match the new hydraulic ladder
rack compartment on the passenger side with three (3) new compartments total.
Two (2) full height compartments with full height lap style doors will be provided, one
(1) in front of the rear wheels and one (1) behind the rear wheels.
One (1) center compartment with two (2) vertically hinged lap style doors will be
provided.
DOORS, SIDE COMPARTMENTS
Three new hinged compartment doors located on the passenger's side body will be lap
style with double panel construction. Doors will be a minimum of 1.50" thick with a full
Page 10 of 24
interior panel. To provide additional door strength, a "C" section reinforcement will be
installed between the outer and interior panels.
Doors will be provided with a closed cell rubber gasket around the surface that laps onto
the body. A second heavy-duty automotive rubber molding with a hollow core will be
installed on the door framing that seals onto the interior pan, to ensure aweather-resisting
compartment.
All compartment doors will have polished stainless steel continuous hinge with a pin
diameter of .25", that is bolted or screwed on with E-Zinc plated fasteners.
All door lock mechanisms will be fully enclosed within the door panels to prevent fouling
of the lock in the event equipment inside shifts into the lock area.
Doors will be latched with recessed, polished stainless steel "D" ring handles and
Eberhard 106 locks.
To prevent corrosion caused by dissimilar metals, compartment door handles will not be
attached to outer door panel with screws. A rubber gasket will be provided between the
"D" ring handle and the door.
HARD SUCTION RACK
Remove the hard suction troughs from the driver's side catwalk area and plug existing
mounting holes. New treadplate will also be provided later in this quote.
REAR BODY MODIFICATIONS
The existing rear upper horizontal compartment will be deleted.
The rear vertical wall will be moved back approximately 10" to be even with the lower
body compartment.
A new vertical rear body wall will be fabricated flush with the existing body wall.
The lower compartment will be modified to be higher into the area that had the horizontal
compartment
One (1) new Gortite, satin finished, roll up door will be provided on the new larger
compartment.
Access steps to the hosebed will be provided.
New water tank grating approximately 10" longer will be provided.
New adjustable hosebed dividers will be provided approximately 10" longer.
A new black vinyl hosebed tarp with rear flap will be provided.
Page 11 of 24
PULL-OUT ADJUSTABLE HEIGHT TRAY
There will be one (1) slide out adjustable tray with 2.00" sides and a capacity of 250
pounds provided. Capacity rating will be in the extended position.
Slides will be equipped with ball bearings for ease of operation and years of dependable
service.
Tray location will be in the new larger rear body compartment.
Automatic locks will be provided for both the "in" and "out" positions. The trip
mechanism for it will be located at the front of the tray for ease of use with a gloved
hand.
Tray will be adjustable up and down within the compartment.
PULL-OUT TRAY
There will be one (1) slide out floor mounted tray with 2.00" sides and a minimum
capacity of 250 pounds provided. Capacity rating will be in the extended position.
Automatic locks will be provided for both the "in" and "out" positions. The trip
mechanism for it will be located at the front of the tray for ease of use with a gloved
hand.
Tray location will be in the new larger rear compartment
REAR UPPER HANDRAIL
Rear the rear upper hosebed handrail to make loading and unload hose easier.
Supports will be installed under the hosebed grating to secure the side sheet.
Install a new handrail below the hosebed level to aid in accessing the top of the truck.
BRIGHT ALUMINUM TREADPLATE
All exterior, bright, aluminum treadplate will be replaced with NFPA 1901 compliant,
slip-resistant material. To include:
• Catwalks
• Running boards
• Front bulkhead
• Tailboard
• Beavertail lining
• Rear cab wall
• Aluminum treadplate panels above pump panels
CROSSLAY MODIFICATION
The existing crosslays will be modified, making two (2) beds for 1 3/" hoses both beds
Page 12 of 24
double stacked. The rear cross divider will move forward increasing the space in the
cargo area.
BACKBOARD STORAGE
The existing backboard compartment will be relocated to be hinged on top of the new
crosslay area.
WATER TANK
The 1000 gallon existing steel water tank will be replaced with a new poly tank.
Booster tank will have a capacity of 750 gallons and will be constructed of
polypropylene plastic by United Plastic Fabricating, Incorporated. The capacity is
reduced because of material thickness difference, physical size will be the same as the
existing.
Tank joints and seams will be nitrogen welded inside and out.
Tank will be baffled in accordance with NFPA Bulletin 1901 requirements.
Baffles will have vent openings at both the top and bottom to permit movement of air and
water between compartments.
