HomeMy WebLinkAboutSilverstone Bus Campus PP RecsRECOMMENDATION TO CITY COUNCIL OF APPROVAL OF PRELIMINARY PLAT FOR
SILVERSTONE BUSINESS CAMPUS BY SUNDANCE INVESTMENTS – PP-03-018 - Page 1
BEFORE THE PLANNING AND ZONING COMMISSION
IN THE MATTER OF THE
REQUEST FOR PRELIMINARY
PLAT FOR SILVERSTONE
BUSINESS CAMPUS SUBDIVISION
Pinnacle Engineers,
Applicant
)
)
)
)
)
)
)
Case No. PP-03-018
RECOMMENDATION TO CITY
COUNCIL
1. The property is approximately 80 acres in size and is generally located east of
Eagle Road and south of Overland Road.
2. The owner(s) of record of the subject property is Sundance Investments and Ada
County Highway District.
3. Applicant is Sundance Investments, LP.
4. The subject property is currently zoned RUT. There is, however, an application
for annexation and zoning to C-G before the City Council. The zoning of C-G is
defined within the City of Meridian Zoning and Development Ordinance Section
11-7-2.
5. The subject property is within the city limits of the City of Meridian.
6. The entire parcel is included within the Meridian Urban Service Planning Area as
defined in the Meridian Comprehensive Plan.
7. The Applicant proposes to develop the subject property in the following manner:
49 lot commercial subdivision.
8. The Eight Mile Drain and its wetlands are a scenic feature of major importance
that affects the consideration of this application.
9. The Planning and Zoning Commission recognized the concerns of Trevor C.
Roberts, in a letter dated June 2, 2003.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF PRELIMINARY PLAT FOR
SILVERSTONE BUSINESS CAMPUS BY SUNDANCE INVESTMENTS – PP-03-018 - Page 2
RECOMMENDATION
The Meridian Planning and Zoning Commission hereby recommends to the City
Council of the City of Meridian that they approve the preliminary plat as requested by the
applicant for the property described in the application, subject to the following:
A. Adopt the Recommendations of the Planning and Zoning and Engineering staff as
follows:
1. Sanitary sewer service to this site will be from an extension of the Five Mile
Trunk. The applicant will be responsible to construct lateral sewer mains, as well
as extending the Five Mile Trunk, to and through this proposed development.
Subdivision designer to coordinate main sizing and routing with the Public Works
Department. Sewer mains will not be allowed within landscape areas, beneath
landscape islands, and manholes will not be allowed in parking and loading areas.
The applicant shall be subject to latecomers’ fees. Payment of the latecomer’s fee
for each phase is required prior to signature on the final plat map of each phase by
the City Engineer.
2. Water service to this site will be from an extension of existing water mains in
Overland and E. Copper Point Street. The applicant will be responsible to
construct water mains to and through this proposed development. Subdivision
designer to coordinate main sizing and routing with the Public Works
Department. The applicant shall be subject to applicable water main latecomers’
fees. Payment of the latecomer’s fee for each phase is required prior to signature
on the final plat map of each phase by the City Engineer.
3. The sidewalks shall be detached along Overland Road and a minimum 5-foot-
wide landscaped parkway shall be installed between the edge of pavement and
sidewalk in accordance with MCC 12-13. A 5-foot-wide sidewalk shall also be
required along all public streets on the interior of the subdivision.
4. In accordance with Finding A, construct a new commercial stub street on the east
side of Lot 9, Block 4 that will be in alignment with the stub street approved with
Sutherland Farm Subdivision. Said stub street shall be constructed in compliance
with ACHD width and design standards.
5. A permanent pedestrian easement, in favor of the City of Meridian, shall be
recorded adjacent to the south side of the Eight Mile Drain. The easement shall be
sufficient width to cover the 10-wide pathway shown. Buildings are precluded
from constructing within this easement. The 10-foot wide hard surfaced pathway
shall be constructed and fully improved prior to the issuance of the first
Certificate of Occupancy for any building within the subdivision. Additionally, a
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF PRELIMINARY PLAT FOR
SILVERSTONE BUSINESS CAMPUS BY SUNDANCE INVESTMENTS – PP-03-018 - Page 3
note shall be added to the face of the final plat indicating the City of Meridian is
responsible for the maintenance of the pathway surface located within the
easement. The note shall also indicate who will be responsible for landscaping
maintenance within the easement.
