HomeMy WebLinkAboutTask Order No. 10193 with Civil Survey Consultants for Sewer Main Replacement~~E IDR IAN;~- ~J PURCHASING AGENT 33 E. Broadway Ave, Meridian, ID 83642 Phone: (208) 888-4433 x 417 Fax: (208) 887-4813 TASK ORDER NO. 10193 Between CITY OF MERIDIAN AND CIVIL SURVEY CONSULTANTS, INC. This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated April 13, 2010. SEWER MAIN REPLACEMENT SCOPE OF SERVICES Per the City's request, the Engineer will provide professional engineering services related to the design of replacing or rehabilitating sections of existing 8" sanitary sewer mains in their current locations. The locations are as follow: Located in alley just south of Cherry Lane that is between Meridian Road and Main Street. Manhole N14-57 to Manhole N14-58. The sewer main turns and runs north under a building from Manhole N14-48 to Manhole N14-63 located in Cherry Lane. The section running north will be abandoned and the main in the alley will be extended west to Meridian Road and then north to Cherry Lane. 2. Existing main runs through the backyards of properties on the west side of NW 4t" Street from Maple Avenue to the south. Manhole N12-320 to Manhole N12-248. 3. Existing main runs through the backyards of properties on the west side of NW 4t" Street from Carlton Avenue to the North. Manhole N12-320 to Cleanout N12-344. 4. Located in NW 4t" Street from Washington Avenue to the North. Manhole N14-40 to Manhole N14-55. 5. Located in alley north of State Street between NE 3~d and NE 4t" Streets. Manhole N 14-67 to Manhole N 14-50. 6. Located in alley from Meridian Road to Main Street between Broadway Avenue and Idaho Avenue. Manhole N14-84 to Manhole N14-28. 7. Located in alley west of Meridian Road from Broadway Avenue to Idaho Avenue. Manhole N12-06 to Manhole N12-323. 8. Located in Bower Street from Main Street to East 2"d Street. Manhole N14-96 to Manhole N14-97. 9. Existing main runs across private properties from Gem Street to Franklin Road between Main Street and Meridian Road. Manhole N14-03 to Manhole N14-31. This site will be evaluated to possibly abandon a portion of the existing main and connect the existing main to the sewer main in Main Street. Task 1 -Administration 1.1 This task includes duties associated with setting up the contract and submitting monthly invoices. Task 2 -Design Surveying 2.1 This task includes field work associated with performing topographic survey required to complete the design. Topographic survey will cover existing utilities, irrigation, pavement, curb, gutter, sidewalk, water meters, and any other items within the public right-of-way required to complete the design. The City shall contact dig-line and have the existing utilities marked. It shall be the City's responsibility to obtain permission from property owners to complete surveying and construction activities on private property. Engineer will assist city staff with the process of obtaining permission. 