HomeMy WebLinkAboutAPSCO for Turbo BlowersMayor Tammy de Weerd
E IDIAN~-~- Cry Cewncil Meinbe~l~
Keith Bird
Brad Hoaglun
Public ~ D A H O Charles Rountree
David Zaremba
Works Department
TO: Mayor Tammy de Weerd
Members of the City Council
FROM: Clint Dolsby, P.E.
Assistant City Engineer
DATE: September 17, 2010
SUBJECT: APPROVAL OF AWARD AND AUTHORIZATION OF ISSUANCE OF A
PURCHASE ORDER WITH APSCO, INC FOR TURBO BLOWERS FOR
A NOT-TO-EXCEED AMOUNT OF $280,000.00 AND APPROVAL FOR
THE PURCHASING MANAGER TO SIGN PURCHASE ORDER
(Next Available Consent Agenda)
I. RECOMMENDED ACTION
A. Move to:
Approval of award and authorization of issuance of a Purchase Order with
APSCO, Inc. for Turbo Blowers for anot-to-exceed amount of $280,000.00;
and
2. Authorize the Mayor to sign the agreement
II. DEPARTMENT CONTACT PERSONS
Clint Dolsby, Asst. City Engineer (Project Manager) 489-0341
Warren Stewart, PW Engineering Manager 489-0350
Tom Barry, Director of Public Works 489-0372
III. DESCRIPTION
A. Background
The Public Works and Planning Departments have acquired grant funding of a
combined $287,000 from the Department of Energy and Idaho Power for energy
Page 1 of 3
efficiency improvements at the Wastewater Treatment Plant. These grants plus
an the budget amendment that was approved at the April 27, 2010 Council
meeting and the budget for this project that was approved for fiscal year 2011
will fund the design and construction of the turbo blowers and energy efficiency
improvements that are estimated to save more than $4,000 a month in energy
costs.
B. Proposed Project
Air for the aeration basins at the Wastewater Treatment Plant is currently
provided by three multi-stage blowers located in the blower building. The
replacement of the multi-stage aeration basin blowers with high efficiency turbo
blowers and aeration system efficiency improvements has the potential to save
several thousand dollars per month. The procurement of the turbo blowers is the
first step towards the completion of this project. Following this equipment
procurement, the City plans to install the turbo blowers and implement the
aeration basin efficiency improvements in fiscal year 2011.
C. Contractor Selection
APSCO, Inc. was the lowest bidder and is qualified to provide the specified
equipment package.
N. IMPACT
A. Strategic Impact:
This project supports the Public Works Mission and Vision for emphasizing
financial stewardship and environmental sustainability. The proposed
improvements are responsive, innovative, and increase operational efficiencies
while saving the City several thousand dollars a month in energy.
B. Service/Delivery Impact:
The improvements will reduce the power consumption of the Wastewater
Treatment Plant through the installation of more efficient blowers and aeration
efficiency improvements.
C. Fiscal Impact:
Project Costs
Base Bid Amount
Total Cost
Project Funding
$280,000.00
$280,000.00
Meridian WWTP Blower Replacement (3590-96101) $280,000.00
Page 2 of 3
Total Funding $280,000.00
Construction Grant Funding
Idaho Power Grant $112,000.00
Department of Energy Grant $175,000.00
Total Grant Funding $287,000.00
V. ALTERNATIVES
A. The City could defer the turbo blowers and aeration basin air efficiency
improvements. However, the Department of Energy Grant must be spent
within a year and a half from acquisition, Public Works may run into time
constraints to complete this project if it is deferred. This would also delay
realization of the energy savings and operational improvements.
VI. TIME CONSTRAINTS
Council's approval will allow for the acquisition of the blowers in early FY11.