Longitudinal partitions will be constructed of .38" polypropylene plastic and will extend
from the bottom of the tank through the top cover to allow for positive welding.
Transverse partitions will extend from 4.00" off the bottom of the tank to the underside of
the top cover.
All partitions will interlock and will be welded to the tank bottom and sides.
Tank top will be constructed of .50" polypropylene. It will be recessed .38" and will be
welded to the tank sides and the longitudinal partitions.
Tank top will be sufficiently supported to keep it rigid during fast filling conditions.
Construction will include 2.00" polypropylene dowels spaced no more than 30.00" apart
and welded to the transverse partitions. Two (2) of the dowels will be drilled and tapped
(.50" diameter, 13.00" deep) to accommodate lifting eyes.
A sump that is 8.00" long x 8.00" wide x 6.00" deep will be provided at the bottom of the
water tank.
Sump will include a drain plug and the tank outlet.
Tank will be installed in a fabricated cradle assembly constructed of structural steel.
Page 13 of 24
Sufficient crossmembers will be provided to properly support bottom of tank.
crossmembers will be constructed of steel bar channel or rectangular tubing.
Tank will "float" in cradle to avoid torsional stress caused by chassis frame flexing.
Rubber cushions, .50" thick x 3.00" wide, will be placed on all horizontal surfaces that
the tank rests on.
Stops or other provision will be provided to prevent an empty tank from bouncing
excessively while moving vehicle.
Mounting system is approved by the tank manufacturer.
WATER TANK WARRANTY
The tank will have a lifetime warranty.
If the tank manufacturer determines that the tank problem has rendered the truck out-of-
service, the tank manufacturer will dispatch a service technician WITHIN 48 HOURS (2
DAYS) to repair the tank (This time period is for the United States and Canada only).
PUMP OVERHAUL, WATEROUS
The Waterous CMUYBX-1500 water pump will be rebuilt as follows:
The master drain assembly and connecting tubing will be removed, and set aside for
servicing.
The pump drive unit and drivelines will be removed. The pump body will be split and the
lower portion of the pump body, along with the impeller assembly, will be removed for
bench service. The upper and lower pump halves will be carefully cleaned and inspected
for abnormal wear on the stripping edges or other damage. Any damage to the center
case will be identified in writing and forward to the fire department with a parts
and labor estimate if replacement is needed.
An entirely new impeller assembly will be installed, to include new impellers, wear rings,
impeller shaft and seals/gaskets. Standard packing is included. The pump body will be
reassembled following the manufacturers tightening sequence and fastener torque
specifications. The pump drive unit and driveline will be reinstalled. The driveline and
drive unit will be serviced, including oil change in the drive unit and greasing of the U-
joints. The master drain valve and connecting tubing will be reinstalled.
The transfer valve will be removed from the pump body, checked for movement, and
operation. The transfer valve will be disassembled, cleaned and inspected for abnormal
wear or damage. The transfer valve will be reassembled with all new seals and gaskets.
The valve will be installed into the pump body and re-checked for proper operation.
Page 14 of 24
The pump master drain valve will be replaced with new, and reinstalled on the pump. The
connecting link and drain tubing will be reconnected and the valve will be checked for
smooth operation and proper sealing.
The pump will be dynamically tested for leaks and to insure the performance meets the
manufacturers flow and pressure standards. The transfer valve, and any indicators, will be
checked for correct operation within the manufacturers operating parameters. A Pierce
Manufacturing pump certification will be provided when the work is complete.
RELIEF VALVE OVERHAUL
The relief valve body will be removed from the pump body, thoroughly cleaned and
inspected for pitting and other evidence of wear. Small imperfections will be sanded or
honed to reduce the size and allow smooth operation. The control, (pilot), valve will be
removed from the operators panel. The control will be disassembled, flushed and
inspected to insure all passages are clear and clean. New O-rings, seals and gaskets will
be installed per the manufacturer's recommendations. The control and relief valve will
be re-installed and tested to assure proper operation per the manufacturers and NFPA
standards.
VALVE OVERHAUL
All discharge, tank fill, tank to pump and auxiliary inlet valves will be removed from the
adjacent piping to facilitate cleaning and allow bench rebuilding. The valve seals and ball
will be removed and carefully inspected for wear or abnormal operation. New seals and
O-rings will be installed per manufacturer's recommendation, including a new stainless
steel ball. The valves will be reinstalled and dynamically tested for internal and external
leakage.
OUTLET BLEEDERS. SWING STYLE HANDLE CONTROL
All drains will be updated to the new swing handle design.