6. All perimeter lots along E. Overland Road are subject to a minimum 35-foot wide
landscape easement. This street buffer shall be designed in accordance with MCC
12-13-10. The Silverstone Business Association shall maintain said easement and
all common area lots within the subdivision.
7. The preliminary landscape plan (Sheet L-1, dated 5/16/03 by The Land Group) is
approved with the exception of the proposed signage on Overland Road. All
signage for the subdivision must be approved through a separate Planned Sign
Program application. No signage is permitted until said application is submitted
and approved by the Planning & Zoning Department.
8. Any tree over 4” in caliper that is removed from the property shall be replaced by
installing additional trees, being the equivalent number of caliper inches of trees
that were removed. Required landscaping trees will not be considered as
replacement trees for those trees that have to be removed.
9. Landscaping within Lot 7, Block 2, the ACHD common/drainage lot, shall be
designed in accordance with MCC 12-13-14, unless otherwise approved by the
Planning & Zoning Department.
10. A detailed landscape plan, in compliance with MCC 12-13, shall be
submitted with the final plat application.
11. A detailed fencing plan shall be submitted upon application of the final plat. Any
fencing adjacent to the Eight Mile Drain shall be open vision and non-
combustible, unless the City otherwise agrees in writing.
12. The wetlands area adjacent to the west boundary shall be maintained in
accordance with all U.S. Corps of Engineers and other agency requirements.
Evidence of full compliance with wetland mitigation shall be submitted to the
City prior to signature of the final plat.
13. Applicant has not indicated who will own and maintain the pressurized irrigation
system within this development. The applicant shall be required to provide a
backup source to the pressurized irrigation system. The Public Works
Department as part of the development plan-review process shall review plans
and specifications for the irrigation system. A draft copy of the pressurized
irrigation system O&M manual must be submitted prior to plan approval.
PRELIMINARY PLAT GENERAL REQUIREMENTS
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF PRELIMINARY PLAT FOR
SILVERSTONE BUSINESS CAMPUS BY SUNDANCE INVESTMENTS – PP-03-018 - Page 4
1. Submit letter from the Ada County Street Name Committee, approving the
subdivision and street names. Make any corrections necessary to
conform.
2. Coordinate fire hydrant placement with the City of Meridian Public Works
Department.
3. Assessment fees for water and sewer service are determined during the building
plan review process.
4. Two-hundred-fifty-watt, high-pressure sodium streetlights will be required at
locations designated by the Public Works Department. All streetlights shall be
installed at subdivider's expense. Typical locations are at street intersections
and/or fire hydrants.
5. Underground, year-round pressurized irrigation must be provided to all landscape
areas on site. Please submit hook-up and design details based on the proposed
landscaping. Due to the size of landscaped area, primary water supply connection
to the City’s mains will not be allowed. Applicant shall be required to utilize any
existing surface or well water for the primary source. If City water is proposed as
a secondary source, developer shall be responsible to pay water assessments for
the entire common open area.
6. All irrigation ditches, laterals or canals, exclusive of natural waterways,
intersecting, crossing or lying adjacent and contiguous to the area being
subdivided shall be tiled per City Ordinance 12-4-13. The ditches to be piped
should be shown on the site plans. Plans will need to be approved by the
appropriate irrigation/drainage district, or lateral users association, with written
confirmation of said approval submitted to the Public Works Department.
7. Show all existing and proposed easements for irrigation/drainage facilities
located within the boundaries of this proposed development (i.e., Eight
Mile Drain easement).
8. Any existing domestic wells and/or septic systems within this project will
have to be removed from their domestic service per City Ordinance
Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes
such as landscape irrigation.
9. Provide five-foot-wide sidewalks throughout development in accordance with
City Ordinance.
10. All construction shall conform to the requirements of the Americans with
Disabilities Act.
B. Adopt the Recommendations of ACHD as follows:
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF PRELIMINARY PLAT FOR
SILVERSTONE BUSINESS CAMPUS BY SUNDANCE INVESTMENTS – PP-03-018 - Page 5
Site Specific Conditions of Approval
1. The Board of Commissioners authorizes the expenditure of available collected
impact fees, or other District funds, if available, for the purchase of right-of-way
dedicated by the applicant, with the applicant constructing a sidewalk as
described below. However, if funds cannot be secured, the applicant shall do one
of the following:
a. Dedicate by donation (or through a development offset agreement
whereby the applicant is reimbursed from impact fees to be collected
solely from the applicant’s specific development project) an additional 23-
feet of right-of-way along Overland Road, and construct a minimum 5-
foot wide concrete sidewalk along Overland Road, located a minimum of
41-feet from the centerline of the right-of-way.
b. Do not dedicate additional right-of-way, but construct a minimum 5-
foot wide concrete sidewalk along Overland Road, located a minimum of
41-feet from the centerline of the right-of-way, in an easement provided to
the District.
c. Provide a road trust deposit in the amount of $26,660.00 to be used for
future sidewalk construction along the applicant’s property.