VII. LIST OF ATTACHMENTS
A. APSCO K-Turbo bid for the Turbo Blowers
Approved for Council Agenda: z d
Dat
Page 3 of 3
o~~
Proposal For
Meridian, ID WWTP
Date: Aug 17th 2010
Supplier ;
KTurbo Inc
1183 Pierson, Bldg 118, Batavia,
IL 60510 USA
Te1.630-406-1473 Fax.630~06-1538
Representative ;
APSCO
J'c ~ KERNKk m~
P.O. Box 2639 Kirkland, WA 98083
Office :1-425-822-3335
Fax ~1-425-827-6171
o~~
Specification Review by technical manager,
Sung Tae KIM
2.05. 6.4 Discrete Outputs Contacts : 120AC rated
KTurbo the conditions stated in the following
Discrete outputs Contracts: 250 VAC / 2A
Recommendation
f.) Piping size of the motor cooling duct
In this case the motor cooling discharge pipe connected to outside.
For the smooth cooling of the motor, the pipe must be extended up to 10 inches.
2) Max Air flow
The Max airfbw ,6500 SCFM at 8.1ps1 does not meet the criteria of TB 300-O.ST model .
Max fbw condition for T6300-0.8T is 5500 SCFM at 8.1 PSI. For more information, Please
Refer to the performance Map.
AUG 17th, 2010
ATTN :Alt members whom it concerns Meridian, ID VNNTP
We are pleased to submit this quotation and proposal submittal. KTurbo inc is a world leader
now in air bearing type high speed turbo blowers, enjoying over 1,420 successful units in
operation. KTurbo, swell-respelled 14 year-old firm owned by Sung Shin Group, Korea's largest
cement company. KTurt~o's full North American rep network is now in place In order to meet Buy
American Ad, a sales office, a factory and a stocking service center established in Batavia. All
projects indude factory startup service from their Batavia office. The KTurbo blower utilizes the
principles of advanced air bearing tedznology, a permanent magnet motor, SST cast impellers
for maximum operational range, for both flow and pressure variation aspects, and a tuned
variable frequency drive that is matdied to the characteristics of the permanent magnet motor.
The unit comes with auser-friendly LCP and touch scxeen displaying many typical parameters,
as well as machine sensors for all manners of protection.
KTurbo certifies that atl information is accurate and correct in our proposal, per your iRFP. We
thank you for the opportunity to provide KTurbo equipment
Yours sincerely,
Heon Scek LEE
CEO
KTurbo Inc.
...,...,.~...
gam ~ ~..rr•~
Description
QTY
Remarfc
PROPOSAL
PRICE
1 T8300-0.8`f (High Speed Turbo Blower) 2 Type C
2 Expansion Joint 1400A (16 Inch) 2
3 Check valve / 400A (161nch) 2
4 Discharge silencer /400A (it3 Inch) 2
5 Isolation buttertly valve (Manua! type} / 400A(i6lnch) 2
6 Expansion Joint / 500A {20lnch) 2
7 Anchorage Component (Set) 2
8 Passive Harmonic Filter / 300HP 2
9 Spare Intake filter 4
10 Intake enclosure 2
The proposed price doesn't include sales tax.
' Turbo Blower Assembly
i) Bump Fofl Air Bearing
2) High Speed PM Motor
3) VFD
4) LCP (MICOM control, Touch Screen)
5) Inlet Filter/Silencer (will be provided when standard filter type glower selected)
B) Blow-off Valve
7} BOV Silencer
8) DC Choke
2. Manufacturing and Delivery terms
- The blower manufacturing would be start after submittal approval.
- It would be taken about 12 weeks to the jobsite after submittal approval.
3. Start-up Supervision, Testing, and Training
- lnIC6~10E/~ AS .~~ciFitO
{1 day additional payment :1,000$, (1) Separate Trip payment :1,000$,
3. Quality Assurance
1) KTurbo blower quality assurance program is ISO 9001 and 14001 oertfied.
2) KTurbo blower is NRTL certified by T~lV.
3) USA Office, Factory, Service Center
KTURBO INC.
