Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Task Order No. 10162A with CH2M Hill for WWTP Blower Replacement
PURCHASING AGENT 33 E. Broadway Ave, Meridian, ID 83642 Phone: (208) 888-4433 x 417 Fax: (208) 887-4813 TASK ORDER NO. 10162A Between CITY OF MERIDIAN AND CH2M HILL This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated April 13, 2010. Meridian WWTP Blower Replacement Task Order 10162A PAGE 1 OF 10 Project Understanding The City plans to replace the existing multi-stage aeration blowers located at the Meridian Wastewater Treatment Plant (WWTP) with two high-speed, turbo blowers. This new, more efficient blower system will significantly reduce the power requirements at the WWTP. In addition, a new dissolved oxygen (DO) control system is planned as part of this expansion. The City has already completed a significant amount of work in developing this project. The City has worked with Idaho Power to receive assistance in funding this Project. The Department of Energy has also provided a grant to assist with this purchase. A primary goal of this project is to have the retrofit complete and in operation by October 2010. Scope of Work CH2M HILL will perform tasks for the development of design documents for the installation of the high-speed, turbo blowers at the Meridian WWTP. This scope of work presents the tasks associated with assisting the City of Meridian with replacement of their existing multistage aeration basin blowers with two more efficient, 200-HP turbo blowers. Design assumes that the new high efficiency blowers will be housed in an existing blower room, and powered from the existing plant power distribution system. The blower room structure will not be modified for blower installation beyond construction of new equipment pads for blower mounting. The plant electrical distribution system will not be modified beyond provision of a new power distribution panel, or new branch circuit breakers, to feed the blowers. CH2M HILL will also provide assistance during the construction phase of the project, providing submittal reviews and attending progress meetings with the City and Contractor. CH2M HILL will complete record drawings once the installation is complete and accepted by the City. Task 1-Project Management 1.1 Staff Management and Task Coordination Project management will consist of supervising project staff, holding consultant staff coordination meetings, documenting meeting decisions and action items, and assigning activities to team members. 1.2 Monitor Project Progress Monitor project progress, including work completed, work remaining, budget expended, schedule, estimated cost of work remaining, and estimated cost at completion. Monitor project activities for potential changes, anticipate changes when possible, and with City approval, modify project tasks, budgets, and approach. 1.3 Invoices PAGE 2 OF 10 Prepare and submit a monthly billing. Prepare invoices for services performed on a monthly basis, including a brief summary of work completed. 1.4 Project Quality Control Perform project quality control reviews of all deliverables on this project. Senior technologists will be involved in the work tasks and perform necessary reviews at deliverable milestones. 1.5 Schedule Evaluation An evaluation of the anticipated project schedule will be prepared for the 60% design and 90% design submittals to the City. The schedule evaluation will include the remainder of design tasks to be completed, bid and award, equipment delivery (if long lead time), and construction schedule. Task 1 Assumption: None Task 1 Deliverables: • Estimated Project Schedule (60%, and 90% design submittals) Task 2-High-Speed, Turbo Blower Sizing Review 2.1 Blower Sizing Review This task shall review the CITY's evaluation and associated size of high efficiency blowers required to replace the existing aeration basin blowers located at the CITY's WWTP. The analysis assumes that the control of the system-will not change from its current mode of -operation. Installation of a different control system is beyond the scope described herein. CITY may have the option of modifying air flow by controlling the variable frequency drives of the new high efficiency blowers. This operation would also be a manual operation and not driven by any new control devices. Task 1 includes one site visit by mechanical and electrical engineers (two CH2M HILL staff total). Task 2 Assumption: • CITY to furnish future influent flow and load projections and historical influent flow/load, process control data, and blower sizing evaluations (as Microsoft Excel® electronic files if applicable). Task 2 Deliverable: • Correspondence