TASK ORDER NO. 7 0022
Betwe®n
CITY OF MERIDIAN
AND
CH2M HILL
This Task Order is issued by City and accepted by the Engineer pursuant to the
mutual promises, covenant and conditions contained in the Master Agreement
between the above mentioned parties dated April 93, 2040.
Meridian Wastewater Treatment Facility Plan
Task Order 10022
s
PAGE 1 OF 29
Project Understanding
The City of Meridian needs to develop a comprehensive wastewater treatment facility plan in
order to effectively plan for and deliver treatment services in the future in relation to growth
and development and evolving regulatory requirements. This plan is to be prepared in
accordance with the Idaho Administrative Procedure Act {IDAPA), IDAPA 58, Title O1, Chapter
16, more commonly referred to as IDAPA 58.01.16-Wastewater Rules. Section 410 of the
Wastewater Rules lists the requirements and contents for Facility Plans.
Scope of Work
The Scope of Services includes the following main tasks:
• Task I-Kickoff and Vision Alignment Workshop
• Task 2-Xnitial Technical Analyses
• Task 3-Alternatives Development Workshop
• Task 4-Open House/Focus Crroup Meeting
• Task 5-Alternatives Development
• Task 6-Alternatives Evaluation Workshop
• Task 7 Draft Facilities Plan Documents
• Task 8-Draft Preliminary Financial Plan
• Task 9-Public Open House and Formal Heazing
• Task 10----Final Facilities Plan Documents
• Task 11 Final Preliminary Financial Plan
• Task 12 Project Management
A detailed description of the objectives, activities, assumptions and deliverables is provided
below for each task.
Task 4-Kickoff and Vision Alignment Workshop
Objective
The objective of the workshop is to charter the Consultant and City wastewater facilities
planning team so that consensus on project scope, schedule, and responsibilities is obtained.
Another goal will be to develop non-monetary criteria that will be used in subsequent
evaluations of alternatives, with those criteria and weightings being in alignment with the
Public Works Department's vision statement.
PAGE 2 OF 29
Description
Consultant will prepare workshop materials (Powerpoint and handouts) and facilitate the
workshop. It is anticipated that the morning session would focus on project kickoff and
afternoon on establishing and weighting non-monetary criteria appropriate for the City and in
alignment with the Public Works Department vision statement. Candidate criteria could
include:
• Permutability
• Permit compliance risk
• System reliability
• Operational flexibility
• Adaptability/phasing opportunity
• Ancillary environmental benefits or impacts
• Sustainability (e.g., minimize carbon footprint and energy consumption)
• Public acceptance
• Social impacts
Consultant will prepare draft text defining candidate criteria prior to the workshop. It is
anticipated that no more than five or six criteria will be established (i.e., some of the criteria
above overlap and can be consolidated). Consultant also will prepare a technical
memorandum summarizing the discussion and outcomes of the workshop.
Assumptions
The Kickoff and Vision Alignment Workshop will be a 5 to 6-hour meeting, including a
working lunch, and will be facilitated by Consultant.
Deliverables
• Workshop materials (Powerpoint and handouts).
• The discussion and outcome of the workshop will be included in draft and final technical
memorandum (electronic .pdf format).
Task 2-Initial Technical Analyses
This task involves a number of subtasks aze included within as listed below and described in
the following sections.
2.1 Collect, compile and review data and documents
2.2 Flows and loads
2.3 Initial CIP/budget review
2.4 Evaluation of existing treatment facilities
2.5 Development of treatment criteria
Subtask 2.1-Collect, Compile and Review Data and Documents
Objective
PAGE 3 OF ~
The objective of this task is to provide the wastewater facilities plan team with relevant data
and documents.
Description
Consultant already has much of the relevant data and pertinent documents as a result of
previous work for the City. Consultant will compile a list of such documents and data and
meet with the City to determine if additional data and reports need to be obtained from the
City. Once this information is obtained it will be compiled and reviewed by key Consultant
team members.
Assumptions
Consultant will develop list of reports and data, and share it with the City to determine if the
City may have additional information important to the wastewater treatment plan; if so the
City will provide electronic copies of such documents or data to Consultant if available,
otherwise a hard copy will be provided.
Consultant will produce additional hard or electroxc copies of documents as its needs dictate
for this project.
Deliverables
A list of available documents and data in Word table or Excel format.
Subtask 2.2-Flows and Loads
Objective
Develop wastewater treatment influent design flows and loads for existing and future
facilities.
Description
• Meet with the City and City's consultant conducting the sewer master plan project to
discuss and agree upon a common methodology for estimating near- and long-term
population and flow growth projections (i.e., 5 year and year 2030 build-out).
• Establish the influent design basis to include influent nutrient loads, such as TKN,
NH4-N, and TP, in addition to organics and solids Loads.
• Review treatment plant process monitoring data to establish historical influent
wastewater characteristics and trends.
• Merge data from different sources or periods and clean text entries, error messages, ox
notes from source data.
• Calculate mass loadings and moving averages.
• Determine the probability of occurrence of the influent loads by using Microsoft
Excel or a specialized statistical software.
• Determine relationships between maximum month, maximum week, maximum day,
and annual average conditions using a statistical analysis method. The following
percentiles apply to select the loading conditions:
o Annual average = 50`~ percentile
o Maximum month = 91.71h percentile (11/12a'~percentile)
o Maximum week = 98.151 percentile (358/3651 percentile)
o Maximum day = 99.7` percentile (364/365` percentile)
?AGE 4 OF 29
• In some instances, the design flows and loads will be augmented using a moving
average method.
• If treatment plant process monitoring data are not available for key constituent loads
(e.g., monitoring has not yet been established for a constituent), reference values will
be used from comparable facilities, Consultant's internal best practice guidelines, or
published references, as determined by the Consultant.
• Compile historical treatment plant process monitoring data for use in calibrating mass
balance model.
• Project future average loads for BOD, TSS, TKN, NH3 N, TP, and Temperature.
