Loading...
HomeMy WebLinkAboutTask Order No. 10018b with Civil Survey for Bittercreek Lift Station and Pressure Sewer Staking�E IDIAN)�R- PURCHASING AGENT 33 E. Broadway Ave, Meridian, ID 83642 Phone: (208) 888-4433 x 417 Fax: (208) 887-4813 TASK ORDER NO. 10018b Between CITY OF MERIDIAN AND CIVIL SURVEY CONSULTANTS, INC. This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated November 8, 2006. BITTERCREEK LIFT STATION AND PRESSURE SEWER CONSTRUCTION STAKING SCOPE OF SERVICES The Surveyor's scope of services, time of completion and compensation shall be as set forth herein. Services shall generally be described as Land Surveying Services. Task 1 — Construction Stakina The Surveyor will provide one set of construction stakes for approximately 11,000 LF of pressure sewer pipe at all angle points and valves. Intermediate points will only be provided along Amity Road. The intermediate points will be at every 500' along the pipe. The pressure sewer pipe will only be staked for horizontal control. No vertical control will be provided for the pressure sewer line. The Surveyor will provide one set of construction stakes for the fence and building corners at the lift station site. Surveyor will set one benchmark at lift station site to provide vertical control for the contractor. The City will provide the Surveyor with one complete set of lift station and pressure sewer construction plans that provide the horizontal and vertical control points necessary to stake the project. Task 2 —As -Built Information The Surveyor will obtain as -built information for the installed cleanouts and valves and provide this information to the City in an AutoCAD file along with a text file containing the point data. As -built information will be provided on project control datum. Task 3 — Togo Existing Gravity Sewer The Surveyor will obtain as -built information for 7 gravity sewer manholes and 2 cleanouts previously constructed and provide this information to the City in an AutoCAD file along with a text file containing the point data. As -built information will be provided on project control datum. TIME OF PERFORMANCE Surveying services will be completed as requested to construct the lift station and pressure sewer line. The City shall provide the Surveyor with a minimum of 48 hours prior notice of all required staking. COMPENSATION The Not -To -Exceed amount for this Task Order No. 10018b is Four Thousand Two Hundred Eighty dollars ($4,280). The hourly rate for services and direct expenses is attached and by reference made part hereof. CITY OFjMERI N CIVIL S EY CON/SUL NTS, INC. BY: / BY: t ft, V4r� �' puRe:a�s! )q r�WC Glenn K. Bennett, President Dated: Al - / _25 — i Z) Dated: Approved as to Content BY: KEITH WATr�9_,YURCOWNG AGENT Dated: 11. `f Man -Hour And Fee Estimate City of Meridian Task Order #10018B Bittercreek Lift Station and Pressure Sewer Construction Staking Task Description Project Chief Manager of Surveys Design Engineer 1 Technician I Total Hours Task Cost $105.00 $0.00 Chief of Surveys 8.00 @ $105.00 $840.00 Task 1 -Construction Staking (t35 points) 4.00 @ $95.00 $380.00 Design/Survey Technician 1 36.00 @ 1.1 Office Work 8 8 $840.00 1.2 Field Work 1 48.001 1 1$4,280.00 26 26 $2,210.00 Task 2 - As -Built Information (t10 points) 1 5 6 $520.00 Task 3 - To o Existing Gravity Sewer 9 is 3 5 8 $710.00 Total Man -Hours 1 0 1 8 4 1 36 1 48 $4,280.00 Classification Hours Rate Total Project Manager 0.00 @ $105.00 $0.00 Chief of Surveys 8.00 @ $105.00 $840.00 Design Engineer 1 4.00 @ $95.00 $380.00 Design/Survey Technician 1 36.00 @ $85.00 $3,060.00 Labor Subtotal 1 48.001 1 1$4,280.00 Total Estimated Fees taskorder10018B.xls $4,280.00