1183 Pierson, Unit 118, Batavia, IL 60510 USA
4. Warranty
The first coming day between 24 months after start-up and 30 months after delivery
S. Payment term
- Net 30days 30°k upon submittal approval, 609/° upon delivery, 10°k upon successful start-up
- If there are Causes in purchase order stating differential term. KTurbo will follow these terms
• KTurbo USA, Organization Chart
Spare part wiB be supplied within 5 days from KTurbo's USA office
Kturbo, USA
# APPENDIX
A. Specification
B. Performance Curve
C. Dimensional Drawing
D. Reference List
A. Specification
Dsscri tian -' ~ ~Oetalis --_~..
___ _
Irk oI Blgwrs _ _-__.___- _ -------_ _
Hi S ed __ - _- _
-- -- --- . ~ ,,pe-Turbo 8lawer
;Manufacturer _ __ _ - K7UI180 INC - _..__.~._ ._ __
- _._
I- _ _ _ lT83D0-O. BT _ . _ r
Rate~~Speed _ _ __-_ _ _ __._
•--_ _
Blotter Deslgn Discharge Pressure, based on Standard condi t ton ~ --_ rpn
.~.4..>~.1"r ~ 4Jm.F.L 3b W1, 0 elevat toe _ _ -. 9.000 ~ / ~ M kPa / 11.97 psiq
Blower Maxinun Capacity 9 Design Pressure, based on Standard - -` "~ ~-' -- -1
~gndition_,-,__ ;161 n3/nin (5686 cin)
Aerodvnanlc Ilserllrooic) ~1tic+gncy_Q_Nlpcltrra capacp!~1r.1_. _. _ 7d,5
o~w_....-___ ~----~- A = - =
~~
.400 {sound oraot
~i Isis} _ .
an i nun _.
....___m- - - ._ _. _ __
aro(SS41j~jth hr~t tens'>on Btol{S171440)
ss3o,.~n a Pri} - -__-__ _.__-_.
i I Sea f p~,l~n t) __ _. _---
-.__ _.
laniun +Irrcornel iMagpnt{Imer~_ ,._
r F~ i I '
_.__ __
JRBO INC
~30o-4
~~
=
_ - - _
ewer Factor
._____-_-~_ _ ___ __T
_ _. _-
___
;3 Phase _--__ _..._ .
..
_ _. _. _ _~
0.84
;
a rro slomtian
--_..____ _ _ _ __ _-_ .
- _. _.
'.Air-Cooled
t.h~~of SlartrnQ__--- --__-, _ Soft Start _ -
___
D wet --_ _._ 8 ~ i~in__ _
_
- _ ._ _ _ ___s-_
?201Ds-.. IODk
i
nu_ lecturer
--__ _.
.. _ _. ~- - - J
jKTURBO tNC __
._ _ - -
i ve rvoe
--- ---- -- ~
--
~1 PerMnent Me~net _ __ __ _
'
lir~_
_ _--- ._ __ . __ _.__. _
r
300 BFP
It d Fr _
roY
_ _ -- --- - ,
---- -- --- __
_ _Variable Voita _ Fr fron VFi
Ge ~
S41ulfw
L~ ~
trti Currant _ _"---`_ -
_!'gr______. _.._..__ ..
_
__ .__
3 Phase __ - _____-
".'__'t---~_°- _..__. ..._ __ _J
iwlthln 101E of rat yelue 1
>Iir~ 0esinnation
! Iciertcx ~ Q?4)iln.POtllt
_ Air I~ i
..- _.__----.__ -____- . ---._.___._ . _
95% 7
_~_ . _. __.
ttrlalion Class_ _ __.___.__-._-_ ------__--. _-_-~
or Mln~irq Protect ion_ yES _ _ _ _ _
trtnsiorts{L x tY x h1 _-._ _
_ ___ _._._ ..._ . ___. ~ - _---.._ _ _
._
r we l t !4181 bs .(19q(q~_ _ _
lLgt tr I I r
-~-~--- ----- _-----_--- _ _ __ . ___.. -.------
_'W~{gcQ,ntrQ,~Ifr -- AYR Atateoa 128
MCP 19
R
f b0 oyera~pn
__. ~ !)
DEVI~
E
. _ e
_ -~
__ ..... .._ ._- .._-
ut ~
I+ s I
thro
h
~
_____ __
~
c
•
_ _
put -
~,..4G.._4.~0 !W_[ dl~I,tei_ • Or~on_t
a
l
.