• Base flow projections on future population estimates from the Community Planning
Association of Southwest Idaho (COMPASS} and expected future flows from non-
domestic sources.
• Consider recorded growth trends, service area build out, changes to service area
zoning, planned annexations, and anticipated industrial growth.
o Use the historical flow and load analysis to establish historical peaking factors
for the existing service azea.
o Based on historical flows and loads, calculate the per capita average flow and
load for the existing service area.
-:°:: o If no changes in land use aze anticipated for the existing or future service area,
then load projections will be proportional to flow increases.
o If changes are anticipated in the land use for the future service area, estimate
the per capita average flow and loads for the future service azea.
o Apply the per capita flows and loads to the population projection for the
design year to establish average flows and loads at the design yeaz.
o Multiply the annual average flows and loads by the peaking factors to
establish maximum month, maximum day, maximum week, and peak hour for
_ the design yeaz.
Assumptions
• Flow and load projections will be mostly based on a review of treatment plant data.
• Three to five yeazs worth of historical data will be used to complete the flow and .load
analysis.
• Maximum month flow and loads will be used as the basis of design for process sizing
of the majority of the wastewater treatment facilities.
• Process-specific design flows and loads will be determined by calibrating the mass
balance model based on historical treatment plant process monitoring data (See
Task 5 -Alternatives Development).
• City will provide historical flows and loads and anticipated flows and loads from non-
domestic sources, such as septage receiving and significant industrial users. If data
are not available, Consultant will assume typical values based on published
references.
Deliverables
Flow and Load Technical Memorandum {electronic .pdf format}.
PAGE 5 OF 29
Subtask 2.3-Initial Review of CIPlBudget
Objective
The objective of this Subtask is to provide the City with Consultant's input on the pending
Capital Improvement Plan (CIP) and budget.
Description
Consultant will meet with the City to review and provide input into the City's fiscal year
2011 CIP and budget. This meeting will occur in May 2011 such that the City has this input
well in advance of the annual budget submittal to City Council.
Assumptions
• City will provide Consultant with its initial draft of the CIP and budget.
• Input from Consultant will be provided at 2 hour meeting with the City.
Deliverables
Consultant's verbal input at the meeting.
Subtask 2.4-Evaluation of Existing Treatment Facilities .
Objective
This Subtask provides the evaluation of the City's existing treatment facility and associated
programs.
Description
Work previously completed by the Consultant will be used in this task, updated accordingly
to reflect any of the findings from the other Task 2 subtasks. Results from past reports will be
documented in this task to provide one location for this information. Information developed
in this task will provide the WWTP configuration and condition from which all follow on
treatment alternative configurations are based and developed.
Assumptions
Previous reports and studies will be used as the basis for information on the existing
treatment facilities. Recent work and expansion at the WWTP will be documented as well.
Deliverables
A technical memorandum will be developed, providing a summary of the past evaluation of
existing treatment facilities.
Subtask 2.5-Development of Treatment Criteria
Objective
This subtask identifies criteria for the level of treatment to be included in alternatives.
Description
Level of treatment criteria will be identified for key parameters. Existing permit limitations
for conventional parameters will provide the basis for some of these criteria. Others will be
water quality driven and are still subject to ongoing or upcoming TMDLs (e.g., phosphorus),
or by reclaimed water considerations (e.g., nitrogen). For parameters with uncertain
PAGE 6 OF 29
limitations, it may be appropriate to consider several levels of potential treatment {e.g., total
phosphorus of 0.5 mg/L with trading, 0.2 mg/L with or without trading, or 0.07 mg/L as
presumed most restrictive limitation}.
Assumptions
No more than 2 or 3 phosphorus criteria options will be established.
Deliverables
Treatment criteria technical memorandum (electronic .pdf format)
Task 3-Alternatives Development Workshop
Objective
The objective of this workshop is to develop a manageable list of reasonable wastewater
treatment alternatives that will be subject to further development and evaluation in
subsequent tasks.
Description
Consultant will prepare workshop materials and facilitate the workshop, and provide a
.summary memorandum of the discussion and outcomes. It is anticipated that a wide array of
alternatives will be considered, including mainstream treatment options, nutrient removal
options at the WWTP (for both total phosphorus and total nitrogen), tertiary treatment,
fermentation, effluent use/discharge options (discharge to Fivemile Creek and/or Boise River,
reclaimed water use, aquifer recharge, wetlands treatment and/or trading), biosolids
management options, one treatment plant versus two or multiple treatment locations, along
with sidestream treatment and struvite recovery options. Rehabilitation and/or capacity
oriented unprovements could include:
• Older equipment replacement
• Existing hydraulic bottleneck improvements
• Sludge settleability control (methods for eliminating M.parvicella and other nuisance
organisms)
• Redundancy improvements
• Operability improvements
Further, some options maybe more pertinent for the short-term time frame (i.e., the next 5
years}, while others may be more pertinent for the long-term horizon (out to buildout
conditions at 2030 or beyond}. This myriad array of options will likely be combined into
logical high-level alternatives, or hybrid alternatives, and some options maybe subject to a
more confined or narrow decision evaluation. The workshop will serve to define those
"packages" and individual decisions that will be further developed and evaluated in Tasks S
and 6. This list will also be included in materials for the open house/focus group meeting in
Task 4.
Our process experts will be involved for this workshop, where WWTP alternatives and
configurations to meet future treatment criteria will be developed. Out-of--state experts will
be involved via videoconferencing.
PAGE 7 OF 29
Assumptions
• The alternatives development workshop will be a meeting up to 8 hours in length, and
will be facilitated by Consultant.
• Consultants not based in the Treasure Valley will participate in the workshop by
videoconference.
Deliverables
• Workshop materials (Powerpoint and handouts).
• The discussion and outcome of the workshop will be included in a technical
memorandum (electronic .pdf format).
Task 4--Open HouselFocus Group Meeting
Objective
Obtain stakeholder input on the vision and values to be considered in the wastewater facility
planning effort.