2. Construct a commercial roadway that intersects Overland Road approximately
400-feet east of Silverstone Way to align with Jade Avenue, as proposed.
3. Construct a commercial roadway that intersects Overland Road approximately
1,150-feet east of Silverstone Way to align with Topaz Avenue, as proposed.
*****The applicant has proposed to construct the internal roadways as commercial
roadways. The proposed street section will accommodate for vehicular traffic that
is anticipated to be generated by this site. It appears that the City’s comprehensive
plan wishes to have bike lanes at/near the half-mile. The commercial street section
that is proposed will not accommodate for bike lanes.
If the City requires the applicant to construct the roadway as a collector, the City
should require the roadways to be constructed as 46-foot street section within 70-
feet of right-of-way. This would allow for 3-traffic lanes with curb, gutter, bike
lanes and a detached 5-foot sidewalk.
4. Construct the internal roadways as 40-foot street sections with curb, gutter and 5-
foot concrete sidewalk within 54-feet of right-of-way, as proposed.
5. Extend an existing stub street (Copper Point Way) from the west property line
approximately 160-feet north of the south property line, as proposed.
6. Extend Copper Point Way as a stub street to the east property line approximately
305-feet north of the south property line, as proposed. Install a sign at the
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF PRELIMINARY PLAT FOR
SILVERSTONE BUSINESS CAMPUS BY SUNDANCE INVESTMENTS – PP-03-018 - Page 6
terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN
THE FUTURE".
7. Extend Knapp Avenue from the south property line.
8. If the applicant would like a third access point to Overland Road, construct a 35-
foot wide shared driveway that intersects Overland Road approximately 600-feet
west of the east property line and aligns with the existing driveway at 3820
Overland Road.
9. If the applicant develops before the Overland Road project, construct a center turn
lane for ALL of the approved access points that intersect Overland Road. Provide
a minimum of 100-feet of storage with shadow tapers for both the approach and
departure directions. Coordinate the design of the turn lane with District staff.
Dedicate sufficient right-of-way to accommodate for the turn lanes that have been
identified by the traffic impact study.
10. Construct right-turn lanes for ALL of the approved access points that intersect
Overland Road, as they become warranted. Coordinate the design of the taper
with District staff. Dedicate sufficient right-of-way to accommodate for the turn
lanes that have been identified by the traffic impact study.
**The applicant is required to provide a financial surety for the construction of
the right turn lanes on Overland Road. Once the turn lanes have been constructed
or the District has entered into a contract for the construction of this segment of
Overland Road, the financial surety will be released.
11. Identify and complete the proposed wetlands mitigation that was proposed as a
part of the Silverstone Corporate Center Subdivision in accordance with the
wetlands mitigation permit that was issued by the United States Army Corps of
Engineers.
12. Provide the District with a parcel that is equal to and greater in value and size
than the previous parcel.
13. Provide the District with drainage calculations and drawings showing that the
newly proposed pond will have a capacity that is equal to or greater in storage
area than the previous parcel and will function at a level that is equal to or greater
than what the District had originally designed.
14. Install an adequately sized drainage pipe that will extend from the proposed
drainage pond to Overland Road through the Topaz Avenue right-of-way.
15. Provide the District with sufficient access to the site by providing the District by
providing public road frontage and a permanent easement through the adjoining
parking lot for additional access to the pond.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF PRELIMINARY PLAT FOR
SILVERSTONE BUSINESS CAMPUS BY SUNDANCE INVESTMENTS – PP-03-018 - Page 7
16. If the applicant chooses to landscape the drainage pond, the applicant shall obtain
a license agreement for all landscaping that is proposed within the District’s right-
of-way, drainage pond or easement. The applicant is required to have all
landscape and sprinkler plans reviewed and approved by the ACHD Drainage
Division.
17. Other than the access points that have specifically been approved with this
application, direct lot or parcel access to Overland Road is prohibited. Notes of
this are required to be placed on the final plat.