_ ____-._ ___ ___ _._---___ _.
Be tetlp~retUre Se11m6rS Iiefeke ldisrha nr lVFM pM~e IQg~_: 420 mA~~i to I__ Re~~.~. _ .. _.___. .
~ 7r__ ~ __ .~_____- -. _ __ -
Prefillers (Polyester fiber)
Final Filisrs (Synthetic }fiber with alu~inun housing)
2. HIGH SPEED TURBO BLOWER ASSEMBLY
1) Shaft /Air Bearing
Main shaft is directly connected with impeller and hydrodynamic air foil bearings construct
oil-less lubrication system. Lifting force produced by pressure gradient around the rotating
shaft makes no mechanical contact between shaft and journal. This fact makes various
complicated components unnecessary such as oil bearing, seal, oil filter, cooler, etc., which
are used for the existing high speed turbo machine.
2) Variable Frequency Driver (VFD)
The combination with the frequency modulation of inverter and PM motor controls the speed
of impeller, flow rate and/or discharge pressure.
3) PM motor
PM (permanent magnet) motor rotates by the electromagnetic interactions between stator
oohs and the rotor made of permanent magnets. It can start under 10 % of rated current,
and operate with high speed and high effiaency of 9.~r-97%.
(1) PM (Permanent magnet) motor (460 Volts, 3 Phase, 60 Hz, fan cooled)
(2) Start: under 10% of current at design condition.
(3) Insulation: Epoxy coated Class H.
(4) Maximum Ambient temperature: above 120 Deg F
(5} Stator Temperature Detector: Two thermal protectors in the stator windings {one each
end). Rod and tube type or similar that is sensitive to rate of rise as well as
temperature.
(6) Bearing: Air foil bearings.
(7) Electric Standards: IEEE, ANSI, and NEMA.
(8) Frequency sensing: sensorless.
4) Blower Local Control Pane!
LCD Display shows some measurement dam and alarm signs as follows;
-Air temperature of Intake and discharge
- Differential pressure at intake fitter
- Discharge pressure
... ~ S
-Flow rate of air
- Rotating speed
-Current /Power
- Error code
-Accumulated running hours
5) Sensors
- Sensors for the measurement of intake/discharge air temperature
- Sensor for the measurement of discharge pressure
- Sensor for the measurement of intake differential pressure
- DC current sensor
- Overheat sensor at inverter
-There are motor temperaiure switches instead of sensors
6) 17-4PH Stainless Steel Cast Impeller
7) DC choke inside a package
8) I(Turbo blower designed to minimize the footprint required for installation.
B. Performance Curve
F < ~t
Turbo Blower dl Cort7preasor Power Celculetor(V2.0) s..p9la.lo7,7 IfT1.oe
m isnal9hmro. -. _'._____ -------.---
VOLUMETRIC FLOW [cfmJ
1000 2000 3000 4000 5000 6000 7000
i l l l I l 7 1 I 1 1 1 1 I I
--- total-a#ficlency
.-,14 total power (ratio) ~
°o speed ratio= l .0 ; {-~
~w 0.8 r J ,~~~/ /,y.,~,.
can 4 0.7 : ~.(._~
C7 2 ~ .-~~., ~ , _
~ `Je' p~I~RN~A~ 1~``
0
T~3oo-o.sT
- ~'~~ ~ 161 m3/min
• `~ at 8000 mmAq
'~~ ~ , 1~
• ~ ~Q7
`~ / , ~~~ \
.,\ ` \
..~ ~\` ,0
~~ ~~
~ ~O
~s
temperature ~ 20 °C
density ~ 1.20-kq/m3
5
:~
00
u
u
u
a
0
U
C
5
0 20 40 60 80 100 120 140 160 180 200
_ VOLUMETRIC FLOW [m~'min]
•TffLE ~~_~ ~-_--_ IFeridian,ID (IfrAU9-201 DJ
• UNfi SYSTEM US lMID7
• YYiiCNF 01W1N W 36%RM ®OB•ry20'C). 1~b16psw(301 335kpe7 for V9A. 69%RN ~ 20Y, 101 325kp• for 3epea
,.._
STAN07rID CONDfIION i
TM[~' ____ _.__-ItNu I%]__ i P~ Ip.K~N NIi7D0e [Id MDI7d PIl67111p IpaiW1
~; ~ 11 fi96 2471, 19.2
COMMENT
et a en ~r,~la • s
• Dull-in Fi9er :Fresh 0.03 psi/D'+N 0-22 pti
Tr'- I.RN~'
~~ tal f.