Description
• Serve as a facilitator for a public outreach (i.e., Focus Crroup) meeting with
stakeholders.
• Invite stakeholders to participate in a Focus Group meeting to provide input on
alternatives for the Wastewater Treatment Plant.
• .Prepare Powerpoint presentation and up to two posters to help stakeholders gain an
understanding of the Wastewater Facility Plan project.
Assumptions
• A list of stakeholders to be invited and contact information will be provided by the
City to Consultant. -
Deliverables
• One Powerpoint presentation with up to 15 slides.
• Up to two posters (sized up to 36"x48") mounted on foam core board.
Task 5-Alternatives Development
This task presents the evaluation and development of wastewater treatment alternatives and
concepts for the City to future regulatory and growth requirements. The work completed in
the previous tasks will be used within this alternative development task, providing the design
criteria and basis for the treatment strategy. A number of subtasks aze included within as
listed below and described in the following sections.
5.1 Process simulation development
5.2 Sidestream treatment options
PAGE 8 OF 29
Subtask 5.1-Process Simulation Development and Alternative Evaluation
Objective '
Develop whole-plant simulations for proposed treatment alternatives and associated hydraulic
profile implications at the WWTP.
Description
CH2M HILL's whole-plant process simulator, Pro2D, will be used to evaluate the proposed
treatment alternatives carried forward from Task 3. Pro2D will help, in part, to determine the
size of the respective unit processes and configurations for each treatment alternative. A mass
balance will. be developed for each alternative, with the associated treatment performance
documented. Alternatives proposed from the Task 3 workshop will be evaluated under this
task.
Hydraulic evaluations will be completed as required to evaluate the treatment alternative. A
hydraulic profile will not be created for each alternative, but rather major bottlenecks will be
identif ed. The overall hydraulic capacity of the existing WWTP is limited and previous
studies identified the ultimate hydraulic capacity feasible for the existing site. These
evaluations will work within these previously defined limits.
This subtask will be part of an itezative approach with the other subtasks listed in Task 5. The
overall mass balance for the WWTP treatment alternatives will be developed under this task,
but individual unit processes and treatment approaches will undergo further evaluations in the
other tasks. Findings from these tasks will be incorporated into the process simulation and
mass balance as appropriate to help with the overall treatment alternative evaluation.
Assumptions
A total of six base treatment alternative configurations and associated process simulations are
proposed for this task.
Deliverables
• Process Flow Diagrams for each treatment alternative
• Narrative description for each treatment alternative
• Process simulation printouts and output files for use in Biowin
• Technical memorandum swnmarizing evaluation (electronic .pdf format}.
Subtask 5.2--Sidestream Treatment Options
Objective
PAGE 9 OF 29
Develop alternatives for side stream treatment to reduce recycle loads. -
Description
• Focus side stream treatment on reducing the load of phasphorus and nitrogen returned
to the head of the wastewater treatment plant.
• Consider the impacts from the following recycle streams:
o Primary Sludge Thickening Return
o Waste Activated Sludge Thickening Return
o Primary Sludge and Waste Activated Sludge Co-Thickening Return
o Primary Sludge Fermentation Return
o Dewatering Centrate from Anaerobic Sludge
o Dewatering Centrate from Aerobic Sludge
o Anaerobic Digester Decant and Recuperative Thickening Return
o Waste Activated Sludge Dewatering Return
• Evaluate current sampling and monitoring program related to return flows and
recommend adjustments in sampling and monitoring strategies.
• Evaluate side stream management and recommend adjustments in side stream
management strategies.
• Assess side stream treatment system alternatives, including:
o Side stream nitrification - RAS nitrification
o Side stream nitrification --activated sludge
o Side stream nitrification - MBBR
o Sharon-Anammox Nitrogen Removal Technology
o Chemical P removal
o Ammonia stripping
• Assess the treatment potential and economics for phosphorus recovery, including
recovery through either calcium phosphate (hydroxyl apatite) or magnesium
ammonium phosphate (struvite) compounds.
• Considerations of performance factors for assessment will include:
o Expected range of ammonia removal and phosphorus removal possible with
the technology
o Byproducts or waste from the technology.
o Design footprint.
o Impacts on plant capacity.
o Proprietary nature of the technology.
o Non-economic factors {e.g., reliability).
o Regulatory considerations and/or issues.
• The performance factors will be summarized in a matrix and included in the side
stream treatment technical memorandum.
Assumptions
• Impacts from recycle streams that are not being considered in the facility plan process
alternatives will not be addressed.
PAGE 10 OF 29
Deliverables
• Side stream treatment evaluation technical memorandum {electronic .pdf format).
Subtask 5,3--Land AcquisitionlWastewater Treatment Plant Site Considerations
Objective
Develop alternatives for land acquisition or wastewater treatment plant site considerations.
Description
• Once process modeling has been completed and the treatment process structures have
been sized for the treatment alternatives, Consultant will develop preliminary site
planning based on the 2-dimensional footprint required for the facilities.
• Plan for treatment plant process piping corridors to convey flow to downstream
treatment process structures.
• Determine if the current treatment plant property is sufficient for near-term and long-
term (20-yeaz} operational requirements based on the modeled treatment process
alternatives.
Assumptions
• Detailed site renderings will not be required.
• 2-dimentional future layouts of treatment process alternatives will overlay the site
aerial photo.
. • City will provide AutoCAD drawings of previous planning and design projects and
record drawings of previous projects, including the recent liquid stream and solids
treatment upgrades, for use in site planning.
• Right-of--way acquisition services is not included in this scope of work, but can be
provided upon request through a separate task order or contract amendment.
Deliverables
• Land Acquisition and Wastewater Treatment Plant Site Considerations technical
memorandum (electronic .pdf format).
Objective
The objective is to evaluate the feasibility of trading and/or wetlands treatment as a potential
long-term strategy to help comply with stringent phosphorus limits in the NPDES permit.