A .75" bleeder valve will be provided for each outlet 1.50" or larger. Automatic drain
valves are acceptable with some outlets if deemed appropriate with the application.
The valves will be located behind the panel with a swing style handle control extended to
the outside of the side pump panel. The handles will be chrome plated and provide a
visual indication of valve position. The swing handle will provide an ergonomic position
for operating the valve without twisting the wrist and provides excellent leverage.
Bleeders will be located at the bottom of the pump panel. They will be properly labeled
identifying the discharge they are plumbed in to. The water discharged by the bleeders
will be routed below the chassis frame rails.
ANODE, INLET
A pair of replaceable sacrificial 0.75" magnesium anodes will be provided in the water
pump to protect the pump from corrosion. One (1) will be placed in the inlet side of the
pump and the other in the discharge side of the pump.
Page 15 of 24
FRONT SUCTION VALVE
The existing front suction manual valve will be replaced with an electrically operated
valve with an electric control at the pump operator's panel. The control will be
momentary to allow the valve to be gated for ease of operation. Indicator lights will be
provided to show if the valve is open or closed.
PIERCE PUMP CERTIFICATION
Pierce pump certification to the same standards as the third party UL test but no 3`d party
witness will be issued.
ALL EMERGENCY WARNING AND DOT LIGHTS WILL BE UPDATED TO
LED LIGHTS AS FOLLOWS:
DIRECTIONAL (Front)
Front turn signals to be Whelen 600 series LED full populated amber lamps housed in
chrome bezels. The turn signals will be housed in the same common bezel as the front
warning light and be located above the headlights.
In addition to the front facing directional, a Weldon, Model: 9186-8560-20, marker/turn
indicator will be provided on each side of the cab.
LIGHTS, FRONT ZONE LOWER
One (1) pair of Whelen model 60*02F*R, flashing "Super" LED lights will be installed
on the cab face above the headlights, in a common bezel with the directional lights.
The color of these lights will be red Super LED/red lens.
These lights will meet or exceed NFPA front lower zone requirements.
Per NFPA, these lights will be activated by a switch in the cab.
STEP LIGHTS
All cab and body step lights will be changed to Ri-Tar, Model M27HW2 Super LED,
step lights.
The new LED step lights on the apparatus will be illuminated per the current edition of
NFPA 1901.
REAR FMVSS LIGHTING
The rear stop/tail and directional LED lighting will consist of the following:
Two (2) Whelen model 60ROOXRR red LED stop/tail lights.
Two (2) Whelen model 60AOOTAR amber LED arrow turn lights.
Two (2) Whelen, Model: 60J000CU backup lights will be provided.
Each light will be installed separately at the rear without a flange.
Page 16 of 24
These lights will be installed in chrome bezels.
REAR ZONE LOWER LIGHTING
Two (2) Whelen model 60*02F*R flashing "Super" LED warning lights will be located
at the rear of the apparatus, required to meet or exceed the lower level optical warning
and optical power requirements of NFPA.
The color of these lights will be red Super LED/red lens.
One (1) switch in the cab on the switch panel will control these lights.
These lights will be installed in the CAST 4 bezel.
WARNING LIGHTS (Rear of Hose Bedl
Two (2) Whelen L31 H*FN LED warning beacons will be provided at the rear of the
truck, located one (1) each side. These lights will be activated by a lighted switch on the
instrument panel.
The color of the lights and domes will be red LED on the driver's side and amber LED on
the passenger side.
HAND HELD LIGHT
There will three (3), customer supplied hand held 12 volt lights mounted by Pierce.
Location to be determined at a later date.
CORROSION and SMALL DENTS
Metal finish and repair all minor body and cab corrosion and any small dents prior to
repainting the complete exterior of the apparatus body and cab. Additional major
corrosion and / or accident damage repair costs will be open: subject to inspection
and written approval by the fire department.
CAB TWO-TONE
The cab will be two-tone, with the upper section painted Upper cab black #101 along
with a shield design on the cab face and lower section of the cab red #80. Two tone to
match existing scheme.
BODY PAINT COLOR
Single color RED # 80
PAINT, COMPARTMENT INTERIOR
The compartment interior will be painted with a gray spatter finish for ease of cleaning
and to make it easier to touch up scratches and nicks.
BODY PAINT COLOR and SCHEME to MATCH ORIGINAL
The exterior custom body will be metal finished and repainted to include hosebed,
Page 19 of 24
crosslays, cargo area and exterior of pump hose.