2.2 This task includes office work associated with drafting the topographic survey and establishing centerline control and the public right-of-way. For the purposes of this project existing public right-of--way will be established using record of surveys and subdivision plats recorded with Ada County along with any property corners found during the topographic survey. Right-of-way or boundary surveys are not included in the scope of services. For purposes of this project it is assumed that all existing sewer mains located on private property are located within an existing easement. Copies of all existing easement documents will be provided by the City. If no easement documents are found easements will be required prior to any work on private property. Obtaining easements for existing sewer lines located on private property is not included in this scope of work. Task 3 -Design Sewer Replacement 3.1 This task includes work associated with reviewing the video of the existing sanitary sewer main to determine the location of existing sewer services and plotting them on the plans. City shall provide a video of the existing sewer main. 3.2 Determining replacement method and designing sewer replacement. City staff shall assist the Engineer in determining the preferred method of replacement. Pipe bursting, sliplining, and open trench methods will be evaluated to determine the best method of replacing the existing sewer mains. The existing sewer services will not be replaced and will be reconnected to the new sewer main. -The existing water meters and service lines will be replaced at locations identified by the City. 3.3 If existing irrigation facilities are found to be impacted by the project this item will include preparing and submitting an application for a license agreement to the appropriate irrigation district. City shall pay all fees associated with the agreement. 3.4 Correspondence and coordination with adjacent property owners regarding surveying and construction activities on their property. It shall be the Cities responsibility to obtain permission from property owners to complete surveying and construction activities on private property. Engineer will assist city staff with the process of obtaining permission. Task 4 -Construction Document Preparation and Review 4.1 Develop plans, specifications and bid schedule that meet current design standards and standard specifications of the City and ISPWC. One complete set of plans, specifications, and a bid schedule will be developed for each site, except sites 2 and 3 will be combined on one set. Multiple bid schedules may be provided to allow contractors to bid the project using different methods of replacing the sewer mains. 4.2 Submit one set plans to ACHD for review and approval prior to construction. Includes one set of revisions per ACHD comments and then resubmitting to ACRD for approval. 4.3 Submit 2 full size physical copies of plans and special provisions to City Engineering for Development Services review and approval, Engineer to revise plans as necessary and resubmit. 4.4 Submit 4 full size physical copies of plans and special provisions to City Engineering for QLPE review and approval, Engineer to revise plans as necessary and resubmit. 