Description
This subtask entails ahigh-level, feasibility-type, evaluation of the concepts of trading, with
or without wetland treatment. This will include potential trading and wetlands treatment
within the Fivemile Creek sub-watershed, as well as within the larger Lower Boise River
watershed. This could occur within the existing Lower Boise trading framework, or via a
separate trading or permitting process specific to the City of Meridian. The evaluation will be
PAGE 17 OF 29
based on trading/wetlands treatment being a method to avoid having to treat to very low
levels of phosphorus discharged to surface waters (Fivemile Creek or Boise River} from City
treatment facilities. The analysis will use existing information available from the Lower
Boise Watershed Council, such as information on loadings from the ovexall
Fivemile/Tenmile/Fifteenmile system, and also those within the system based on the detailed
USGS study of the sub-watershed in 2009. The Consultant will use its experience in other
trading programs to evaluate the feasibility and rough costs of certain types of trades or
offsets. Wetlands treatment is just one potential type of offset. Other nonpoint sources can be
considered, including agricultural sources and removal of septic systems.
The results of this evaluation will assist in determining if trading should remain on the table
in relation to the long-term implementation plan that would be developed in Task 7.2.
Assumptions
This evaluation will not include assessment of specific sites or trading partners, but will focus
on the broader-scale aspects of the feasibility of trading.
Deliverables
.Consultant will prepaze.techxucal memorandum summarizing the results of the evaluation
(electronic .pdf format}.
Subtask 5.~-Treatment Alternative Capacity and Redundancy Considerations
Objective
The goal of the risk-based evaluation is to quantify the level of uncertainty existing within the
WWTP and determine the appropriate design parameters to use when calculating the overall
WWTP capacity. This approach takes into account the uncertainties in the influent and major
operating pazameters, and allows the use of probability distributions to determine capacity.
Description
The capacity and redundancy requirements for each alternative will be considered throughout
the treatment evaluation process. Acost-effective approach for each alternative will be
developed, while maintaining the capacity and associated redundancy requirements. Arisk-
based evaluation will be completed for the alternatives, incorporating uncertainty principals
and developing associated probabilities of various unit process failures.
Assumptions
An approach similar to that used as part of the statistical analysis for the re-rating of the
facility will be used.
Deliverables
Technical memorandum (electronic .pdf format).
Subtask 5.6-Reclaimed Water Considerations
Objective
To incorporate in the wastewater facility plan relevant considerations originated in the
separate Reclaimed Water plan.
PAGE 12 OF 29
Description
• Describe the water quality and treatment considerations resulting from the reclaimed
water master planning (being developed under a separate contract between Meridian
and HDR).
• Summarize the outcome of the City's reclaimed water master planning effort in the
Wastewater Facility Plan.
• Describe the anticipated schedule for upgrades to treatment processes based on the
reclaimed water program..
Assumptions
• Reclaimed Water Master Planning will be substantially complete prior to this subtask
Deliverables
• Reclaimed Water Considerations report text for the Wastewater Facility Plan
(electronic .pdf format)..
Objective
Develop alternatives for energy/sustainability considerations.
Description
• Investigate opportunities to reduce energy usage and to increase energy production
= from available resources.
• Identify and describe methods to improve sustainability at the plant.
• Identify projects to reduce greenhouse gas emissions, reduce energy and chemical
consumption, expand biogas utilization beyond digester heating by investigating
cogeneration, and reduce odors and possibly make the plant a valuable educational
tool for the public.
• Description of the sustainability benefits resulting from improved on dissolved
oxygen control for the aeration basins (with accompanying flow/speed control of the
new high speed blowers), right sizing of new equipment, and modifications for
potential denitrification, optimizing biogas production by improving primary clarifier
performance, and the potential for adding fats oil and grease receiving facilities, and
associated planning-level capital cost opinion for implementation of each of these
technologies.
• Investigate renewable power options including wind and photovoltaic.
• Recommend energy and sustainability strategies to include in the implementation
plan.
Assumptions
• Being mindful of wastewater faciliiy plan budget constraints, this effort will be
limited to a preliminary, conceptual review of opportunities and will not include a
PAGE i3 OF 29
comprehensive effort to reduce energy demand to remove the treatment plant from the
energy grid nor to identify a comprehensive list of opportunities for sustainability.
Deliverables
• Energy/SustainabiIity Considerations technical memorandum (electronic .pdf format).
Subtask 5.8-Odor Control Considerations
Objective
Develop odor control criteria for WWTP, include conceptual odor control alternatives as
required for each treatment alternative presented.
Description
This subtask will initially document acceptable numeric limits for odor at the plant property
Line by first determining the surrounding community's tolerance for odors and Meridian's
tolerance for the number of complaints. This will minimize over-designed or
underperforming solutions that meet the community's needs without making an excessive
capital investment.
With the criteria established for odor control from this evaluation, the associated odor. control
requirements for each treatment alternative will be developed. Previous work completed by
CH2M HILL, presented in the Meridian Wastewater Treatment Plant Odor Control
Preliminary Engineering Report (CH2M HILL, February 2010}, along with other past studies
will be used where applicable fox this evaluation. The odor control system will be evaluated
with an approach similar to the other unit process associated with treatment alternatives.
Conceptual sizing and configuration of the proposed odor control systems will be developed.
Assumptions
An odor control management plan is not included within the scope of work. Air dispersion
models are not planned for development as part of phis task.
Deliverables
• Process Flow Diagrams for odor control alternative
• Narrative description far each treatment alternative
• Technical memorandum summarizing odor control criteria and associated evaluation for
treatment alternatives
Subtask 5.9-Cost Estimating
Objective
Objective is to develop the conceptual cost estimates that will be needed for each treatment
alternative evaluated in Task 5.
Description
Total life-cycle costs will be used, incorporating total capital and annual costs.
CH2M HII,L's parametric cost estimating system (CPES) will be used in part to develop
PAGE 14 OF 29
these conceptual life-cycle costs. Where appropriate, this cost-estimating system will be
supplemented with vendor quotes or similar cost estimating information.