detailing engineering review in electronic format PAGE 3 OF 10 Task 3-Coordinate with Idaho Power and Review ESCOR Proposal Assist City of Meridian with the coordination of grant funding available from Idaho Power. Task 3 assumes 2 meetings with Idaho Power and one CH2M HILL staff member. It also includes a review of their power and cost calculations. CH2M HILL will review the Roots Control System proposal (ESCOR proposal) to determine its applicability for the Meridian WWTP. Coordination requirements between this control system and the blower installation will be presented. Task 3 Assumptions: • CITY to furnish historical power consumption data along with Idaho Power proposal, as Microsoft Excel® electronic files if available. • CITY to furnish ESCOR proposal Task 3 Deliverables: Memorandum detailing review of Idaho Power requirements and ESCOR Proposal (sent to CITY electronically) Task 4-Develop Bid Package 4.1 Preliminary Engineering Report A Preliminary Engineering Report summarizing the preliminary design effort will be prepared in accordance with IDAPA 58.01.16, Wastewater Rules and submitted to IDEQ. CH2MHILL will submit the draft report to the City for review. Review comments will be incorporated and two copies will be submitted to IDEQ Boise Regional Office for review and approval. As per a discussion with IDEQ, the Preliminary Engineering Report will be submitted together with the Contract Documents once the design is complete. 4.2 75% Design Documents Preparation CH2M HILL will produce approximately 75% complete drawings and specifications. Specifications will be prepared using CH2M HILL standard specifications including CH2M HILL standard front end specifications. Aproject review meeting will be held following the City's review of these documents. 4.3 Final Fix-up and Contract Documents Preparation CH2M HILL will provide final fix-up of the drawings and specifications based on the City's comments from the previous Subtask. Bid documents, in the form of and one set of electronic files and 4 sets of printed documents (drawings printed at half-size), will be delivered to the City. Electronic bid documents will be delivered in Portable Document Format (PDF). 4.4 Agency Approval CH2M HILL will deliver a stamped set of the final bid documents to IDEQ for agency review and approval. It is assumed that any necessary changes to the contract documents, as required by IDEQ's review comments, would be effected by addendum during the bid phase of the PAGE 4 OF 10 project. It is noted that the IDEQ review period may be as much as 42 calendar days from the time of submission to the agency. 4.5 Project Review Meetings Four copies of 75% complete project documents will be provided for the owner's review and comment. Project review meetings will be conducted for each submittal. Owner's Comments will be incorporated into the project documents. Task 4 Assumptions: • Site visit to investigate the modifications required and as-built existing conditions. Effort is 6 hours for two staff members (12 hours total). • Development of piping modifications and connection details required for connecting the new equipment to the existing piping. • CITY will provide base map for drawing sheets, in CAD format if available. CH2M HILL will transfer to design drawings. • CH2M HILL will develop 3 drawings: Mechanical Plan/ Details, Electrical Plan, Electrical Details. • Drawings will be prepared in Microstation using CH2M HILL CAD standards • CH2M HILL will provide blower specification and related sections (See Specification List below). • CH2M HILL will develop a project narrative for submittal to the Idaho Department of Environmental Quality (IDEQ). As discussed with IDEQ, this will be submitted along with the final documents to IDEQ to meet the Preliminary Engineering Report requirements. • CITY will provide all bid forms, general conditions and legal portion of the Bid Package. • Technical specifications will be based on CH2M HILL master specifications, conforming to Construction Specification Institute (CSI) MasterFormat 2004 (49- division format). • City will provide written comments on 75% design submittals in a timely manner. • City will file all required permit applications and pay associated fees. • Structural modifications will not be required as part of the bid package. Task 4 Deliverables: PAGE 5 OF 10 • 75% Design (PDF of half size drawings, Microsoft Word® files of specifications) • Final Design (PDF of half size drawings and one reproducible half size set, Microsoft Word® files of specifications) • Project Narrative to Accommodate IDEQ Preliminary Engineering Report Task 5-Services During