4.5 Prepare an Erosion and Sediment Control Plan (ESCP) and submit the plan to the City and ACHD for review and approval. The ESCP will be prepared in accordance with the City of Meridian Construction Stormwater Management Program. All other stormwater management program requirements shall be completed by the City or the Contractor. 4.6 Prepare final construction documents with inclusion of any addenda from the bidding phase and provide one physical copy for City's use and 10 physical copies for contractor's use. Task 5 -Construction Services 5.1 Provide one set of construction stakes for the new sewer mains. A maximum of six points will be staked at each site. Staking will be completed as requested by the City and Contractor. 5.2 Attend pre-bid meeting. 5.3 Attend pre-construction meeting. 5.4 Answer RFI's from contractor during bidding and construction about the design. 5.5 Review material specifications submitted by contractor. 5.6 Prepare record drawings meeting the City of Meridian Acceptance of Record/Electronic Drawings, dated August 26, 2009. 5.7 Send letters to property owners fronting project notifying them of the project and its anticipated construction schedule. The letter will be submitted City staff for approval prior to mailing of the letter. City will provide property owner mailing addresses as needed. This task also includes time responding to telephone calls from property owners. TIME OF PERFORMANCE Engineer will work with City staff to complete construction plans in a timely manner. COMPENSATION The Not-To-Exceed amount for this Task Order No. 10193 is One Hundred Twenty-Four Thousand Seven Hundred Sixty dollars ($124,760.00). The hourly rate for services and direct expenses is attached and by reference made part hereof. CITY OF MERI IAN B ~ .~~ TAMMY de RD, MAYOR Dated: ~ - l ~ ` ?A ( 0 CIVIL RVEY CONSULTANTS, INC. BY: Dated: ~-~3 ~' O Approved by City Council: ~li s,.~~ l~ ~ oZOI C~ , ;~ ~'~ ~~ M~'o~q ''-, o~~T~ b '~, Attest: C'G ~ - EAL CEE . HOLMAN, CITY CLERK _ F M Gs, 1~ ~: ~:, -9O (Is.T 1 S~ , ~~Q~ \.~~ Approved as Conten ~~'%,9 C~U~eI~(t~nt Approv BY: ttif ii KEITH ATTS, PURC ING AGENT /~ TITLE: ` r w ~ ~ rce ~-o ~ Dated: ~ ~~ w Dated: 7 ~ a ~' ~Q Man-Hour And Fee Estimate City of Meridian-Task Order #10193 Sewer Main Replacement Site #1 Task Description Project Mana er Chief of Surve s Project En ineer 2 Design En ineer 1 Survey Crew Total Hours Task Cost Task 1 -Administration 1.1 Contract and Invoices 2 2 $190.00 Task 2 -Desi n Surve in 2.1 Topo Surve -Field 2.2 To o Surve & Control -Office 16 16 16 16 $2,160.00 $1,520.00 Task 3 -Desi n Sewer Re lacement 3.1 Sewer Video Review & Plottin 1 1 $95.00 3.2 Develo Desi n 2 16 18 $1,730.00 3.3 Irri ation License A reement 2 2 $190.00 3.4 Pro a Owner Correspondence 3 3 $285.00 Task 4 -Construction Documents 4.1 Plans, Specifications, Bid Schedule 3 32 35 $3,355.00 4.2 Plans to ACHD for Review 1 1 $95.00 4.3 Develo ment Services Review 2 2 $190.00 4.4 QLPE Review 2 2 $190.00 4.5 Erosion and Sediment Control Plan 8 8 $760.00 4.6 Final Documents 8 8 $760.00 Task 5 -Construction Services 5.1 Construction Stakin 8 8 $1,080.00 5.2 Pre-Bid Meetin 1 1 $95.00 5.3 Pre-Construction Meetin 1 1 $95.00 5.4 Answer RFI's from Contractors 2 2 $190.00 5.5 Review Material