The objective of the life-cycle cost evaluation is to provide a comparison between the
alternatives. Given the conceptual level of the alternative evaluation, the cost opinion
includes contingencies and markups for each alternative. During future design phases,
contractor markups and contingencies can be refined and reduced as additional design details
become available which are captured in the cost estimate detail. These estimates are intended
to be used only for comparing initial conceptual alternatives for the purpose of screening
them to a reasonable few for further evaluation.
This estimating effort adopts the classification of estimates as defined by the Association for
the Advancement of Cost Engineering {AACE). The industry classification system is
Recommended Practice-17R-97: "Cost Estimate Classification System" and 18R-97: "Cost
Estimating Classification System as Applied in Engineering, Procurement, and Construction
for the Process Industries."
Figure 1 shows the relationship of level of detail to the expected accuracy of the estimate.
FIGURE 1
Construction Cost Estimate Accuracy Ranges
The capital costs for this report are defined as order-of-magnitude-level (Class 4} estimate as
defined in the RACE International Recommended Practice No. 18R-97, Cost Estimate
Classification System As Applied in Engineering, Procurement, and Construction for the
Process Industries. An estimate of this type is normally expected to be within +50 percent or
-30 percent of the actual construction cost. The fmal cost of the projects will depend on
actual labor and materials costs, actual site conditions, productivity, competitive market
PAGE 15 OF 29
conditions, bid dates, seasonal fluctuations, final project scope, final project schedule, and
other variables. As a result, the final project costs will vary from the estimates presented in
this report.
Assumptions
Life-cycle costs are to be developed for six treatment alternative configurations.
Deiiverables
• Technical memorandum summarizing total capital, annual, and associated Iife-cycle costs
for each alternative
• Cost-estimating system printouts providing details for each treatment alternative cost
opinion.
Objective
Evaluate whether additional laboratory space is necessary for present and future staff and the
laboratory methods that aze pending future NPDES and process modifications.
Description
• Conduct a programming effort to determine the size and characteristics of the
laboratory.
• Evaluate options for the addition of a new or expanded Laboratory Building to
accommodate the laboratory needs of the treatment facilities.
• Conduct a preliminary survey of space needs for the wastewater division laboratory
staff through interviews with key staff members and from current facilities planning.
• Evaluate options for the addition of a new or expanded Administration Building to
accommodate anticipated future administrative needs through year 2034.
• Develop a preliminary programming and space planning summary using similar
planning efforts completed at other similar facilities.
• Include a brief summary of the programming data collected, a summary of
recommended space needs, listing of required equipment and support facilities
necessary for identified functions, and up to three preliminary layout options.
• Identify costs associated with the options and an evaluation of the feasibility of the
options.
Assumptions
• City staff will answer key questions to space needs, required staff functions, and
specific equipment needs by staff.
Deliverables
• Administrative and Laboratory Evaluation technical memorandum (electronic .pdf
format).
PAGE 16 OF 29
Subtask 5.11--Instrumentation and Controls Evaluation
Objective
The objective of this subtask is to develop recommendations for improvements to
instrumentation and controls for the wastewater treatment plant, including that needed in
anticipation of future low-level phosphorus treatment requirements.
Description
Consultant will facilitate anall-day workshop with City operations staff to review existing
and evaluate potential future I&C improvements. The workshop will initially focus on
developing overall guiding principals and then apply these principals in evaluating each unit
process in the treatment plant for I&C needs. Consultant will prepare draft and final technical
memorandums summazizing the workshop and its decisions and outcomes.
Assumptions
• The alternatives development workshop will be a meeting up to 8 hours in length, and
will be facilitated by Consultant.
• Consultants not based in the Treasure Valley will participate in the workshop by
videoconference.
Deliverables
Instrumentation and Controls Evaluation draft and final technical memorandums (electronic
.pdf format).
Task 6-Alternatives Evaluation Workshop
Objective
:This goal of this task is for City's staff and management to evaluate alternatives using the
evaluation/decision tool developed, in part, in Task 1.
Description
The alternatives defined and developed in eazlier tasks will be further evaluated in this task
using the non-monetary and monetary information applicable to each. Monetary criteria will
include capital, O&M and NPV costs. The alternatives will be scored in relation to the non-
monetary criteria by City staff and management at this workshop, facilitated by Consultant.
The benefit score will be used to calculate the benefit to normalized NPV cost score (see
Figure 2 for a hypothetical example). The information and inputs to the monetary and non-
monetary evaluation will be developed in previous tasks.
PAGE 17 OF 29
Total Benefit Scores forWWTF Effluent Discharge Alternatives
5.06
4.50
4.50 4 ~ $
~ 4.00 0
3.50 ~
3.SD a
c 3.00 3.00 Z
~
m 2.50 2.50
m
2.00
9m ~
2.00
.
.
~ 1.50 1.50 z
3 1.oD S
x.06 ~
0.50 d
0.50 m
0.00 m
D,DO
Ricer Discharge Reclaimed Water floc Parks Ricer pia Wetland Pdishing Irrigation Canal
^~ System Reliability Adaptability! Phasing! Flexibility oOperability
o Social Impacts ~ Enuronmental Impacts ~-BenefltltJonnaiized NPV
Figure 2
Assumptions
• The Alternative Evaluation Workshops will bean 8-hour meeting, and will be facilitated
by Consultant.
• Consultants not based in the Treasure Valley will participate in the workshop by
videoconference.
Deliverables
• The discussion and outcome of the workshop will be included in draft and final technical
memorandum that is prepazed for the alternative evaluation.
• Presentation materials for the focus group meeting on alternatives evaluation.
Task 7- Prepare Draft Wastewater Facilities Plan Documents
This task involves a number of subtasks aze included within as listed below and described in
the following sections.