PAINT -BODY and CAB
The exterior custom cab and body painting procedure will consist of a seven (7) step
finishing process as follows:
1. Manual Surface Preparation -All exposed metal surfaces on the custom body will be
thoroughly cleaned and prepared for painting. Surfaces that will not be painted include
all chrome plated, polished stainless steel, anodized aluminum and bright aluminum
treadplate. Each imperfection on the exterior metal surface will be removed or filled and
then sanded smooth for a smooth appearance. All seams will be sealed before painting.
2. Chemical Cleaning and Treatment -The aluminum surfaces will be properly cleaned
using a 4-phase, high pressure and high temperature acid etching system. All steel
surfaces will be properly treated using a 3-phase, high temperature,
cleaning/phosphatizing system. Surfaces are chemically cleaned to remove all dirt, oil,
grease and metal oxides to ensure the subsequent coatings bond well. An ultra pure water
final rinse of 25 parts per million solids or less, will be applied to final rinse all metal
surfaces at the conclusion of the metal treatment process. This final rinse ensures all
chemical residues are removed and that no minerals, (salts), from the water dry onto the
metal surface and remain under the primers and topcoats. These salts can lead to
blistering and under film corrosion.
3. Primer/surfacer Coats - A minimum of two (2) mil dry, (.002), of two component
urethane primer/surfacer will be hand applied to the chemically treated metal surfaces to
provide a strong corrosion protective base coat and to smooth out the surface. The primer
is a high solids and low VOC paint.
4. Hand Sanding to Ultra Fine Finish The primer/surfacer coat is lightly sanded with
mild abrasive paper to an ultra smooth finish. This hand finish process is critical to
produce the smooth mirror like finish in the topcoat.
5. Sealer Primer Coat A two- (2) component sealer primer coat is applied over the
sanded primer to again build toward the final smooth finish. This layer of primer sealer
also gives additional corrosion protection.
6. Topcoat Paint Two (2) coats of an automotive grade, two component acrylic urethane
paint are applied to provide the lasting beauty and durability. The acrylic urethane
topcoat contains a clear coat resin chemistry that creates the high gloss and depth of
image. This type of topcoat provides the best resistance against acid rain and other more
common chemicals.
7. Clearcoat -Two (2) coats of an automotive grade two (2) component urethane will be
applied. Lap style doors will be clear coated to match the body. Roll-up doors will not
be clear coated and the standard roll-up door warranty will apply.
A cyclic corrosion test, (General Motors test GM-9540), of 40 cycles will be required
before making changes to the exterior coating process. Exterior coating systems,
(excluding the undercarriage components), must achieve a 1/16 or less maximum creep
Page 20 of 24
from the scribe for aluminum and an 1/8 or less maximum creep from the scribe for
galvanneal after 40 cycles in the General Motors GM-9540 test.
Each batch of color topcoat, together with the finish painted vehicle, is tested for precise
color match. Visual color match will be checked following ASTM D-1729, (American
Standard Testing Methods), procedures using CIE, (International Commission on
Illumination), D75 Northern Daylight light source. Instrumental color match will follow
ASMT D-2244 procedures with a maximum delta E of 1.0 for whites, 1.4 for yellows,
blues, greens and 1.5 for reds.
All removable items such as brackets, compartment doors, door hinges, trim, etc. will be
removed and painted separately to insure paint behind all mounted items. Body
assemblies that can not be finish painted after assembly will be finish painted before
assembly.
PAINT -ENVIRONMENTAL IMPACT
Contractor will meet or exceed all current State (his) regulations concerning paint
operations. Pollution control will include measures to protect the atmosphere, water and
soil. Controls will include the following conditions:
- Topcoats and primers will be chrome and lead free.
- Metal treatment chemicals will be chrome free. The wastewater generated in the metal
treatment process will be treated on-site to remove any other heavy metals.
- Particulate emission collection from sanding operations must have a 99.99% efficiency
factor.
- Particulate emissions from painting operations will be collected by a dry filter or water
wash process. If the dry filter means is used, it must have an efficiency rating of
98.00%. Water wash systems will be 99.97% efficient.
- Water from water wash booths will be reused. Solids will be removed mechanically on
a continual basis to keep the water clean.
- Paint wastes are disposed of in an environmentally safe manner. They are used as fuel
in kilns used in the cement manufacturing process -thereby extracting energy from a
waste material.
- Empty metal paint containers will be cleaned, crushed and recycled to recover the
metal.
- Solvents used in clean-up operations will be collected, recycled on-site, or sent off-site
for distillation and returned for reuse. Residue from the distillation operation will be
used as fuel in off-site cement kilns.