Submittals 2 2 $190.00 5.6 Record Drawin s 4 4 8 $920.00 5.7 Pro ert Owner Letters 4 4 $380.00 Total Man-Hours 5 0 107 0 28 140 $14,470.00 Classification Hours Rate Total Pro~ect Mana er 5.00 $105.00 $525.00 Chief of Surve s 0.00 $105.00 $0.00 Pro~ect En ineer 1 0.00 $100.00 $0.00 Project En ineer 2 107.00 $95.00 $10,165.00 Desi n En ineer 1 0.00 $85.00 $0.00 Desi n En ineer 2 0.00 $80.00 $0.00 Surve Crew 28.00 $135.00 $3,780.00 Labor Subtotal 140.00 $14,470.00 Classification Each Rate Total Misc. Printin $300.00 License A reement Fees $300.00 Direct Subtotal $600.00 Subtotal Total Estimated Fees $15,070.00 $15;070.00 taskorder10193.x1s Man-Hour And Fee Estimate City of Meridian-Task Order #10193 Sewer Main Replacement Site #2 and #3 Task Description Project Mana er Chief of Surve s Project En ineer 2 Design En ineer 1 Survey Crew Total Hours Task Cost Task 1 -Administration 1.1 Contract and Invoices 2 2 $190.00 Task 2 -Desi n Surve in 2.1 To o Surve -Field 20 20 $2,700.00 2.2 To o Sunre & Control -Office 24 24 $2,280.00 Task 3 -Desi n Sewer Replacement 3.1 Sewer Video Review & Plottin 1 1 $95.00 3.2 Develo Desi n 2 40 42 $4,010.00 3.3 Irri ation License A reement 2 2 $190.00 3.4 Pro ert Owner Corres ondence 8 8 $760.00 Task 4 -Construction Documents 4.1 Plans, S ecifications, Bid Schedule 4 40 44 $4,220.00 4.2 Plans to ACHD for Review 1 1 $95.00 4.3 Development Services Review 4.4 OLPE Review 2 2 2 2 $190.00 $190.00 4.5 Erosion and Sediment Control Plan 8 8 $760.00 4.6 Final Documents 8 8 $760.00 Task 5 -Construction Services 5.1 Construction Stakin 8 8 $1,080.00 5.2 Pre-Bid Meetin 1 1 $95.00 5.3 Pre-Construction Meetin 1 1 $95.00 5.4 Answer RFI's from Contractors 2 2 $190.00 5.5 Review Material Submittals 2 2 $190.00 5.6 Record Drawin s 6 6 12 $1,380.00 5.7 Pro ert Owner Letters 4 4 $380.00 Total Man-Hours 6 0 154 0 34 194 $19,850.00 Classification Hours Rate Total Project Mana er 6.00 $105.00 $630.00 Chief of Surve s 0.00 $105.00 $0.00 Project En ineer 1 0.00 $100.00 $0.00 Project En ineer 2 154.00 $95.00 $14,630.00 Desi n En ineer 1 0.00 $85.00 $0.00 Desi n En ineer 2 0.00 $80.00 $0.00 Surve Crew 34.00 $135.00 $4,590.00 Labor Subtotal 194.00 $19,850.00 Classification Each Rate Total Misc. Printin $300.00 License A reement Fees $300.00 Direct Subtotal $600.00 Subtotal Total Estimated Fees $20,450.00 $20,450.00 taskorder10193.x1s Man-Hour And Fee Estimate City of Meridian-Task Order #10193 Sewer Main Replacement Site #4 Task Description Project Mana er Chief of Surve s Project En ineer 2 Design En ineer 1 Survey Crew Total Hours Task Cost Task 1 -Administration 1.1 Contract and Invoices 2 2 $190.00 Task 2 -Desi n Surve in 2.1 Topo Surve -Field 2.2 To o Surve & Control -Office 16 12 12 16 $1,620.00 $1,520.00 Task 3 -Desi n Sewer Re lacement 3.1 Sewer Video Review & Plottin 1 1 $95.00 3.2 Develo Desi n 2 16 18 $1,730.00 3.3 Irri ation License A reement 2 2 $190.00 3.4 Propert Owner Correspondence 0 0 $0.00 Task 4 -Construction Documents 4.1 Plans, S ecifications, Bid Schedule 3 32 35 $3,355.00 4.2 Plans to ACHD for Review 1 1 $95.00 4.3 Development Services Review 2 2 $190.00 4.4 QLPE Review 2 2 $190.00 4.5 