7. i Executive briefing document
7.2 Implementation plan
7.3 Main FP report
7.4 Biosolids evaluation
PAGE:18 OF 29
Subtask 7.1-Draft Executive Briefing Document
Task Description
The executive briefing document is intended for non-technical readers, such as some
members of the focus group, the general public, and the City Council. The Executive Briefiixxg
Document presents the near-term actions and long-term strategy far wastewater treatment for
the City of Merdian. .
The Table of Contents of the Executive Briefing Document is listed below:
a) Introduction
b) Public Participation
c} The Meridian System of Wastewater Treatment
i} Service Areas, Conveyance, and Treatment
(1) Service Areas and Conveyance (note: this subsection will be a summary of
information from the separate sewer system master plan being developed by '
others).
(2) Meridian WWTF
(3} Biosolids Management
d) What are the Future Wastewater Management Needs
i} Population, Flows, and Loads Drivers
ii) Regulatory Drivers
iii} Infrastructure Drivers
e) Recommended Actions
i} Merdian WWTF
ii) Biosolids Management
iii} Wastewater Treatment for Future Service Area
f} Implementation and Schedule for the Recommended Actions
g) Cost Implications
Assumptions
• One draft Executive Briefing Document will be prepared for the City's review and
comment.
• City will review the draft Executive Briefing Document with the objective of producing
one (1) round of applicable City comments for the Consultant to consider.
PAGE 19 OF 29
Deliverables
• Electronic Microsoft Word file and PDF of the draft Executive Briefmg Document for
City's review e-mailed or delivered to City's project manager.
• Ten hard copies of the draft Executive Briefmg Document delivered to City's project
manager.
Subtask 7.2--Prepare Implementation Plan
Objectives
The goal of this Subtask is to prepare the plan to implement the recommendations for short-
term and long-term actions as defined in the wastewater treatment facilities plan.
Description
It is probable that the final regulatory decisions regarding phosphorus control will not be
made before the completion of this wastewater treatment facilities plan. As a result, it is
anticipated that the ultimate solution for the City could change in relation to this outcome,
and adecision-tree kind of implementation process and schedule will be necessary. The
implementation process could include recommendations for follow up studies that might be
needed, such as site-specific or partner-specific trading or wetlands treatment options if
deemed feasible from the work in Subtask 5.4.
Assumptions
• One draft Executive Briefing Document will be prepared for the City's review and
comment.
• City will review the draft Executive Briefing Document with the objective of producing
one (1) round of applicable City comments for the Consultant to consider.
Deliverables
• Electronic Microsoft Word file and PDF of the draft Executive Briefng Document for
City's review e-mailed or delivered to City's project manager.
• Ten hard copies of the draft Executive Briefing Document delivered to City's project
manager.
Subtask 7.3-Prepare Draft Main Report: Wastewater Treatment Facilities Plan
Objective
The main report will present the story of the comprehensive planning effort that resulted in
the long-term strategy and near-term actions for wastewater management for the City of
Meridian.
Description
The Consultant will prepare draft documents that describe the Wastewater Facilities Plan.
Appendixes will include the EID {Subtask 7.4) and an accumulation of previously completed
Technical Memoranda that provide the technical basis for the content provided in the draft
Wastewater Facilities Plan Document. The Table of Contents of the documents to be
prepared is listed below:
PAGE 20 OF 29
The main xeport will be written for a target audience that includes interested technical
off cials xesponsible for planning, implementing, and approving wastewater facilities such as
City of Meridian Public Works staff and Idaho Department of Environmental Quality staff.
The outline consists of the following major headings:
a) Introduction. The Consultant will prepaze this section that describes:
i) the purpose, scope and need for the facilities plan amendment
ii) the xeport organization
b} Existing Conditions. The Consultant will prepare this section that describes:
i) planning area identification
ii) description of existing treatment facilities
c) Future Conditions. The Consultant will prepaze this section that forecasts the
following:
i) population growth
ii) flows and waste loads
iii} wastewater facilities needs
iv) conditions without the project
v) reference land use plans
d} Development and Initial Screening of Alternatives. The Consultant will prepaze
this section that describes the following:
i) Description of problems and deficiencies with the existing facilities
ii) Development of Alternatives
iii) Treatment System Alternatives
iv) Wastewater Management Options
v} Alternative Selection and Decision-making Process
vi) Presentation of Total Benefit Scoring for the Alternatives
e) Final Screening of Principal Alternatives and Plan Adoption. The Consultant will
prepaze this sectian that describes the following:
i) Comparison of Technical Features of the Wastewater Management Alternatives
ii) Comparison of Costs for the Wastewater Management Alternatives
iii) Evaluation of Non~Monetary Decision Criteria
iv) Presentation of Total Benefit Scoring for the Alternatives
PAGE 210E 29
fl Selected Approaches, Description, and Implementation. This section will describe
the proposed Plan elements in more~detail by providing the following:
i) Justification and Description of the Selected Approaches
ii} Cost Estimate for the Selected Approaches
iii) Implementation and Schedule for the Selected Approaches
g) Appendices. This scope of services for this section is noted below:
i} Project Costs. This appendix will present the more detailed opinion of
construction costs prepared by the Consultant.
ii) Public Participation. This appendix will summarize the community sounding
board process that has been completed for the project to date.
iii) References and Documents Cited. The Consultant will prepaze a list of the reports,
and other documents that are cited in the Facilities Plan.
Subtask 7.4--Biosolids Evaluation
Objective
The effort is to present a strategy for long-term Biosolids management that is consistent with
the City's vision and values.
Description
• Compile existing documents from the City of Meridian regarding current Biosolids
management program (e.g., landfill hauling and disposal), including operation and
maintenance costs.
• Conduct one site visit by up to three Consultant team members to the Meridian
wastewater treatment plant.
• Review the City's list of significant industrial users.
• Review Meridian's 2009 Biosolids Management Plan to identify and summazize
regulatory requirements and alternatives.
• Review potential sites where Biosolids maybe disposed/reused as identified in
Meridian's 2009 Biosolids Management PIan.
• Develop a matrix for rating solids treatment and disposal options, including
landfilling, thermal conversion, land application, distribution and marketing, and
innovative and emergency technologies, using criteria of costs, performance,
environmental, and implementation.