PYw
GPs. dlvw>, ~
Oa<t of J'
O w;Mas3 FbJi ~ ToW b1411
. P<e. '1i'rl ~
7
-- i
~ €1h i~(xl FCPIN Wic fnMq] 4ell 1 !Gild ICFUI _ [CMN~ - Whl . p1
1 pwaAf
IPill i F%1 ° - i "
'
~..
~ ~ ~~ 5
._ ~ ...
I 100
.
36 1
230D al; 921 270609, 29p.tl 278i16 2917. 9.9D3 67.6:- 97.5 97.
~
100' 96 Q7m' I:~ &1 92j Si65D.9! 6737.33 6516!9. 6015 93tl~ 698 191.0 IB7.4'
~
3 700 30 E900i I! 91~ 0.2; T,DI.93~ Lia7.9t L701A3,
~ 7.319 6393' 0 90 QO~IIryal ld I!I j
a tOD 3i~ 5700 1' RI~ D2~ 661212 6713.09'; 6519.H 7.039 93RD' 67 Y17.D 227.9-Ai71
C. Dimensional Drawing
... a
~. O
.....
......
~
!
1
~
_'
i~
u
2
i
O
C
N~ i
~u`
;g
~~
M
iJ
w
~~
,W
V
~ _______,._..__.__~_.~.___ _~n._m_ _ ~_~__.._ __ _~
_ _ ~ W
~~g~
~
~
a
._
S ~ Y
W
4 C
('
Z 6 ^r
``
O
d
W
Z
5 ~
W ~
Y o ~ _
W
' C
~ c
d EE ~
~ E ~ g
8 ~
__-_.-_
D. Reference List
^ 1 SUNRIVER Water LLC
Model : 1 unit of TB100-0.6S, 1 unit of TB100-0.6S
Date of installation :Feb 18th 2008, May 15th 2009
Address : 57850 W Cascade Rd
Sunriver, OR 97707
Contact Point :Todd Penhollow (Tel. 541-408-2061) Plant Manager
^ 2 MUKILTEO WWT
Model: 3 units of TB50-0.6S
Date of installation :Nov 5th 2008
Address :9417 62ND PL. W.