Bidding and Construction Provide engineering services during bidding including responding to questions from potential bidders and developing addenda if necessary. Task 4 will also include review of bids and a recommendation for award to the CITY. • During the Construction phase of the project, CH2M HILL will provide the following tasks: • Submittal review for the blower system • Attend up to 5 progress meetings during construction • At the completion of the project, record drawings will be completed for the blower installation (PDF of half size drawings and one reproducible half size set along with CAD files available for the City). An allocation up to 76 hours has been established for this task. This level of effort may or may not represent the actual level of effort required by the CITY. If more hours are needed, an amendment to this agreement will be required. Task 5 Assumption: • None Task 5 Deliverables: • Two addenda and Bid Review (provided in the appropriate electronic form) • Technical specifications will be based on CH2M HILL master specifications, conforming to Construction Specification Institute (CSI) MasterFormat 2004 (49- division format). • Record Drawings will be prepared in Microstation using CH2M HILL CAD standards • City will file all required permit applications and pay associated fees. PAGE 6 OF 10 CITY OF MERIDIAN 2M ILL .--~'~_ BY: TAMMY de RD, MAYOR Y: Ro d J. Fe ringer Dated: ~ lt.~A- cl a-© ~ ~ Dated: ~~ ``\`\,~~ 1111///.~'/J Attest: ~ ``~ C~` p~iPOR,~ ~~ °/ '~' 0 JAYCE . HOLMAN, CITY CLERK ~~~~ ~ o~ Approved as to C ntent ';,, 9ij ~~'ST ,;g-t . ~ .~~rtment Approval ovNT~c , KEIT T , PU ING AGENT',///++'+++I leltt~``~~~` Y'--°nn r TITLE: 1~i~,SS~S~~' C ~~~! ~~;f~ Dated:~4' 8 ~! ~ Dated: ~t~gl~ PAGE S OF 10 Compensation Level of Effort The task level of effort estimates are summarized in the following table. CH2M HILL has developed this level of effort estimate based on the work plan presented herein and assumptions stated previously. The fees will be billed as time and material, and will not exceed the total amount below without prior approval by the City. Level of Effort Task Description Total Task 1 Project Management $9,206 2 High-speed turbo blower sizing review $4,025 3 Coordinate with Idaho Power and Review ESCOR proposal $1,724 4 Develop Bid Package $35,683 5 Services during Bidding and Construction $10,057 Summary -All Tasks $60,695 Schedule The schedule is listed below: • Notice to Proceed (NTP) -Date to be determined • Delivery of Task 2 and Task 3 memorandums and project review meeting with City - 2 weeks after NTP • Delivery of 75% design documents - 4 weeks after preliminary design project review meeting • Delivery of 100% bid documents to City - 2 weeks after 75% design project review meeting • Delivery of agency review set to IDEQ (including Preliminary Engineering Report) - 1 weeks after 100% design project review meeting PAGE 7 OF 10 Attachment A -Specification List Section No. Section Title City Res onsible CH2M HILL Res onsible DIV 00 PROCUREMENT AND CONTRACTING REQUIREMENTS X GENERAL REQUIREMENTS DIV 01 GENERAL REQUIREMENTS 01 11 00 SUMMARY OF WORK X 01 31 13 PROJECT COORDINATION X 01 29 00 PAYMENT PROCEDURES X 01 88 15 SEISMIC ANCHORAGE AND BRACING X 01 31 19 PROJECT MEETINGS X 01 33 00 SUBMITTALS PROCEDURES X 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION X -01 45 33 SPECIAL INSPECTION, OBSERVATION, AND TESTING X 01 50 00 TEMPORARY FACILITIES AND CONTROLS X 01 50 00 TEMPORARY FACILITIES AND CONTROLS X 01 91 14 EQUIPMENT TESTING AND FACILITY STARTUP X 01 77 00 CLOSEOUT PROCEDURES X 01 78 23 OPERATION AND MAINTENANCE DATA X TECHNICAL SPECIFICATIONS, DIVISIONS 02 THROUGH DIV.02 EXISTING CONDITIONS 02 41 00 DEMOLITION X DIV 03 CONCRETE 03 63 00 CONCRETE DOWELING X 03 62 00 NONSHRINK GROUTING X DIV 05 METALS 05 05 23 WELDING X 05 50 00 METAL FABRICATIONS X 01 88 15 SEISMIC ANCHORAGE AND BRACING X DIV 09 FINISHES X 09 90 00 PAINTING AND COATING X DIV 11 EQUIPMENT 44 42 10.01 SECONDARY TREATMENT BLOWER SYSTEM X DIV 40 05 15 PIPING SUPPORT SYSTEMS X 40 27 00 PROCESS PIPING-GENERAL X PAGE 9 OF 10 07 92 00 JOINT SEALANTS X 40 05 15 PIPING SUPPORT SYSTEMS X VIBRATION ISOLATION AND SEISMIC CONTROLS X 22 05 48 FOR PLUMBING AND EQUIPMENT 15099 EXPANSION CONTROL FOR PIPING X 40 27 01 PROCESS VALVES AND OPERATORS X 40 42 13 PROCESS PIPING INSULATION OR OR X 22 07 00 PLUMBING PIPING INSULATION 22 30 00 PLUMBING EQUIPMENT X DIV 26 ELECTRICAL 26 05 01 ELECTRICAL X 26 05 33 RACEWAY AND BOXES X 26 27 26 WIRING DEVICES X 26 05 70 ELECTRICAL SYSTEMS ANALYSIS X GROUNDING AND BONDING FOR ELECTRICAL X 26 05 26 SYSTEMS 26 24 16 PANELBOARDS X PAGE 10 OF 10