• Review Meridian's 2009 Biosolids Management PIan to identify processing options
based on potential end uses, considering the consequences of changing processing at
the wastewater treatment plant regazding nutrient removal, odor control, and future
wasteload allocations for the Lower Boise River or reclaimed water use.
• Provide a recommendation on a long-term (10-year horizon) Biosolids management
sixategy.
PAGE 22 OF 29
• Prepare a technical memorandum which summarizes the 2009 Biosolids Management
Plan and presents the direction of the recommended Biosolids management strategy
for inclusion in the Wastewater Facility Plan.
Assumptions
• The current and future Biosolids quantity and quality is defined in the 2009 Biosolids
Management Plan. This information will be used to determine the size of processing
and utilization facilities in Task 8 -Draft CIP and Rates Evaluation.
• In order to meet project goals while limiting budget impact, the matrix evaluation will
rely on readily available information, Consultant's expexience on other projects, and
City input on feasibility of these options.
Deliverables
Biosolids Evaluatian Technical Memorandum (electronic .pdf format}.
Task 8-Draft Preliminary Financial Plan
Objective
Determine the financial feasibility and potential funding sources of the plan. Develop a
preliminary financial plan that includes a capital improvements program (CIP) based on a
phased approach for meeting txeatment needs for the near-term (5-years) and over the
planning period (through 2030) in an effort to identify the potential financiaUrate impacts of
the wastewater facility plan and the feasibility/affordability of that initial plan.
Description
• Development of a simplified financial planning model to assess the overall O&M and
capital infrastructure requirements of the plan.
--_ • List capital program requirements for an extended 20-year planning period to 2030.
• Incorporate into the financial plan. the opinion of probable capital and operations and
maintenance costs for the selected plant improvements from Subtask 5.9.
• Prioritize the capital improvement program for next five yeazs including budgets and
schedules.
• Identify on a preliminary basis the potential outside funding sources for the plan
• Quantification of the potential rate impacts along with the other key financial
planning criteria {e.g. debt service coverage, reserve levels, etc.}.
• Identify early action items such as site master planning interface with surrounding
land uses, neighborhood/site enhancement activities, and effluent management
options (i.e., reclaimed water use).
• Identify conditions that would trigger the next expansion phase or updating the
Wastewater Facility Plan.
Assumptions
• City will review the preliminary financial plan and provide a single, consolidated set
of written comments.
• A detailed rate study (i.e., cost of service study or calculation of revised rates) is not
included in this scope.
PAGE 23 OF 29
Deliverables
• Draft and fmal near term and planning period preliminary financial plan.
Task 9-Focus Group and Public Open HouselFormal Hearing
Objective
This task includes activities for regulatory agency coordination program with the Idaho
Department of Environmental Quality, as well as a limited public involvement process to
address alternatives in the wastewater facility plan to support the environmental process.
Description
• Prepare for and conduct one public meeting during the wastewater facility plan
process.
• Coordinate with City to provide notification of public meeting.
• Prepare handout materials, displays, and comment forms for the meeting.
• Develop a written summary of the results of the meeting.
• Summarize public comments and prepare responses to comments.
Assumptions
• Meeting will be held at Meridian City Hall.
• City will review and comment on materials for meeting.
• City will identify the distribution list for the public meeting.
• City will coordinate the distribution ofineeting/event announcements.
• City will review and approve public education and media involvement activities.
• City will participate in meetings with Idaho DEQ and other agencies, as jointly
determined by the City and Consultant.
• City will provide separate legal or building permit services to support the permitting
of the existing or new treatment plant sites.
• Up to four members of consultant team will attend the public meeting.
Deliverables
• Up to two displays boards.
• Meeting summary.
• Powerpoint slides (up to 15 slides).
Task 10-Final Facilities Plan Documents
Objective
The objective is to finalize the draft documents from Task 7, as modified based on City and
public comments, such that they can be submitted to and approved by Idaho DEQ.
Description
The Consultant will prepare final documents that describe the Wastewater Treatment
Facilities Plan. The Consultant will prepare a table that aids IDEQ's review of the final
Wastewater Treatment Facilities Plan Document. The table will reference the IDEQ checklist
PAGE 24 OF 29
requirements for wastewater facility plans and whe~`e that information maybe found within
the final Wastewater Treatment Facilities Plan document.
Assumptions
• One draft Executive Briefing Document will be prepared for the City's review and
comment.
• City will review the draft Executive Briefing Document with the objective of producing
one (1) round of applicable City comments for the Consultant to consider.
Deliverables
• Electronic Microsoft Word file and PDF of the draft Executive Briefing Document for
City's review e-mailed or delivered to City's project manager.
• Ten hard copies of the draft Executive Briefing Document delivered to City's project
manager.
objective
Refine the phased approach for meeting treatment needs over the planning period (through
2030). Develop a business plan to address funding and resource requirements.
Description
• Conduct aone-day business planning workshop with up to four Consultant team
members to integrate the updated wastewater treatment plant improvement program
with othex activities in the Wastewater Division including collection system, biosolids
composting, and other activities/functions (e.g., site management and reclaimed water
use).
• Considerations include ideas for reducing cost, increasing the value of services
provided, and improving business management practices. Incorporate optimization
and resource development ideas developed in other portions of the work effort. The
workshop will be organized as follows:
o Update statement of Wastewater Business Plan goals and objectives
o Integration of Wastewater Division functions, capital and O&M programs
o Brainstorm new approaches and ideas to Wastewater Division operations
o Assign priorities to ideas generated
o Separate ideas into short-term (5-year) and long-tern (20-year) measures
o For highest rated ideas, assign responsibilities for developing an action plan
for implementation
• Develop an updated wastewater department business plan including
o Update the preliminary financial plan (Task 8} to reflect revised assumptions.
o Review of funding and finance options including grants, loans, judicial
validation, revenue bonds and existing revenue.
o Develop a final financial plan that identifies projected O&M and capital costs,
potential funding sources for capital projects, estimated rate impacts and key
financial planning criteria (e.g. debt service coverage, adequacy of reserves).