MUKILTEO, WA 98275
Contact Point: GIL (Tel. 425-355-6837) Plant Manager
^ 3 King County
Model: 1 unit of TB50-0.6S
Date of installation :Jun 10th 2009
Address :1400 Utar Street West
Seattle, WA 98199
Contact Point :Jim Botcher (Tel. 206-263-3843) Plant Manager
^ 4 Burlington VT
Model: 1 unit of T650-0.8S
Date of installation : Juty i5th 2009
Address : 53 Lavalley Lane
Burlington, VT 05401
Contact Point :Tim Grover (Te1.802-882-7164)
^ 5 EI Mirage
Model: 3 units of T6100-0.8SH
Date of installation : Od 1st 2009
Address :12000 W. Peoria Avenue
El Mirage, AZ 85335
CoMad Point :Dave Emon (Te1.623-980-9972) Plant Superintendent
^ 6 Unlon Rome
Model: 3 units of TB50-0.8S
5 units of TB75-0.6S
Date of installation : Od 26th 2009
Address :1117 Rear 3rd Ave Chesapeake, Ohio 45619
Contact Poini :Tim Porter or Gary ChrisweM (740-867,8700) Plant Operator and Manager
^ 7 Running Springs
Model: 2 units of TB75-1.55
Date of installation :Nov 20th 2008
Address :30480 Fredalba Road
Running Springs Califomla 92382
Contact Point :Trevor Miller (TeI.909-867-3689) Plant Manager
^ 8 Santa Paula
Model: 3 units of TB75-0.8S
4 units of TB100-1.OS
3 units of TB200-0.6s
Date of installation :Dec 4th 2009
Address :921 Corporation Street
Santa Paula CA 93060
Contact Point :Juergen Nidc(Tel. 714-514-1958) Owner/Engineer/Operator
^ 9 Jerome
Model: 1 units of TB300-0.8T
Date of installation :Jan 25"' 2010
Address : 50 North 100 West
Jerome, Idaho 83338
Contact Point: John Boyd {208-308-6197) Ptant Manager
a 10 Taylorville
Model: 1 units of TB400-O.SS
Date of installation :December 2009
Address :1058 E. Langleyville Road Taylorvipe, IL 62568
Contad Point: Norman Ramsey (217-824-6833) Plant Manager
~ 11 McMinnville Water and Light
Model: 2 units of T8200-1.2S
Date of installation : Fetxuary 15th 2010
Address :23100 IdW Haskins seek road
Yamhlll, OR 97148
Contact Point :Doug Buxton (541-472-6919) Plant Manager
^ 12 Kellogg Water Pollution Control Facility
Model: 1 Unit TB200-0.6T
Date of installation :March 4th 2010
Address :11525 S.E. McLoughlin Blvd. Milwaukee, OR 97222
Contact Point :Randy Rosane {503-742-4573) Cell (503-320-4664) Water Environment Services
Capital Improvements Supervisor
2. Total References in N!A
NO. Client Location Applicatbn Model No. Q'ty Delin~ery
1 SUNRIVI.R Water LLC SUNRIVER, OR Aeration TB100-O.6S 1 2008-Feb
2 SUNDANCE WRF BUCKEYE, AZ Aeration TB50-0.8S 1 2008-Jun
3 SUNRIVER WATER LLC 2i° 5UNRNER, OR Aeration TBi00.0_BS 1 2008-Nov
4 MUKILTEO WiIV'T MUKiLTEO, INA Aeration TB50-0.BS 1 2008-Nov
5
UNION ROME WWT
UNION ROME
OH
A
ti T650-0.8S 3
2008
N
, on
era
T875-0.6S
5 ov
-
6 Sierra Ysta WWT Sierra Ysta, AZ Aeration T625-0.85 1 2009-Mar
7 McMimilleWWTP McMinnville, OR Aeration T6200-1.2S 2 2009-Mar
8 KING COUNTY WWT SEATTLE, WA Aeration T650-D.BS 1 2009-APR
T875-0.8S 3
9 SANTA PAULA WRF SANTAPAULA, CA Aeration TB100-1.05W 4 2009-May
TB2D0.O.BT 3
10 Burlington WWiP Burlington, VT Aeration T850-0.83 1 2009-Jun
11 Dallas Dallas WiNTP, TX Aeradan TB100-1.OS 1 2D09-Jun
