WORK CHANGE DllÅ’CTnÅ’
No. Two (2)
DATE OF ISSUANCE 9/16/2003
EFFECTIVE DATE 9/16/2003
OWNER: City of Meridian
CONTRACTOR: IrmÍIll!er Construction
Contract: Well 24 Facilities
Project:
OWNER's Contract No.
City Council Approval: 9/9/2003
You are directed to proceed promptly with the following change(s):
Description: Landscaping of both lots as designed in plan set issued 6/26/2003.
Purpose of Work Change Directive: Comply with HOA requirements for landscaping.
Attaclnnents: Quote.
If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a
Change Order based thereon will involve one or more of the following methods as defined in the Contract
Documents.
Method of determining change in
Contract Price:
0 Unit Prices
0 Lump Sum not to exceed
0 Cost ofthe Work
Estimated increase (decrease) in Contract Price:
$ 27.259.00
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Estimated increase (decrease) in Contract Times:
Substantial Completion: ~ days;
Ready for fmal payment: ~ days.
;l1ð:t
ENGINEER ~
By: / Á,UAR..ð A C;;;1/I,oI4.0Y
AUTHORIZED:
..,-
WORK CHANGE DIRECTIVE
INSTRUCTIONS
A. GENERAL INFORMATION
This document was developed for use in situations involving changes in the Work which, if not processed
expeditiously, might delay the Project. These changes are often initiated in the field and may affect the
Contract Price or the Contract Times. This is not a Change Order, but only a directive to proceed with
Work that may be included in a subsequent Change Order.
For supplemental instructions and minor changes not involving a change in the Contract Price or the
Contract Times a Field Order should be used.
B. COMPLETING THE WORK CHANGE DIRECTIVE FORM
Engineer initiates the form, including a description of the items involved and attachments.
Based on conversations between Engineer and Contractor, Engineer completes the following:
METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method
to be used in determining the final cost of Work involved and the estimated net effect on the
Contract Price. If the change involves an increase in the Contract Price and the estimated amount
is approached before the additional or changed Work is completed, another Work Change Directive
must be issued to change the estimated price or Contractor may stop the changed Work when the
estimated time is reached. If the Work Change Directive is not likely to change the Contract Price,
the space for estimated increase (decrease) should be marked "Not Applicable".
Once Engineer has completed and signed the form, all copies should be sent to Owner for authorization
because Engineer alone does not have authority to authorize changes in Price or Times. Once authorized
by Owner, a copy should be sent by Engineer to Contractor. Price and Times may only be changed by
Change Order signed by Owner and Contractor with Engineer's recommendation.
Paragraph lO.O3.A.2 of the General Conditions requires that a Change Order be initiated and processed to
cover any undisputed sum or amount of time for Work actually performed pursuant to this Work Change
Directive.
Once the Work covered by this directive is completed or final cost and times are determined, Contractor
should submit documentation for inclusion in a Change Order.
THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT
PRICE OR CONTRACT TIMES. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED
PROMPTLY.
Meridian City Council Meeting
September 9, 2003
Page 2 of 73
Bird: Mr. Mayor?
Corrie: Mr. Bird.
Bird: I have got a question before I make a motion.
Corrie: Okay.
Bird: On our computer under Mayfair Commons, which is the one that wants to be
withdrawn, we are showing the CUP and the other - we are showing three there. We
have only go two listed on the - we have got the CUP listed and we have got the
preliminary -- or the 03-008, but we don't have the Preliminary Plat listed on here.
Berg: Mr. Mayor, the Preliminary Plat was denied at the Planning and Zoning
Commission.
Bird: Okay.
Berg: And it stays there, it doesn't get passed on, but the other two can proceed on and
probably at the recommendation of the staff, it was said that you probably would not
pass the annexation unless you saw a Preliminary Plat.
Corrie: So, we can let the Council--
Berg: That's why you do not see a Preliminary Plat.
Bird: Thank you for answering - with that Mayor, I would make a motion that we adopt
the revised agenda.
Nary: Second.
Corrie: Okay. Motion has been made and seconded. Any further discussion? All
those in favor of the motion say aye. All ayes. Motion carried.
MOTION CARRIED: THREE AYES, ONE ABSENT
Item 3.
Consent Agenda:
Approve minutes of August 26, 2003 City Council Regular Meeting:
A.
B.
Approve Purchase of Additional Lot for Well No. 24 - 2870 N. Blue
Springs Avenue:
C.
Change Order No.2 for Well No. 24 Pumping Facilities - Inninger
Construction:
Meridian Cily Council Meeting
September 9, 2003
Page 3 of 73
Corrie: Next is the Consent Agenda.
Bird: Mr. Mayor?
Corrie: Mr. Bird.
Bird: I would move that we approve the Consent Agenda and for the Mayor to sign and
the Clerk to attest on all proper papers.
McCandless: Second.
Corrie: Motion has been made and seconded to adopt the Consent Agenda. Any
further discussion? Roll call vote, please, Mr. Berg.
Roll Call: McCandless, aye; Nary, aye; de Weerd, absent; Bird, aye.
Corrie: Okay. All ayes. Motion carried.
MOTION CARRIED: THREE AYES, ONE ABSENT
Item 4.
Department Reports:
A.
Fire Department - Chief Bowers:
1.
Update on Fire Station No.3:
Corrie: Item Number 4 is Department Reports. Fire Department. Chief Bowers.
Bowers: Good evening, Mayor Corrie and City Council Members. I just wanted to give
you a little update on the Fire Station No.3. I don't know if you guys have drove by it
lately. It is going up fast. The concrete, foundation, floors are up, the walls are up, the
brick is up, the roof trusses are up. the plywood is on top of the trusses, so it is coming
along very well at this time. It's right on schedule still and they are talking like
completion possibly around the end of October. If you guys are driving by, stop by and
take a look at it.
Corrie: Yes. It looks like there are ants up there running around. They are really
working hard, so tell them thank you. Appreciate that.
2.
Update on Fire Safe House:
Bower: You bet you. Also, on the safe house, we have got the foundation poured and
we have the remanufactured home bolted down to the foundation. We have got the
earthquake straps on it now, we have got the power. the phone, the natural gas, the
sewer and water ran to the house at this time. It's not hooked up at the house, but it is