PAGE 25 ~ 29
o Review of affordability criteria in relation to the f nal financial plan.
o Summary of ideas and action items to reduce cost and improve business
management.
• Prepare an updated draft Implementation and Business Plan chapter for inclusion in
the facilities plan. Submit to City for review; incorpoxate review comments and
prepare final chapter.
Assumptions
• Judicial validation will be prepared separately by the City's bond counsel.
• A detailed wastewater rate or impact fee analysis is not included in this scope of
work.
Deliverables
• Draft and final Wastewater Division Business Plan (electronic .pdf format).
Task 12--Project Management
Objective
The objective of this task is to successfully manage this project, perform all tasks to the
City's satisfaction, within the established budget and schedule.
Description
The following activities aze included for project management:
• Budget Status Monitoring: Monitor the project work remaining to complete the overall
Project, the budget expended, and the estimated cost of the work remaining, and the
estimated cost at completion. Inform the City of budget status through the monthly
invoices and the monthly progress meetings. Manage acrivities within overall total
Project budget.
• Schedule Status Monitoring: Monitor progress of work tasks and compare progress to
overall Project Schedule. Estimate the time to complete remaining work tasks and update
the Project Schedule. Inform the City of schedule status through the montlily progress
meetings. Manage activities within overall Project Schedule.
• Subcontractor Management: Engage the Subcontractor in the Project execution,
review scopes of work and budget, issue purchase orders to the Subcontractor, review and
approve Subcontractor invoices, and monitor the progress of the Subcontractor's
deliverables.
• Staff Management -Hold regulaz meetings with key members of the CONSULTANT
and Subcontractor team to review the status of the work and coordinate work activities.
Coordinate between tasks and team members. Document meeting decisions and action
items, assign activities to team members, and follow up to ensure timely resolution.
PAGE 2fi OF 29
• Change Management -Monitor Project activities fox potential changes, anticipate
changes whenever possible, and with City approval, modify Project tasks, task budgets,
and approach to keep the overall Project within budget and on schedule.
• Invoicing - Prepaze and submit a monthly invoice and narrative report.
• Develop Quality ControUQuality Assurance (QA/QC) Plan: Manage the quality
review of all work activities and project deliverables by developing and distributing a
QA/QC plan to the Project staff that outlines the QA/QC review process for the Project.
• Execute Quality ControVQuality Assurance Plan: Manage the quality control review
of all work activities and project deliverables. Identify senior technical consultants for the
various technical disciplines and oversee the adherence to the plan during the execution
of all Task Orders. Ensure all draft and fmal deliverables are reviewed according to the
final QA/QC Plan prior to submittal to the City for review.
Assumptions
• Budget status monitoring is a monthly activity for the duration of the project, 5 months.
• Schedule status monitoring is a monthly activity for the duration of the project, 5 months.
• HDR is the Subcontractor on the Project.
• Project coordination meetings for key internal staff and Subcontractor's key staff are
conducted weekly for 5 months
• Assume 5 monthly invoices and narrative reports aze prepazed
~• Execution of the Quality ControUQuality Assurance PIan will be completed under the
appropriate tasks.
Deliverables
• Budget status monitoring results incorporated into the monthly invoice narrative and the
montlily progress meeting with Management.
• Schedule status monitoring results incorporated into the monthly invoice narrative and
the monthly progress report.
• Change management issues identified in Monthly Progress Report
• Monthly invoices and narratives.
• Draft Quality Control/Quality Assurance Plan
• Final Quality ControUQuality Assurance Plan
PAGE 27 OF 29
Compensation
Level of Effort
The task level of effort estimates are summarized in the following table. CH2M HILL has
developed this level of effort estimate based on the work plan presented herein and
assumptions stated previously. The fees will be billed as time and material, and will not
exceed the total amount below without prior approval by the City.
Level of Effort
Task
Task 1 -Kickoff and Vision Alignment Workshop
Total
FY 2x10
$4,204
$44,833
$12,036
$s,o94
$121,502
Total
Optional
FY 2011
Task 2 -Initial Technical Analyses
Task 3 -Alternatives Definition Workshop
Task 4 -Open House or Focus Group Meeting
Task 5 -Alternatives Development
Task 6 - Altematives Evaluation Workshop
Task 7 -Draft Facilities Plan Documents
Task 8 -Draft Preliminary Financial Plan
Task 9 -Public Open House and Formal Hearing
Task 10 -Final Facilities Plan Documents
$12,556
$95,561
$17,374
$6,652
$37,152
$73,650
Task 11 -Final Preliminary Financial Plan (Optional Task) $0 $19,163
Task 12 -Project Management $41,955 $20,447
Total $399,920 $113,290
Clus .Task Order 1 Q0~2~authonzes only the FY 2010 bucige~,of $9;~20~~ ~Opt~onal sub't
>r tasks that may be later°authorized by the~City.would be~doneyv~a a~~ atnenduient.to~th
Schedule
The services outlined in the Scope of Work will be performed from May 2010 through
September 2010.
PAGE 28 OF 29
CITY OF MERIDIAN - CH L
BY:
TAMMY de D, MAYOR :Ronal J. Fehri ger
Dated: ~! 0 Dated: ~ay ~i ZG~O
\,,, ~~ p~ t~ERipe''~~,,',
. ~ q
Attes ~ ~\ V~ ~'OapO~TFO ~ ~;
JAYCE . HOLMAN, CITY GOER
-~~L O
Approved as to Content ~,~90,9 ST 15~ ~ ~4~\~~epart nt Ap rov
,,,,, ~o~y . ,~,,.
KEITH , P ASING AGENT
TITLE' Piy 1~1d-t~ J~ -y~iMl ~ X11
Dated: ~ ~ V ~~~
~.. ,~:
Dated: its
PAGE 29 OF 29