18. Comply with all Standard Conditions of Approval.
ACHD Standard Conditions of Approval
1. Any existing irrigation facilities shall be relocated outside of the right-of-way.
2. All utility relocation costs associated with improving street frontages abutting the
site shall be borne by the developer.
3. Replace any existing damaged curb, gutter and sidewalk and any that may be
damaged during the construction of the proposed development. Contact
Construction Services at 387-6280 (with file number) for details.
4. Utility street cuts in pavement less than five years old are not allowed unless
approved in writing by the District. Contact the District’s Utility Coordinator at
387-6258 (with file numbers) for details.
5. All design and construction shall be in accordance with the Ada County Highway
District Policy Manual, ISPWC Standards and approved supplements,
Construction Services procedures and all applicable ACHD Ordinances unless
specifically waived herein. An engineer registered in the State of Idaho shall
prepare and certify all improvement plans.
6. The applicant shall submit revised plans for staff approval, prior to issuance of
building permit (or other required permits), which incorporates any required
design changes.
7. Construction, use and property development shall be in conformance with all
applicable requirements of the Ada County Highway District prior to District
approval for occupancy.
8. Payment of applicable road impact fees are required prior to building construction
in accordance with Ordinance #197, also known as Ada County Highway District
Road Impact Fee Ordinance.
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF PRELIMINARY PLAT FOR
SILVERSTONE BUSINESS CAMPUS BY SUNDANCE INVESTMENTS – PP-03-018 - Page 8
9. It is the responsibility of the applicant to verify all existing utilities within the
right-of-way. The applicant at no cost to ACHD shall repair existing utilities
damaged by the applicant. The applicant shall be required to call DIGLINE (1-
800-342-1585) at least two full business days prior to breaking ground within
ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-
6190 in the event any ACHD conduits (spare or filled) are compromised during
any phase of construction.
10. No change in the terms and conditions of this approval shall be valid unless they
are in writing and signed by the applicant or the applicant’s authorized
representative and an authorized representative of the Ada County Highway
District. The burden shall be upon the applicant to obtain written confirmation of
any change from the Ada County Highway District.
11. Any change by the applicant in the planned use of the property which is the
subject of this application, shall require the applicant to comply with all rules,
regulations, ordinances, plans, or other regulatory and legal restrictions in force at
the time the applicant or its successors in interest advises the Highway District of
its intent to change the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to
the law in effect at the time the change in use is sought.
C. Adopt the Meridian Fire Department Recommendations as follows:
1. That a fire-flow consistent with Appendix III-A of the Uniform Fire Code be
provided to service the entire project. Fire hydrants shall be placed an average of
400’ apart. 1997 UFC Appendix III-A
2. Operational fire hydrants and temporary or permanent street signs are required
before combustible construction begins. UFC 901.4.2 & 901.3
3. Acceptance of the water supply for fire protection will be by the Meridian
Water Department.
4. Final approval of the fire hydrant locations shall be by the Meridian Fire
Department thru the Public Works Department.
5. All radii shall be 28’ inside and 48’ outside radius for all entrances and internal roads.
6. All fire lanes shall have an unobstructed width of 20’. UFC 902.2.1
7. The proposed project will have an undetermined transient population. Based on
historical run analysis the Meridian Fire Department will respond to one call for
service for every 24 people in the service area. This will generate an undetermined
number of calls for service at build out. According to a report completed by Fire &
Emergency Services Consulting Group in February of 2000 our requests for service
RECOMMENDATION TO CITY COUNCIL OF APPROVAL OF PRELIMINARY PLAT FOR
SILVERSTONE BUSINESS CAMPUS BY SUNDANCE INVESTMENTS – PP-03-018 - Page 9
are projected to reach 2800 in the year 2005 and 3800 by the year 2010, this is up
from 2069 responses in the year 2000.
D. Adopt the Recommendation of Nampa & Meridian Irrigation District as follows:
1. Applicant shall apply for a land use change/site application.
E. Adopt the Recommendations of the Central District Health Department as
follows:
1. This proposal can be approved for central sewage & central water after
written approval from appropriate entities is submitted.
2. The Applicant’s central sewage and central water plans must be submitted
to and approved by the Idaho Department of Health & Welfare, Division of
Environmental Quality.
3. Run-off is not to create a mosquito breeding problem.
4. Stormwater shall be pretreated through a grassy swale prior to discharge to
the subsurface to prevent impact to groundwater and surface water quality.
5. The Engineers and architects involved with the design of the subject
project shall obtain current best management practices for stormwater disposal
and design a stormwater management system that prevents groundwater and
surface water degradation.