12 Mukdteo 2nd Mukilteo 1NWTP, Vd4 Aeration T650.O.BS 2 2009-July
13 EI Mirage EI Mlrage,AZ Aeration T8100-0.8SH 2 2009-Aug
14
Running Springs Running Springs Water
DisUict, CA
Aeratbn
T875-1.5S
2
2009-Sep
15 CdYnsville 11VYYTP Cd6nsvilb, IL Aeration T820D-0.BTH 3 2009-July
16 Teylorvrlle Taylorville, IL Aeration T6100-0.8SH 1 2009-Aug
17 Corv4gra ConAgra, IL Aeration TB100.1.OS 1 2009-Aug
78
Skyway Burlington Skyway
WPCP
Aeration
TB200-D.6T
2
2008-Dec
19 Casco Casco Facility Aeration TB100-0.6S 1 2D09-Dec
20 1h~seca Waseca, MN Aeration TB450-0.BS 4 2009-Sep
21 Edmonds Edmonds,llYA Aeration T6300-1.OT 1 2009-Nov
22 Mishawaka Mishawaka, IN Aeration T8300-0.6T 1 2009-0ec
23 Aqua Tec, Inc. Aqua Tec, Inc, IL. Aeration TB100-1.OS 2 2009-Dec
24 Somerton Somerton, AT Aeration TB50.O.SS 2 2009-Dec
25 Second Aqua TeC, Inc Aqua TeC, Inc Aeration 78150-1.5S 1 2009-Dec
26 Jerome Jerome, ID Aeration 78300,0.87 1 2009-0ec
27 Kellogg Kegogg, OR Aeretion 78200-0,87 3 2009-Dec
Total 57 Norr
3. Future Reference
NO. Client Location Applicatbn Modal No. Q'tr DeliMery
Aeration 76300-0.8T 12
1 TSSD Timpanogos, UT
Aeration
78400.0.87
8 2010-Nov
2 Orem City Orem city, UT Aeration T8250-0.8S 6 2010aulay
3 Delphos Delphos, OH Aeration 76200.0.83 8 2010-May
4 Erie Erie, CO Aeration 78150-1.OSX 2 2010-Mar
5
F
rita
Fruits
CO
Aeration 76100-1 AS 1
2010-Apr
u , TB200-1.OS 3
TB150-0.8S 3
6 Second Sierra Uinta Sierra vista, AZ Aeration
TB50-0.8S
2 2010-May
7
Mlssippi Mills tNPCP Mississippi Mills,
ONTARIO
Aeration
78150-0.85
3
20f0-May
8 JerseWille Jerseyville, IL Aeration T650.0.8S 2 2010-May
9 Columbia Fats UNNiP Columbia Falls, IL Aewtion TB150-0.8S 1 2010-May
10
Seaway tNPCP SeawaylNPCP
Regbn of Niagw
Aeration
TB200-0.87
3
2010~Mey
76400-0.87 3
l
11 Little Patuxent Ltte Pahixent, MD Aeration
78400-1.OT
2 2090-Ju
y
12 WasMngton Beef tfitashirgton, DC Aeration TB150-0 8S 5 2010-Aug
13 Indian Springs Indian Springs, NV Aeration TB50-0.85 3 2010-Jun
14 Tech pads Tech pads, Incheon Aeretlon TCL400-4.0 2 2010-Aug
15 BuAington Burlington, OH Aeretion T6200.0.8S t 2010Ju1
18 Greeley Greeley,CO Aeration T6300-0.8T 8 2010-May
17 Oren Cily Orem,UT Aeration T8250-0.8S 6 2ptOJun
18 Lake County take County,ll Aeration TB75-O.SS 1 2010-Jul
98 Per~eton Pendleton,OR Aeration TB100-1.OS 3 2010.1u1
A
i T6300-0.6T 3
2010-Jul
20 LovreA LoweII,MA on
erat T8200-0.8T t
T
M
ti
A TB150-0.8S 3
2010-Jul
21 Toes oas,N ere
on TB200-0.8T 3
22 Mitlbree Millbnw,CA Aeration TB75-0.8S 3 2010-Jul
Total 88 Now
~. :, .
,~
4. Contact information
Company Name Title Emal! Cell
Heon Seok LEE CEO hstee®kturbo.com +82-10-4702-4708
Min Seok LEE Global Sales Director pooh~kturbo.oom +82-10-5438.7510
Su Duk Seo Sales General Manager ssd~kturbo.com +82-11-251-6834-
KTurbo iNC Trinity SewgEun
LEE
US /Canada General Manager
trinily~kturbo.oom
630-329-5049
Seung Tae KIM Technical engineer stkim~kturbo.oom +82-10-7597.6445
Sung Duck Chce Customer Service General Manager sdchoe~kiurbo.com 630-408-1473
APSCO
Jce Kemkamp
Sales manager jkemkamp~apsco-
inc.oom
425-822-3335