Erosion and Sediment Control Plan 8 8 $760.00 4.6 Final Documents 8 8 $760.00 Task 5 -Construction Services 5.1 Construction Stakin 8 8 $1,080.00 5.2 Pre-Bid Meetin 1 1 $95.00 5.3 Pre-Construction Meetin 1 1 $95.00 5.4 Answer RFI's from Contractors 2 2 $190.00 5.5 Review Material Submittals 2 2 $190.00 5.6 Record Drawin s 4 4 8 $920.00 5.7 Pro ert Owner Letters 4 4 $380.00 Total Man-Hours 5 0 104 0 24 133 $13,645.00 Classification Hours Rate Total Pro~ect Mana er 5.00 @ $105.00 $525.00 Chief of Surve s 0.00 $105.00 $0.00 Pro~ect En ineer 1 0.00 $100.00 $0.00 Project En ineer 2 104.00 $95.00 $9,880.00 Desi n En ineer 1 0.00 $85.00 $0.00 Desi n En ineer 2 0.00 $80.00 $0.00 Surve Crew 24.00 $135.00 $3,240.00 Labor Subtotal 133.00 $13,645.00 Classification Each Rate Total Misc. Printin $300.00 License A reement Fees $300.00 Direct Subtotal $600.00 Subtotal Total Estimated Fees $14,245.00 $14,245.00 taskorder10193.x1s Man-Hour And Fee Estimate City of Meridian-Task Order #10193 Sewer Main Replacement Site #5 Task Description Project Mana er Chief of Surve s Project En ineer 2 Design En ineer 1 Survey Crew Total Hours Task Cost Task 1 -Administration 1.1 Contract and Invoices 2 2 $190.00 Task 2 -Desi n Suroe in 2.1 Topo Surve -Field 8 8 $1,080.00 2.2 Topo Surve & Control -Office 12 12 $1,140.00 Task 3 -Desi n Sewer Re lacement 3.1 Sewer Video Review & Plottin 1 1 $95.00 3.2 Develo Desi n 2 16 18 $1,730.00 3.3 Irri ation License A reement 2 2 $190.00 3.4 Propert Owner Correspondence 0 0 $0.00 Task 4 -Construction Documents 4.1 Plans, S ecifications, Bid Schedule 3 32 35 $3,355.00 4.2 Plans to ACHD for Review 1 1 $95.00 4.3 Development Services Review 2 2 $190.00 4.4 QLPE Review 2 2 $190.00 4.5 Erosion and Sediment Control Plan 8 8 $760.00 4.6 Final Documents 8 8 $760.00 Task 5 -Construction Services 5.1 Construction Stakin 8 8 $1,080.00 5.2 Pre-Bid Meetin 1 1 $95.00 5.3 Pre-Construction Meetin 1 1 $95.00 5.4 Answer RFI's from Contractors 2 2 $190.00 5.5 Review Material Submittals 2 2 $190.00 5.6 Record Drawin s 4 4 8 $920.00 5.7 Propert Owner Letters 4 4 $380.00 Total Man-Hours 5 0 100 0 20 125 $12,725.00 Classification Hours Rate Total Pro~ect Mana er 5.00 $105.00 $525.00 Chief of Surve s 0.00 $105.00 $0.00 Project En ineer 1 0.00 $100.00 $0.00 Project En ineer 2 100.00 $95.00 $9,500.00 Desi n En ineer 1 0.00 $85.00 $0.00 Desi n En ineer 2 0.00 $80.00 $0.00 Surve Crew 20.00 $135.00 $2,700.00 Labor Subtotal 125.00 $12,725.00 Classification Each Rate Total Misc. Printin $300.00 License A reement Fees $300.00 Direct Subtotal $600.00 Subtotal Total Estimated Fees $13,325.00 $13,325.00 taskorder10193.x1s Man-Hour And Fee Estimate City of Meridian-Task Order #10193 Sewer Main Replacement Site #6 Task Description Project Mana er Chief of Sunre s Project En ineer 2 Design En ineer 1 Survey Crew Total Hours Task Cost Task 1 -Administration 1.1 Contract and Invoices 2 2 $190.00 Task 2 -Desi n Surve in 2.1 Topo Sunre -Field 2.2 To o Sunre & Control -Office 8 8 0 $1,080.00 $0.00 Task 3 -Desi n Sewer Replacement 3.1 Sewer Video Review & Plottin 1 1 $95.00 3.2 Develo Desi n 2 16 18 $1,730.00 3.3 Irri ation License A reement 2 2 $190.00 3.4 Propert Owner Correspondence 0 0 $0.00 Task 4 -Construction Documents 4.1 Plans, S ecifications, Bid Schedule 3 32 35 $3,355.00 4.2 Plans to ACHD for Review 1 1 $95.00 4.3 Develo ment Services Review 2 2 $190.00 4.4 OLPE Review 2 2 $190.00 4.5 Erosion and Sediment Control Plan 8 8 $760.00 4.6 Final Documents 8 8 $760.00 Task 5 -Construction Services 5.1 Construction Stakin 8 8 $1,080.00 5.2 Pre-Bid Meetin 1 1 $95.00 5.3 Pre-Construction Meetin 1 1 $95.00 5.4 Answer RFI's from Contractors 2 2 $190.00 5.5 Review Material Submittals 2 2 $190.00 5.6 Record Drawin s 4 4 8 $920.00 5.7 Propert Owner Letters 4 4 $380.00 Total Man-Hours 5 0 88 0 20 113 $11,585.00 Classification Hours Rate Total Project Mana er 5.00 $105.00 $525.00 Chief of Surve s 0.00 $105.00 $0.00 Project En ineer 1 0.00 $100.00 $0.00 Project En ineer 2 88.00 $95.00 $8,360.00 Desi n En ineer 1 0.00 $85.00 $0.00 Desi n En ineer 2 0.00 $80.00 $0.00 Surve Crew 20.00 $135.00 $2,700.00 Labor Subtotal 113.00 $11,585.00 Classification Each Rate Total Misc. Printin $300.00 License A reement Fees $300.00 Direct Subtotal $600.00 Subtotal Total Estimated Fees $12,185.00 $12,185.00 taskorder10193.x1s Man-Hour And Fee Estimate City of Meridian-Task Order #10193 Sewer Main Replacement Site #7 Task Description Project Mana er Chief of Surve s Project En ineer 2 Design En ineer 1 Survey Crew Total Hours Task Cost Task 1 -Administration 1.1 Contract and Invoices 2 2 $190.00 Task 2 -Desi n Surve in 2.1 To o Surve -Field 8 8 $1,080.00 2.2 To o Surve & Control -Office 12 12 $1,140.00 Task 3 -Desi n Sewer Re lacement 3.1 Sewer Video Review & Plottin 1 1 $95.00 3.2 Develop Desi n 2 16 18 $1,730.00 3.3 Irri ation License A reement 2 2 $190.00 3.4 Propert Owner Correspondence 0 0 $0.00 Task 4 -Construction Documents 4.1 Plans, S ecifications, Bid Schedule 3 32 35 $3,355.00 4.2 Plans to ACHD for Review 1 1 $95.00 4.3 Development Services Review 2 2 $190.00 4.4 OLPE Review 2 2 $190.00 4.5 Erosion and Sediment Control Plan 8 8 $760.00 4.6 Final Documents 8 8 $760.00 Task 5 -Construction Services 5.1 Construction Stakin 8 8 $1,080.00 5.2 Pre-Bid Meetin 1 1 $95.00 5.3 Pre-Construction Meetin 1 1 $95.00 5.4 Answer RFI's from Contractors 2 2 $190.00 5.5 Review Material Submittals 2 2 $190.00 5.6 Record Drawin s 4 4 8 $920.00 5.7 Propert Owner Letters 4 4 $380.00 Total Man-Hours 5 0 100 0 20 125 $12,725.00 Classification Hours Rate Total Project Mana er 5.00 $105.00 $525.00 Chief of Suroe s 0.00 $105.00 $0.00 Project En ineer 1 0.00 $100.00 $0.00 Project En ineer 2 100.00 $95.00 $9,500.00 Desi n En ineer 1 0.00 $85.00 $0.00 Desi n En ineer 2 0.00 $80.00 $0.00 Surve Crew 20.00 $135.00 $2,700.00 Labor Subtotal 125.00 $12,725.00 Classification Each Rate Total Misc. Printin $300.00 License A reement Fees $300.00 Direct Subtotal $600.00 Subtotal Total Estimated Fees $13,325.00 $13,325.00 taskorder10193.x1s Man-Hour And Fee Estimate City of Meridian-Task Order #10193 Sewer Main Replacement Site #8 Task Description Project Mana er Chief of Surve s Project En ineer 2 Design En ineer 1 Survey Crew Total Hours Task Cost Task 1 -Administration 1.1 Contract and Invoices 0 $0.00 Task 