WARRANTY -PAINT AND CORROSION
Limited Warranty
Except as provided below, and provided the vehicle has been placed in service within 60
days after delivery to the original purchaser as established by our original invoice, for a
period of ane (1) year after. Pierce Manufacturing Inc. ("Pierce") warrants to the user
Page 21 of 24
that its cab and body are free of blistering, peeling, bubbling, or any other adhesion defect
caused by defective manufacturing methods or paint material selection for exterior
surfaces of the cab and body of the vehicle. This limited warranty will apply only if the
vehicle is properly maintained and used in service which is normal to the particular
vehicle. Normal service means service which does not subject the vehicle to stresses or
impacts greater than normally result from the careful use of the vehicle or chassis. If the
buyer discovers a defect or nonconformity it must notify Pierce in writing within 30 days
after the date of discovery. This limited warranty is not transferable by the first user, and
is applicable to the vehicle in the following percentage costs of warranty repair, if any:
Months Adhesion Blistering Bubbling Corrosion Cracking Gloss Color Retention
0 to 12 100% 100% 100% 100% 100% 100% 100%
This limited warranty applies only to cab and body exterior paint
REFLECTIVE BAND. LETTERING and GRAPHICS
All graphics, lettering and reflective bands are to match the newest current apparatus
20589TR
FINALIZATION and DETAILING
Prior to delivery the entire vehicle will be washed to include the interior and exterior.
All fluid levels will be checked on topped off if needed.
The vehicle will be fully fueled.
COST: $ 242,552.00
OPTIONS:
COMPARTMENT LIGHTING
Replace all body compartment lights with AMDOR, LED strip lights.
The strips will be centered vertically along each side of the door framing.
Opening the compartment door will automatically turn the compartment lighting on.
Cost: $ 4,912.00
Page 22 of 24
CHEVRON/INVERTED "V" STRIPING ON REAR WALL DIAMOND GRADE
All vertical surfaces of the rear aluminum treadplate will be replaced with smooth
aluminum sheet and covered will chevron stripping.
There will be alternating inverted "V" chevron striping located on the rear wall of the
apparatus to include the rear bulkheads.
The striping will consist of the following colors:
The first color will be Diamond grade RED
The second color will be Diamond grade YELLOW
The size of the striping will be 6".
Cost: $ 1,321.00
BODY FENDER CROWNS
Stainless steel fender crowns will be provided around the rear wheel openings.
A rubber welting will be installed between the body and the crown to seal the seam and
restrict moisture from entering.
A dielectric barrier will be provided between the fender crown fasteners (screws) and the
fender sheet metal to prevent corrosion.
Cost: $ 797.00
WHEELS
The new front tires will be mounted on Alcoa 22.50" x 9.00" polished aluminum disc
wheels with a ten (10) stud, 11.25" bolt circle.
The existing rear tires will be mounted on new Alcoa 22.50" x 8.25" polished aluminum
disc wheels with a ten (10)-stud 11.25" bolt circle.
LUG NUT COVERS
Chrome plated lug nut covers will be installed on all lug nuts.
Cost: $ 6,101.00
MECHANICAL SIREN, (Auxiliary)
A new Federal Q2B siren will be mounted on top of the new bumper deckplate between
the two (2) boxes on the driver's side to match 20589TR.
Cost: ~ 3,758.00
FRONT SUCTION SWIVEL
The existing front suction outlet at the front bumper will be modified to include a swivel
on top of the new bumper extension as follows:
The front suction will have a chromed 6.00" swivel with National Standard hose threads
and a long handle chromed plated cap.
Page 23 of 24
The swivel will have a rough smooth chrome finish.
Cost: $ 2,394.00
TELESCOPIC PIPING DELUGE GUN
The existing deluge riser piping will include an 18.00" Task Force Model XG18 Extend-
A-Gun extension.
This extension will be telescopic to allow the deluge gun to be raised 18.00" increasing
the range of operation.
A position sensor will be provided on the telescopic piping that will activate the "do not
move vehicle" light inside the cab when the monitor is in the raised position.
The existing monitor and tips will be reused.
Cost: $ 4,700.00
12 VOLT TELESCOPING LIGHTING
Two (2), Whelen PFA2 Pioneer LED, 12 volt floodlights will be provided on a Fire
Research model LTP-540-DCO-TW, side mount, top raise pole with top wire. The LED
flood light will use a Havis Shield KR-PLA adapter bracket with a switch to mount each
light.
Remove the two (2) existing Nightfighter and replace these lights in the same locations.
The lights will be wired to the "Do Not Move Truck" light in the cab.
Switching will be controlled on each light.
Cost: $ 3,431.00