Loading...
HomeMy WebLinkAboutTask Order No. 10173a with Civil Survey Consultants for Sewer and Water Line Replace Broadwayv PURCHASING AGENT 33 E. Broadway Ave, Meridian, ID 83642 Phone: (208) 888-4433 x 417 Fax: (208) 887-4813 TASK ORDER NO. 10173a Between CITY OF MERIDIAN AND CIVIL SURVEY CONSULTANTS, INC. This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated April 13, 2010. SEWER/WATER REPLACEMENT -BROADWAY AVENUE SCOPE OF SERVICES Per the City's request, the Engineer will provide professional engineering services related to the design of replacing or rehabilitating the existing sanitar~ sewer and potable water lines in Broadway Avenue between Meridian Road and NW. 8t Street. Task 1 -Administration 1.1 This task includes duties associated with setting up the contract and submitting monthly invoices. Task 2 -Design Surveying 2.1 This task includes field work associated with performing topographic survey required to complete the design. Topographic survey will cover existing utilities, irrigation, pavement, curb, gutter, sidewalk, water meters, and any other items within the public right-of-way required to complete the design. The City shall contact dig-line and have the existing utilities marked. 2.2 This task includes office work associated with drafting the topographic survey and establishing centerline control and the public right-of--way. We anticipate that for the purposes of this project we will be able approximately define the existing public right-of--way using record of surveys and subdivision plats recorded with Ada County. The majority of the parcels along this project are not part of a platted subdivision and if any easements are needed title reports will be required to prepare the easements. Title reports and the preparation of easements are not covered under this scope of services. Task 3 -Design Sewer and Water Improvements 3.1 This task includes work associated with coordinating potholing by contractor and the review of the results. 3.2 This task includes work associated with reviewing the video of the existing sanitary sewer main to determine the location of existing sewer services and plotting them on the plans. City shall provide a video of the existing sewer main. 3.3 Determining replacement method and designing sewer and water improvements. City staff shall assist the Engineer in determining the preferred method of replacement. Pipe bursting, sliplining, and open trench methods will be evaluated to determine the best method of replacing the existing sewer and water mains. The existing sewer services will not be replaced and will be reconnected to the new sewer main. The existing water meters and service lines will be replaced at locations identified by the City. 3.4 Preparing and submitting application for license agreement to NMID for the Nine Mile Creek Crossing. City shall pay all fees associated with the agreement. 3.5 Send letters to property owners fronting project notifying them of the project and its anticipated construction schedule. The letter will be submitted City staff for approval prior to mailing of the letter. City will provide property owner mailing addresses as needed. This task also includes time responding to telephone calls from property owners. 3.6 Engineer will contact ACHD to discuss project and potential pavement repair options. Task 4 -Construction Document Preparation and Review 4.1 Develop plans and specifications and bid schedule that meet current design standards and standard specifications of the City and ISPWC. The City shall provide the Engineer with a high resolution orthographic photo of area to be possibly included on the plans. Multiple bid schedules may be provided to allow contractors to bid the project using different methods of replacing the sewer and water mains. 4.2 Submit one set plans to ACHD for review and approval prior to construction. Includes one set of revisions per ACHD comments and then resubmitting to ACRD for approval. 4.3 Submit one set plans to power, gas, telephone, and cable companies for review and approval prior to construction. 4.4 Submit 2 full size physical copies of plans and special provisions to City Engineering for Development Services review and approval, Engineer to revise plans as necessary and resubmit. 4.5 Submit 4 full size physical copies of plans and special provisions to City Engineering for ~,2LPE review and approval, Engineer to revise plans as necessary and resubmit. 4.6 Prepare an Erosion and Sediment Control Plan (ESCP) and submit the plan to the City and ACHD for review and approval. The ESCP will be prepared in accordance with the City of Meridian Construction Stormwater Management Program. All other stormwater management program requirements shall be completed by the City or the Contractor. 4.7 Prepare final construction documents with inclusion of any addenda from the bidding phase and provide one physical copy for City's use and 10 physical copies for contractor's use. Task 5 -Construction Services 5.1 Provide one set of construction stakes for the new water and sewer mains. It is anticipated that staking will be completed in a maximum of six visits to the project. Staking will be completed as requested by the City and Contractor. 5.2 Attend pre-bid meeting. 5.3 Attend pre-construction meeting. 5.4 Answer RFI's from contractor during bidding and construction about the design. 5.5 Review material specifications submitted by contractor. 5.6 Prepare record drawings meeting the City of Meridian Acceptance of Record/Electronic Drawings, dated August 26, 2009. TIME OF PERFORMANCE Within 60 days of receiving a notice to proceed Engineer will submit plans to the City for review and approval. COMPENSATION The Not-To-Exceed amount for this Task Order No. 10173a is Thirty-Eight Thousand Seven Hundred Twenty dollars ($38,720). The hourly rate for services and direct expenses is attached and by reference made part hereof. . . CITY OF MERID BY: ~ - ,~~ TAMMY de WEE'R/ AYOR Dated: '7 ~ ~~t ~ ~0 CIVIL SURV ONSULTANTS, INC. ~:,~ ~~ BY: " Dated: ~~ ~""O~ Approved by City Council: ~~ ft 47~~"*'`" '#"°~~~"., ~^ Attest ~ ~ T ~'~~~ ~ FO YCE . HOLMAN, CI CLERK = $~~~ r Approved a to Co tot ~"'%, '9 C' '. BY: /,~~~~~~rrrr i KEITH S, PU SING AGENT Dated: L/ - . ~~ ~V o~ ~8~ •, ~~ rt~ent Approval ~I ,~ ~' ~'V~ ~ ~ roe` ~ TITLE: `s r l4 /=F ~}./ C~ /~'~! ~L`=/Z Dated: 7 ~~ D