2 -Desi n Surve in 2.1 Topo Surve -Field 2.2 Topo Surve & Control -Office 16 16 16 16 $2,160.00 $1,520.00 Task 3 -Desi n Sewer Replacement 3.1 Sewer Video Review & Plottin 1 1 $95.00 3.2 Develo Desi n 2 16 18 $1,730.00 3.3 Irri ation License A reement 2 2 $190.00 3.4 Pro ert Owner Corres ondence 0 0 $0.00 Task 4 -Construction Documents 4.1 Plans, S ecifications, Bid Schedule 3 32 35 $3,355.00 4.2 Plans to ACHD for Review 1 1 $95.00 4.3 Development Services Review 2 2 $190.00 4.4 OLPE Review 2 2 $190.00 4.5 Erosion and Sediment Control Plan 8 8 $760.00 4.6 Final Documents 8 8 $760.00 Task 5 -Construction Services 5.1 Construction Stakin 8 8 $1,080.00 5.2 Pre-Bid Meetin 1 1 $95.00 5.3 Pre-Construction Meetin 1 1 $95.00 5.4 Answer RFI's from Contractors 2 2 $190.00 5.5 Review Material Submittals 2 2 $190.00 5.6 Record Drawin s 4 4 8 $920.00 5.7 Pro ert Owner Letters 4 4 $380.00 Total Man-Hours 5 0 102 0 28 135 $13,995.00 Classification Hours Rate Total Project Mana er 5.00 $105.00 $525.00 Chief of Surve s 0.00 $105.00 $0.00 Project En ineer 1 0.00 $100.00 $0.00 Project En ineer 2 102.00 $95.00 $9,690.00 Desi n En ineer 1 0.00 $85.00 $0.00 Desi n En ineer 2 0.00 $80.00 $0.00 Surve Crew 28.00 $135.00 $3,780.00 Labor Subtotal 135.00 $13,995.00 Classification Each Rate Total Misc. Printin $300.00 License A reement Fees $300.00 Direct Subtotal $600.00 Subtotal Total Estimated Fees $14,595.00 $14, 595.00 taskorder10193.x1s Man-Hour And Fee Estimate City of Meridian-Task Order #10193 Sewer Main Replacement Site #9 Task Description Project Mana er Chief of Surve s Project En ineer 2 Design En ineer 1 Survey Crew Total Hours Task Cost Task 1 -Administration 1.1 Contract and Invoices 2 2 $190.00 Task 2 -Desi n Surve in 1 To o Surve -Field 2 16 16 $2,160.00 . 2.2 To o Suroe & Control -Office 16 16 $1,520.00 Task 3 -Desi n Sewer Re lacement 3.1 Sewer Video Review & Plottin 2 2 $190.00 3.2 Develo Desi n 4 40 44 $4,220.00 3.3 frri ation License A reement 2 2 $190.00 3.4 Pro ert Owner Corres ondence 2 2 $190.00 Task 4 -Construction Documents 4.1 Plans, S ecifications, Bid Schedule 4.2 Plans to ACRD for Review 6 64 1 70 1 $6,710.00 $95.00 4.3 Develo ment Services Review 3 3 $285.00 4.4 QLPE Review 3 3 $285.00 4.5 Erosion and Sediment Control Plan 8 8 $760.00 4.6 Final Documents 8 8 $760.00 Task 5 -Construction Services 5.1 Construction Stakin 8 8 $1,080.00 5.2 Pre-Bid Meetin 1 1 $95.00 5.3 Pre-Construction Meetin 1 1 $95.00 5.4 Answer RFI's from Contractors 2 2 $190.00 5.5 Review Material Submittals 2 2 $190.00 5.6 Record Drawin s 6 6 12 $1,380.00 5.7 Pro ert Owner Letters 4 4 $380.00 Total Man-Hours 10 0 167 0 30 207 $20,965.00 Classification Hours Rate Total Pro~ect Mana er 10.00 $105.00 $1,050.00 Chief of Surve s 0.00 $105.00 $0.00 Project En ineer 1 0.00 $100.00 $0.00 Pro~ect En ineer 2 167.00 $95.00 $15,865.00 Desi n En ineer 1 0.00 $85.00 $0.00 Desi n En ineer 2 0.00 $80.00 $0.00 Surve Crew 30.00 $135.00 $4,050.00 Labor Subtotal 207.00 $20,965.00 Classification Each Rate Total Misc. Printin $300.00 License A reement Fees $300.00 Direct Subtotal $600.00 Subtotal Total Estimated Fees $21,565.00 $21, 565.00 taskorder10193.x1s